framatome ANP-10323P (GALILEO) Plan to Resume NRC Review

Chris Allison Nathan Hottle

Rockville, MD April 24, 2018

Agenda -• Objectives

• ANP-10323P review status

• Resolution of code stability issue

• Additional changes to the code and methodology

• Path forward

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.2 framatome

Objectives

• Re-establish the topical report review

• Present resolution of code stability issue

• Provide an overview of changes made to the code and methodology described in ANP-10323P Revision 0

-

• Discuss Framatome's plans for ANP-10323P Revision 1 and for responding to RAls, with the objectives of:

+ Reaching agreement on the proposed plan

+ Aligning resource plans to promptly resume the NRC review

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.3 framatome

Background

• Framatome (formerly known as AREVA) submitted ANP-10323P for review and approval in August 2013.

-• After extensive discussions between Framatome and NRC in

2015, RAls were issued in March 2016.

• In November 2015, Framatome revised the requested review and approval to remove the BWR and MOX scope. An unofficial mark-up was provided identifying portions of the topical report that were no longer in scope.

• Also in November 2015, Framatome informed NRC about a code stability issue with the GALILEO code, and later requested that the NRC suspend the review until the issue was resolved.

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.4 framatome

Code Stability Issue Original Symptoms

Questioning attitude helped uncover the issue during update of the statistical methodology automation tool + Common automation tool used for both R0DEX4 and GALILEO analyses

-+ Automation had to be updated to incorporate new BWR functionality which should

have no impact on PWR applications + Engineer decided to re-run GALILEO PWR sample cases as additional test cases and

noticed unexpected differences due to slight differences in input round-off

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.5 framatome

2015 Version of the Code Was [ ] -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.6 framatome

2015 Version of the Code Was [ ] -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.7 framatome

2015 Version of the Code Was [ ] -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.8 framatome

Causal Factors of Code Instability -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.9 framatome

Resolution of Code Stability Issue Timeline -

ANP-10323P (GALILEO) Plan to Resume NRC Review - April 24, 2018 p.10 framatome

Resolution of Code Stability Issue Key Changes to the Code -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.11 framatome

Resolution of Code Stability Issue Key Changes to the Code -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.12 framatome

Resolution of Code Stability Issue Key Changes to the Code -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.13 framatome

GALILEO Code Response is Now Stable -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.14 framatome

GALILEO Code Response is Now Stable -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.15 framatome

GALILEO Code Response is Now Stable -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.16 framatome

Additional Changes to ANP-10323P -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.17 framatome

Additional Changes to ANP-10323P -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.1a framatome

Additional Changes to ANP-10323P -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.19 framatome

Additional Changes to ANP-10323P Under Consideration -

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.20 framatome

Summary -[ • Code stability issue has been resolved

J • Additional changes will streamline the methodology and

address specific concerns from RAls

• Revision 1 of ANP-10323P will contain a significant amount of new information

+ Descriptions of the new models

+ Descriptions of methodology changes

+ Updated code benchmark results

+ Revised model uncertainties

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.21 framatome

Plan to Address RAls -• Responses to the current set of RAI will be provided in two

batches

+ Batch 1 delivered in [ ] • Primarily responding to RAI requesting clarification or additional justification of the

methodology

+ Batch 2 delivered in [ ] • Primarily responding to RAI requesting additional benchmarks or example calculations

,, NRC review of the new material can begin in parallel ,, with the preparation of RAI responses

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.22 framatome

Path Forward

• ANP-10323P Revision 1 submittal - [ ]

• Revision O RAI responses

+ Batch 1 - [ ]

+ Batch 2 - [ ]

• Audits for understanding following submittals may be beneficial

• To support future licensing activities [ ],

-

Framatome is targeting NRC approval of ANP-10323P Revision 1 by [ ].

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.23 framatome

• AOO

• · BWR

• EATF

• FCM

• FGR

• L/D

• LOCA

• MOX

• PWR

• RAI

• RIA

• TCS

Acronyms/Nomenclature -Anticipated operational occurrence

Boiling water reactor

Enhanced accident tolerant fuel

Fuel centerline melt

Fission gas release

Length to diameter ratio

Loss of coolant accident

Mixed oxide

Pressurized water reactor

Request for additional information

Reactivity insertion accident

Transient cladding strain

ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.24 framatome