Greg Trombold 

Page 2: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 2/74

By: Greg Trombold

Page 3: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 3/74

Code books used during presentation

Terms and definitions Water supply

  Pressure calculation

Flow calculation xamp es Pump selection Code issues Avoiding trouble Contractors point of view on pump selection

Page 4: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 4/74

  –

Fire Protection NFPA 13 – Installation of S rinkler S stems

NFPA 14 – Installation of Standpipe and hose

s stems

NFPA 22 – Water tanks for Private FireProtection

Page 5: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 5/74

NPSH – net positive suction head (32 feet at sea

level) Rotation – direction that a pump shaft spins – –

of vertical head, friction loss, and other losses due

to heat or elevation  –at a specific point on a pump curve

Locked rotor current – maximum amp draw for a

mo or e s a s e n a oc e pos on Service entrance rated – a device that is rated to

handle direct feed from the utility

Page 6: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 6/74

  –

level that a vertical turbine fire pump willoperate to its design parameters

Static pressure – pressure reading at no flow

Residual ressure – ressure at a s ecific flow

Churn pressure – pressure that a pumpproduces at no flow

AHJ – Authority having jurisdiction

Page 7: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 7/74

  –

75 feet in height. Where the building ismeasured from the lowest level of firedepartment vehicle access to the floor of the

highest occupiable story.

Page 8: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 8/74

 

when sizing a fire pump is water supply The first uestion one needs to ask is “does the

municipal supply provide enough volume to

meet the system demand” For example if a city water test is 75 static, 50

residual at 1350 flowing

 pump

Answer: Yes – the maximum you test a 750 GPM firepump to is 1125 GPM or 150% of rated flow

Page 9: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 9/74

Does this same water supply provide enough waterfor a 1500 GPM fire pump

  nswer : may e – you p o a ow curve ou you

could have the flow required for the 100% flow point(1500 GPM) *see curve

However this can be misleading there is a couple ofrules that I follow when talking about a municipal

water supply.1. Make sure the test is recent – within a year

2. Make sure the residual flow is at least the 100% flowratin of the um

3. Avoid winter tests versus summer tests – flow tests donein the winter are always better than flow tests done inthe summer

Page 10: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 10/74

Page 11: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 11/74

Page 12: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 12/74

If the water su l does not su l enou h

volume what are your options Gravity feed tank – a ground level storage tank

sprinkler demand

30 of system demand for light hazard 60 min for ordinary hazard

90 min for extra hazard

Below round tank – usuall limited to 50 k ofsupply

Lake or reservoir – leads to some system-

Page 13: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 13/74

Page 14: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 14/74

 

City water test 82 static, 45 residual with 1941flowing

Test date February 2011

Main size 8”  ystem eman at psi

Pump size 2500 GPM at 80 psi

 you have enough water at 2500 GPM or 100%

Page 15: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 15/74

Page 16: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 16/74

Page 17: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 17/74

 

should have been looked at when engineeringthis job

1. The water test was done in the winter

2. The main size is 8” when the main is tapped thecoupon a s appe n e p pe s roug y .

3. The city water test was only run to 1941 GPM – notfull flow of the fire um

Actual flow when pump was tested in August2011

Page 18: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 18/74

Page 19: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 19/74

 

Horizontal split case pumps Inline fire pumps

End suction pumps

Vertical turbine fire pumps

Page 20: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 20/74

  –

a double suction fire pump because the waterpathways direct water to both sides of theimpeller. It is also the most common fire pump

on the market partly because of the ratingsava a e n s s y e o pumpthrough 5000 GPM

 fire protection systems

Page 21: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 21/74

Page 22: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 22/74

Page 23: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 23/74

  –

expanded in use in the last five years forseveral reasons

Space savings

Increase in ratings allowable by NFPA 20 from maxo , en o , o o ay w c sunlimited rating. The largest currently available is1500 GPM

Cost of installation – these are typically lessexpensive to install because there is no base plate

Page 24: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 24/74

Page 25: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 25/74

Page 26: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 26/74

  –

mostly because they are limited in size percode

They are also slightly more expensive than in

line pumps The one pump application where it is used is

small diesel driven applications 500 GPM or

ess

Page 27: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 27/74

Page 28: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 28/74

Page 29: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 29/74

  –

water supplies that are below the suctionflange of a fire pump

NFPA 20 states that you have to have a positive suctionpressure to a fire pump #

Page 30: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 30/74

Page 31: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 31/74

Page 32: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 32/74

The first thin we should talk about when

discussing pressure is height of the building If a building is more than 75 feet tall the building

will have stand pipes. The pressure required at thetop most outlet is required to be 100 psi at a given

Does this mean that the AHJ will not require 100PSI on buildin less than 75 feet tall that have

standpipes The answer is maybe different AHJ’s have different

requ remen s

Page 33: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 33/74

 

building is not classified as a high rise thestandpipes installed can be classified as manualdry, or manual wet.

