FORAYS SERVICES & CONSTRUCTIONS PVT. LTD.OVERVIEW 2015

Page 2: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

INTRODUCTION Welcome to Forays Services & Constructions Pvt. Ltd., an Engineering and

Construction Company striving to cater to the growing needs of the

Instrumentation, Electrical and Telecom Industry.

Relying on the expertise of our specialized teams composed of Project

Management and Site Supervision Professionals, we offer a wide spectrum of

services including construction, plant commissioning and annual maintenance of

process plants.

Our Project Management and Site Supervision Team consists of qualified

Engineers and Technical Experts capable of overseeing all aspects of construction

and customizing services to conform with each of our client’s requirements.

The company's strategy is aimed at strengthening the integration of its services

and thrive to build a longstanding relation with every client.

We endeavor to maintain our reputation of delivering projects on time with

excellent quality and safety records.

Page 3: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

OUR NETWORKS

HEAD QUARTERSForays Services & Constructions Pvt. Ltd.Mumbai, India

Page 4: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

OUR MISSION

To Develop Forays as a world scale, single source,

Instrumentation, Electrical, Telecom, Construction & Annual

Maintenance Engineering and Constructions Company

To provide service excellence meeting all Techno-Economic

requirements of our clients

Page 5: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

OUR VISION

To develop a conducive working environment

To develop a slew of measures for improving operational

efficiency

To renew, rejuvenate and add human resource management &

development system so as to ensure a vibrant and motivated

workforce in order to provide continued quality service to all our

clients

To ultimately operate and run the organization with the strength

of its own procedures & systems

Page 6: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

BUSINESS GROWTH

2010 2011 2012 2013 2014 2015

40.06

60.1

103.3

121.46

150.89

170.1Turnover in INR Million

Page 7: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

ORGANISATION CHARTCHAIRMAN & MANAGING

DIRECTOR[CMD]

Mr. Mathew M. Mankanthanam

EXECUTIVE DIRECTOR[EXDR]

Mr. Suresh P. Thomas

BUSINESS DEVELOPMENT[BD]

Mr. Joel Johnson Sam

COMPANY SECRETARY[COSE]

Mr. V.G.Venkataraman

FINANCE, ACCOUNTING & CONTROL

[FACO]Mr. Nevin Alex

HUMAN RESOURCE MGT.[HRMA]

Mr. Manu Emmanuel Philip

PROCUREMENT[PROCU]

Mr. P. N. Pillai

ESTIMATION & PROPOSAL[EPRO]

Mr. Srinath Morampudi

QUALITY & HSE MGT.[QHSE]

Mr. Libin T. Thomas

PROJECT CONSTRUCTION[PROJCONST]

Mr. Binu George

CONSTRUCTION MANAGERS[CONST]

QA/QCEngineer

Planning Engineer

Field Engineer

Testing Engineer

SafetyEngineer

Site Admin& Accounts

Page 8: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

MANPOWER BREAKUP

50%

38%

7%

3%2%

Total Direct & Indirect Manpower - 832 nos.

Direct Labour: 400 nos.

Direct Labour (Sub-Contractor): 300 nos.

Supervisors & Tech-nicians: 90 nos.

Construction Managers & Engineers: 26 nos.

Administration, Accounts & Logistics: 16 nos.

Page 9: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

FIELD OF BUSINESS

Oil & Gas

Petrochemicals

Refineries

Cement & Steel

Telecommunication

Fertilizers/Chemicals

Power/Nuclear/Solar Power & Desalination

Pharmaceuticals & Food Processing

Liquefied Natural Gas

Page 10: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

FIELD OF SERVICES

ELECTRICAL & INSTRUMENTATION

• Field Engineering

• Procurement

• Inspection

• Installation

• Testing/Calibration

• Commissioning Assistance

• Revamping/Retrofitting

• Shutdown/Annual Maintenance

• Supply of Technical Manpower

Page 11: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

FIELD OF SERVICES

TELECOMMUNICATION

• Fiber Optic Splicing & OTDR Testing

• Software Installation, Integration & Commissioning of UBR, WMAX,

EDP, LMDS & OME Systems

• Cable Blowing & Trenching

Page 12: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

MAJOR ONGOING PROJECTSSr. No.

