Architecture 1. Vincent TCH 0320285 2. Ang Averllen 0321444 3. Wong Qin Kai 0320024 4. Yeo Kai Wen 0319844 5. Trace Gew Yee 0320269 6. Tan You Liang 0320215 Presented By Tutor : Miss Iffa Nayan

Upload: kaiwenyeo

Post on 14-Jul-2015

380 views

Category:

Presentations & Public Speaking


0 download

TRANSCRIPT

Architecture

1. Vincent TCH ! 0320285!

2. Ang Averllen ! 0321444!

3. Wong Qin Kai! 0320024!

4. Yeo Kai Wen! 0319844!

5. Trace Gew Yee! 0320269!

6. Tan You Liang ! 0320215!

!

Presented By

Tutor : Miss Iffa Nayan

Architect ? WHO???

A person who designs buildings and supervises construction

GENERAL INFORMATION

- Licensed and Qualified profession

- Transforming Vision into Reality

- Construction Guider

- Make sure everything is functional, safe, economical and suit the

needs of people

ARCHITECT ARCHITECT ARCHITECT ARCHITECT ARCHITECT

DURING! CONSTRUCTION !!!!!

BEFORE CONSTRUCTION!

!!!!!

!!!!!!!

CONSULTATION

PRELIMINARY IDEA

EXECUTION PHASE

HAND-OVER

AFTER !CONSTRUCTION

DESIGN

BEFORE CONSTRUCTION

Initial discussion with clients to understand the need and requirement

Ar show them their port-folios

Give opinion to client about the project

Ar do their own Feasibility Study

suitable materials used, setback, cost

Sketches

CONSULTATION

SKETCH DONE

- Sketches done by architect to show client about the conceptual idea

PRELIMINARY IDEA

Feasibility Study Sketching Might be changed

according to client’s need

Do a Schematic Design to show

how the construction looks

like

shows Preliminary Designs to

clients

PLANNING PHASE

Option on design for client to

choose

All in diagram, graphic and

sketches, not an architectural drawing yet

Responsible to make any

changes before finalise it

Architect changes sketches into schematic &

architectural drawing

Consult Structural

Engineer and QS for more

information

share schematic drawing with

other professions

- After collected all data from other consultants, a detail drawing should be drawn.

- The data should include relevant details, code information, placement of object, light intensity, etc.

- Compilation- Send the Submission Drawing

DESIGN DEVELOPMENT

DRAWING BEFORE CONSTRUCTION DRAWING

Shows client the overall

view of building

Subject to change

according to client’s

need

DESIGN DEVELOPMENT

SUBMISSION DRAWING

SUBMISSION DRAWING

SUBMISSION DRAWING

APPROVED

DURING CONSTRUCTION

CONSTRUCTION

Execution Phase

CONSTRUCTION DRAWING (CD)

1. Architects have to make sure the codes used in CD meets state, city and local code in construction.

2. As a reference to begin construction.

3. This might be the final drawing if there’s no changes of the design or structure of building.

CONSTRUCTION EXECUTION PHASE

Provide administration of contract for construction

Monitor the progress on site regular intervals

make sure construction of the building runs smoothly

-review shop drawings, product data and samples for general

conformance to the design intent.

Report the Owner about the progress of the work

- provide supplemental documents to clarify

design intent for the contractor.

Review then accept or reject the contractor's application payment.

Inspect the work

Interpret and dedicate the matters if there are any changes

AFTER CONSTRUCTION

HAND-OVER

1.Architects stop working on the site.

2.Transfer every resources to other organisation.

3.Even though the job is terminated, operation and maintenance should be carried out frequently.

4.Contractor will then produce an As-Built Drawing for the built construction.

HAND-OVER

Interrelationship between Ar and other professions

Builders Quantity Surveyor Engineers

Moving forward to !Owner's mind

Architect design project & make materials choice

●integral to the design and construction of structures

Architect gives !instruction to the !builder.

QS judgement and !regarding the !choice & estimate !the budget

Communicate ideas !through Blueprint & !Technical drawing

Builder moves !quickly & efficiently !with the critical !decision

Deals with the running costs of a construction project, materials & contractors

Responsibility is to !ensure the design !is safe & meet all !the building codes

The Differences between Architect & Landscape Architect and Interior Architect

-Designs and arranges land forms and develops outdoor spaces.

-Design things such as residential area, public parks, playground, garden, college campuses.

-create decorative layouts plans.

-Specialise in designing & building interiors for safety, functionality and aesthetic.

Landscape Architect Interior Architect

Resources