final narrative report - asia network for sustainable ... · final narrative report ... women...

61
Final Narrative Report July 2010 Transforming Local Communities into Enterprises for Economic Security in Nepal (Grant number: 1070 – 1158) Women microentrepreneurs making allo thread in Dhairing, Parbat (see Annex 1 for more photographs from the project) Grantee Name: Asia Network for Sustainable Agriculture & Bioresources (ANSAB) Grant Number: 1070 – 1158 Reporting Period: August 1, 2007 to July 31, 2010 Submitted to: The Ford Foundation, 55 Lodi Estate, New Delhi 110003, India Submitted by: Asia Network for Sustainable Agriculture & Bioresources (ANSAB) Contact: Bhishma P. Subedi, Ph.D., Executive Director Tel. 97714497547, Fax: 97714476586 Email: [email protected]

Upload: vutu

Post on 18-Aug-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

Final Narrative Report July 2010  

Transforming Local Communities into Enterprises for  Economic Security in Nepal (Grant number: 1070 – 1158) 

 Women micro‐entrepreneurs making allo thread in Dhairing, Parbat (see Annex 1 for more photographs from the project)

Grantee Name:   Asia Network for Sustainable Agriculture & Bioresources (ANSAB)  Grant Number:   1070 – 1158  Reporting Period: August 1, 2007 to July 31, 2010  Submitted to:   The Ford Foundation, 55 Lodi Estate, New Delhi 110003, India  Submitted by:   Asia Network for Sustainable Agriculture & Bioresources (ANSAB) 

    Contact: Bhishma P. Subedi, Ph.D., Executive Director     Tel. 977‐1‐4497547, Fax: 977‐1‐4476586     Email: [email protected] 

Page 2: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  ii 

ACRONYMS  ANSAB  Asia Network for Sustainable 

Agriculture and Bioresources Bmf  blue moon fund BDS  Business Development Service CA  Constitutional Assembly CBO  Community Based Organization CF  Community Forest CFUG  Community Forest User Groups CoC  Chain of Custody CRC  Community Resource Center CSIDB  Cottage  and  Small  Industry 

Development Board DAG  Disadvantaged Group DFO  District Forest Office(r)  DoF  Department of Forests DRSP  District Road Support Program DN  Discover Nepal EDRF  Enterprise Development Revolving Fund EIA  Environmental Impact Assessment 

FECOFUN Federation  of  Community  Forestry Users, Nepal 

FSC  Forest Stewardship Council GDN  Global Development Network ha.  Hectare HBTL  Himalayan BioTrade Pvt. Ltd.  HH  Household HGEPL  Himalayan Green Energy Pvt. Ltd.  IEE  Initial Environment Examination LFP  Livelihood and Forestry Program MIS  Market Information System  MoU  Memorandum of Understanding NGO   Non‐Governmental Organization NNN  Nepal NTFPs Network NTFP  Non‐Timber Forest Product PAF  Poverty Alleviation Fund ROI  Return on Investment Rs.  Nepali Rupee USD  US dollar (1 USD = 74 Nepali Rupee) 

 

  TABLE OF CONTENTS 

 

1.  INTRODUCTION .......................................................................................................................................... 1 

2.  REFLECTIONS ............................................................................................................................................. 1 3.  ACTIVITIES/ISSUES ADDRESSED ............................................................................................................. 5 

4.  INDICATORS OF SUCCESS ........................................................................................................................ 7 5.  GOALS ACHIEVED TO DATE .................................................................................................................... 7 

6.  ORGANIZATIONAL/ENVIRONMENTAL CHANGES ............................................................................... 8 7.  ORGANIZATIONAL OR MANAGEMENT CHALLENGES ....................................................................... 8 8.  DIVERSITY ................................................................................................................................................... 8 

ANNEX 1: SOME PHOTOGRAPHS CAPTURED DURING THE PROJECT IMPLEMENTATION ............................. 9 

ANNEX 2: PROJECT MANAGEMENT STRUCTURE .................................................................................................. 11 ANNEX 3: MAP OF NEPAL SHOWING GEOGRAPHIC COVERAGE OF THE PROJECT (FORD 2007-2010) ....... 12 ANNEX 4: DETAILS OF ECONOMIC PARTICIPANTS OF THE PROJECT ............................................................... 13 ANNEX 5: PROGRESS IN ENTERPRISE DEVELOPMENT ......................................................................................... 14 ANNEX 6: LIST OF ENTERPRISES, THEIR NUMBER, ECONOMIC PARTICIPANTS AND SALES ..................... 16 ANNEX 7: LIST OF PROJECT SUPPORTED COMMUNITY FOREST USER GROUPS ............................................ 22 ANNEX 8: LIST OF ACTIVITIES AND RESOURCES LEVERAGED FOR PROJECT ACTIVITIES ........................ 25 ANNEX 9: LIST OF TRAININGS, WORKSHOPS AND OTHER EVENTS IN THE PROJECT DISTRICTS ............. 27 ANNEX 10: PRICE LIST OF PRIORITIZED NTFPS AND HIGH VALUE CROPS IN DIFFERENT MARKETS ...... 59  

    

Page 3: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB  

harvpro

m

entr

1. INTRThis Final Nsuccess as Local ComANSAB (Ascommunit(see Annexincluding lofragrantisstimber. A t

The target 4, 5, 6, 7 foof Commucollection, were then entreprenelarger natioassurances

The cash ethe Founda$261,053 wThe enterpproject pesetting asidratio is poiinvestmen

2. REFLEThis sectioovercame,achieve its

CFUG subgcommunitand motivaand/or incover skepttold ANSABHe proudlyof Argeli deadded: "Thbenefits, w                          1 Disadvantage

Fi

Sustainable vesting & primaryocessing of raw

materials in CF(753 micro-

repreneurs + 100subgroups)

ODUCTIONNarrative Repwell as organmunities intosia Network foies and 8 distx 2 and 3). Cookta (Daphnesimia), bio‐brtotal of 31 fie

project clienor details). Spnity Forest Ucultivation, plinked with ceurs for valueonal enterpris and certifica

expenditure oation, US $20was leveragedprises developriod, with tarde US $225,3sed to increat. 

ECTIONS on presents va significant acs long‐term go

groups providy forests whiate them to come generattics and now CB that they py explained thevolved to 4 hey have highwhich are spe                                

ed Groups (DAG) i

Transfo

igure 1: Flow

y

0

N port presents nizational ando Enterprises for Sustainabltrict based NGommunity ente spp.), yarshaiquette, soapeld staff and 6

ts are now orpecial attentioser Group (CFprimary procecommunity ene‐added procses, which coations (organ

of the project 05,253 was led from 20 othped have alrergeted comm15 in commuase over the y

arious cases fctivities carrieoals. 

de a promisinile promotingconserve bioding activities.CFUG leaderslan to providehe reasons: "Tsubgroups in h motivation bcified in subg                       

includes ultra‐poo

orming Local Co

w of product

Value-added processing (33

community enterprises)

the lessons ld managemenfor Economice AgricultureGOs, implemeterprises weragumba (Cordp‐nut (Sapindu6 central offic

rganized into on was paid tFUG) subgrouessing and conterprises owessing. Theseonsolidate, mic, FSC, wildli

reached US $veraged fromher organizateady generateunities earninunity funds foyears as enter

from the projed out as wel

ng mechanismg social justicdiversity by ha. Over the 3 ys such as Krishe other patchThe amount omy CFUG is ibecause of thgroups manag

or, women and Dal

ommunities int

ts in the pro

earned, majont challengesc Security in N and Bioresouented the proe developed dyceps sinensus mukorossice staff were i

917 economo disadvantagups and microollective markwned and mane community anufacture afe friendly).

