Technical Documentation Installation and operating instruction
Siekmann Job No.: 102 7002/KN Customer: Siemens AG - KWU Project: PHU MY3 CCPP
Valve Type 01
Installation, Operation and Maintenance Manual
Siekmann-Econosto GmbH & Co. KG Tel: 02 31 / 93 75 - 0 Freigrafenweg 2 Fax: 02 31 / 93 75 - 199 44357 Dortmund www.siekmann-econosto.de
jLynxy
S O M M A I R E
S U M M A R Y
FAB 1410
2/17
hT " TlTT1T'TTTTl,TS " T i " TTP1 T1 DEiviARR_A~E Dlr ._LI'N'S 1 MLLa-.T1-INv til J IAR i IiNU 11iE11\ > ALLh 1 1u T\
VII PROPRETE DE 1-'INSTALLATION VII CLEAN CONDITIONS OF THEINSTALLATION
VIII APTITUDE DE LA TUYAUTERIE A VIII ABILITY OF THE PIPING TO RECEIVERECEVOIR LE MATERIEL THE EQUIPMENTS
IX POSITION DU VOLANT OU DU SERVO- IX POSITION OF HANDWHELL ORMOTEUR ACTUATION DEVICE
X POSITION DE VOBTURATEUR X POSITION OF THE OBTURATOR
XI ENTRETIEN DU MATERIEL DE XI MAINTENANCE OF VALVESROBINETTERIE
XII REPARATION DU MATERIEL DE XII REPAIRING VALVESROBINETTERIE
XIII PERFORMANCE DU MATERIEL DE XIII PERFORMANCE OF VALVES. ROBINETTERIE
CONSTITUTION DES APPAREILS I CONSTITUTION OF THE VALVES
II TERMINOLOGIE -APPAREILS DE II TERMINOLOGY-CLOSINGSECTIONNEMENI- EQUIPMENTS1°) Robinet Vanne l') Gate Valves2°) Robinet ä Soupape 2°) Globe Valves3°) Clapet de Non Retour 3°) Swing Check Valves
III STOCKAGE DES APPAREILS 111 STORAGE OF THE EQUIPMENTS
IV ESSAIS EFFECTUES SUR LE MATERIEL IV TESTS PERFORMED ON THEEQUIPMENTS
V MONTAGE DES APPAREILS V INSTALLATION OF THE EQUIPMENTS
t 7T
®® REFNOTTCE DE MONTAGE & D'ENFRETTEN
M. M. ASSEMBLY AND MAIINTENANCE NOTTCE REVMALBRANQUE
PAGE
M. M.
'MALBRANQUE
Le type de robinetterie propose est con~u de maniere äpouvoir etre utilise dans les condi- tions de services lesplus severes.
En effet~ un ensemble de normes, de codes et despecifications d'une grande precision ;regit sa construction,son calcul, sa fabrication et son contr,äle
1- .,JNSTITUTION DES APPAREILS
Les matieres intervenant dans la construction de larobinettere peuvent etre Glassees en quatre categoriesdistinctes
- Celles relatives ä I'enveloppe, c'est-ä-dire, 1'ensembleCorps-Chapeau-obturateur-arcade .
- Gelles relatives ä l'e-uipen?ent tnteneur, c'est-ä-Adre,les portees d'etancheite
du
Corps
et
de1'obturateur, ainsi que les pieces fixes ou mobiles encontact avec le fluide (tige de manoeuvre, axe debattant, etc. ..)
-
Ales relatives aux produits manufactures, c'est-ädire,
les elements tels que joint,
garniture, tige fileteed'assemblage Corps Chapeau
- Gelles relatives aux organes secondaires, non enrontact avec le fluide, c'est-ä-dire, les pieces telles querolant de manoeuvre, ecrou de tige, bride de fouloir,icrou de volant~ etc. . .)
EIMNOTICS DE MONTAGE & D'ENTRETENASSENMLY AIv'D MAINTc-NANCE NOTICS
The type of valves proposed has been designed so as tobe used in the most severe conditions of use.
Indeed,
a set of standards, codes and specificationsa high precision govems its construction, calculation,manufacturing and its control .
I CONSTITUTION OF VALVES
The materials used in the manufacturing of ialvescan be classified into four distinct categories
- Those relatng to the shell, the body, the bonnet, thewedge and the yoke .
- Those relating to the inside EQUIPMENTS, thesealmg faces ofthe body and :vedge, as well as the fikedor moving parts in contact with the fluid (operatinestem,
hinge pin, etc . . .)
- Those relating to manufactured products, such as thegasket, the packing, the stud bold for the body and thebonnet assembly
- Those relating to secondary organs, not in contactwich the fluid, such as the handwheel, the stem nut, thegland flange, the handwheel nut, etc. . .
M. M_
'
MALBRANQUE
NOTICE DE MONTAGE &D'ENTRETIENASSE:�MLYAND MAINTENANCE NOTICE
11 - TERMINOLOGIE - APPAREILS DESECTIONNEMENT
L'obturateur se deplace perpendicu;lairement ä faxe1'ecoulement du fluide, au niveau des sieges du Corps.robinet-vanne est generale- ment symetnque par rapportau sens de l'ecoulement du fluide et il n'y a pas dech~- .gement notable de direction pour l'ecoulement dufluide sauf dans le cas particulier oü 1'appareil est equiped'un robinet de by pass du type robinet ä soupape. Dansce cas, le sens
d'koulement
du
fluide estun idirectionnel .
- A portage oblique (wedge seated)obturateur monobloc (one pieU. obturator)ä
l') Robmets-Vannes
Rigide (rigid) dit ä "coin monobloc" (solidwedge)Flexible (Flexible) dit ä "coin flexible"(flexible wedge)
. a obturateur double (two pike obturator)dit ä "double opercule (slip wedge)
- A portage parallele (parallel seated). ä obturateur monobloc (one-pike obturator)
. . sans dispositif de serrage(without seattightness device)
. . avec dispositif de serrage (wich seat tightnessdevice)
deLe
Les
principales
variantes
de construction desrobinets-vannes sont comprises
dans
la
classificationsuivante
Il TERMINOLOGY-CLOSING EQUIPMENTS
1 °) Gate Va1ve
The wedge moves perpendicular to the flow axis of thefluid, at the level of the body seats . The gate valves isusually symetrical to the direction ofthe flow and there isno important change in the direction of the flow except inthe particular rase when the equipmentsby pass valve of globe valve type .direction of the flow is unidirectional .
The main manufacturing design for gate «alves aremcluded in the following classification
- Wedge seated gate valve
. with one pike obturator
. . rigid called solid wedge
. . flexible called flexible wedge
. with a two piece obturator called split wedge
- Parallel seated gate valve. with one piece obturator
. . without mechanical seat tightning device
. . wich seat tightness device
is fitted with aIn this rase, the
M_ M .MALBRANQUE
NOUCE DE MONTAGE ä: D'ENTRF;'ITETIASSENMLY AN-D MAIN"i-ENANCE NOTICE
. ä obturateur double (two pike obturator)
. with two piece obturator
. . sans dispositif de serrage (without Beat
. . without seat tightness devicetightness device)
. . avec dispositif de sen-age (with seat tightnessdevice)
. a obturateur ä e1ementsobturator)
Exemple
- 13% Cr-Stellite-Teflon-Viton
(Voir Plan ci joint)
multiples (multipiece
- A portage multiforme (multifomi seated)
. . with seat tightness device
. with multipiece obturator
- Multiform seated gate valve
Exemple
- 13% Cr-stelliteteflon-viton
(see the attached drawing)
-rw~ mkALBEANQUE
ILLIES
IEDGE GATE VALVE
DRAYINC
- DESIGN : API 600 - ES 1414
- TESTS : API 599 - BS 6755
p:̀:. h;.
Fzc-
I i 7
YEDGE GATE VALVE :
RA ILLIES LE STÄAIDARD TRIP - ÄX - Pate 2 i 7
f
3 Baod "brel out Ecrou de rolaal A 47 Lr 3501E or Carboo St" li Haedabeel Volant kalleable ir'oc or Carboo Sleelf Slem out Ecrou de tite A 439 Gr DZC
Tbruat needle bear . Buteoa a ai uillca Ttealed St-1Lubritieatiat tut Graiaaeur Sleel1'oke retainin~-aut Ecroa d arcade
-A 47 Gr 25016A 105
JI
A 182 F6 a
Tite ,tilelee~Ln " :bit aabeatoa iaeooel "tred
Stud ._ .t A 199 Lr 67Nut Ecrou A 194 Gr ZBBackaeat buabin Ba ue d'elancbeile A 182 FB a8anocl Ctu cau A 216 UCBBoeael aakel Joint Armee eorru atedFut Ecrou A 194 Gr 2HSlud bell Ti e tilclec A 193 Gr 87St cm Tite A 182 F6aled e Coia A 216 ICB + AIS) 410Seal Sie e A 105 + AlS1 4 10Body Corps A 216 !CB
2°) Robinets ä Soupape
Le corps presente, generalemerrt, un seul siege surlequel vient s'appuyer un obturateur, dit clapet, muni d'unegamiture deformable ou d'un portage metal- lique.L'obturateur se deplace perpendiculai- rement i faxedecoulement du fluide .
