fixedplatformjun17presentation reduced
TRANSCRIPT
Santa Barbara, California1895-1899
South Louisiana1930s
Template Jacket1947
Deepwater Jacket Loadout, 1979
Steady Progress to Deep Water1947 100' 1947 100' 1955 206' 1955 206' 1959 285' 1959 285'20' 20'
340 1965 340' ' 1965 1967 1967 474' 474' 1975 1975
1976 1976
850' 850'
1978 1978 1998 1998 1988 1998 19981754' 1754' 1350' 1350' 1350'
1025' 1025'
Development of bottom-founded platforms
Shallow WaterWell Protectors
Medium Depth
Medium Depth
Deep WaterCombined Drilling & Production
Jacket Fabrication
Jacket Fabrication
Jacket Fabrication
Jacket Fabrication
Deck Fabrication
Deck Fabrication
Deck Fabrication
Jacket Fabrication
Transportation
Lifting Equipment
Lifting Equipment
Installation Methods (Lifting)
Installation Methods (Lifting)
Installation Methods (Launching)
Installation Methods
Installation Methods
Installation Methods
Installation Methods
Steam Hammer
Pile InstallationFree riding configuration Surface power pack Energies to 2,200 ft-kips Dead weight = 400 tons
Free-riding configuration Underwater power pack Energies to 2,200 ft-kips
Pile Installation Slim line configuration Energies to 2,200 ft-kips
Pile Installation
Exxon Hondo Platform
Exxon Hondo Platform
Exxon Hondo Platform
Exxon Hondo Platform
Exxon Hondo Platform
Exxon Hondo Platform
Exxon Hondo Platform
Shell Cognac Platform
Shell Cognac Platform
Shell Cognac Platform
Shell Cognac Platform
Shell Cognac Platform
Shell Cognac Platform
Shell Cognac Platform
Shell Cognac Platform
Shell Cognac Platform
Shell Cognac Platform
Shell Cognac Platform
Jacket Launch
Bullwinkle Transportation
Free-Standing Compliant Tower
Analysis Model & Deflected Shape
Analysis model
Deflected shape
Texaco Petronius
Petronius Base Launch
Dual Barge Deck Lift
Floatover
Auger Topsides
Well Blowout
IVAN
Damaged jack-up drilling rig