FirstNetA National Public Safety Mobile Broadband Network
Bill Price, State of Florida Division of TelecommunicationsDirector Broadband Programs Office
A National Vision
• Authorized the FirstNet Authority
2012 Congress Acts
• Assigns 20Mhz Broadband Spectrum
• Up to $7B Network Funding
• $135M State Planning Funding
Board Formed
February 2012
Tim BryanNRTC
Chuck DowdNYC Police
Craig FarrillKodiak
Net
Paul FitzgeraldSheriff
Sam GinnTelco Exec
Jeff JohnsonFire Chief
Wellington WebbMayor
Teri TakiGov CIO
Susan SwensonTelco Exec
Ed ReynoldsTelco Exec
William KeeverTelco Exec
Kevin McGinnisEMS
SecretaryDHS
Attorney General
DirectorOMBBoard
Formed
August 2012
• Department Commerce Appoints FirstNet Board
• NTIA Publishes State Planning Grant Program
• Governor Decision on Entity leading Florida FirstNet Responsibilities
• States Develop and Apply for Planning Funds• State Planning Projects & Results• FirstNet RFPs and Results to States• Governor Decision to Opt In or Out
Board Formed
2012- 2014
National Backbone + Radio Access Service
Radio Access NetworkLTE 4G Wireless
IP/MPLS Backbone
Core Network
The Core: FirstNetCloud Core at Data Centers:Common Shared ServicesAdministrative FunctionsEvolved Packet Core: Mobility Management EntityHome Subscriber Server Policy and Charging and Rules FunctionLTE Operation Support System Network Management System DNS/DHCP/NTP Server.Networking and Security EquipmentConverged Packet Gateway
ACCESS: FirstNet Or StatesTower SitesBackhaul NetworksGovernanceLocal AdministrationDevicesApplications
Phase I: 2014…4G Wireless DataVOIP, Video, Data for CAD, GPS, databasemedical telemetry
Phase II (5+ yrs)Mission Critical Voice
HSDPA
EV-DO
UMTS
EDGE
CDMA 1X
GPRS
FirstNet 4G LTE 4.0 Mb in 10 Sec
11 min
6 min
3 min
2 min
38 sec
18 min
3G
Information to Rescue and to Protect
Strokes, Heart Attacks, Wrecks, Drowning, Fires, Disasters, Crime
Do You Want to Wait?
Public Safety Decision Factors: Coverage, Cost, Performance and Features Will Depend on Funding , Cost and Asset ContributionsIdentified through State Planning and RFP Results
Limited by Funding and Assets Contributed
FirstNet carrier encryption
TBD, Consumer Shorter battery life
VOIP Phase I
4G LTE with selective reinforcement
TBD, Consumer Small form factor
High speed
FirstNet carrier authentication
FirstNetDesigned for Public Safety
FirstNet Will be Offered as a Service
Coverage
Encryption
Device Battery
Voice Priority
Design
Device Size
Data
Authentication
Varies by provider
Commercial carrier encryption
Shorter battery life
Best effort voice delivery
Commercial grade; 1G, 2G, 3G, 4G
Small form factor
Low to High speed data
Commercial carrier authentication
Commercial MobileData Designed for Mass
Mission CriticalTwo Way Radio
Voice optimized, prioritized over data
Rugged design, exacting ergonomics
High power, expanded coverage
Large form factor
Long battery life
Advanced audio techniques, loud
Trunked call control
Low speed (9600 bps) data
Strict access control
End-to-end encryption
Voice Priority
Design
Coverage
Size
Battery
Audio Quality
Call Control
Data
Authentication
Encryption
FirstNetLTE 4G
Phase I VOIP voice delivery
Commercial grade to selective reinforcement
Lower power, coverage sensitive
TBD, Consumer Small form factor
TBD, Consumer Shorter battery life
Cellular voice quality
Digital cellular or VoIP
High speed data
FirstNet carrier authentication
FirstNet carrier encryption
Initially Data Only: Until Mission Critical Voice is Supported in 3GPP Standard (LTE)LMR and P25 System Requirement Continues
But they don’t have a way to share criminal activity…
Collaborative Networks for Law Enforcement
State Planning Grants
State Planning Grant
Project Purpose: Informs and Consults with FirstNet for Service Planning and RolloutInform and Consult with Governor for Opt In or Out Decision
Project Components1. Needs Assessments, Priorities2. Inventory of Assets and Resources3. Asset Valuations; towers, facilities, fiber4. Statewide Wireless LTE Design5. Cost Modeling6. RFP Requirements (For Opt Out)
Results for Decision Making1. % Indoor and Outdoor Coverage2. # subscribers required to cover annual operating costs3. Funding required to build to requirements4. Potential business models, partners, users ; PPP, Public5. Sustainability Requirements
Governor Designates Entity in Charge of the Project by AugustAll Stakeholders need to participate to optimize resources, lower costs, increase coverage
The Project is VERY BigComplex
Local Public Safety ParticipationIs CRITICAL
Organizational walls
CitiesCountiesStateTribal
Break Down Walls
Economic walls (need lower cost)
AssetsFundingModels
Technological walls
BandwidthVideo, CAD911IntegrationLMRP25
Factors to Consider
Factors Opt In Opt Out
User Fees FirstNet FirstNet + State Access
Coverage Phases Planning Project Outcome
Local Control TBD TBD
Match No 20% Cash or In Kind
ProcurementFed Backbone + RAN
State-Access Network
Sustainability Fed State Access Network
Governance Fed + State FED + State
Responsibilities Fed RAN Construction & Sustainment
Manage Contracts Fed Fed/State
Negotiate Roaming Fed TBD
Operations & Billing Fed Fed/State
Secondary Users Fed + State Fed + State
User Equipment State State
Considerations
Funding RequirementsDemonstrateTechnical Capabilities to Operate, Fund and SupportMaintain Interoperability with FirstNetComplete Project in Timelines Comparable to FirstNetComparable Economics to FirstNet Comparable Security, Coverage and QOS to FirstNet20% Match
“Opt Out” State Builds180 days to complete RFP processState Submits Deployment Plan to FCC for ApprovalState Request Construction Funding from NTIAState Applies to NTIA to Lease SpectrumBuild and Maintain State ACCESS NetworkPays to Sustain Access (RAN) NetworkPay FirstNet Backbone Fees
Monthly Costs DriversPriorities for Coverage, Bandwidth,
HardeningAssets Available
Number Subscribers
Florida PlanningFlorida Planning
“FirstNet” Phase I Does NOT:
Mission Critical Voice
Planning forShared P25
City System
Motorola Harris
LMR System
LMR-P25
Broadband Inventory-Mapping
Cell Towers-FCC = 759
LMR-Commercial = 3038 sites
Private LMR = 18,922
Minnesota Public Safety Wireless Broadband Data Network Requirements Study
https://dps.mn.gov/divisions/ecn/programs/armer/Pages/studies-reports.aspx
Study Data Sheet and Overall SummarySection 1: Minnesota Public Safety Broadband User Needs AssessmentSection 2: Minnesota Public Safety Broadband Statement of Network RequirementsSection 3: Minnesota Carrier AssessmentSection 4: Minnesota Public Safety Broadband Network Implementation ModelSection 5: Minnesota Public Safety Broadband Funding and Grants Models
The Rise of DRONES
Biometrics
Social Surveillance