$866,306, of wm the commuions for specied a return onng a total addor continuous rprises contin

ect that highlll as the impa

m for sustainace: The main ianding them years of the phna Bahadur hes of degradof efforts putimpossible fohe clear link bgement plans

lits (so called unto

to Enterprises f

oject suppor

Manufacturingmarketing (3 national

enterprises)

or activities, a of the 3‐yearNepal” fundedurces), in partoject in nine din several prosis), wintergr), allo (Girardinvolved.  

ic entities anged groups (Do‐enterprisesketing of natunaged jointly enterprises wnd market th

which US $40nities themseific activities (n investmentditional incominvestment i

nue to genera

light lessons lact of the proj

ably and effeidea behind sexclusive conroject, the coKarki, chairpeed communitt on conservatr me to organbetween theirs developed th

ouchable caste). 

for Economic Se

rted enterpr

g &

)

achievementsr project “Trad by the Fordtnership withdistricts of Neomising valueeen (Gaulthedinia diversifo

d 166 CFUGs DAG)1 throug for the sustaral products.by CFUGs anwere in turn lie end produc

00,000 was reelves, and the(see Annex 8 t (ROI) of 189%me of US $1,64n enterprise ate income fro

learned, chalject on ANSA

ectively manasubgroups is tntrol over speoncept progreerson of Thanty forest to mtion of forestnize at the CFr responsibilithanks to ANS

ecurity in Nepa

rises 

6 internatiocompanie

+7 distributersretail outlets organization

Nepal

s, indicators oansforming  Foundation. h local epal Himalayae chains, eria olia), and 

(see Annexgh the creatioainable  These entitied individual inked with cts with quali

eceived from e remaining Ufor details). % within the 40,866 and activities. Thiom the initial

lenges B’s capacity t

aging to enrich DAGecific areas essively won ngsadeurali, more subgroupt and plantatiFUG level." Heties and their SAB's support

al 

onal es

+ 51 + 20

ns in

of 

es 

ty 

US 

is  

to 

ps. on e 

.  

Page 4: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 2 

Most of the people in the subgroups are ultra‐poor and were never effectively organized before under CFUG framework, rather acting as a major threat to the community forest. Now they are the first to come in CFUG meetings and to participate in the community’s conservation activities."  

Similar successes have been realized by 100 subgroups in 47 CFUGs, representing 2,252 households. The project initially provided a seed fund of US $1,649 to 22 subgroups for demonstration purposes and the idea was quickly picked up throughout the area. Most subgroups currently have monthly saving and credit systems, the value of which now reaches US $33,436. Subgroups mobilized the funds to invest in their members’ forest and agriculture based enterprise activities, generating US $67,028 in additional income within the project period.  

Major improvements are also seen in the conservation of the patches of forest allocated to them, as they control grazing, ensure regeneration, sustainably harvest firewood and protect from encroachment and improper harvesting of forest products. Subgroups also planted more than 500,000 Argeli (Edgeworthia gardneri) plants, which some have already started harvesting and selling.  

The concept of CFUG subgroups is now being replicated throughout the country by other NGOs and the Government of Nepal, which recently issued a policy to promote the allocation of degraded forest area to subgroups. 

National marketing enterprises are a key component of value chains to transform rural poor into entrepreneurs earning benefits from sustainable community enterprises:  To ensure sustainable income generation at the lowest level (DAG subgroups), the project had to support all the layers of the value chain. It notably worked intensively with national enterprises to plan and organize their supply requirements from the project districts, as well as to design, develop and market the end products in national and international markets. The most important national enterprises developed or strengthened by the project are Himalayan Green Energy Pvt. Ltd. (HGEPL), Himalayan BioTrade Pvt. Ltd. (HBTL) and Discover Nepal (DN). 

Many achievements vindicate the emphasis placed on this particular layer of the value chain. HGEPL, a new national company developed from scratch to efficiently market the bio‐briquettes supplied by rural community enterprises, now stands as the main briquette marketing company in Nepal. Managed by a consortium of 5 community enterprises created by the project, it sold 120,000 briquettes through 51 retail outlets and 7 distributers for a total income of US $27,027 in 2009 alone.  

Similarly, an existing community‐owned national level marketing company (HBTL) was successfully linked with Aveda Corp. (a subsidiary of the Estee' Lauder Companies Inc.), USA, Johnson Printing Corp., USA, Howard Packaging, USA, S & D Aroma, UK, Maharshi Ayurveda, Netherlands and CTM Altromercato, Italy, for the marketing of handmade paper, essential oils and Yarshagumba.  

To foster social justice and inclusive development, efforts must be targeted, well designed and, just as importantly, persistent: Before the beginning of the project, members of the Dalit caste in Bajhang district had never been able to participate in the harvesting of high value products such as Yarshagumba because of local beliefs that if they did, some negative consequences (sickness, death, etc.) would happen. Similarly, Dalits of the Lulang village in Myagdi had never been given the opportunity to participate in the trading of raw herbs. In this context, simply carrying out traditional enterprise development and market linkage activities would likely only have improved the livelihoods of those who were already the most well off in the targeted communities. To overcome existing prejudices, ANSAB had to devote more energy to the inclusion of DAG in enterprises activities than originally planned (see Figure 2).  

The challenge was made even more acute by the large geographical coverage of the project relatively to its limited resources, as well as the limited investment capacity of DAG for enterprise development. With perseverance (the project organized a total of 1,377 formal activities involving 78,475 people to ensure the genuine participation of all community members; see Annex 9 for details) the integration objectives were however finally met.  

Page 5: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB  

The projecDalits contthat all humnatural restheir own sharvesting42 CFUGs hrevolving fgrants andperhaps, Cgreater shaby the collenatural res

Local leadeenterprisefacilitationincentivesshowed thenterpriseincongruoumanage thtraditionalenterprise 

The projeccommunitentreprenealso introdhire him or

Proper selealso showeon how to modalitiesimportant tied with pa thorough

This projecworthwhiledue to the

Implemenlevel and ethe projectrelated to projects. Timportanccommittedstakeholdenational mimprove thas highly k

ct for exampletaminating namans are equsources. Dalitsubgroups ang and processihave establisfunds (EDRF) d technical assFUGs have beare of the newection and trasources to poo

ership is cruces and it can bn, clear owne: The project at, let to thems. When the cus character che enterprise  leadership inoperating co

ct tackled thisies prior to theurship, dediduced the conr her.  

ection is onlyed that good ensure that t of leadershipto give manaperformance. h assessment

ct applied thee, the except leadership sk

tation in partensures greatt expressed tenterprise deThe major elee of having a d field staff, aers (partner Nmanagement the program enowledgeabl

Transfo

e established atural resourcual and have tts in Bajhang and enterprisesing of severalhed enterpriswhich dedicasistances to Decome supporw economic oansformation or and margin

cial for the sube fostered thership modaliarea mostly cmselves, comcommunities can for examvoluntarily. Hn communitieosts. 

s type of issuehe meeting focation and soncept that a g

y the first stepmanagers ofttheir individup in many comagers a good sIt was also fo of the leader

ese lessons leional successkills of their m

tnership withter sustainabhat while woevelopment, bments they hclear vision ond a transpaNGOs, local coteam also maffectiveness. e and effectiv

orming Local Co

that beliefs aces were a mythe same righand Myagdi ns with rights ol NTFPs. No leses developmate most of thDAG. More imrtive of allocaopportunities of previouslynalized memb

uccess of comhrough propeity and sufficconsists of ba

mmunities havmeet to seleple come forwHe is likely to es has been e

es by initiatinor leader’s selocial motive) wgood manage

p required to ten lose interal qualities immmunity enteshare in the eound that althr social motiv

arned across s of many entmanagers. 

h local NGOs bility : Local prking with ANbut also abouave highlightof the goals torent planningommunities, fde it easy forLocal partneve organizatio

ommunities int

F(%

about yth and hts to use now have over the ess than ment heir portantly, ating a created y unused bers. 

mmunity er ient ackward ruralve difficulties ect leaders, anward and shoget the job oxerted “volun

g dialogue in lection. Qualiwere placed r can in fact p

groom effectrest in the entmprove their erprises for aenterprise (whough busineve was also re

the board anerprises crea

and CBOs buartner NGOs NSAB they haut how to effited during theo be achievedg, review and field staff, etcr field staff tor NGOs reporons in their re

to Enterprises f

Figure 2: Distr% of total number 

Develomark

linkagesvalue ch

11%

Trainings & technical 

assistance on forest 

management activities15%

l mountain coto select the n individual wow its commitver more quantarily” and o

small groupsities requiredat the heart opays back far 

tive and dedicterprises afteown livelihoobout a decadherever possess experienceequired.  

