fmp - production diary

4
BTEC Extended Diploma in Creative Media Production IG4 Final Major Project Production Diary Ryan Sharman PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including Possible Contingency Plans If Problems Anticipated) Mon W/B 05/01/15 (Detailed Weekly Summary) Started to fill in the project schedule so I can stay on task and complete my deadlines. Doing this allows me to know what to do and when to do it. Next week I will finish off my schedule and hopefully start to generate ideas and come up with a solid project idea. Mon W/B 12/01/15 (Detailed Weekly Summary) This week completed the schedule and also started to complete Task 1 and am still doing so. Because of having to complete Task 1 I had to leave the ideas generation to a later week. Mon W/B 19/01/15 (Detailed Weekly Summary) This week I am still completing the Task 1 which was assigned; I am struggling to understand the second past of the task but have asked for help and slowly but surely completing it and hopefully will finish before next week. I am hoping to finish task 1 by the start of next week and hopefully next week I will start my ideas generation and continue the rest of the research work. Mon W/B 26/01/15 (Detailed Weekly Summary) Finishing off Task 1 due to other work a lack of completing it has become effected but will finish ASAP. Finish off Task 1 and begin Ideas generation Mon W/B 02/02/15 (Detailed Weekly Summary) The completion of task 1 is still undergoing, although task 2 and ideas generation has been started and mind maps are in the making. Finally finish task 1 over the weekend and finish ideas generation mind map Mon W/B 09/02/15 (Detailed Weekly Summary) Task 1 has now been complete after several week of putting it off due to lack of motivation, now that that is done I am now focusing on more towards my ideas generation. Working on more of my ideas generation, I will start my proposal form and also a mood board for task 2 ideas generation. Mon W/B 16/02/15 (Detailed Weekly Summary) I completed a mind map of a range of ideas for my final major project; I also started to write my proposal form. Mind map is completed, proposal form is undergoing I hope to finish this by next week and hopefully start a mood

Upload: ryansharman

Post on 28-Jul-2015

17 views

Category:

Devices & Hardware


0 download

TRANSCRIPT

Page 1: FMP - Production Diary

BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction Diary

Ryan Sharman PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including Possible Contingency Plans If Problems Anticipated)

Mon W/B 05/01/15(Detailed Weekly Summary)

Started to fill in the project schedule so I can stay on task and complete my deadlines. Doing this allows me to know what to do and when to do it.

Next week I will finish off my schedule and hopefully start to generate ideas and come up with a solid project idea.

Mon W/B 12/01/15(Detailed Weekly Summary)

This week completed the schedule and also started to complete Task 1 and am still doing so.

Because of having to complete Task 1 I had to leave the ideas generation to a later week.

Mon W/B 19/01/15(Detailed Weekly Summary)

This week I am still completing the Task 1 which was assigned; I am struggling to understand the second past of the task but have asked for help and slowly but surely completing it and hopefully will finish before next week.

I am hoping to finish task 1 by the start of next week and hopefully next week I will start my ideas generation and continue the rest of the research work.

Mon W/B 26/01/15(Detailed Weekly Summary)

Finishing off Task 1 due to other work a lack of completing it has become effected but will finish ASAP.

Finish off Task 1 and begin Ideas generation

Mon W/B 02/02/15(Detailed Weekly Summary)

The completion of task 1 is still undergoing, although task 2 and ideas generation has been started and mind maps are in the making.

Finally finish task 1 over the weekend and finish ideas generation mind map

Mon W/B 09/02/15(Detailed Weekly Summary)

Task 1 has now been complete after several week of putting it off due to lack of motivation, now that that is done I am now focusing on more towards my ideas generation.

Working on more of my ideas generation, I will start my proposal form and also a mood board for task 2 ideas generation.

Mon W/B 16/02/15(Detailed Weekly Summary)

I completed a mind map of a range of ideas for my final major project; I also started to write my proposal form.

Mind map is completed, proposal form is undergoing I hope to finish this by next week and hopefully start a mood board.

Mon W/B 23/02/15(Detailed Weekly Summary)

Completed my proposal from and published in to my blog, then started my mood board finding different video snapshots on YouTube. I then had to come up with a power point for a presentation pitch for my final major project idea.

Mood board and presentation will be completed for next week and all prepared for when I present my idea.