La ferTneture est normalemernt obtenue contre lecot- -1nt du fluide sauf cas particuliers . Le robinet äsoLrape est, donc, un appareil non symetrique ä montersur une tuyautene dans un sens deternrine .
Le robinet ä soupape est du type. "droit" (right anglehead) ou du type "inclme" (inchned head).
Les tubulures d'entree et de sortie (body end flanges)peuvent etre
- coaxiales (in line)- perpendiculaires (right angle) .
Afin de realiser 1'equilibrage des efiorts exerces par lefluide sur l'obturateur, le robinet peut comporter un clapetdouble (double seat obturator) .
Les formes de portees d'etarrcheite entre l'obturateuret ' siege sont diverses : plan sur plan, cöne sur cöne,sphere sur cöne .
11 y pour 1'ecoulement du fluide des changements dedirection differents suivant le type de robinet ä soupapeconsidere.
2°) Globe Valve
Usually, the body presents only one Beat an wich sits anobturator called a disc,
which is
fitted with adeformable packing
or
a metallic wearing surface. Theobturator moves perpendi -cular to the direction
of theflow .
The
closure
is normally obtained against
theexcept
in particular cases. 'ne globe valves is,symetrical equipment
to be mounted an pipingspecific direction .
The globe valve is of the straight pattem type, or ofthe angle type .
Tlre body end flanges can be
- in line,- at 90° angle_
irr order to halance the forces exerced by the fluid
anthe obturator, the valve
may
have
a
double
seatobturator .
Tlrere are vanous shapes of wearing surfaces betweenthe obturator and the seat flat an flat, cöne an cöne,sphere an cöne .
As far as the flow
of fluid is concemed, there aredifferent changes of direction according to the type ofglobe valve considered .
NOTICE DE MONTAGE & D'ENTRETIENASSEMBLY AND MAINTENANCENOTICE
- DESIGN : ES 1871
Eee-1,3 ple:e
- TESTS : ES 6755
Pe :~ 1-i
E--t-i. .
Las-r:
E.:t
En:" sen: t .a^:~ ;
4:s : n",t
O :s-
See :
Ev_'9
;1 GLOBE 1'ALS'EP'"
835I" EPASQCE iw . 0 e~mes STA,tiDAP.D TP.tY - A.x' - pe_ e : z ,
I9 öeed "Lecl cul Fcroe de --e 1 .z( A !7 6r 75016 er Carbaa Sterl
® " ! Ya1lwDl e iroa er CuDoa Sieel
'm ' 1 162 F6 e1 47 Cr ]5016
© 1 A-422c, 62C
ht] ` Gletl-folloerr- _ Foufoir - 1 162 F6 e© "Cre pit eibrrioe " ieeeeei elredL 216 'CC
®-
-
Ärzte
181 . 8ecpseet Euspia~- ~ B'Gue / 'c letCDeitci1i 162 F6 e
191 Gr 87~A 19" Cr 29
© A 162 F6 eA 182 F6 uA 216 TCB e ASST <10
© A 105 4 Alls1 410- ~A 216 ICB
M. M.
MALBRANQUE
NOTICE DE MONTAGE&D'ENTRETIENASSENMLY AND MIAINTENANCE NOTICE
3°) Clapet de non retour
La fermeture est obtenue automatiquement~ sansintervention exteneure, lorsque le sens normal de1'ecoulement du fluide est inverse.
s clapets de non retour se divisent en
. Clapet de non retour ä battant (swing checkvalve)
Le Corps est uruni d'un siege, soit perpendiculaire äFaxe des tubulures sofft legerement inchne par rapport äcelui-ci, sur lequel vient s'appuyer un obturateur oscillantautour d'un axe.
. Clapet de non retour ä levee verticale (liftcheck valves)
L'obturateur (clapet) guide suivant son axe sedeplace paralMement ä Faxe de l'ecoulement du fluideau niveau du siege,
L'ensemble peut Etre prevu
. Pour tuyauterie horizontale (cas general)
I
Le Corps est le meme que celui du robinet ä soupapedroit (ou quelquefois incline avec alors un rappel de1'obturateur par ressort) Quand 1'obturateur doit Etrebloque de l'exterieur, par l'internl6diaire d'un volant1'appareil est dit "Capet de non retour ä levee verticale"(globe stop and lift check valve) .
(Voir plan joint)
3°)
Check Valve
The closing is obtained automatically without
anyextemal intervention, when the normal direction of theflow is reversed .
Check valves desmgs are the following
. swing check valve
The body is fitted with a seat, wfiich is eitherperpendicular to the axes of the ports, or slightly inchnedin relation to this one, an which rests anoscillating around an axis .
. Lift check valves
e obturator is guided along itsto the axis of flow
Those equipments can
be used for horizontal pipmg(general case) for vertical use the body is of the saureshape than the straggth parttem as that of globe valve(or sometimes inclined,
but with a spring loadedobturator.
When the obturator has to be blocked from the outside,through a handwhell, the piece of EQUIPMENTS iscalled a stop check valve.
(See the attached drawing)
axis and
obturator
moves parallel 1
NO"17CE DE MWI-AGE & D'ENTRETII;NASSEMBLY A,ND MALRIENANCE NO-W:
IIiessimiM. M.
MALBRANQUE
SIFING CHECK VALVEF;
YA IoE -o :-ILLLLSES STANIJAP"D
Paoe : 2 i
IS ' L~r1eL Jolet 41 :1 BIS eor:ureled~m,, 5t4 :1 Dlur 6euao¢ 4 1C5!m, W1cl Jelat Arbealeo
CtaDea - 4 105~!~,Eeccctfo "er imicl I ~Arnco
IO \ul ',4 191 Lr 2b9 st .d te1l -7i .e flletee -A 197 Lr 57E elc"c DI¢ Ale dc b.tlcot A leg f6 ¢
Elc"c 84t1¢cl A 105L ` Ecroa
-A 191 Lr 6SLcI¢Icrf fLerl
IlSlal¢Iw slal'A 515 Lr 150 1 AISI 410
2 -( Sa .l -_1 SICSe --
- A 105- A ISI 1101 Bode C¢rDe 1 4 215 IC8
M. M_MALBRANQUE
III STOCKAGE DES APPAREILS
Avant de quitter nos ateliers, tous les appareils ontsubi divers essais et contröles . Les parties usinees ont eterevetues de vemis de mani&e äeviter toute corrosion intempestive .
"'-)utes ces precautions ont ete prises en vue d'obtenirun ronctionnement irreprochable . Cependant, afin que lematenel puisse conserver toutes ses caracteristiquesd'origme, il est bon d'ob-server,
lors
du
stockalte an certain nombre de consignes
- maintenir les divers appareils avec leurs protec-tions d'ongine,
- les stocker, si possible, ä l'abn des intemperies, defa~on ii ein- pecher, en particuIier, que le sable ou touteauUe parjcule ne vienne former avec la graisse unepäte abrasive, au niveau de la tige de manoeuvre,
- les laisser en position fermee,
- ne pas enlever les protections recouvrant les emboutsouder ou les faces surelevees des
bndes paralleles .
IV ESSAIS EFFECTUES SUR LE MATERIEL
Toute la robinettene subit avantd'etre livree ä laclientele des epreuves destinees ä en verifier la quality.l i s'agit
des contröles suivant
- Resistance de corps effectuee ä une fois et demi
lapression de service ä 1'eau
NOTICE DE MONTAGE & D'ENTRETIENASSENMLY AND MAIN-IENANCENOTICE
III STORING THE EQUIPMENT
Before leaving our workshops, all the equipment haspassed different tests and controls . The machined partshave been covered with vamish to avoid corrosion .
All these cares have been taken in order to get goodworking conditions However, to enable the ecluipment tokeep all its original characteristics, you sliould take inaccount these following rules .
- keep
the
different pieces ofequipments in ,their original protections .
- a protection, if possible, from bad weather, inorder to prevent, sand or any other particles,to form %vith grease, an abrasive paste, an thesstem.