nd they have ted this past 

uilds capacityand other stad not only leaciently implee series of wrd, well definemonitoring pc.). The intenso make mid‐corted that theyespective dist

for Economic Se

ribution of mof project activitie

Capabuilditechn

assistanenterp

develop18%

oping ket s and hains%

Coordination & linkages for stakeholders' ownership 

on interventions 

and leveraging resources

18%

ommunities. P best leaders with vested intment by offealified candidof the greed t

s or at individ of good leadof these discumore than w

cated leaderser a while andod. After testde, it was founible) and/or ge can obvious

once again pr3 years being

y at the villageakeholders paarned the tecment develorap‐up workshed principles aprocess that esive engagemourse correcty are now beitrict. 

ecurity in Nepa

major project es ‐ 1,377 formal a

Awareness raising and organizing 

communities, esp. DAG 

for enterprise 

development

38%

acity ng & nical nce for prise pment%

Past experienfor emergingterest or ering to ates becauseo reduce the 

ual level in thders (mainly ussions, whichwhat it costs to

s. Experience d start focusining various nd to be very good incentivsly be an asse

roved g in good part

e and districtarticipating inchnical aspectpment hops are the and guidelineengage all ment of the tions and ng recognize

al 

 activities activities) 

nce g 

he 

h o 

ng 

ves et, 

t n ts 

s, 

Page 6: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 4 

The Ford Foundation grant consolidated ANSAB expertise at the national level: Having acquired a unique and thorough experience in the field, ANSAB is now frequently solicited and consulted by various governments, NGOs and development agencies. Organizations having required our assistance within the project period include: Netherlands Development Organization (SNV Nepal); Nepal Swiss Community Forest Project (NSCFP) and District Road Support Program (DRSP) of Swiss Agency for Development and Cooperation (SDC); Livelihood and Forestry Program (LFP) of DFID; Micro‐enterprise Development Program (MEDEP) of UNDP; and Poverty Alleviation Fund (PAF) of Nepal Government’s Program funded by World Bank. ANSAB has been continuously consulted by the Ministry of Forests and Soil Conservation (MFSC) for strategic inputs in the policy process and programs development, especially on NTFPs and forest enterprises issues. It also provided expertise to the national and district levels of the Federation of Community Forest Users Nepal (FECOFUN), several District Forest Offices and the Cottage and Small Scale Industry Development Board (CSIDB). These later stakeholders are now requesting ANSAB to further extend its services in other districts. 

Community‐based development is especially suited for Nepal’s current political situation: Community‐based enterprises developed in this project (and those that preceded it) have proven to be impressively resilient to Nepal’s political instability and often surprising policy changes. Having been built through grassroots mobilization and being tightly integrated into larger national and international value chains, they have been able to thrive despite the pervasive inefficiency, instability and corruption of the different levels of government. The enterprises have also empowered communities with both additional income and increased knowledge of their rights, allowing them to better hold government representatives to account. The new community leaders that have emerged through the project moreover potentially represent a promising new breed of politicians for future village and district level elections.  

This is not to say that creating the right policy environment is not important over the mid and long term, especially in light of the recent improvements in the country’s political situation. As such, the project has devoted a significant amount of energy in policy advocacy and networking. When the government issued a policy requiring all CFUGs to carry out Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) despite the numerous (and successful) environmental protections mechanisms already in place in Nepal’s community forest framework, for example, the project team rapidly took action. It first gathered the Nepal NTFP Network (NNN) for a special session on the topic, which in turn created a task force to analyze the new policy. The project team then brought the task force recommendations to the Government through its seat on the high level Herbs and NTFP Coordination Committee. It also educated project CFUGs, their national Federation (FECOFUN) and other stakeholders about the policy, allowing them to become active in the debate as well. At the moment of writing the policy had not yet been modified, but all actors remain engaged in a constructive and democratic dialogue. 

There is more to community enterprise development than technical trainings and machinery: Although awareness is increasing among development professionals that a comprehensive approach to sustainable forest management is required to address poverty issues, most of programs still only include machinery supply and technical trainings in their plans for the development of community enterprises. These programs lack a complete understanding of the sheer complexity of organizing very poor and remote community into groups, building their capacity and integrating them into remunerative value chains.  

During the project wrap‐up meetings, communities and stakeholders heartily thanked the Ford Foundation and ANSAB for generating concrete outcomes that have created hope for the poor and disadvantaged. According to them, many development projects and bilateral programs in Nepal are limited to talks, workshops and trainings that are not followed with genuine work opportunity, wasting a lot of time and money. They maintained that the only examples they have ever seen of development activities that genuinely improve lives and give communities a path to success came from this project.  

Page 7: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 5 

The enterprise development model developed thanks to grants from the Ford Foundation is now mature and ready for wider replication: All projects funded by the Ford Foundation over the past decade have been very important in advancing ANSAB’s program approach, as they provided a unique opportunity of experiential learning and continuous improvement. The successive grants have helped ANSAB to implement, test and advance several innovative intervention mechanisms that have proven to be highly effective in generating impacts and that stimulated several other organizations to replicate the example.  

The maturity of the approach was further validated last year when the Global Development Network (GDN) awarded the second prize of its Most Innovative Development Project (MIDP) competition to ANSAB. Similarly, ANSAB has been recognized by the US‐based blue moon fund (bmf) as an organization having perfected effective methods related to conservation and rural development. The fund has brought all its grantees to a two day workshop given by ANSAB and funded a project called "Nepal Center of Excellence in Rural Development" to compile ANSAB knowledge for dissemination on a wider level. Organizations in other South Asian countries have also demonstrated a keen interest: SNV Bhutan solicited ANSAB services on enterprise development trainings, designing NTFP marketing strategies and setting up market information system, while City Pharmacy Limited (CPL), a private company in Papua New Guinea (PNG), recently invited senior staff to identify opportunities and design interventions for community enterprises development in this country.  

More importantly, many communities in Nepal that were not included in previous projects have been soliciting ANSAB for interventions in their own villages and CFUGs after having seen the concrete impact they can have. Local leaders in Bajura, Kalikot, Rolpa, Rukum, Gulmi, Palpa, Arghakhachi, Rupandehi, Nawalparasi, Dhading, Lamjung, Gorkha, Kavre, Taplejung, Ilam, Panchthar, Dhankuta, Ramechhap, Okhaldhunga and Khotang districts have for example asked for the project to be expanded to their areas. With over 15,000 registered CFUGs throughout Nepal and an estimated US $575 million in annual lost opportunities in the country’s forestry sector, there is indeed a lot of room for the deployment of a scaled up version of the Transforming Local Communities into Enterprises over the next few years.  

3. ACTIVITIES/ISSUES ADDRESSED In addition to the technical assistance, facilitation, information and research services, a total of 1,377 structured events (such as trainings, workshops, study visits and forest inventories) were organized for 78,475 participants (including 29,078 women and 5,435 DAG) during the project period (see the complete list in Annex 8). Table 1 presents a summary of activities accomplished for each issue included in the initial project proposal. The main outcomes are presented under ‘Indicators of Success’ (also see the Reflections section above). 

Table 1: Brief description of major project activities (Aug 1, 2007 – July 31, 2010) Activities/ Issues in Proposal 

Activities/Issues Addressed  

1.  Pro‐poor, community‐based enterprise development and networking 

 

 

 

732 formal activities regrouping a total of 42,005 participants (including 16,574 women and 3,445 DAG) were conducted under this issue. They: a) raised awareness and oriented communities on enterprise development through sharing and discussions about the best practices and opportunities for local natural resources products during community meetings and household visits; b) sought individual commitments for participation and investment in enterprises and CFUGs, starting with the analysis of business opportunities and helping each community realize their comparative and competitive advantages. Various options of collective action between the targeted clients and the existing entrepreneurs were discussed and the best options identified, which was followed by a series of meetings and discussions to gather financial and human resources; c) identified enterprise leaders according to several assessment criteria and guidelines through 

Page 8: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 6 

consultations, observations and verifications;  d) facilitated communities to prepare and implement a business plan for each enterprise in four stages: (i) Preparatory stage ‐ included awareness raising, forming a task force and defining each participant’s role,  orientation training, collection of product‐relevant information, feasibility study, identification of business functions and goal‐setting; (ii) Business planning & analysis ‐ included analysis of production process, marketing, ownership structure, organizational management and finance; (iii) Writing the draft business plan and action points for implementation – included drafting, sharing, cross‐checking and verifying with community members, the formation of an ad‐hoc committee, the identification of key personnel for enterprise operation and management positions and the final endorsement of the board; (iv) Implementation ‐ included securing capital, registration, infrastructure development, procurement, skill training and enterprise operations; and e) provided entrepreneurship training to 1,687 community enterprise leaders and managers focusing practical aspects of enterprise development and management.  