PROJECTSERVICE

DESCRIPTIONCLIENT YEAR MANHOURS

1.1.89 MTPA Benefication Plant, Hospet, Karnataka

Installation of Electrical Works

NMDC Ltd,EPC: Hindustan Dorr Oliver Ltd

2015 95,666

2. Aerial Cabling WorksErection of ADSS Cables

Reliance corporate IT Park Hyderabad

2015 72,333

3.

BBU, SRU, SWS, ARU, SGU,TGTU & All Utilities/Off sites of Sohar Refinery Improvement Project, Sohar Oman

Installation of Electrical, Instrumentation & Telecommunication Works

ORPIC- Oman Oil Refineries and Petroleum Industries CompanyEPC: Daelim-Petrofac JV

2015 1,078,008

4.CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar

Instrumentation AMC & Field Inst. Modification

Reliance Industries Limited 2015 233,300

5. GMP Project at Vapi, Gujarat

Supply & Installation of Instrumentation works

Bayer Vapi Limited 2015 268,000*

6.Instrumentation ARC & Modification works at Vapi, Gujarat

ARC for Instrumentation works

Bayer Vapi Limited 2015 66,750

7.Instrumentation Cable Laying Works at Plant 9270,SMPL,Vadinar, Gujarat

Supply & Installation of Instrumentation works

Indian Oil Corporation Limited

2015 20,700*

8.SEZ Steam Super Heater project at Jamnagar, Gujarat

Supply & Installation of Electrical & Instrumentation works

Reliance Industries Limited/Linde Engineering India Ltd.

2015 116,775*

Page 13: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

MAJOR ONGOING PROJECTSSr. No.

PROJECTSERVICE

DESCRIPTIONCLIENT YEAR MANHOURS

9.

SRU,HGU,HCU,TANK FARM, AVU, DHDT, DCU, PET COKE, DHDS, RFCCU, CCRU,VBU, CPP, PX & PTA Units of IOCL, Panipat Refinery, Haryana

ARC for Instrumentation Jobs

Indian Oil Corporation Limited

2015 195,250

10.DTA Steam Super Heater project at Jamnagar, Gujarat

Supply & Installation of Electrical & Instrumentation works

Reliance Industries Limited/Linde Engineering India Ltd.

2014 69,835*

11.Fiber Rectification Project, Andhra Pradesh

T&D, Blowing, Splicing, Testing

Reliance corporate IT Park Hyderabad

2014 43,750

12.

People Project Active Pharmaceutical Ingredient Facility Ambernath, Maharashtra

Supply & Installation of Electrical & Instrumentation Works

Ferring Therapeutics Pvt Ltd PMC : Bayer TechnologyEPC: Mott Mac Donald Pvt Ltd)

2014 312,663*

*Supply Value Extra

Page 14: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

MAJOR COMPLETED PROJECTSSr. No.

PROJECT JOB CLIENT YEAR MANHOURS

1.Integrated Steel Plant, Danapur Village, Hospet, Karnataka

Installation of Electrical & Instrumentation works

BMM Ispat Limited 2015 82,083

2.CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar

Instrumentation AMC & Field Inst. Modification

Reliance Industries Limited 2014 233,300

3.Internal Electrical works, RIL Jamnagar, Gujarat

Installation of Electrical Works

Reliance Industries Limited 2014 78,166

4.Ammonia Storage Tank of 10,000 MT Capacity for IFFCO– Kalol, Gujarat

Supply & Installation of Electrical Works

Uhde India Pvt Ltd 2013 24,666*

5.CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar

Instrumentation AMC & Field Inst. Modification

Reliance Industries Limited 2013 79,500

6.PET3 (SSP,AHU & PCY Area) at RIL DMD, Dahej, Gujarat

Installation of Instrumentation Works

Reliance Industries Limited 2013 73,833

7.1.8 MTPA Syn Gas based DRI, Angul ,Orrissa

Supply & Installation of Electrical & Instrumentation Works

Jindal Steel and Power Ltd 2012 359,778*

8.1X50 MW Solar Thermal Power Plant, Rajasthan

Supply & Installation of Electrical & Instrumentation Works

Lauren Engineers & Constructors (I) Pvt Ltd

2012 93,777*

Page 15: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

MAJOR COMPLETED PROJECTSSr. No.

