funding process for federally funded tip projects flowchart
TRANSCRIPT
PMU CreatesWBS Elements in
SAP if Needed
PMU CreatesFunding Document
in SAP
PMUDetermines
Detailed FundTo Be Used
PMU Completesthe Engineer DataSummary Sheetfor This Phase
PMU CreatesFHWA Number(s)for
the Project
PMU Sends SAPWorkflow Requestto Federal FundsManagemant Unit
(FFMU)
See Separate Process Chartfor Creating FHWA Numbers
Used by FFMU for FMIS entryCopied to PDEA Bridge UnitSee Separate Process Chart for Completing the Engineers Sheet
See Separate Process Chart forDetermining Detailed Fund from TIPSource Funding
SAP ZF12
ZF04 to enter control data on WBSZF11 to create funding document and long text
PMU receives Locationand Design Approval
Letter (LADA)
PMU ChecksProject Documents
DocumentsComplete?
Schedule ChangeNeeded
Required DocumentsProduced
N
Y
Start PEFundingProcess
Request PDB addProject to TIP (BOT
Agenda Item N)
See Processfor Funding TIPPOC Projects
POCProject
or State ForceAccount
?
N
Submit Request forPreliminary Engineering
Funds to PDB
Y
N
PMU Checks ProjectData & Adusts theRequest if Needed
Checks:Check that Construction funds are programmed in the TIP for appropriate fiscal
year.Environmental Planning Documents are complete.Combined (or Final Field) Inspection was conducted.Final R/W Plans Title Sheet and Transmittal LetterConstruction consultation was conducted if Environmental Document is > 1 year old
(does not apply for PCE or Minimum Criteria Checklist projects).ROW Certification Letter
Funding ProcessFor Federally Funded TIP Projects
Advertised, Bid and Let to Contractrevised 5 - 25 - 2007
Check:ROW & Let dates agree with TIPInitial PE $ amount allowed is 10% of TIP ConstructionEstimate. (If project requires FONSI or EIS, only 5%will intially be funded to start work).Agreements have been scanned by PMU
IsProjectin theTIP?
N
ProjectAdvertised for
BidBids Receved
PMU ReceivesAward Letter and
Forwards to FFMU
Project ServicesPosts Award
Letter
ConstructionBegins
FFMU Receives PostLetting Sheet From
FHWA
FFMU CalculatesLow Bid Adjustment,Forwards to PMU,and Updates WBS
Funding
Y
PMU Places Low BidAdjustment On BOT
Agenda
BOT Approves
END
PMU ReceivesEngineers
Estimate FromProject Services
PMU ReceivesLet List from Bid
Ad Meeting
BOT AwardsContract ?
Bid MeetingsN
FFMU ReleasesWBS Funds throughWorkflow Notifcation
A
B
C
D
Requests typically from:PDEABridge UnitDivision EngineerTraffic Services (Spot Safety Projects)Rail DivisionEnhancement Unit
Notes:Use this process for Division Design Let (DDL) Projectsthat will be Federally Funded
Program Development Branch
Page 1 of 2
PMU SetsWBS ElementStatus to R50
PMU Adds Requestto BOT Agenda Item
M
BOTApproves
?
PMU SendsHardcopy of Info to
FFMU
See Separate Process ChartR/W and Utility Relocation are added at the TIP amount (Unless otherwiserequested, in Urban areas 10% of this is assumed for Utility Relocation and 5% inRural areas).Construction is added at TIP Amount
FFMU EntersRequest into Federal
ManagementInformation System
(FMIS)
ZF11 Funding Sheet & Long TextEngineer Data Summary SheetCopy of DocumentationIncludes Engineers Estimate
(Construction Phase)
FHWAApproves
?
FFMU ReceivesApproval TransactionLog From FHWA and
Copies PMU
PMU Enters Date ofApproval On EngineerData Summary Sheet.
Sheet is Filed
FFMU Releases WBS,Sets User Status to R100
and Sends SAPWorkflow to PMU
Y
N N
Y
END
Right Of WayRequired?
AdvanceROW
AcquisitionProcess As
Needed
R/W PlansDeveloped
PEPreliminaryEngineering Phase
Begins
PMU SendsNotification of Funding
Authorization toOriginal Requestor via
SAP Workflow
Abreviations:BOT - NCDOT Board of TransportationSPFU - State Project Funding Unit (Fiscal)PDB - Program Development BranchPMU - Project Management UnitTIP - Transportation Improvement ProgramFFMU - Federal Funds Management UnitPE - Preliminary EngineeringROW - Right of WayPOC - Purchase Order Contract
Color Key: Process Boxes Backgrounds
PhaseBeing
Funded:
ROW
CONSTRUCTION
PMU Sends Notificationof Funding
Authorization to OriginalRequestor via SAP
Workflow
Bid Ad MeetingsReview Projects on 12
Month Let List
Adjust Scheduleif Needed
IsProjectDelayed
?
Y
R/W Acquistion andUtility Relocation
Phase Begins
Checks:- Check that Construction funds are programmed in the TIP for appropriate fiscal year.- Environmental Planning Documents are complete.- Combined (or Final Field) Inspection was conducted.- Location and Design Approval Letter (LADA) was received.- Construction consultation was conducted if Environmental Document is > 1 year old
(does not apply for PCE or Minimum Criteria Checklist projects).- ROW Certification Letter
FFMU Releases WBS,Sets User Status to R100
and Sends SAPWorkflow to PMU
ROW FundingProcess Starts
Here
ConstructionFunding Process
Starts Here
y
A
N
B
NC
CONSTRUCTION
D
Business Units
Fiscal
Program Development Branch
Common Processes
Construction Phase
ROW Phase
PE Phase
Six MonthROW Review
MeetingsHeld Monthly
PMU IdentifiesProjects ready
for ROWFunding
Funding ProcessFor Federally Funded TIP Projects
Advertised, Bid and Let to Contractrevised 5 - 25 - 2007
Page 2 of 2