These types of standpipes do not require 100psi at the top most outlet.

If that is the case then you simply need end

ea pressure at t e top o t e structure orstandard heads this number is usually around

Page 34: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 34/74

 

the city flow test. Unless we are using a groundlevel storage tank or reservoir.

Once we have gathered that info most of the

industry would have a form like the one on thefollowing page to compile the data and comeup with your pressure

Page 35: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 35/74

Page 36: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 36/74

 

In both examples we will assume that the citywater test is ri ht at the 100% ratin of um

1. Height of building is 212 feet. City water test is

45 si static, residual is 35 si with 1250 GPMflowing

2. Height of the building is 70 feet. City water

test is 95 psi static with 30 residual with 750flowing

Page 37: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 37/74

Page 38: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 38/74

Page 39: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 39/74

 

examples in example one the pressure is above175 psi.

Since you are no longer allowed to use main

relief valves to control system pressure youhave to install pressure reducing valves onsprinkler lines and pressure restricting valves

high enough in building where the pressure

Page 40: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 40/74

 

that the pump will discharge much higherpressure at churn than at the design point

Per NFPA 20 fire pumps are allowed to have a

40% rise in pressure from rated flow to churn This is almost never the case but different

pumps and speeds affect the churn pressure so

you s ou a ways oo at a curve to eterminethe shut off pressure. (see attached)

Page 41: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 41/74

Page 42: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 42/74

 

130 psi The shut off head is 390 feet or 168 si

This calculates to 29% rise from rated point to

shut off head This pump is a newer design and is 3500 rpm

both contribute to the higher percentage

Page 43: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 43/74

 

The static pressure is 45 psi plus the churn pressureof 211 psi for a total of 255 psi.

If the floors are 12 feet apart we would needpressure reducing valves and pressure restricting

.

255 psi – 175 psi = 80 psi / 12 = 15.4

Page 44: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 44/74

 

calculation sheet and I want you all to try thefollowing example:

Building height 160 feet

City water test done 1-5-09, 60 static, 38 residualw ow ng

Lets assume the pump is 10 feet below grade in abasement

Assume backflow, water meter, and friction insuction piping are constant

Page 45: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 45/74

Page 46: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 46/74

 

Area calculation Standpipe calculation

We will start with the standpipe calculation

NFPA 14 states that the GPM re uired for thefirst standpipe is 500 GPM

Each additional stand i e re uires 250 GPM

with a maximum GPM of 1000 GPM

Page 47: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 47/74

 

combining GPM with sprinkler systemrequirements

Since most area calculations for building with

standpipes come up to be less than 500 GPMthe Fire pump GPM is generally equal to thestand calc

Page 48: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 48/74

 

would be 750 GPM 500 GPM for the first and 250 for the second

If a building has 3 standpipes the pump GPM

would be 1000 GPM 500 GPM , 250 for the second, and 250 for the third

Any building with more standpipes would be

1000 GPM as that is the maximum allowable bycode

Page 49: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 49/74

 

number of factors that come into play. The first is the type of hazard you are protecting

there are 5

Light hazard

 

Ordinary hazard group 2

Extra hazard rou 1

Extra hazard group 2 The density associated with the hazard

Page 50: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 50/74

S uare foota e of area associated with hazard

Hose allowance We are not oin to discuss how to choose a

hazard as that is a different topic

We are also not going to talk about storagedesign approaches. These are for warehousetype facilities and generally require soft ware

o e erm ne pump . ese ypes osystems are better to be left to sprinkler.

Page 51: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 51/74

 

use the chart on the following page from NFPA13.

The density is multiplied by 1500 for light and

ordinary and 2500 for extra hazard The 1500 and 2500 are the most remote square

footage

You then add in the hose allowance from thechart on the next page to get your pump GPM

Page 52: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 52/74

Page 53: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 53/74

Page 54: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 54/74

Buildin with multi le t es of hazards oucalculate each area and take the worst of thetwo to determine your pump GPM

  T ere are a unc o exceptions in NFPA 13which we will only talk about so that you

the examples

Make sure the insurance company is consulted

because they can change the density andsquare footage requirement depending on the.

