for trizetto applications pure storage why...trizetto applications support claims for over 50% of...

1
PURE BENEFITS: Why Pure Storage for TriZetto Applications TriZetto is now replacing its core, tier 1 mainstay of spinning disk arrays with Pure’s FlashArray. TCO reduction on a % basis versus business as usual with traditional disk architecture simpler and smaller technology footprint Reduces data center footprint by 5x or more Always-on encryption for PHI Reduces TCO by 70% on average vs. traditional Tier 1 arrays (more money to invest in innovation). Trizetto applications support claims for over 50% of the US population. (reduces risk, without performance or cost impact). Consistent 1/2 millisecond latency (delivers exceptional end-user experience and enables faster reporting). Typical overnight batch process reduced from 12 hours to 6 hours (ensuring productivity of agents and analysts and completion of critical business processes). Data reduction of 7.3:1 $ $ $ 01011 10101 01101 application acceleration

Upload: others

Post on 14-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: for TriZetto Applications Pure Storage Why...Trizetto applications support claims for over 50% of the US population. (reduces risk, without performance or cost impact). Consistent

PURE BENEFITS:

Why Pure Storage for TriZetto ApplicationsTriZetto is now replacing its core, tier 1 mainstay of spinning disk arrays with Pure’s FlashArray.

TCO reduction on a % basis versus business as usual

with traditional disk architecture

simpler and smaller technology footprint

Reduces data center footprint

by 5x or more

Always-on encryption

for PHIReduces TCO by 70% on average vs. traditional Tier 1 arrays

(more money to invest in innovation).

Trizetto applications support claims for over 50% of the US population.

(reduces risk, without performance

or cost impact).

Consistent 1/2 millisecond

latency (delivers exceptional end-user

experience and enables faster reporting).

Typical overnight batch process reduced from

12 hours to 6 hours (ensuring productivity of

agents and analysts and completion of

critical business processes).

Data reduction of 7.3:1

$

$$

010111010101101

application acceleration

C

M

Y

CM

MY

CY

CMY

K

PureStorage_infographic_TriZetto_draft2_BLEED.pdf 1 5/20/16 1:44 PM