- keep the valves in the closed position
- do not remove the protections covenng the endconnections. (buttwelding ends or raised faces offlanged valves)
IV TESTS PERFORMED ON THE EQUIPMENT
All the valves have passed tests to check their qualitybefore delivery to our customer . These tests are
- Shell test with water performed at 1,5 nominaloperating the pressure
IIl
M. M.
MALBRANQUE
Cet essai est effectue, I'obturateur &ant degagecompl&ement des portees d'etancheite du Corps et il estdestine ä contröler 1'&ancheite de; 1'enveloppe corps-chapeau tant au niveau des pieces moulees et mecano-soudees, qu'au niveau des bndes de raccordement entreelles . Au corps de cette epreuve, est: egalement examinee1'etancheite au passalte de la tige de manoeuvre dans leChapeau.
- au droh des gamitures,
entre töne de tige et Chapeau (back
seating) .
Aucorps
de ce contröle, aucune feite ni aucun suintementWest totere,
- etancheite entre obturateur et sieges ä la pression deservice ä 1'eau . Ce contröle est destine ä reproduire enatelier les conditions de services des appareils. Dans cecas, la specification de test applicable,.s donnera le taux defeite permis .
- etancheite entre obturateur et si('!ges ä une pression(_i'e "̂Lnron 7 bar,ii Fair
Con1 ._ dar--s -A -nc:rprecedant~ un taux de fuite est totere
Ces essais permettent, donc, de verifier, la tenue d'unappareil dans des conditions normales d'exploitation .
KEM NRQUESSi _.:s essais sont realises ulterieurement hors usine, ilest vivement recommande d'assurer prealablement unnettoyage soigne des portees d'obturateur et de sieges .
V MONTAGE DES APPAREILS
Lors de la manutention, des appareils seront eling-ues)ar les tubulures de Corps et non par peroge des trous)revus sur le Chapeau ne servant qu'ä la manutention de;elui-ci .
11 faut absolument eviter de deplacer le materiel enitilisant le volant ou le servo-moteur, ainsi que de trainer°s appareils sur le sol.
NOTICE DE MONTAGE & D'ENTRET~-NASSENIBLYAND MAD TENANCE NOTICE
This test is performed
when the obturator
is fullyopen and
to control the fghtness of the shell .. Duringthis test, the tightness ofthe stuffing box is also checked .
- control ofpackmgs
- control between stem tone and bonnet (backseating) . During tliis test, no leak is acceptable .
- tightness between obturator and seats at workingpressure wich water. This control is designed to reproducein a workshop the service conditions of the equipment.
Inthis rase, the specification will give the allowable leakagerate
- tightness between the obturator and the seats at apressure of 7 bars, with compressed air. As in theprevious rase,
the
required test specifi- cation willthe allowable leakage rate .
These test enable, to check the valve in normal useconditions .
REMARKSIf tests are realized an
field, it is imperative to
cleanwedge and body seating surfaces before these tests .
V INSTALLATION OF THE EQUIPMENT
While handling, the equipment shall be slung under thebody and not through the yoke or the bonnet .
It is absolutely necessary to avoid moving
theequipment
using
the handwheel or the servo-engine, aswell as to drag the equipment an the ground
The equipment must not be moved or dragged usingthe handwheel or the actuation device
NOTICE DE MONTAGE &. D'ENTRETIFNASSEMBLY AND MAIN"IENANCE NOTICE
VI DEMARRAGE DE L'INSTALLATION
Apres un stockalte prolonge du materiel, quelques fuitesau presse garniture peuvent se produire . II est alorsnecessaire de proceder ä un nouveau serrage. Celui-cidoit etre modere et doit cesser des que 1'etancheite a eteobtenue. En effet, dans le cas de vannes motorisees, unex-Ps de serrage peut entrainer, par suite de 1'augmentationdf, couple, qu'il amene, un arrei: intempestif de lamotorisation pour un declenchement du contact actionnepar le limiteur de couple .
Lors du branchement electrique des motorisations, Jecouvercle du coffret doit etre enleve pendant le minimum detemps
de
maniere
ä eviter l'introduction d'eau dans lecarter . En outre, durant cette operation aucune interventionWest ä faire au niveau des contacts de fin de course et dulimiteur de couple, un reglage approprie ayant eteexecute lors de la reception du materiel .
VII
PROPRETE DE L'INSTALLATION
A cet effet, toute la tuyauterie ainsi que 1'appareil derobinetterie devront etre nettoyes par un soufflage d'aircomprime par exemple.
11 y a lieu de veiller tout specialernent ä e1iminer lescopeaux m&alliques et ]es gouttes de soudure quirisqueraient de d&enorer les portees d'c:tancheite .
VI STARTING THE INSTALLATION
After a Jong storage of the equipment a leak can appear atthe stuffrng box . lt is then necessary to increase thepressure an the packing rings by tightening the glandbolting . It is not recom mended to apply an exessivepressure but just enough to stop the leak .
Exessivepressure an packings generating an increase in operatingtorque and in
case
of motor operated
valve a prematurestop
of the engine can occur by the action
of the torqueswitch .
For the electric
connection
of motor operated
%alvetlie
cover of the junction box has to be removed for theshortest time to avoid water coming into the electricorgans .
During this operation, no intervention is being done to thelimit switches and torque s~-itches -%Nrhich haue been seint ihe final :rapectron at ühe facto:y
VII CLEAN CONDITIONS OF THE EQUIPMENT
All the piping as well as the valves shall be cleanedwith compressed air, for example.
It is very important to check that there is no metalcuttings or welding spots an the sealing surfaces thatcould create damaltes to the sealing surfaces (seat forcing)
VIII APTITUDE DE LA TUYAUTERIE ARECEVOIR LE MATERIEL
Pour cela, il y a lieu de verifier l'alignement des 2tron~ons de tuyautene et le parallelisme des brides deraccordement ou des embouts ä souder de celle-ci .
En aucun cas,
]es brides ou les embouts buttwelrimg ne peuvent etre prevus pour comger un defautreh
.-'aux deux points ci-dessus .
- Position de l'appareil par rapport au sensd'ecoulement du fluide .
Les robinets ä soupape, les clapets anti-retour,
lesrobmets
vannes equipes de by-pass ou de dispositif dedecompression dans ]es flasquesd'obturateur qui sont des appareils non symetriquesdevront eire montes en tenant compte de la fleche figuranten reliefsur le corps.
IX POSITION DU VOLANT OU DU SERVO-MOTEUR
Dans la mesure du possible, il faut tendre ä monterles ipareils en position verticale normale, c'est-ä- dire,avec ie volant dirige vers le haut, ceci etant d'autant plusvrai pour les vannes ä passage direct de gros orifices . Dememe, les motonsations electriques ne peuvent pas.oujours fonctionner dans toutes les positions.
Dans tous les cas, il est preferable de ne pas modifiera position d'un appareil
sans en referer
au constructeur .
NOTICE DE MONTAGE & D'ENTRETIENASSEMBLY AND MALti''ITNANCE NOTICE
VIII ABILITY OF THE PIPI-NG TO RECErVETHE EQUIPMENT
The aligment of the two pipe sections as well
as theconnecting flanges parallelism will be checked or thebutts
in
case
of buttwelding connections .
Under no circunstances the flanges of buttwelding endsshall be designed to correct a defect relating to the abovementioned points .
- The position of the equipment with regard of flowdirechan
The globe valve,check valves and gate valves fitted with aby pass or depres surizing device an the closure niember,are non symterical valves and shall be mounted, taking intoaccount the arrow embossed an the body of the valve as theflow direction .
IX POSITION OF HANDWHEEL OR OFACTUATOR DEVICE
As far as possible, the valves will be installed in thehorizontal position, handwheel an top
particularly forthrough
conduit
and
large
port valves .As well, electricmotors cannot always work in all positions.
In every
rase,
it is strongly recommended
not tomodify the position of the valve without reverting to themanufacturer .
in
M. M.MALBRANQUE
X POSITION DE L'OBTURATEUR
Les appareils ä brides seront montes obturateurferme, alors que ]es appareils ä embouts ä souderdevront au contraire, etre laisses ouverts .
Lorsque tous les appareils ont ete montes, il y lieude proceder ä un nettoyage complet de l'installation avantde proceder aux essais .
XI ENTRETIEN
DU
MATERIEI,
DEROBINETTERIE
11 y a lieu de proceder ä un entretien periodiqueprevisionnal . Au cours de celui-ci, les points suivantssont ä examiner
- Graissage des douilles de manoeuvre avec unegraisse minerale classique,
- Verification
des
reserves d'huile
ou
degraisse des motonsations ou des rEklucteurs .
- Etancheite du presse-gamiture.En cas de non etancheite, proceder ä un
nouveauser
e,
par
action altemee sur ]es tiges filetees defixation de la bride de fouloir .