Mon W/B 02/03/15(Detailed Weekly Summary)

This week I presented my pitch idea to my tutor and it think it went okay, he said I had confidence when speaking but the only major issue was how it was presented and how I missed a few minor details within the presentation. I agree with what my tutor said

Now that my presentation is out the way for now, I can now focus on the pre-production work such as the risk assessment and storyboard which I would like to be completed by next week.

Page 2: FMP - Production Diary

BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction Diary

and next time would be more prepared when it came to the presenting side and have well written notes which are easy to read off and also understandable. The overall grade for my presentation was a merit which I am quite happy with but I would like to get it to distinction grade because I know I can do better when it comes this sort of thing.

Mon W/B 09/03/15(Detailed Weekly Summary)

I started and completed the location reece, this was done very easily and quickly because there was only a few locations where I am filming. I have started the equipment checklist and should finish that piece of work before the week is over.

Now to finalise my pre-production I will complete the production plan and shooting schedule.

Mon W/B 16/03/15(Detailed Weekly Summary)

Mon W/B 23/03/15(Detailed Weekly Summary)

At the beginning of the week I had the two tasks to complete a shooting schedule and production. I completed these within the first few days because they were quite a simple process.

Now that I have completed my pre-production, I shall now start my production for my advert campaign. Now that this process is complete I can now put all my focus onto the more different part of the project.

Mon W/B 30/03/15(Detailed Weekly Summary)

Now that all my pre-production has been done, I can now focus on actual production side. To get an idea of what I wanted I gathered a few test shots to see what it would look.

Next week I hope to film some actual clips and start the editing processes.

Mon W/B 06/04/15(Detailed Weekly Summary)

Filmed clips of my first scenes have been shot but not that much was recorded because of the weather conditions on the day which affected the process of this.

Hopefully the weather next week will be much better and much more suitable for the conditions I would be like to shoot in.

Mon W/B 13/04/15(Detailed Weekly Summary)

Filmed some extra clips of scenery and landscapes because actors were unavailable to shoot in this week due to other commitments.

By next week I’ll be able to get at least one of the scenarios complete and filmed.

Mon W/B 20/04/15(Detailed Weekly Summary)

Improved some earlier work to get a better grade, did this with Task 1,2 and 4.

By next week I should have a filming date for one of my actors and then hopefully film everything I can for that situation and upload the footage by the end of next week.

Mon W/B 27/04/15(Detailed Weekly Summary)

This week I managed to film one of the actors on a slightly overcast day, tried to get as many clips and shots as possible. I have also uploaded all the footage from that shoot onto the computer and have started renaming them.

Now that one shoot has been done, I am going to start putting clips into premiere pro and hopefully by next week have another shoot done.

Page 3: FMP - Production Diary

BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction Diary

Mon W/B 04/05/15(Detailed Weekly Summary)

I have completed another shoot with my second actor and it went really well and I have started more of my edit after all the clips were imported and then rename on the computer.

Hopefully by next week I will have another shoot done with the last actor and by Monday I shall be editing my whole final major project.

Mon W/B 11/05/15(Detailed Weekly Summary)

I have now filmed all of my actors, and have started the editing process for my final major project. I have imported the footage into the premiere file and stored it in the E drive so that it has enough memory.

I have just started my editing process for my final major project and hope to finish by the end of next week so that I can finally start the evaluation and hopefully squeeze in work to redo if need be.

Mon W/B 18/05/15(Detailed Weekly Summary)

I am still editing my final major project and think I might be a little behind because of focusing on other subjects but I am still on track with my schedule and hopefully carry on doing so.

Like I just mentioned I am on schedule for my final major project, so from looking I should be finishing the edit very soon and hopefully start the evaluation just after.

Mon W/B 25/05/15(Detailed Weekly Summary)

I have added the last few bits to my final major project edit and should be onto the process of finishing things up and finally rendering, exporting and uploading to YouTube.

Now that my final edit is nearly done I hope too be finished by next week and hopefully export and upload to YouTube so I can tart my evaluation.

Mon W/B 01/06/15(Detailed Weekly Summary)

Now that I have finished editing my final major project I can now render my project, export and upload to Youtube. This didn’t take very long because it is a advert and runs just over a minute long.

Now that I have completed my final major project and I have uploaded it to YouTube I can now start to evaluate it and redo any other work if need be.

PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including Possible Contingency Plans)