PROJECT JOB CLIENT YEAR MANHOURS

9.2 x 35 MW CPP & Rolling Mill, TUML Plant, Nagpur, Maharashtra

Installation of Instrumentation Works

Topworth Urja and Metals Ltd

2012 59,000

10.Ammonia, Urea & OSBL Units of Matix Fertilizer, Durgapur, West-Bengal

Installation of Electrical and Instrumentation Works

ESSAR Projects (India) Ltd 2012 383,916

11.Ammonia, Urea & OSBL Units of Matix Fertilizer, Durgapur, West-Bengal

Installation of Electrical and Instrumentation Works

Uhde India Pvt. Ltd. 2012 52,500*

12.AVU,STR LPG, SWS 2 units, ARU 2 units for IOCL Refinery, Orissa

Installation of Instrumentation Works

ESSAR Projects (India) Ltd.Client – Indian Oil Corporation Limited, Paradeep,PMC – Foster Wheeler

2012 502,000*

13.CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar, Gujarat

Instrumentation AMC & Field Inst. Modification

Reliance Industries Limited 2012 79,500

14.Johnson Matthey Chemical-123, Kanpur- Uttar Pradesh

Supply & Installation of Electrical & Instrumentation Works

Johnson Matthey Chemical India Pvt Ltd. Engg Consultant: Aker Solutions

2012 176,000*

15. PBR Project, Hazira, GujaratInstallation of Instrumentation Works

Reliance Industries Limited 2012 196,750

Page 16: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

MAJOR COMPLETED PROJECTSSr. No.

PROJECT JOB CLIENT YEAR MANHOURS

16.SRU -H2 Plant of Adani Wilmar, Mundra, Kutch, Gujarat

Supply & Installation of Electrical & Instrumentation Works

Linde Engineering India Pvt. Ltd.

2012 22,083*

17.SRU Project of HPCL Mumbai Refinery, Maharashtra

Supply & Installation of Electrical & Instrumentation Works

Engg Consultant: Linde Engineering India Pvt. Ltd. PMC–Jacobs Engineering (I) India Ltd

2012 195,999*

18.40 MW Thin Film Solar Power Plant, Kutch, Gujarat

Supply & Installation of Electrical Works

ADANI INFRA (India) Limited 2011 300,666*

19.CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar, Gujarat

Instrumentation AMC & Field Inst. Modification

Reliance Industries Limited 2011 115,835

20.Essar Oil Refinery Expansion, Jamnagar, Gujarat

Instrumentation works for ETP & Desalination Unit.Train-1

ESSAR Projects (India) Ltd. 2011 233,916

21.BUTENE-1- Reliance Industries, Hazira, Surat, Gujarat

Installation of Instrumentation Works

Reliance Industries Limited 2010 71,500

22.CFU, PP, Coker & Alkylation-Reliance Refinery, Jamnagar, Gujarat

Instrumentation AMC & Field Inst. Modification

Reliance Petroleum Limited 2010 107,500

Page 17: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

MAJOR COMPLETED PROJECTSSr. No.