Afin que le fonctionnement reste normal, il est bon quele fouloir ne descende pas ä I'interieur de son logementd'une valeur superieure ä 2 anneaux soit 12 ä 24 mmsuivant les orifices .
Si
I'etancheite
ne
pouvait etre realisee aprbs unetelle action, il faudrait alors ajouter une bague ou deux enveillant ä utiliser Je meme bourrage q,ue celui d'origine .Cette operation
ne peut se
faire qu'ä condition que1'appareil soit ouvert ä fond de maniere ä obtenir uncontact entre le cöne de tige et Ie cöne de bague de butee.
NOTTCE DE MONTAGE & D'ENTRETTENASSENMLY AND MATiv'iENANCE NOTTCE
X POSITION OF OBTURATOR
XI MAINTENANCE OF VALVES
- lubnfication of stem nut with mmeral grease
- checking the oll or grease in the gear operatorsor in the electric motors .
FAB 1410
2
PAGE 15/17
Flanged valves
shall be installed in line
with theobturator in the fully closed position .Buttwelding end valves shall be welded in line withobturator in the fully open position .
When the valve has been installed the installation
willbe
completely cleaned before proceeding to tests .
Valves will be subject to previsionnal and
periodicalmaintenance .
ne follo~ring ponts have to be checked
- tightness of stuffmg box, in rase of leak an altemateaction an the gland boltmg will
thigten the leak .
For good working conditions it is recommen ded thatthe gland does not go down in the stuffeng box more thantwo times the thickness of a packing ring (approx 12 to 24mm depending an the sizes) .
Iftightness cannot be achieved . alter such an action
oneor two packing rings of adequate size and materialsame as the original part, have to be added. Thisoperation can only be perfomed when the valve is in fullyopen poskion in order to get a sealing contact between thestem cone and the back seat .
- Verification de la manoeuvre ouverture etfermeture
En effet, certains appareils restent pendant treslongtemps, dans la meine position . 11 est alors souhaitablede realiser quelques manoeuvres ä vide de maniere äeviter l'ankylose du materiel .
- Etancheite du plan de Joint corps;-chapeaux etu niveau des brides de raccordement sur la
tuyautene .
Si cette
etancheite n'etait plus obtenue 11 faudraitalors resserrer I'ensemble des tiges filetees de fixation et ce,de fa~on reguliere et symetrique .
Si un changement de Joint s'avere necessaire il est bon,dans Je cas de joints metalliques ondules ou striees, deremonter ceux-ci hui1es . Voperation de serrage des tigesdoit se faire de maniere symetrique .
XII REPARATION DU MATERIEL DEROBINETTERIE
Bien
qu'il
sofft
preferable d'en confier l'execution aucor -ucteur ou ä un reparateur specialise, certamstravaux de reparation peuvent etre realises par Je ServiceEntretien des diverses societes .
Dans cette hypothese, il est souhaitable qu'un
stockde pieces de rechange de premiere urgence soient tenuesen magasin.
Celui-ci doit notamment comporter
- Joints, gamitures, ressorts, boulonnerie,- Sieges, obturateurs, tiges de nranoeuvre et leurdouille correspondante
- Elements de rechange des comrnarrdes mecaniqueselectriques, pneumatiques ou hydrauliques
- checking the opening operation .
Valves can stay, for a Jong period in the
same
position .lt
is then recommended to do some operation ofthevalve in order to prevent the valve to stiffen.
- check the tightness ofthe body bonnet Jointconnection as well as the body/piping flangeconnection .
Iftightness cannot be obtained all bolting will have tobe re-tighten in a regular and s}mietncal way.
If it is necessary to
replace a gasket, it is recommendedto oil it in the case of metallic corrugated or of ring Joint .The tightenmg of the stud bohl shall be donesymetrically .
XII
REPAIRING OF VALVES
Though it is recommended that repair have to be made bythe manufacturer or a specialist~ some repair work canbe made by the user Maintenance Department in thatGase, a first emergency set of spare parts must be storedan site .
'The
stock
-of
spares
should include:
-
gaskets, packings, springs, bolts and nuts,
- seats, obturators, stein and stein nut.
- spare for electric, pneumatic or hydraulicactuators .
Les quantites de pikes de rechange ä commander sont,evidemment, fonction de l'importance du materiel et peuventetre evaluees par le constructeur .
Dans le cas oü les pikes de rechanges spkiales doiventet commandees au foumisseur il est conseille de rappe lerä celui-ci, que les differents renseignements utilesfigureront sur la plaque de firme (voir modele ci-aptes) etsi possible les inscnptions venant en
reliefde fonderie surle corps et qui comportent notanunent, le numero dumodele suivant lequel a ete coulee cette pike .
XIII PERFORMANCE DU MATERIEL DEROBN'ETTERIE
L'augmentation de la quality, 1'evolution continue desnormes de base, 1'amelioration des techniques confirmeespar des essais pousses du materiel ont permis de mehre aupoint une robinettene aux performances de plus en pluselev "~ ,s.
Ainsi, les appareils de robinetterie ä:udies et fabnquespar ja Societe MALBRANQUE sont, de; plus en plus aptesä jouer leur röle d'appareils de skurite.
The quantities of spare parts to be an stock are based anthe importance ofthe valve and can be recommended by themanufacturer .
If special spare parts have to be ordered werecommand to read the useful
information
given
anthe company's
name
plate
(see model attached) aswell as, the embossed informations an the
valve bodywhen it is
possible, those informations are foundry mark- pattem number - among other informations .
X'111 PERFORMANCE OF VALVES
Quality
improvement~
permanent evolution ofbasic standards, the improvement
in
techniques
andelaborate
testings
are
enabling Malbranque to design atop quality and performance product .
All valves of MALBRANQUE manufacture are ableto be used as a safety component .
REF SP 6901-A33 A
INSTALLATION AND MAINTENANCE MANUAL REV 1 DU 01.09.2002
S U M M A R Y SHEET SUMMARY
GENERAL
1/ INTRODUCTION. 2/ RECOMMENDATIONS. 3/ INSTALLATION OF THE EQUIPMENT 4/STARTING AND OPERATING OF THE INSTALLATION 5.VALVES FITTED WITH ACTUATORS 6/ MAINTENANCE BOLTED BONNET VALVES
NM 001 GATE VALVE NM 002 PARALLEL SLIDE VALVES NM 003 GLOBE VALVES NM 004 CHECK VALVES
PRESSURE SEAL BONNET VALVES
NM 005 PRESSURE SEAL BONNET GATE VALVE < OR = TO 4" NM 006 PRESSURE SEAL BONNET GATE VALVE > OR = TO 6" NM 007 PRESSURE SEAL BONNET GATE VALVE < OR = TO 4" NM 008 PARALLEL SLIDE PRESSURE SEAL BONNET GATE VALVE < OR = TO 4" NM 009 PARALLEL SLIDE PRESSURE SEAL BONNET GATE VALVE > OR = TO 6" NM 0010 PRESSURE SEAL BONNET GLOBE VALVE > OR = TO 6" NM 0011 PRESSURE SEAL BONNET CHECK VALVE
IM 001 BODY / BONNET BOLTING TIGHTENING IM 002 GRAPHITE PACKING ASSEMBLING IM 003 PARALLEL SLIDE VALVE DISCS ASSEMBLING IM 004 GEAR OPERATOR ROTATION IM 005 ACTUATOR SETTING INSTRUCTIONS IM 006 PRESSURE SEAL BONNET GASKET ASSEMBLING
TECHNICAL DOCUMENTATION
BE 62800 BODY / BONNET CONNECTION DETAIL FOR PRESSURE SEAL BONNET VALVE < OR = TO 4" BE 62801 BODY / BONNET CONNECTION DETAIL FOR PRESSURE SEAL BONNET VALVE > OR = TO 6" BE 68006 SWING CHECK VALVE ARTICULATION DETAIL BE 68800 PRESSURE SEAL CHECK VALVE ARTICULATION DETAIL
REF SP 6901-A33 A
INSTALLATION AND MAINTENANCE MANUAL REV 1 DU 01.09.2002
SHEET 1
GENERAL
1/ INTRODUCTION.
This manual is used for standard maintenance operation support for bolted bonnet and pressure seal bonnet gate, globe and swing check valves, from class 150 lbs up to 2500 lbs. In case of a specific work to be perform on the valves, additional informations can be obtain from MALBRANQUE upon written request. Other operations than usual valve maintenance may infringe Malbranque guarantee.
2/ RECOMMENDATIONS.
2.1. WARNING
The following recommendations are resulting of our industrial valve manufacturer experience. They are a general guide which cannot cover all different and particular situations met during unit/site installation. However, it brings to the fore absolute and permanent recommendations which, if they are transgressed, may compromise people safety, material and plant durability.