Page 55: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 55/74

 

Density for light hazard .1 Hose stream for light hazard 100 GPM

Calculation 1500 x .1 = 150 + 100 = 250

Pump GPM 250 GPM

Building is 24,000 square feet, ordinary group 1

  .

Hose stream for light hazard is 250 GPM

Calculation 1500 x .15 = 225 + 250 = 475 GPM

Page 56: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 56/74

 

either building had standpipes why thestandpipe calculation would be the primarycalculation.

If standpipes are present there is always at least twow c ma es e pump w c s ar grea erthan the area calculation.

Page 57: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 57/74

 

22,200 square feet is light hazard and 800square feet is extra hazard (group 1)

We will calculate the two areas separately

1500 x .1 = 150

   x . =

As you can see the extra hazard is a greater GPM eventhough the area is much smaller

Pump GPM would be 240 + 500 (hose) = 740 GPM

Page 58: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 58/74

 

building on a blank piece of paper Building is 35,000 square feet

All but 500 square feet is light hazard

Balance is ordinary group 2

Page 59: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 59/74

Page 60: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 60/74

 

Then select the type of driver Electric motor

Diesel engine

Wh would ou select one over the other If you do not have or an electrical feed would be

costly to install to the location

If the AHJ has deemed that the power in an are isunreliable

Page 61: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 61/74

 

Across the line Part winding

Primary reactor

Wye delta open transition

Wye delta closed transition

Auto transformer

  r mary res s ance

Soft start

 

Page 62: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 62/74

  ’

purpose of a reduced voltage start is to save onthe size of your generator

If a soft start is used the inrush current goes

from 600% to roughly 400% this reduction incurrent can be taken off the generator size

Page 63: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 63/74

Take the GPM required for job and determineappropriate pump

NFPA 20 states that you can use up to 150% of the rated GPMfor the system demand but they don’t recommend using more

This makes selecting the pump much more difficult

For example if you are using a 1250 GPM pump for

1450 GPM s stem demand ou have to o to the curveand pick the GPM and pressure required for thesystem and then slide back on the curve to the ULrated point of 1250 GPM to determine rated pressure.

See attached We will assume system pressure required is 121 PSI or

280 feet

Page 64: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 64/74

Page 65: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 65/74

 

selection tables (see attached) Then thin s like RPM and horse ower come

into play when selecting the pump

Page 66: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 66/74

Page 67: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 67/74

Page 68: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 68/74

 

you select the best pump for the job A lot of times the will know which um s

have lower churn pressures and which are

more cost effective

Page 69: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 69/74

 pumps that should factor into selection andsystem design

Horizontal elbows or tees upstream of a fire pumphave to be ten pipe diameters from the suction

Pump rooms require a floor drain

Pum rooms have to be two hour fire rated if no

sprinklers are present and a one hour fire rating ifsprinklered

Page 70: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 70/74

 pressure at the suction flange

Electrical feeds to fire um controllers have tohave a two hour fire rating

Fire um s can’t be used as ressuremaintenance pumps

Variable speed pumps are now allowed by the

code

Page 71: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 71/74

 a problem things like horizontal elbows and 4’of clearance in front of a 480 volt maincontroller are things that need to be looked at.

Make sure the electrical engineer knows whathe is doing and follows NEC article 695. themajority of field issues stem from electrical

Do your homework with the AHJ and the

Page 72: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 72/74

S ecial re uirements some urisdictions re uiredifferent things New York City requires a manual round rotor fire

Ohio EPA requires suction control valves on every

fire pump to prevent going below 20 psi in the main Insurance companies like FM require things

above and beyond the code  ese ue an s are o e ou e wa an ave a

spill basin Every pump room has a low pump room temp alarm

Page 73: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 73/74

 of pressure in a system that they can.

Reason smaller pipe and lower installation costs

For what ever reason they don’t like packagedsystems they think they can do it cheaper anddon’t like to over pay for things

Contractors will try to use inline pumps up tot eir maximum ow ratings ecause t ey on thave to poor a pad

Page 74: Fire Pump Design and Testing

8/9/2019 Fire Pump Design and Testing

http://slidepdf.com/reader/full/fire-pump-design-and-testing 74/74