framatome ANP-10323P (GALILEO) Plan to Resume NRC Review
Chris Allison Nathan Hottle
Rockville, MD April 24, 2018
Agenda -• Objectives
• ANP-10323P review status
• Resolution of code stability issue
• Additional changes to the code and methodology
• Path forward
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.2 framatome
Objectives
• Re-establish the topical report review
• Present resolution of code stability issue
• Provide an overview of changes made to the code and methodology described in ANP-10323P Revision 0
-
• Discuss Framatome's plans for ANP-10323P Revision 1 and for responding to RAls, with the objectives of:
+ Reaching agreement on the proposed plan
+ Aligning resource plans to promptly resume the NRC review
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.3 framatome
Background
• Framatome (formerly known as AREVA) submitted ANP-10323P for review and approval in August 2013.
-• After extensive discussions between Framatome and NRC in
2015, RAls were issued in March 2016.
• In November 2015, Framatome revised the requested review and approval to remove the BWR and MOX scope. An unofficial mark-up was provided identifying portions of the topical report that were no longer in scope.
• Also in November 2015, Framatome informed NRC about a code stability issue with the GALILEO code, and later requested that the NRC suspend the review until the issue was resolved.
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.4 framatome
•
Code Stability Issue Original Symptoms
Questioning attitude helped uncover the issue during update of the statistical methodology automation tool + Common automation tool used for both R0DEX4 and GALILEO analyses
-+ Automation had to be updated to incorporate new BWR functionality which should
have no impact on PWR applications + Engineer decided to re-run GALILEO PWR sample cases as additional test cases and
noticed unexpected differences due to slight differences in input round-off
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.5 framatome
2015 Version of the Code Was [ ] -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.6 framatome
2015 Version of the Code Was [ ] -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.7 framatome
2015 Version of the Code Was [ ] -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.8 framatome
Causal Factors of Code Instability -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.9 framatome
Resolution of Code Stability Issue Timeline -
ANP-10323P (GALILEO) Plan to Resume NRC Review - April 24, 2018 p.10 framatome
Resolution of Code Stability Issue Key Changes to the Code -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.11 framatome
Resolution of Code Stability Issue Key Changes to the Code -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.12 framatome
Resolution of Code Stability Issue Key Changes to the Code -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.13 framatome
GALILEO Code Response is Now Stable -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.14 framatome
GALILEO Code Response is Now Stable -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.15 framatome
GALILEO Code Response is Now Stable -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.16 framatome
Additional Changes to ANP-10323P -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.17 framatome
Additional Changes to ANP-10323P -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.1a framatome
Additional Changes to ANP-10323P -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.19 framatome
Additional Changes to ANP-10323P Under Consideration -
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.20 framatome
Summary -[ • Code stability issue has been resolved
J • Additional changes will streamline the methodology and
address specific concerns from RAls
• Revision 1 of ANP-10323P will contain a significant amount of new information
+ Descriptions of the new models
+ Descriptions of methodology changes
+ Updated code benchmark results
+ Revised model uncertainties
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.21 framatome
Plan to Address RAls -• Responses to the current set of RAI will be provided in two
batches
+ Batch 1 delivered in [ ] • Primarily responding to RAI requesting clarification or additional justification of the
methodology
+ Batch 2 delivered in [ ] • Primarily responding to RAI requesting additional benchmarks or example calculations
,, NRC review of the new material can begin in parallel ,, with the preparation of RAI responses
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.22 framatome
Path Forward
• ANP-10323P Revision 1 submittal - [ ]
• Revision O RAI responses
+ Batch 1 - [ ]
+ Batch 2 - [ ]
• Audits for understanding following submittals may be beneficial
• To support future licensing activities [ ],
-
Framatome is targeting NRC approval of ANP-10323P Revision 1 by [ ].
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.23 framatome
• AOO
• · BWR
• EATF
• FCM
• FGR
• L/D
• LOCA
• MOX
• PWR
• RAI
• RIA
• TCS
Acronyms/Nomenclature -Anticipated operational occurrence
Boiling water reactor
Enhanced accident tolerant fuel
Fuel centerline melt
Fission gas release
Length to diameter ratio
Loss of coolant accident
Mixed oxide
Pressurized water reactor
Request for additional information
Reactivity insertion accident
Transient cladding strain
ANP-10323P (GALILEO) Plan to Resume NRC Review-April 24, 2018 p.24 framatome