2.2. EQUIPMENT STORAGE
When valves are not immediately installed after delivery, following rules must be apply. Keep the valves as long as possible in their original packing. When valves are laid out from original packing, store the valves in a clean and protected area in closed position with their original protections ( end connections taps, locking devices....), to prevent particles contamination of internal volumes, until their installation on pipe. When possible, keep material from bad weather conditions to prevent sand, dust or any other particles which can form with grease, an abrasive paste , on the stem.
3. INSTALLATION OF THE EQUIPMENT
3.1. HANDLING OF THE EQUIPMENT
While handling, the equipment shall be slung under the body or by handling devices (if existing) but not through the handwheel, the yoke, the actuator or the bonnet. Avoid chocks which can result in tightness and external coating damages Don't drag material on the ground. As the seating surfaces are one of the most important portion of any valve for obtaining it's effective function, an extensive attention shall be paid as not to scratch and/or cause damage to this area.
REF SP 6901-A33 A
INSTALLATION AND MAINTENANCE MANUAL REV 1 DU 01.09.2002
SHEET 2
3.2. ASSEMBLING ON PIPE
Prior to assembling on pipe, remove all end connections taps and clean the inside of the valve as well as the flange gaskets surfaces. NOTA: Internal parts of cryogenic service valves must be properly dried out and grease free. Check that there are no metal cutting, welding spots or any other material in the piping that could damage the sealing surfaces. Check that the disc of check valve is not blocked by any wooden piece eventually installed for transport. On installation, check the marking of valve, name plate/tag being attached to each valve which describes Rating, Size, Shell and trim material, or flow direction or others, in order to avoid mistakes or confusion. Check The alignment of the two pipe sections, the pipe connecting flanges or butt weld ends preparation parallelism and distance. Under no circumstances the flanges or the butt-welding ends valves shall be used to correct a defect relating to the above points. Installation direction of a gate valve is normally free but must be performed in accordance with indicated flow marking if the disc is provided with a pressure balance hole or by-pass system ( see arrow or special marking on valve for flow direction). Since the flow direction of check and globe valve is clearly marked, install them as being instructed. As far as possible, assemble the valve on the pipe in a vertical position with hand wheel or actuator on top of the pipe. In case of butt weld ends type valves, welding to the line and post weld heat treatment operation shall be performed with the valve in half opened position. For local annealing, keep the temperature within required range and never give excessive heat transfer to the valve seat area. Also welding slags or spatters shall be completely cleaned off because majority of troubles on a valve attributes to its seat surface damage caused with weld spatter or other foreign material damaging the sealing surfaces.
4.STARTING AND OPERATING OF THE INSTALLATION
After a long storage of the equipment, when the installation is pressurized a leak can appear at the stuffing box. It is then necessary to tighten the gland bolting. It's also essential to check and if necessary to tighten up the body bonnet bolting. For in situ tests and start up of the installation, never drain the valves thru the packing or the shaft plug (for check valves) Gate valves shall be used either in full opened or completely closed position. If used in partially position, vibration on the disc may occurred with high speed flow, and damage the disc and seats sealing surfaces. As far as service conditions allow it, it is very important to regularly perform an opening-closing movement (even partial) of valves which stay in same position for a long period.
REF SP 6901-A33 A
INSTALLATION AND MAINTENANCE MANUAL REV 1 DU 01.09.2002
SHEET 3
5/ VALVES FITTED WITH ACTUATORS
For the electric connection of motor operated valve the cover junction box has to be removed for the shortest time to avoid water coming into the electric organs.
6/ MAINTENANCE
THIS GIVES ONLY RECOMMENDATIONS FOR BASIC MAINTENANCE OPERATIONS. YOU WILL FIND ATTACHED TO THIS MANUAL DIFFERENT NM, IM AND BE REFERENCED DOCUMENTS FOR TECHNICAL HELP AND INFORMATIONS.
6.1. USUAL MAINTENANCE
6.1.1 Retightening of stuffing box on gate and globe valves
When a leak appears at the stuffing box, retighten in order to increase the pressure on the packing. This force is developed by retightening the nuts progressively and alternatively to maintain the gland flange parallel to the upper bonnet flange. On motor operated valves an excessive operating torque may generate an unexpected operation of the torque switches that are protecting the motor. In the event the leakage persists the packing needs to be replaced.
6.1.2 Lubrication of stem on gate and globe valves
In order to guarantee a good efficiency of the material, it is recommended to grease regularly the stem threads .(There is no specific requirement regarding periodicity). For valve with non rising handwheel (mostly gate valves), the lubricating is made by using the lubrication plug. For valve with rising handwheel (mostly globe valve), the lubricating is made directly on the stem threads with a paint brush.
Swing check valve does not require any usual maintenance.
6.2. SPECIAL MAINTENANCE
6.2.1. Replacement of packing (only original spares must be used)
Shall be done when leaking of the stuffing box cannot be stop by retightening or as per end user recommendations 6.2.2. Replacement of Bonnet gasket (only original spares must be used)
Shall be done every time body /bonnet are disconnected or as per end user recommendations
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
WEDGE GATE VALVE BOLTED BONNET REV 1 DU 01.09.2002
DISASSEMBLING – REASSEMBLING SHEET NM 001
GATE VALVE DISASSEMBLING - Release the handwheel nut 20 - Put the valve in half open position - Unscrew the body bonnet bolting - Lift the bonnet 8 / Stem 4/ wedge 3 assembly - Mark the wedge position on the body and take it off from the stem - Remove the gasket 7 - Unscrew the handwheel nut 20 et remove the handwheel 19 - Unscrew the yoke nut 15 and stem nut 18 - Remove the needle bearings 17 - Remove the stuffing box bolting 10 - Remove the stem 4, the gland flange 14, the gland follower 13 - Take off the packing 12 and the back up ring if any from the stuffing
box GATE VALVE REASSEMBLING BONNET SUB ASSEMBLY - Grease and assemble the stem nut 18 and the needle bearings 17 - Install the yoke nut 15 and fix it by a tack weld - Install the pin (When existing) and place the handwheel 19 on the
stem nut 18 - Install the handwheel nut 20 and fix it by stamping in one point on
the top of the threads - Install the packing as per assembling instructions IM 002 - Engage the stem 4 in the stuffing box taking care not to damage the
packing rings. - Screw the stem 4 inside the stem nut and then turn the handwheel to
continue the rising of the stem up to 30 to 40 mm upon the stem nut. BODY / BONNET / WEDGE ASSEMBLY - Install the gasket 7 at its location on the body 1 top flange - Lift the bonnet sub assembly and hang up the wedge on the stem,
and after this assembly is centred on the body, install the assembly inserting the wedge guiding grooves inside the body guides (Take care to install the wedge in the right direction you've marked during disassembling)
- Install the body/bonnet bolting and tighten. Body bonnet bolting tightening : - Refer to assembling instructions IM 001 Packing compression
Refer to assembling instructions IM 002
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
PARALLEL SLIDE GATE VALVE BOLTED BONNET REV 1 DU 01.09.2002
DISASSEMBLING – REASSEMBLING SHEET NM 002
GATE VALVE DISASSEMBLING - Release the close position stop 26 - Release the handwheel nut 20 - Put the valve in half open position - Unscrew the body bonnet bolting - Lift the Bonnet 8 / Stem 4/ Discs 3 + 24 assembly - Remove the discs 3 from the collar 24 - Take off the pin and remove the collar 24 from the stem 4 by
unscrewing - Remove the gasket 7 - Unscrew the handwheel nut 20 et remove the handwheel 19 - Unscrew the yoke nut 15 and stem nut 18 - Remove the needle bearings 17 - Remove the stuffing box bolting 10 - Remove the stem 4, the gland flange 14, the gland follower 13 - Take off the packing 12 and the back up ring if any from the
stuffing box
GATE VALVE REASSEMBLING BONNET SUB ASSEMBLY - Grease and assemble the stem nut 18 and the needle bearings 17 - Install the yoke nut 15 and fix it by a tack weld - Install the pin (When existing) and place the handwheel 19 on the
stem nut 18 - Install the handwheel nut 20 and fix it by stamping in one point on
the top of the threads - Install the packing as per assembling instructions IM 002 - Reassemble the discs / collar assembly in accordance with
assembling instructions IM 003 - Engage the stem 4 in the stuffing box taking care not to damage the
packing rings. - Screw the stem 4 inside the stem nut and then turn the handwheel
to continue the rising of the stem up to 30 to 40 mm upon the stem nut.