PROJECT JOB CLIENT YEAR MANHOURS

23. KCIL-FORMALDHYDE UNIT

Supply & Installation of Electrical & Instrumentation Works

Kanoria Chemical India Ltd.Consultant-Uhde India Pvt. Ltd

2010 80,555*

24. POLY ISCOYNATE UNIT

Supply & Installation of Electrical & Instrumentation Works

EPC Aker Power gas Pvt. Ltd Client: Bayer Technology Services

2010 76,111*

25.REPLICA Plant, Kanpur – Uttar Pradesh

Supply & Installation of Electrical & Instrumentation Works

Johnson Matthey Chemical India Pvt Ltd. Engg Consultants: Aker Solutions

2010 72,611*

26. 30 MW Power PlantSupply and Erection of Instrumentation Works

Shree Virangana Steels Ltd 2009 19,000*

27.CFU, PP, Coker & Alkylation-RIL Refinery, Jamnagar

Instrumentation AMC & Field Inst. Modification

Reliance Industries Limited 2009 101,665

28.DHDS-2 – Reliance Refinery Jamnagar

Instrumentation Erection Works

Reliance Industries Limited 2009 43,500

29.HPU System in Coker-Reliance Refinery, Jamnagar

Instrumentation Erection Works

Reliance Industries Limited 2009 10,000

Page 18: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

MAJOR COMPLETED PROJECTSSr. No.

PROJECT JOB CLIENT YEAR MANHOURS

30.LNUU 471 Compressor; FCC and Crude-2 of Reliance Refinery Jamnagar

Instrumentation Erection Works

Reliance Industries Limited 2009 26,250

31.Sulphur Unit 672 & 431; Reliance Refinery, Jamnagar

Instrumentation Erection Works

Reliance Industries Limited 2009 35,000

32. Wire Line Project Hyderabad Splicing Reliance Infocom Engineering Pvt Ltd

2009 99,300

33. Wire Line Project Orissa Splicing Reliance Infocom Engineering Pvt Ltd

2009 12,835

34.WIN Project East Godavari District

Splicing Reliance Infocom Engineering Pvt Ltd

2008 82,416

35.WIN Project Kamman & Meheboob Nagar & Ananthpur

Splicing Reliance Infocom Engineering Pvt Ltd

2008 47,000

36. Wire Line Project Hyderabad Splicing Reliance Infocom Engineering Pvt Ltd

2007 64,916

*Supply Value Extra

Page 19: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

PHOTOGRAPHS OF SOME OF OUR INSTALLATION WORKS

Page 20: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015
Page 21: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015
Page 22: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015
Page 23: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

QUALITY ASSURANCE

We at Forays are committed to total quality management &

continuous quality improvement.

The key goal of Forays’ Quality Policy is client satisfaction.

The company's Quality Assurance System is dedicated to

satisfying every client’s Technical and Economical requirements.

This covers all phases of Project Management & conforms with

ISO.

The effectiveness of the QA system is constantly monitored by

top management through the Quality Committee, the QA Manual

& the procedures established by the QA/QC Manager.

Page 24: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

QUALITY CONTROL

Forays has a dedicated and well experienced team of Quality Control

Personnel.

It provides checks, testing documents, control and measures against

established requirements.

The Quality workmanship is based on specification of the contract and

other contract documents.

Local regulation & codes of standards have been referred to in the

contract documents.

Quality Control Procedures and Test Plan (duly approved by clients).

Page 25: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

SAFETY

Safety is our top most priority and paramount attention is paid toward

following safety procedures throughout the execution of a project.

Forays' safety department, shall identify, through “zero accident policy”.

How to prevent accidents?

• Eliminate unsafe act

• Eliminate unsafe condition

• Discover the causes

Safety is achieved by adhering to strict safety management and its

procedures.

Page 26: FORAYS SERVICES & CONSTRUCTIONS PVT. LTD. OVERVIEW 2015

FORAYS SERVICES & CONSTRUCTIONS PVT. LTD.

REGISTERED OFFICE

1301, 13th Floor, The Ambience Court, Plot No- 2,  Sector-19 D, 

Vashi, Navi Mumbai- 400 705.

Tel: +91- 022- 2783 2809 / 2820 / 2821

Fax: +91- 22-2783 2815

E-mail: [email protected]

Website: www.forays.co.in

BRANCH OFFICE

1st Floor, 3-5-996, Street No. 5,

Narayanaguda, Opp. Honda Showroom,

Hyderabad-500029, A.P., India

Tel: +91-40-23223134, 30221632

E-mail: [email protected]