2.  Enterprise oriented production and management of natural products  

184 formal activities involving 12,929 participants took place under this issue. They: a) provided capacity building trainings and technical assistance on enterprise oriented community forest management to 166 CFUGs. As a result, 85 CFUGs are now engaged in value added processing and marketing enterprises; b) supported 34 CFUGs in the revision of their management plans, which included forest resource inventory, boundary survey, training on sustainable harvesting, prescription of harvesting and management system, and the rewriting of actual plan; and c) facilitated the process for the endorsement of the plans by CFUGs’ general assemblies and DFOs.  

3.  Community resource center and local capacity building 

Activities under this issue supported a Community Resource Center (CRC) in Dolakha to develop and deliver services to CFUGs to prepare and revise Forest Management Operation Plans. The CRC was successful in delivering these services to 5 CFUGs within the project period. In addition, the CRC provided financial audit services to 33 CFUGs, which has been found both very cost effective for the clients and a source of income for the CRC. 

4.  Financing mechanism and services 

97 formal activities involving 1,774 participants took place under this issue. They: a) provided technical assistance to subgroups and CFUGs’ Enterprise Development Revolving Funds (EDRF) to raise and mobilize fund for enterprise development; b) helped community enterprises secure financial services from subgroups, EDRFs and other sources at the local level as well as from financial institutions; and c) trained CFUGs and subgroups on account and fund mobilization. 

5.  Value chain promotion and marketing linkages 

154 activities involving 19,759 participants took place under this issue. They: a) informed value chain actors (e.g. CFUGs, local value‐added processing and marketing enterprises, and international buyers) about the existing market and supply situation; b) increased communication and fostered market linkage agreements between value chain actors; c) supported the organization of business activities to meet the commitments included in the agreements;  d) facilitated trust building and negotiations between private investors and community groups for the development of value‐added processing and marketing enterprises; e) supported national companies in securing and maintaining Forest Stewardship Council, organic and wildlife friendly certifications; and f) developed access and benefit sharing packages between value chain actors.  

6.  Coordination and linkage 

193 activities involving 1,784 participants were organized under this issue. They: a) encouraged district level government offices and NGOs to include the field work initiated by the project in their annual or periodic plans to improve collaboration for the implementation; b) periodically organized district level project planning, coordination and review meetings in each district; c) conducted regular monitoring visits to the field sites with district stakeholders as well as wrap‐up and sharing meetings in each district towards the end of the project; and d) provided price information on a regular basis through ANSAB’s marketing information system. 

Page 9: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 7 

4. INDICATORS OF SUCCESS Table 2 presents the actual results achieved by the end of the project (July 31, 2010) against the indicators of success included in the initial project proposal. 

Table 2: Performance of Key Indicators (Aug 1, 2007 – July 31, 2010) Indicators of Success & 3‐Year Targets Identified in Proposal 

Actual Results  

Number of economic participants: 10,000 (50% or 5,000 women & 20% or 2,000 DAG) 

12,639 economic participants (5,719 female, 2,730 DAG) were organized into various enterprise activities (see Annex 4 for details). 

Total annual monetary benefits: Rs. 60,000,000 

In year 3, the direct annual economic benefits reached Rs. 63,154,282 (Rs. 4,997 per economic participant). It was distributed as follows: Rs. 34,781,348 from sales of 64 enterprises involved in value added processing and marketing; Rs. 21,865,207 from sales of forest and agriculture based micro‐enterprises products; and Rs. 6,507,727 from organized cultivation, harvesting, primary processing and sale of NTFPs by CFUG subgroups other pro‐poor and women focused groups. In addition, business development services (e.g. MIS, networking) contributed to the improvement of collector’s incomes: the total sales of raw products from the nine project districts increased by 55% from year 0 to reach Rs. 131,187,253 in year 3. 

 Number of enterprises (group or private): 30 

32 new groups or private enterprises (value addition and marketing function) and 1 new national marketing enterprise were developed successfully. Critical support to 29 enterprises and 2 national enterprises developed during the previous project period also continued. 

Number of enterprises (micro‐entrepreneurs): 700 

753 micro‐entrepreneurs (allo, ritha, nigalo, lokta, bee‐keeping, wintergreen, charcoal making for briquette enterprises, fuel wood, furniture making, paper making, vegetable production and sale) and 2,252 community members were organized into 100 pro‐poor and women focused subgroups to carry out enterprise activities. 

Number of CFUGs promoting sustainable harvesting: 135 

The project supported 166 CFUGs in improving harvesting practices, of which 85 have developed a complete management plan and are effectively enforcing sustainable harvesting practices.  

Forest area or farmland under commercial production of natural products: 10,000 ha  

The project strengthened 166 CFUGs managing 48,148 hectares of forest, of which 22,915 hectares of forest and meadow were brought under sustainable commercial production.  

• In addition, about 37,585 community members received market price information for 32 natural products on a periodical basis, offering them an opportunity to improve their negotiation power when selling these products (Annex 10 provides a sample price list). 

• ANSAB’s partnership with FECOFUN has been strengthened and helped to identify and analyze, improve consultations with local communities and develop new programs. This partnership led to the development of a 3‐year pilot project for Reduced Emission from Deforestation and Forest Degradation (REDD) in Nepal. 

5. GOALS ACHIEVED TO DATE Expected Goal: transform natural resources dependent rural communities to commercially viable and sustainable entities to generate employment and economic security for 10,000 rural households by increasing their annual income by 25%, while improving the management and conservation of community forests.  

Page 10: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 8 

Goal Achieved to Date: The project exceeded its initial goal by helping 12,639 rural poor double their annual income from enterprise activities (Rs. 4,997 in year 3 compared to Rs. 2,089 in the base year). The project also strengthened 166 CFUGs and improved the management of 48,148 hectares of forest, ensuring that increased sales of natural products would benefit the conservation of natural resource stocks and the provision of ecosystem services.  

6. ORGANIZATIONAL/ENVIRONMENTAL CHANGES  Nepal is in the process of developing a coherent political system and power structure among central, federal and local governments, with an elected Constitutional Assembly (CA) being tasked with the development of a new constitution for the country. The political environment during the project period was significantly better than the conflict situation that prevailed in the past, but remained unstable. Frequent changes of policy without consultation with stakeholders for example made it difficult to organize CFUGs for the management of larger forest areas and to carry out enterprise registration. High staff turnover in District Forest Offices (DFOs) also presented a challenge, which the project team overcame by systematizing its communications efforts and periodically re‐explaining the project concepts, approaches and activities. It was also decided to engage more senior and stable officials from the Ministry of Forest and Soil Conservation (MFSC) in project meetings.  

7. ORGANIZATIONAL OR MANAGEMENT CHALLENGES  There is a very high demand in the field for ANSAB to expand its programs and help addressing environmental problems and the desperate economic needs of the poor, Dalits and women through the sustainable use of natural products. With its visible livelihood and conservation impacts on the ground, many communities and stakeholders, especially from districts adjoining past projects, are requesting ANSAB to offer its services in their areas. But ANSAB’s capacity to expand its activities is constrained by the limited amount of donor support available for this type of work at present. ANSAB also needs to standardize its various tools to systematically serve a larger number of clients.  

A major challenge for the organization is thus to generate sufficient funds to continue the development of innovative and useful service packages, and sustain some crucial services, such as MIS, networking and evidence‐based policy influence. As the nature of ANSAB work is innovative, there is also a need to educate all concerned stakeholders and train project staff and partner NGOs about what we do. Due to insufficient resources in the project, such capability building activities could not be carried out to their full potential. 