BODY / BONNET / WEDGE ASSEMBLY - Install the gasket 7 at its location on the body 1 top flange - Lift the bonnet sub assembly and after centring this assembly
upon the body, install the assembly inserting the collar guiding grooves inside the body guides (Use the assembling staple as shown on assembling instructions IM 003)
- Install the body/bonnet bolting and tighten. Body bonnet bolting tightening : - Refer to assembling instructions IM 001 PACKING COMPRESSION - Refer to assembling instructions IM 002
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
GLOBE VALVE BOLTED BONNET REV 1 DU 01.09.2002
DISASSEMBLING - REASSEMBLING SHEET NM 003
GLOBE VALVE DISASSEMBLING - Release the handwheel nut 20 - Put the valve in half open position - Unscrew the body bonnet bolting - Lift the Bonnet 8 / Stem 4/ Discs 3 assembly - Remove the gasket 7 - Unscrew the handwheel nut 20 et remove the handwheel 19 - Unscrew the yoke nut 15 and stem nut 18 - Remove the needle bearings 17 - Remove the stuffing box bolting 10 - Unscrew the guide 28 - Remove the stem 4, the gland flange 14, the gland follower 13 - Take off the packing 12 and the back up ring if any from the stuffing box - Grind the tack weld between the Disc nut 27 and the disc 3 - Remove the disc GLOBE VALVE REASSEMBLING STEM / DISC SUB ASSEMBLY - Install the disc nut 27 on the stem 4 and screw it in the disc 3 - Fix it in rotation by a tack weld BONNET SUB ASSEMBLY - Grease and assemble the stem nut 18 and the needle bearings 17 - Install the yoke nut 15 and fix it by a tack weld - Install the pin (When existing) and place the handwheel 19 on the stem
nut 18 - Install the handwheel nut 20 and fix it by stamping in one point on the
top of the threads - Install the packing as per assembling instructions IM 002 - Engage the stem 4 in the stuffing box taking care not to damage the
packing rings. - Install the guide 28 - Screw the stem 4 inside the stem nut and then turn the handwheel to
continue the rising of the stem up to 30 to 40 mm upon the stem nut. - Install the pin and put the guide in position. Then tighten the blocking
screw BODY / BONNET / DISC ASSEMBLY - Install the gasket 7 at its location on the body 1 top flange - Lift the bonnet sub assembly and after centring this assembly upon the
body, install the assembly - Install the body/bonnet bolting and tighten. Body bonnet bolting tightening : Refer to assembling instructions IM 001 PACKING COMPRESSION
Refer to assembling instructions IM 002
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
CHECK VALVE BOLTED BONNET REV 1 DU 01.09.2002
DISASSEMBLING – REASSEMBLING SHEET NM 004
CHECK VALVE DISASSEMBLING - Unscrew the body bonnet bolting 10 and 11, remove the cover 45 and the
gasket 7 - Unscrew the plug 47 - Remove the plug gasket 46 and the hinge pin 44 - Remove the disc / hinge assembly - Remove the pin 41, Unscrew the nut 42 - Remove the washer 40 and separate the disc 3 from the hinge 43
CHECK VALVE REASSEMBLING - Assemble the disc 3 and the hinge 43 - Install the washer 40, the nut 42, and the pin 41 - Install the disc / hinge assembly in the body - Install the hinge pin 44 in the body 1 passing thru the hinge 43 - Install the gasket 46 - Tighten the shaft nut (Refer to table 1 here under for torque) - Install the bonnet gasket 7, the bonnet 45 - Install and tighten the body bonnet bolting (Refer to IM 001 for torque) - Refer to assembling instructions IM 001
TABLE 1 :
TORQUE FOR PLUG TIGHTENING
PLUG DIAMETER TORQUE
M 24 150 NM M 30 210 NM M 36 500 NM M 42 770 NM M 48 1150 NM M 52 1250 NM
47
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
WEDGE PRESSURE SEAL BONNET GATE VALVE < or = to 4" REV 1 DU 01.09.2002
DISASSEMBLING – REASSEMBLING SHEET NM 005
GATE VALVE DISASSEMBLING - Release the handwheel nut 20 - Put the valve in half open position - Unscrew the nuts 10 - Unscrew the screw 5a and the wing nut 31a - Unscrew the nuts 6 - Lift the yoke 30 and turn the handwheel 19 to take off the yoke - Push down the bonnet 32 to release the segment rings 36 - Remove the segment rings 36 - Lift the bonnet / Stem / wedge assembly - Mark the wedge 3 position on the body 1 and take it off from the stem 4 - Install the bonnet on appropriate supporting device - Remove the thrust ring 35 and the gasket 33 - Remove the stem 4, the gland flange 14, the gland 13 - Take off the packing 12 and the back up ring from the stuffing box - Unscrew the handwheel nut 20 et remove the handwheel 19 - Unscrew the yoke nut 15 and stem nut 18 - Remove the needle bearings 17 - Remove the boltings 11 and 5a from the wing nut 31a
GATE VALVE REASSEMBLING BONNET SUB ASSEMBLY - On the bonnet 32 - Install the back up ring and one anti extrusion ring 12b - Install the packing 12, the gland 13. - The top anti extrusion ring will be installed further compression of the
packing 12 - Engage the stem 4 in the stuffing box taking care not to damage the
packing rings. YOKE SUB ASSEMBLY - Take the yoke 30 - Grease and assemble the stem nut 18 and the needle bearings 17 on
the yoke 30 - Install the yoke nut 15 and fix it by a tack weld - Install the pin and the handwheel 19 on the stem nut 18 - Screw the handwheel nut 20 and fix it by stamping in one point on
the top of the threads BODY/BONNET/YOKE ASSEMBLING - Screw the bolting 5 on the body 1 - Screw the bolting 11 and 5a on the wing nut 31a - Lift the bonnet sub assembly - Hang up the wedge 3 on the stem 4 - Install the assembly in the body 1(Take care to install the wedge in
the right direction you've marked during disassembling) - Install the bonnet gasket 33, and the thrust ring 35 - Install the segment rings 36 - Engage the yoke 30, the wing nut 31a, the gland flange 14, on the stem 4 - Turn the handwheel to place the yoke 30, screw the nuts 6 - Lift the stem / bonnet sub assembly by turning the handwheel 19 - Screw the wing nut 31a on the bonnet 32 and tighten the screws 5a (See Graphite pressure seal gasket assembling instructions IM 006) Tighten the nuts 10 (See Packing assembling instructions IM 002)
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
WEDGE PRESSURE SEAL BONNET GATE VALVE > or = to 6" REV 1 DU 01.09.2002
DISASSEMBLING – REASSEMBLING SHEET NM 006
GATE VALVE DISASSEMBLING - Open the valve of about 20 mm against the seats - Remove the Gear box or the actuator (see instruction IM 004 or IM 005) - Remove the nuts 6 - Remove the yoke 30 - Remove the nuts 10 the gland flange 14 - Remove the nuts 6a and the bonnet retaining ring 31 - Remove the screws 5a and Push down the bonnet 32 to release the
segment rings 36 - Remove the segment rings 36 - Install a lifting ring on top of the stem - Lift the bonnet / Stem / wedge assembly - Mark the wedge 3 position on the body 1 and take it off from the stem 4 - Install the bonnet on appropriate supporting device - Remove the thrust ring 35 and the gasket 33 - Remove the gland studs - Remove the stem 4, the, the gland 13 - Take off the packing 12 and the back up ring from the stuffing box
GATE VALVE REASSEMBLING - On the bonnet 32 - Install the back up ring and install the 2 screws 11 - Engage the stem in the bonnet 32 - Install a lifting ring on top of the stem - Lift the bonnet / Stem assembly - Hang up the wedge 3 on the stem 4 - Install the assembly in the body 1(Take care to install the wedge in
the right direction you've marked during disassembling) - Install the bonnet gasket 33, and the thrust ring 35 - Install the segment rings 36 - Install the screws 5a on the bonnet 32 - Install the bonnet retaining ring 31 - Lift the stem / bonnet sub assembly - Screw the nuts 6a (without jamming) - In the bonnet install one anti extrusion ring 12b - Install the packing 12, the gland 13, the gland flange 14, the nuts 10 - The top anti extrusion ring will be installed further compression of
the packing 12 (See packing assembling instructions IM 002) - Tighten the nuts 6a (See pressure seal gasket assembling
instruction IM 006) - Unscrew the nuts 10, lift the gland - Install the top anti extrusion ring, install and tighten the nuts 10 (See packing assembling instructions IM 002) - Install the screws 5, the yoke 30 and the nuts 6. Fix everything. - Install the gear operator or actuator (see instruction IM 004 or IM 005)
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
PRESSURE SEAL BONNET PARRALEL SLIDE GATE VALVE < or = to 4" REV 1 DU 01.09.2002
DISASSEMBLING – REASSEMBLING SHEET NM 007