8. DIVERSITY There was no change in the diversity composition of ANSAB board. There were slight changes in staff composition. At present, ANSAB employs 61 people, of which 34% are women. The proportion women and men from underrepresented groups are of 54% and 46% respectively. At the beginning of the project, the overall proportion of women was 32% and the proportion of women from underrepresented groups was 58%. The proportion of women increased because of priority given to female candidates in new staff hiring, but the proportion of women from underrepresented groups decreased because of the reduced number of the female staff in the field after the completion of one of ANSAB’s biggest project, “Business Development Services‐Marketing, Production and Services”. 

   

Page 11: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 9 

ANNEX  1:  SOME  PHOTOGRAPHS  CAPTURED  DURING  THE  PROJECT IMPLEMENTATION    

Photo 4: Member of briquette enterprise collecting raw material Sikre, Sindhupalchok

Photo 5: Lokta collectors carrying Lokta from forest to enterprise, Dahabagar, Bajhang

Photo 6: Women preparing briquette in Lankuridanda, Dolakha

Photo 1: Settlement in project area in Dolakha Photo 2: Project staff and community discussing on enterprise development in Sailung, Dolakha

Photo 3: Community leaders showing highlights of business plan of

essential oil distillation to the group, Sikre, Sindhupalchok

Page 12: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 10 

  

    

Photo 10: David Hircock, Senior Advisor for Este'e Lauder with the poorest member of Bhitteri CFUG, Boch, Dolakha who is organized

into CFU sub-group and supported by CFUG

Photo 11: Briquette and clay stove developed by the project which become popular in Kathmandu market Photo 12: Briquette marketing campaign through kiosks in

Kathmandu

 Photo 7: Yarshagumba collectors cleaning the product in their camp

at 3500 meter altitude in Kanda, Bajhnag

Photo 8: Communities selling wintergreen leaves to their distillation unit in Lekhphant, Parbat

 

Photo 9: Community member looking at refractometer during juice

making training in Paribagar, Darchula

Page 13: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 11 

ANNEX 2: PROJECT MANAGEMENT STRUCTURE  

ECARDS, Dolakha: Ecology, Agriculture and Rural Development Society – ECARDS, Dolakha SANGAM: Sustainable Approach on Natural Resource Management and General Awareness for Micro‐Enterprises, Myagdi BYC: Bhimpokhara Youth Club, Baglung SEEWA: Sustainable Enterprise, Environment and Women Awareness Society, Parbat SDC: Social Development Center, Bajhang MDS: Markendeya Development Community, Darchula SEWA: Sustainable Enterprise and Women Awareness Society, Baitadi HCDA: Himalaya Conservation and Development Association, Humla   

Project manager 

Team Leader 

Project Management Committee 

Support (part time) ‐ Account/finance, admin & information  

Experts/Trainers (part time) ‐ Enterprise, NRM, value chain/marketing & M&E 

Area: Coordinator‐ Far‐westStation: Baitadi 

District TeamsMyagdi & Baglung:  Field coordinator (1) Parbat: Field coordinator (1) 

Local partner NGO (3): Myagdi: SANGAM Baglung: BYC Parbat: SEEWA 

Local partner NGO staff: ‐ NGO‐program coordinator (3) ‐ Enterprise dev. facilitator (6) 

‐Local resource persons (12) involved in activities 

Field site office: Baglung & Myagdi: Darbang, Myagdi Parbat: Salija  

Area Coordinator: West Station: Baglung 

Area Coordinator: East Station: Dolakha 

District Teams Dolakha and Sindhhupalchok:  Field coordinator (1) 

Local partner NGO (1): ECARDS, Dolakha 

Local partner NGO staff: ‐ NGO‐program coordinator (1) ‐ Enterprise dev. facilitator (3) 

‐Local resource persons (10)  involved in activities 

Field site office: Dolakha: Botle, Katakuti Sindhhupalchok: Sildhunga, Jethal  

District Teams Baitadi & Bajhang:  Field coordinator (1) Darchula: Field coordinator (1) Humla: District coordinator (1) 

Local partner NGO (4): Humla: HCDA Baitadi: SEWA Bajhang: SDC Darchula: MDC 

Local partner NGO staff: ‐ NGO‐program coordinator (4) ‐ Enterprise dev. facilitator (7) 

‐Local resource persons (16) involved in activities 

Field site office: Bajhang & Baitadi: Bitthad, Bajhang Darchula: Latinath; Humla: Simikot 

Page 14: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 12 

ANNEX 3: MAP OF NEPAL SHOWING GEOGRAPHIC COVERAGE OF THE PROJECT 

(FORD 2007‐2010)    

Page 15: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 13 

ANNEX 4: DETAILS OF ECONOMIC PARTICIPANTS OF THE PROJECT 

District 

CFUG1  Economic participants 

HHs Total 

population Ent. owner2  Ent. employment3 

Raw material and other input supplier (CFUG)4  Total 

Male  Female  DAG  Male  Female  DAG  Male  Female  DAG 

Baglung   1,427    8,315   11  86  45   2  16  15  159   166   67  440 

Parbat   2,362    14,248   84  138  62  18  43  10  172   180   13  635 

Myagdi   1,498    8,988   280  119  141  38  11  25  27   63   18  538 

Dolakha   8,822    46,517   764  686  564  73  33  21  596   536   235   2,688 

Sindhupalchok   1,590    8,885   233  99  34  14  16   5  466   497   251   1,325 

Baitadi  906    5,338    5  26   5  ‐  ‐  ‐  171   95   18  297 

Bajhang   5,082    27,584   382  241  61  14  107  ‐   1,098   832   277   2,674 

Darchula   1,450    10,596   499  192  235  125  49  103  881   883   401   2,629 

Humla   1,809    9,514   11  11  ‐  ‐  ‐  ‐  764   569   124   1,355 

Kathmandu  ‐   ‐   11   1  ‐  22  24  ‐  ‐   ‐   ‐  58 

Total  24,946    139,985    2,280   1,599   1,147  306  299  179  4,334    3,821   1,404  12,639 

 1. All the households of CFUGs selected by project are beneficiaries of project services. Annex 6 below 

provides detail of CFUG 2. Ownership could be (a) Individual (b) Partnership (small group below 5 members) (c) Other group (above 5 

members) (d) CFUG (e) Sub‐group.  If owned by groups, number of group is counted unless there is annual dividend of more than Rs. 500 to the members of group             

3. Employment is counted only at the value added processing and marketing enterprises and they work full time to the enterprises 

4. People involved in raw material and other input suppliers are identified in each CFUGs 

Page 16: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 14 

ANNEX 5: PROGRESS IN ENTERPRISE DEVELOPMENT  Enterprise types  Districts  Total sales* Progress 

Handmade paper making 

Baglung, Parbat, Myagdi, Dolakha, Bajhang 

4,960,397 Five community based handmade paper making enterprises (1 in Parbat, 2 in Myagdi, 1 in Bajhang and 1 in Dolakha) developed and started production and selling. These enterprises are developed jointly by CFUGs, existing entrepreneurs and ultra poor members of the CFUGs. 56 household level paper makers in Baglung, Parbat and Myagdi were strengthened. 

Essential oil distillation  Dolakha, Sindhupalchok, Parbat, Humla 

613,250  Two new wintergreen distillation enterprises in Sindhupalchok and Parbat were developed and operating successfully.  

Allo thread and fabric making 

Baglung, Parbat, Myagdi, Bajhang 

1,491,905  One new allo thread making enterprise developed in Parbat and provided skill development trainings and support in developing market linkages. In addition, 67 allo based micro‐entrepreneurs were developed in Baglung, Parbat and Myagdi and established linkage with cloth weaving enterprise in Parbat. 

Organized collection and collective marketing of Yarshagumba 

Bajhang, Darchula 3,019,840 This is the primary activity in the project and has provided good incomes to ultra‐poor within a short period. 335 community members in Bajhang and Darchula were organized into 12 groups, linked with buyers, and organized collection and marketing. 

Organized collection and collective marketing of Ritha 

Darchula, Bajhang 14,075,710 440 community members organized into 19 groups for collection and marketing of Rittha in Bajhang and Darchula. One community based marketing company ‐ Malikarjun Natural Products Private Limited (MNPPL) has been developed to market the community product. Now marketing linkage has been established and a verbal agreement has been made between MNPPL and Discover Nepal Export Private Limited, Nepal (a major export company of Rittha in Nepal) for selling first grade Rittha.  

Organized collection or cultivation, and collective marketing of other NTFPs 

Humla, Bajhang, Dolakha, Sindhupalchok Myagdi, Baglung, Parbat 

23,498,704 176 new micro‐entrepreneurs and their groups were organized for collection, cultivation and marketing of NTFPs. This has had a major impact in Humla in terms of improving the collector's bargaining power. 

Timber processing and fuel wood production 

Dolakha, Sindhupalchok, Bajhang 

2,244,885  8 new CFUG timber depots in Dolakha and Sindhupalchok operating successfully. 

Briquette production  Dolakha, Sindhupalchok 

3,104,004 5 new briquette enterprises were developed in Dolakha and Sindhupalchok. In addition, one national level marketing company, Himalayan Green Energy Private Limited (HGEPL) has been developed, which has been successfully established in Kathmandu. 

Charcoal production and Marketing 

Dolakha, Sindhupalchok 

1,008,409  332 community members were organized into 7 groups for charcoal production and linked with local briquette enterprises for marketing.  

Furniture making  Dolakha, Baglung  969,650  One new community based furniture enterprises in Baglung has been developed and six private furniture enterprises in Dolakha were strengthened.  

Chiuri ghee processing  Baglung, Baitadi  67,500  3 Chiuri butter enterprises developed in Baitadi and business plan for Chiuri butter enterprise in Baglung and Darchula have been developed and market feasibility analysis was conducted. 

Dhatelo oil expelling  Bajhang, Darchula  12,280  Potential of marketing of Dhatelo oil explored with companies of Estee’ Lauder Group and some intiation have been made for marketing. 

Nigalo products making 

Darchula, Myagdi, Sindhupalchok 

158,015  38 entrepreneurs in Myagdi and Sindhupalchok were organized and produced Nigalo goods. The project supported the enterprises with financial and business planning and market linkages at local level. 

Bee keeping  Baitadi  456,405  Collaborating with Micro‐Enterprise Development Program (MEDEP), the project facilitated 30 farmers to adopt improved bee hives and techniques for bee keeping in Baitadi district. 

Juice processing enterprise 

Darchula  120,000  1 new Seabukthorn juice processing enterprise was developed in Darchula and established market linkage with Nepalgunj market.  

Page 17: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 15 

General forest and agriculture based micro‐entrepreneurs (Enterprise development revolving fund and subgroups) 

Dolakha, Bajhang, Darchula, Myagdi, Sindhupalchok 

4,398,193  In this enterprise type, various micro‐enterprise activities those were feasible to facilitate ultra‐poor for enterprise planning and development. Total 1,958 community members have started micro enterprise activities (goat farming, poultry farming, pig farming, timber sawing, retailing groceries, agricultural and veterinary services and vegetable farming). These activities were prioritized by sub‐groups and CFUG enterprise development revolving fund for investing their fund to members. 

Lokta bark collection and sale 

Myagdi, Parbat, Bajhang 

372,835  83 new micro‐entrepreneurs were organized into 9 groups for collection and marketing of Lokta bark. They collected Lokta from community forest according to the CFUG management plan and sold to community based handmade paper making enterprises.  

Vegetable production and marketing cooperatives 

Sindhupalchok, Dolakha 

926,800  18 individuals were organized into 2 cooperatives in Dolakha and Sindhupalchok for production and marketing of fresh and offseason vegetables. The market of the cooperative is Kathmandu. 

Mask production and marketing 

Sindhupalchok  1,515,000 19 entrepreneurs were identified and trained on mask production and marketing in Sindhupalchok. 

Cardamum cultivation and marketing 

Sindhupalchok  140,500 29 individuals in Sindhupalchok were organized and started cardamum cultivation and marketing. 

Total      63,154,282    

* The total sale presented in the table is from all the enterprises supported by the project.  

 

 

Page 18: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 16 

ANNEX  6:  LIST OF  ENTERPRISES,  THEIR NUMBER,  ECONOMIC  PARTICIPANTS AND SALES 

Sn.  Enterprise Name  District Products Economic Participants  Sales amount (Rs) Owner  Employee 

M  F  DAG  M  F  DAG A  Group/Private value adding enterprise1  Deepkiran Furniture   Baglung  Furniture  5  1  2  2   ‐  1   288,650 

2 Bagali chuiry collection and marketing Enterprise 

Baitadi  Chiuri ghee   *50   *49   *25   ‐   ‐   ‐ 18,000 

3 Nwaghar chuiry collection and marketing Enterprise 

Baitadi  Chiuri ghee   *50   *49   *25   ‐   ‐   ‐ 22,500 

4 Sangada chuiry collection and marketing Enterprise 

Baitadi  Chiuri ghee   *50   *49   *25   ‐   ‐   ‐ 27,000 

5  Gadaraya Allo enterprise  Bajhang Allo products 1  ‐  ‐   ‐   ‐  ‐ 20,000 6  Ghataldev nigalo enterprise  Bajhang  Nigalo goods  1   ‐  ‐  1   ‐   ‐ 16,800 

7 Gorkhali Dhatelo Processing Enterprise 

Bajhang  Dhatelo oil  1   ‐  ‐   ‐   ‐   ‐ 1,280 

8 Himali Handmade Paper Enterprise 

Bajhang  Handmade paper  1   ‐  ‐  3  3   ‐  ‐

9 Juneli Hand Made Paper Enterprise 

Bajhang  Handmade paper  3   ‐  ‐  1  4   ‐  225,000 

10  Kailas Allo Processing Enterprise  Bajhang Allo products 1  ‐  ‐   ‐   ‐  ‐ 25,000 

11 Kailash timber and firewood and fuelwood depot 

Bajhang  Timber  1   ‐  ‐  1   ‐   ‐  ‐

12 Malika Handmade Paper Enterprise 

Bajhang  Handmade paper  1   ‐  ‐  3  4   ‐  645,000 

13 Masta Dhatelo Processing Enterprise 

Bajhang  Dhatelo oil  1   ‐  ‐   ‐   ‐   ‐ 11,000 

14  Masta Rilu Allo Enterprise  Bajhang Allo products 2  ‐  ‐  1   ‐  ‐ 22,500 15  Pariban timber depot  Bajhang  Timber  1   ‐  ‐  1   ‐   ‐ 11,600 16  Ranada timber depot  Bajhang  Timber  1   ‐  ‐  1   ‐   ‐ 10,400 17  Shree HERBIL Co‐oprative  Bajhang NTFPs 5  ‐  ‐  1   ‐  ‐ 4,320 18  Thakunna timber depot  Bajhang  Timber  1   ‐  ‐  1   ‐   ‐ 44,320 19  Yarshagumba Conservation Group  Bajhang  Yarsagumba  3   ‐  ‐   ‐   ‐   ‐  160,000 