GATE VALVE DISASSEMBLING - Release the close position stop 26 - Release the handwheel nut 20 - Put the valve in half open position - Unscrew the nuts 10 - Unscrew the screw 5a and the wing nut 31a - Unscrew the nuts 6 - Lift the yoke 30 and turn the handwheel 19 to take off the yoke - Push down the bonnet 32 to release the segment rings 36 - Remove the segment rings 36 - Lift the bonnet / Stem / wedge assembly - Install the bonnet on appropriate supporting device - Remove the thrust ring 35 and the gasket 33 - Remove the stem 4, the gland flange 14, the gland 13 - Take off the pin and remove the collar 24 from the stem 4 by
unscrewing - Remove the discs 3 - Take off the packing 12 and the back up ring from the stuffing box - Unscrew the handwheel nut 20 et remove the handwheel 19 - Unscrew the yoke nut 15 and stem nut 18 - Remove the needle bearings 17 - Remove the boltings 11 and 5a from the wing nut 31a
GATE VALVE REASSEMBLING STEM / DISCS SUB ASSEMBLY - Assemble the discs 3, spring 25, staple - Screw the stem 4 in the collar 24 and install the pin BONNET SUB ASSEMBLY - On the bonnet 32 - Install the back up ring and one anti extrusion ring 12b - Install the packing 12, the gland 13. - The top anti extrusion ring will be installed further compression of the
packing 12 - Engage the stem 4 in the stuffing box taking care not to damage the
packing rings. YOKE SUB ASSEMBLY - Take the yoke 30 - Grease and assemble the stem nut 18 and the needle bearings 17 on
the yoke 30 - Install the yoke nut 15 and fix it by a tack weld - Install the pin and the handwheel 19 on the stem nut 18 - Screw the handwheel nut 20 and fix it by stamping in one point on the
top of the threads BODY/BONNET/YOKE ASSEMBLING - Screw the bolting 5 on the body 1 - Screw the bolting 11 and 5a on the wing nut 31a - Lift the bonnet sub assembly and maintain the 2 discs with the
assembling staple - Install the assembly in the body taking care to engage the collar in the
body guides (See assembling instruction IM 003) - Install the bonnet gasket 33, and the thrust ring 35 - Install the segment rings 36 - Engage the yoke 30, the wing nut 31a, the gland flange 14, on the stem 4 - Turn the handwheel to place the yoke 30, screw the nuts 6 - Lift the stem / bonnet sub assembly by turning the handwheel 19 - Screw the wing nut 31a on the bonnet 32 and tighten the screws 5a (See Graphite pressure seal gasket assembling instructions IM 006) Tighten the nuts 10 (See Packing assembling instructions IM 002)
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
PRESSURE SEAL BONNET PARRALEL SLIDE GATE VALVE > or = to 6" REV 1 DU 01.09.2002
DISASSEMBLING – REASSEMBLING SHEET NM 008
GATE VALVE DISASSEMBLING - Open the valve of about 20 mm against the seats - Remove the close position stop the Gear box or the actuator (see
instruction IM 004 or IM 005) - Remove the nuts 6 - Remove the yoke 30 - Remove the nuts 10 the gland flange 14 - Remove the nuts 6a and the bonnet retaining ring 31 - Remove the screws 5a and Push down the bonnet 32 to release the -
segment rings 36 - Remove the segment rings 36 - Install a lifting ring on top of the stem - Lift the bonnet / Stem / wedge assembly - Install the bonnet on appropriate supporting device - Remove the sub assembly stem 4/ discs 3/ collar 24 - Remove the discs 3 - Take off the pin and remove the collar 24 from the stem 4 by unscrewing - Remove the thrust ring 35 and the gasket 33 - Remove the boltings 11 from the stuffing box - Remove the gland flange 14, the gland 13 - Take off the packing 12 and the back up ring from the stuffing box GATE VALVE REASSEMBLING
STEM / DISCS SUB ASSEMBLY - Assemble the discs 3, spring 25, staple - Screw the stem 4 in the collar 24 and install the pin BONNET SUB ASSEMBLY - On the bonnet 32 - Install the back up ring and install the 2 screws 11 - Engage the stem in the bonnet 32 - Install a lifting ring on top of the stem 4 - Lift the bonnet / Stem assembly and maintain the 2 discs with the
assembling staple - Install the assembly in the body taking care to engage the collar in the body
guides (See assembling instruction IM 003) - Install the bonnet gasket 33, and the thrust ring 35 - Install the segment rings 36 - Install the screws 5a on the bonnet 32 - Install the bonnet retaining ring 31 - Lift the stem / bonnet sub assembly - Screw the nuts 6a (without jamming) - In the bonnet install one anti extrusion ring 12b - Install the packing 12, the gland 13, the gland flange 14, the nuts 10 - The top anti extrusion ring will be installed further compression of the
packing 12 (See packing assembling instructions IM 002) - Tighten the nuts 6a (See pressure seal gasket assembling instruction IM
006) - Unscrew the nuts 10, lift the gland - Install the top anti extrusion ring, install and tighten the nuts 10 (See packing assembling instructions IM 002) - Install the screws 5, the yoke 30 and the nuts 6. Fix everything. - Install the gear operator or actuator (see instruction IM 004 or IM 005) - Install the close position stop when applicable
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
PRESSURE SEAL BONNET GLOBE VALVE ≤ 4" REV 1 DU 01.09.2002
DESASSEMBLING – REASSEMBLING PAGE NM 009
GLOBE VALVE DISASSEMBLING - Release the handwheel nut 20 - Put the valve in half open position - Unscrew the nuts 10 - Unscrew the 5a and the wing nut 31a - Unscrew the nuts 6 - Lift the yoke 30 and turn the handwheel 19 to take off the yoke - Unscrew the handwheel nut 20 and remove the handwheel - Unscrew the yoke nut 15 and remove the stem nut 18 and the needle
bearings 17 - Push down the bonnet 32 to release the segment rings 36 - Remove the segment rings 36 - Lift the bonnet / Stem / wedge assemb ly - Install the bonnet on appropriate supporting device - Remove the thrust ring 35 and the gasket 33 - Remove the stem 4, the gland flange 14, the gland 13 - Remove the screws 11 and 5a and the wing nut 31a - Take off the packing 12 and the back up ring from the stuffing box - Grind the tack weld between the disc nut 27 and the disc 3 - Remove the disc nut 27 GLOBE VALVE REASSEMBLING STEM / DISC SUB ASSEMBLY - Install the disc nut 27 on the stem 4 and screw it in the disc 3 - fix it in rotation by a tack weld BONNET SUB ASSEMBLY - On the bonnet 32 - Install the back up ring and one anti extrusion ring 12b - Install the packing 12, the gland 13. - The top anti extrusion ring will be installed further compression of the
packing 12 - Engage the stem 4 in the stuffing box taking care not to damage the
packing rings YOKE SUB ASSEMBLY - Take the yoke 30 - Grease and assemble the stem nut 18 and the needle bearings 17 on
the yoke 30 - Install the yoke nut 15 and fix it by a tack weld - Install the pin and the handwheel 19 on the stem nut 18 - Screw the handwheel nut 20 and fix it by stamping in one point on the
top of the threads BODY / BONNET / YOKE ASSEMBLY - Screw the bolting 5 on the body 1 - Screw the bolting 11 and 5a on the wing nut 31a - Lift the bonnet sub assembly - Install the assembly in the body 1 - Install the bonnet gasket 33, and the thrust ring 35 - Install the segment rings 36 - Engage the yoke 30, the wing nut 31a, the gland flange 14, on the stem 4 - Turn the handwheel to place the yoke 30, screw the nuts 6 - Lift the stem / bonnet sub assembly by turning the handwheel 19 - Screw the wing nut 31a on the bonnet 32 and tighten the screws 5a (See Graphite pressure seal gasket assembling instructions IM 006)
Tighten the nuts 10 (See Packing assembling instructions IM 002)
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
GLOBE VALVE PRESSURE SEAL BONNET > or = 6" REV 1 DU 01.09.2002
DISASSEMBLING – REASSEMBLING SHEET NM 0010
GLOBE VALVE DISASSEMBLING - Open the valve about 20 mm - Remove the actuator or the gear box (see instruction IM 004 or IM 005) - Remove the nuts 6 - Remove the yoke 30 - Remove the nuts 10 the gland flange 14 - Remove the nuts 6a and the bonnet retaining ring 31 - Remove the screws 5a and Push down the bonnet 32 to release the
segment rings 36 - Remove the segment rings 36 - Install a lifting ring on top of the stem - Lift the bonnet / Stem / wedge assembly - Install the bonnet on appropriate supporting device - Remove the guide spring 28 - Remove the sub assembly stem 4/ Disc 3 - Remove the thrust ring 35 and the gasket 33 - Remove the nuts 10, the Gland flange 14, the gland 13 , the screws 11 - Take off the packing 12 and the back up ring from the stuffing box - Grind the tack weld between the disc nut 27 and the disc 3 - Remove the disc nut 27