20 Khandeswori Sibukthron Juice Processing Enterprise 

Darchula  Juice   ‐  ‐  ‐  6   ‐   ‐  120,000 

21 Malikarjun Natural Product Pvt.Ltd. 

Darchula  Ritha   15  2   ‐  2  1   ‐ 5,400,000 

22 Bhimeshwor Forest Products Processing Pvt. Ltd 

Dolakha  Handmade paper   13   ‐  ‐  3  5  2   408,800 

23 Briquette making enterprise, Shankhadevi 

Dolakha  Briquette   13   ‐  ‐  3  2  2   176,000 

24  Community fuel wood depot, Jiri  Dolakha  Fuelwood  1   ‐  ‐  1   ‐   ‐  ‐

25 Community fuel wood depot, Suspa FUG 

Dolakha  Fuelwood  1   ‐  ‐  1   ‐   ‐ 20,000 

26 Community timber depot, Bhitteri CFUG 

Dolakha  Timber  1   ‐  ‐  1   ‐   ‐  319,000 

27 Community timber depot, Boldesetidevi CFUG 

Dolakha  Timber  1   ‐  ‐  1   ‐   ‐  160,370 

28 Community timber depot, Charnawoti CFUG 

Dolakha  Timber  1   ‐  ‐  1   ‐   ‐  460,700 

29 Community timber depot, Dhandesinghdevi CFUG 

Dolakha  Timber  1   ‐  ‐  1   ‐   ‐ 45,000 

30 Community timber depot, Phalampokhari 

Dolakha  Timber  1   ‐  ‐  2   ‐   ‐  150,000 

31 Community timber depot, Sanobotle 

Dolakha  Timber  1   ‐  ‐  2  1  1   164,900 

32  Community timber depot, Shrijana  Dolakha Timber 1  ‐  ‐  2  1  ‐ 160,650 

33 Community timber depot, Suspa FUG 

Dolakha  Timber  1   ‐  ‐  1   ‐   ‐  253,000 

34  Deodhunga Multipurpose  Dolakha  Essential Oil   25   ‐  ‐  14   ‐   ‐  324,000 

Page 19: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 17 

Cooperative Ltd. 35  Dolakha Briquettes Enterprise  Dolakha  Briquette   25   ‐  ‐  3  2   ‐ 5,500 36  Dolakha_Sindhu Pvt. Ltd.  Dolakha Handmade paper 9  ‐  40  6  6  ‐ 750,000 37  Everest Gateway Herbs Pvt. Ltd.  Dolakha  Handmade paper  9   ‐  124  11  4  4  1,160,650 38  Hastakala Furniture Enterprise  Dolakha  Furniture  1   ‐  ‐  5   ‐   ‐  300,000 

39 Indrawati essential oil production & processing Pcom. Ltd, Dandakhark ‐ 4 

Dolakha  Essential Oil  5   ‐  ‐  2   ‐  1   ‐

40  Jiri briquette enterprise  Dolakha Briquette 9  ‐ 124  1  4  2  7,200 41  KalinchockFurniture Enterprise  Dolakha  Furniture  1   ‐  ‐  3   ‐   ‐  ‐

42 Panditkamala Forest Products Processing Pvt. Ltd. 

Dolakha  Handmade paper  1   ‐  ‐   ‐   ‐   ‐  ‐

43  Sailung briquette enterprise  Dolakha  Briquette   11  7  8  3  1  4   143,320 

44 Shailung Forest Products Production & Processing Pvt. Ltd. 

Dolakha  Handmade paper   34  3   10  2  7  5   309,000 

45  Ubak Furniture Enterprise  Dolakha  Furniture  1   ‐  ‐  4   ‐   ‐  ‐46  Humla Oil Pvt. Ltd.  Humla  Essential Oil   ‐  ‐  ‐   ‐   ‐   ‐  NA 47  Discover Nepal Export Pvt.Ltd.  Kathmandu Ritha 3  ‐  ‐  5  4  ‐ 8,100,000 

48  Himalayan Bio‐Trade Pvt. Ltd.  Kathmandu NTFPs products and essential oil 

1  1   ‐  15  15   ‐ 8,206,393 

49  Himalayan Green Energy Pvt. Ltd.  Kathmandu  Briquette  7   ‐  ‐  2  5   ‐ 2,072,000 50  Dhorpatan Herbs Processing  Myagdi  Handmade paper   62   16   41  1  5  5   437,000 51  Sole Hand Made Paper Processing  Myagdi Handmade paper 39  15   16  3  2  4  670,000 52  Allo processing enterprise  Parbat  Allo products   ‐ 9   ‐   ‐  12   ‐  680,000 53  Salija lokta processing enterprise  Parbat  Handmade paper   63   25   45   ‐  5   ‐ 36,316 54  Wintergreen processing enterprise Parbat Essential Oil ‐ ‐  ‐  2   ‐  ‐ 90,250 

55 Agriculture Development co‐oprative 

Sindhupalchok  Vegetable   ‐  ‐  ‐   ‐   ‐   ‐  504,000 

56 Agriculture Development Group Tamche 

Sindhupalchok  Vegetable  9  3  4   ‐   ‐   ‐  350,000 

57  Briquitte making enterprise sikre  Sindhupalchok  Briquette   24   ‐  ‐  3  9   ‐  440,000 

58 Community timber depot, Kalapani 

Sindhupalchok  Timber  1   ‐  ‐  1   ‐   ‐ 81,445 

59  Community timber depot, Khalte  Sindhupalchok Timber 1  ‐  ‐  1   ‐  ‐ 150,000 60  Community timber depot, Okhreni  Sindhupalchok  Timber  1   ‐  ‐  1   ‐   ‐ 18,000 

61 Community timber depot, Patlekharka 

Sindhupalchok  Timber  1   ‐  ‐  1   ‐   ‐  115,500 

62  Community timber depot, Tamche  Sindhupalchok Timber 1  ‐  ‐  1   ‐  ‐ 80,000 63  Okreni Briquette enterprise  Sindhupalchok  Briquette  7  9  3  3  7  5   159,984 

64 Wintergreen essential oil enterprise sikre 

Sindhupalchok  Essential Oil   15   ‐  ‐  3   ‐   ‐  199,000 

Subtotal   446   91   417  139  109  36  34,781,348 B  Micro‐enterprises             1  Allo processing enterprise  Baglung  Allo products  1   42   32   ‐  16  14   219,005 

2 Household level paper processing enterprise  

Baglung  Handmade paper  3   42   10   ‐   ‐   ‐  257,631 

3 Organized collection and collective marketing of other NTFPs 

Baglung  NTFPs  2  1  1   ‐   ‐   ‐ 51,000 

4  Bee keeping  Baitadi Honey 5  26  5   ‐   ‐  ‐ 456,405 

General forest and agriculture based micro‐entrepreneurs (Enterprise development revolving fund and subgroups) 

Bajhang  IGA   31   19   17   ‐  50   ‐  334,620 

6  Lokta bark collection and sale  Bajhang  Lokta   112   138  3   ‐   ‐   ‐ 23,400 

7 Organized collection and collective marketing of other NTFPs 

Bajhang  NTFPs   19   29   13   ‐  46   ‐  509,475 

General forest and agriculture based micro‐entrepreneurs (Enterprise development revolving fund and subgroups) 

Darchula  IGA   43   11   54  43  11  54   530,831 

9 Organized collection and collective marketing of other NTFPs 

Darchula  NTFPs   59   37   49  74  37  49   666,756 

Page 20: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 18 

10  Charcoal production  Dolakha  Charcoal   14   56   18   ‐   ‐   ‐  113,709 

11 

General forest and agriculture based micro‐entrepreneurs (Enterprise development revolving fund and subgroups) 

Dolakha  IGA  5   ‐  ‐   ‐   ‐   ‐  249,000 

12 Organized collection and collective marketing of other NTFPs 

Dolakha  NTFPs  1  1   ‐   ‐   ‐   ‐ 63,500 

13 Vegetable production and marketing enterprise 

Dolakha  Vegetable  3   ‐  ‐   ‐   ‐   ‐ 62,800 

14 Organized collection and collective marketing of other NTFPs 

Humla  NTFPs   11   11   ‐   ‐   ‐   ‐ 11,178,700 

15  Allo processing enterprise  Myagdi Allo products ‐ 20   20   ‐   ‐  ‐ 156,400 16  Briquette production  Myagdi  Briquette  2   ‐ 2   ‐   ‐   ‐  100,000 17  Furniture making enterprise  Myagdi  Furniture   15   ‐ 6  23  1  8   381,000 

18 

General forest and agriculture based micro‐entrepreneurs (Enterprise development revolving fund and subgroups) 

Myagdi  IGA   ‐ 6  5   ‐   ‐   ‐ 40,000 

19 Household level paper processing enterprise  

Myagdi  Handmade paper  7  7   10   ‐   ‐   ‐ 61,000 

20  Lokta bark collection and sale  Myagdi Lokta 1  ‐  ‐  1   ‐  ‐ 100,000 21  Nigalo goods making enterprise   Myagdi Nigalo goods 19  ‐ 7   ‐   ‐  ‐ 102,000 