GLOBE VALVE REASSEMBLING STEM / DISC SUB ASSEMBLY - Install the disc nut 27 on the stem 4 and screw it in the disc 3 - fix it in rotation by a tack weld
BONNET SUB ASSEMBLY - On the bonnet 32 - Install the back up ring, the screws 11 - Engage the stem 4 in the bonnet 32 - Install a lifting ring on top of the stem - Lift the bonnet / Stem sub assembly - Install it in the body 1 - Install the bonnet gasket 33, and the thrust ring 35 and the segment
rings 36 - Install the screws 5a in the bonnet - Install the retaining ring 31 - Pull the bonnet / Stem sub assembly - Screw the nuts 6a (without jamming) - In the bonnet install one anti extrusion ring 12b - Install the packing 12, the gland 13, the gland flange 14, the nuts 10 - The top anti extrusion ring will be installed further compression of the
packing 12 (See packing assembling instructions IM 002) - Tighten the nuts 6a (See pressure seal gasket assembling instruction
IM 006) - Unscrew the nuts 10, lift the gland - Install the top anti extrusion ring, install and tighten the nuts 10 (See packing assembling instructions IM 002) - Install the screws 5, the yoke 30 and the nuts 6. Fix everything. - Install the gear operator or actuator (see instruction IM 004 or IM 005)
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
PRESSURE SEAL BONNET CHECK VALVE REV 1 DU 01.09.2002
DISASSEMBLING – REASSEMBLING SHEET NM 011
CHECK VALVE DISASSEMBLING - Remove the bolting 5a and 6a, the retaining ring 31 - Install a lifting ring in the center of the bonnet 32 - Push the bonnet 32 to release the segment rings 36 - Remove the segment rings 36 and remove the bonnet 32 - Remove the thrust ring 35 and the gasket 33 - Remove the screws 51 and the flange 50 - Screw a ring and pull off the plug 47, remove the gasket 49 - Remove the hinge pin 44 - Remove the disc / hinge assembly - Remove the pin 41, Unscrew the nut 42 - Remove the washer 40 and separate the disc 3 from the hinge 43
CHECK VALVE REASSEMBLING - Assemble the disc 3 and the hinge 43 - Install the washer 40, the nut 42, and the pin 41 - Install the disc / hinge assembly in the body - Install the hinge pin 44 in the body 1 passing thru the hinge 43 - Install the plug 47, the gasket 49, the flange 50 - Install the screws 51 and tighten (See torque figures in table 1 behind) - Install a lifting ring on the bonnet 32 - Install the gasket 33, the thrust ring 35 on the bonnet 32 - Install this in the body 1 and install the segment rings 36 - Pull up the bonnet 32 and install the screws 5a - Install the retaining ring 31 and install the nuts 6a (Refer to assembling instructions IM 006)
TABLE 1
TORQUE FOR SCREWS TIGHTENING
∅ PLUG TORQUE
M 8 20 NM M 10 45 NM M 12 60 NM M 16 120 NM M 24 200 NM M 24 240 NM
51
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
REV 1 DU 01.09.2002
TIGHTENING FIGURE AND TORQUES SHEET IM 001
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
ASSEMBLING INSTRUCTIONS FOR REV 1 DU 01.09.2002
GRAPHITE PACKING SHEET IM 002
PACKING ASSEMBLY - Install the lower back up ring, and one anti extrusion ring 12b - Install the packing rings 12, the gland 13, the gland flange 14, the
gland bolting 10 and 11 - The last anti extrusion ring 12h will be installed further packing
compression operation - Engage the stem 4 in the stuffing box taking care not to damage the
packing rings. - Screw the stem 4 inside the stem nut and then turn the handwheel to
continue the rising of the stem up to 30 to 40 mm upon the stem nut. PACKING COMPRESSION - Tighten alternatively the nuts 10 - The gland shall go down in the stuffing box for approximately a half
ring height - Uptight the studs 11, lift the gland 13, install the last anti extrusion
ring 12 h, Tight again the studs 11 to engage the gland 13 of approximately a half ring height in the stuffing box.
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
ASSEMBLING INSTRUCTIONS FOR REV 1 DU 01.09.2002
PARALLEL SLIDE DISCS SHEET IM 003
DISCS SUB ASSEMBLY - Install the discs and the spring in the collar - Maintain the discs compressed (Using the assembling staple) - Install the hook (Staple) and screw the stem in the collar (Strongly tighten) - Install the pin
Assembling in the valve body. - Engage the discs between the 2 seats - Remove the assembling hook (staple) when engage in the seats
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
INSTRUCTION FOR GEAR OPERATOR REV 1 DU 01.09.2002
ROTATION SHEET IM 004
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
ACTUATOR SETTING INSTRUCTIONS REV 1 DU 01.09.2002
SHEET IM 005
WEDGE GATE VALVES (SETTING ON POSITION LIMIT SWITCHES)
- Set the torque limit switches at the minimum - Close the valve in order to obtain tightness between seats and wedge facings. - Set the actuator position limit switch (Close position) to stop on limit switch position - Then power the actuator to fully open the valve up to back seat position. The actuator stops on torque limitor when fully open. - Close the valve manually (3 mm to 5 mm) in order to avoid stem cone/back seat contact - Set the actuator position limit switch (Open position) to stop on limit switch position - Re set the torque limit switches at the required torque.
PARALLEL SLIDE GATE VALVES (SETTING ON POSITION LIMIT SWITCHES)
- Set the torque limit switches at the minimum - Close the valve manually (collar 24 shall be in contact with bottom valve body or close position stop 26 if any shall be in contact
with the actuator nut) - Slightly Open the valve manually in order to center the discs facings with the seats facings. - Set the actuator position limit switch (Close position) to stop on limit switch position - Then power the actuator to fully open the valve up to back seat position. The actuator stops on torque limitor when fully open - Close the valve manually of 3 mm in order to avoid stem cone/back seat contact - Set the actuator position limit switch (Open position) to stop on limit switch position - Re set the torque limit switches at the required torque.
DBB WEDGE GATE VALVES (SETTING ON TORQUE LIMIT SWITCHES FOR CLOSE POSITION)
- Set the torque limit switches at 40 % - Power the actuator to close the valve. (The valve stops on torque limit switch when fully closed) - Power the actuator for full opening. (The valve stops on torque limit switch when fully open in back seat position)) - Close the valve manually of 3 mm in order to avoid stem cone/back seat contact - Set the actuator position limit switch (Open position) to stop on limit switch position - Re set the torque limit switches at the required torque - Close on torque limit switch only
GLOBE VALVE (SETTING ON TORQUE LIMIT SWITCHES FOR CLOSE POSITION)
- Set the torque limit switches at 40 % - Power the actuator to close the valve. (The valve stops on torque limit switch) - Power the actuator for full opening. (The valve stops on torque limit switch) - Close the valve manually (3 to 5 mm) in order to avoid stem cone/back seat contact - Set the actuator position limit switch (Open position) to stop limit switch position - Re set the torque limit switches at the required torque
Only close position is on torque limit switch.
DISCONNECTION OF ACTUATOR FROM THE VALVE
Close the valve and remove the actuator fixing nuts. Turn the actuator handwheel in order to remove the actuator from the stem (Closing direction)
ASSEMBLING OF THE ACTUATOR ON THE VALVE
Install the actuator on the top of the stem Turn the actuator handwheel in order to screw the actuator on the stem (opening direction) Install and tighten the actuator fixing nuts.
INSTALLATION AND MAINTENANCE MANUAL REF SP 6901-A33 A
INSTRUCTION FOR PRESSURE SEAL BONNET GASKET REV 1 DU 01.09.2002
INSTALLATION SHEET IM 006
TECHNICAL CARACTERISTICS
" GRAPHITE PRESSURE SEAL GASKET"
• Minimum Density 1.6 • Double anti-extrusion dishes are imperative • Maximum compression force 500 to 1000 bar. • Limited at 1000 bar by metal contact
ASSEMBLING RECOMMANDATIONS
• Grease is prohibited for assembling
• Preloading force 300 bars minimum v By tightening of nuts C. v Tightening clearance A.
• Metal contact checking v Bonnet thrust ring v Complete elimination of A clearance 3 to 5 mm depending
of the size of the valve
TEST RECOMMANDATIONS
• Do not fill up the valve with water until above detailed operation are completed
• Bleed the body cavity thru the bleeder screw B no other
process is authorized
• Pressurize the valve
• Check when pressurized that the nuts C are in contact with the bonnet retaining ring. Do not give excess torque to these nuts.