22 Organized collection and collective marketing of other NTFPs 

Myagdi  NTFPs   87   35   17  10  3  8  2,649,560 

23 Organized collection and collective marketing Yarsagumba 

Myagdi  Yarsagumba  1   ‐  ‐   ‐   ‐   ‐  475,000 

24 Vegetable production and marketing enterprise 

Myagdi  Vegetable  3   ‐  ‐   ‐   ‐   ‐ 10,000 

25  Allo processing enterprise  Parbat Allo products ‐ 25   ‐  2  25  10  315,000 

26 Organized collection and collective marketing of other NTFPs 

Parbat  NTFPs  2   ‐  ‐   ‐   ‐   ‐  162,000 

27 Cardamum cultivation and marketing 

Sindhupalchok  Cardamum   29   ‐  ‐   ‐   ‐   ‐  140,500 

28  Charcoal production  Sindhupalchok  Charcoal   15  3  2   ‐   ‐   ‐  894,700 29  Mask production and marketing  Sindhupalchok Mask 37  ‐  ‐   ‐   ‐  ‐ 1,515,000 30  Nigalo goods making enterprise   Sindhupalchok  Nigalo goods   19   ‐  ‐   ‐   ‐   ‐ 39,215 

31 Organized collection and collective marketing of other NTFPs 

Sindhupalchok  NTFPs  4   ‐  ‐   ‐   ‐   ‐ 7,000 

Subtotal‐‐among 538 micro‐enterprises  569  521  271  167  190  143  21,865,207 C  Subgroups             

1 Bhabani Yarsagumba collection and marketing Enterprise 

Bajhang  Yarsagumba   18  3   ‐   ‐   ‐   ‐  252,000 

2 Bhabani Yarsagumba collection and marketing Enterprise 

Bajhang  Yarsagumba   34  6   ‐   ‐   ‐   ‐ 78,340 

3 Bhawani Rittha collection and marketing enterprise 

Bajhang  Ritha   17  4   ‐   ‐   ‐   ‐ 19,400 

4 Dalkot Yarsagumba collection and marketing Enterprise 

Bajhang  Yarsagumba   21  2   23   ‐   ‐   ‐ 40,500 

5 Deulikot Ritha collection and marketing enterprise 

Bajhang  Ritha  4   19   ‐   ‐   ‐   ‐ 22,000 

6 Liche Himalaya Yarsagumba collection and marketing Enterprise 

Bajhang  Yarsagumba   30  4   ‐   ‐   ‐   ‐  319,000 

7 Loga Rittha collection and marketing enterprise 

Bajhang  Ritha   35  9   ‐   ‐   ‐   ‐ 13,976 

8 Nimori Yarsagumba collection and marketing Enterprise 

Bajhang  Yarsagumba   26  1  5   ‐   ‐   ‐ 85,000 

9 Pipalkot Rittha collection and marketing enterprise 

Bajhang  Ritha   11  7   ‐   ‐   ‐   ‐ 5,000 

10 Adarsha Ritha Colletion and sales group 

Darchula  Ritha   17  1  5   ‐   ‐   ‐ 16,790 

11  Bhagawati Ritha Colletion and  Darchula Ritha 14  4  7   ‐   ‐  ‐ 28,760 

Page 21: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 19 

sales group 

12 Bhairabnath Ritha Colletion and sales group 

Darchula  Ritha   14  4  8   ‐   ‐   ‐ 9,786 

13 Chaubisan (Barausepani) Yarsagumba Collection and sales group  

Darchula  Yarsagumba   11  7  8   ‐   ‐   ‐  382,000 

14 ChaulaniRitha Colletion and sales group 

Darchula  Ritha   18  2  7   ‐   ‐   ‐ 26,540 

15 Childhugra Mahila Yarsagumba Collection and sales group  

Darchula  Yarsagumba   22   10   12   ‐   ‐   ‐  110,000 

16  Dandabag   Darchula Ritha 12  4   ‐   ‐   ‐  ‐ 54,600 

17 Dauthi Yarsagumba Collection and sales group 

Darchula  Yarsagumba   25  5  6   ‐   ‐   ‐  144,000 

18  Galainath   Darchula  Ritha   16  7  3   ‐   ‐   ‐ 85,400 

19 Gauri (Lidke) Yarsagumba Collection and sales group 

Darchula  Yarsagumba   36   13   18   ‐   ‐   ‐  386,000 

20 HariyaliRitha Colletion and sales group 

Darchula  Ritha   17  1  5   ‐   ‐   ‐ 8,090 

21 Kholteraula Yarsagumba Collection and sales group 

Darchula  Yarsagumba   18  7   12   ‐   ‐   ‐  220,000 

22 LaliguransRitha Colletion and sales group 

Darchula  Ritha   14  2  5   ‐   ‐   ‐ 15,460 

23  Latinath  Darchula  Ritha   19  5   ‐   ‐   ‐   ‐  102,000 24  Latinath  Darchula Ritha 27  11  7   ‐   ‐  ‐ 45,800 

25 Naupata Yarsagumba Collection and sales group  

Darchula  Yarsagumba   21   15   12   ‐   ‐   ‐  368,000 

26 Odakhet Ritha Colletion and sales group 

Darchula  Ritha   14  2   ‐   ‐   ‐   ‐ 20,550 

27  Shikhar  Darchula  Ritha   21  9   ‐   ‐   ‐   ‐ 20,400 28  Siddhanath  Darchula Ritha 15  8   ‐   ‐   ‐  ‐ 43,500 29  Srijansil  Darchula Ritha 11  25  9   ‐   ‐  ‐ 25,200 

30 SunlightRitha Colletion and sales group 

Darchula  Ritha   20   ‐ 8   ‐   ‐   ‐ 12,458 

31  Aankhebhume  Dolakha  IGA   21   16  2   ‐   ‐   ‐ 14,240 32  Arkhaule  Dolakha IGA 8  15   ‐   ‐   ‐  ‐ 31,800 33  Bojhepani  Dolakha  IGA   11   19  5   ‐   ‐   ‐ 21,300 34  Chitre  Dolakha  IGA   10   14  5   ‐   ‐   ‐  ‐35  Chuchedhunga  Dolakha IGA 19  10  1   ‐   ‐  ‐ 49,900 36  Chyandanda  Dolakha  IGA   17  8  7   ‐   ‐   ‐ 93,650 37  Devithan  Dolakha  IGA   13  4   ‐   ‐   ‐   ‐  ‐38  Devithan  Dolakha IGA 5  15  5   ‐   ‐  ‐ 18,000 39  Dhandchaur  Dolakha  IGA   14  1  3   ‐   ‐   ‐ 61,200 40  Dharedhunga  Dolakha  IGA  1   22  4   ‐   ‐   ‐ 39,340 41  Gaindachape  Dolakha IGA 15  2  5   ‐   ‐  ‐ 44,775 42  Gamnage  Dolakha  IGA   12   20  3   ‐   ‐   ‐  109,100 43  Ganeshthan  Dolakha  IGA   20  7  6   ‐   ‐   ‐ 20,600 44  Gipsingpakha  Dolakha IGA 14  2  5   ‐   ‐  ‐ 35,600 45  Gochet  Dolakha  IGA   12   21  3   ‐   ‐   ‐  101,300 46  Guphachape  Dolakha  IGA   11   19  7   ‐   ‐   ‐ 91,125 47  Gurung danda  Dolakha IGA 9  21  6   ‐   ‐  ‐ ‐48  Hilemaidane  Dolakha IGA 10  36  5   ‐   ‐  ‐ ‐49  Indra devi   Dolakha  IGA  9   20  2   ‐   ‐   ‐ 30,560 50  Jagarkalika  Dolakha IGA 13  8  3   ‐   ‐  ‐ ‐51  Jansrijansil  Dolakha IGA ‐ 27  1   ‐   ‐  ‐ 45,000 52  Jhakokharka  Dolakha  IGA   ‐  ‐  ‐   ‐   ‐   ‐  ‐53  Jhingan  Dolakha IGA 6  13  5   ‐   ‐  ‐ 6,500 54  Jhor  Dolakha IGA 28  17  7   ‐   ‐  ‐ 47,980 55  Kande  Dolakha  IGA   10   11  1   ‐   ‐   ‐ 34,940 56  Khadadeve  Dolakha IGA `4  19  3   ‐   ‐  ‐ 11,040 57  Khanidanda  Dolakha IGA 10  18  4   ‐   ‐  ‐ ‐58  Lahare  Dolakha  IGA   12   11  2   ‐   ‐   ‐  ‐

Page 22: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 20 

59  Laligurans   Dolakha  IGA  9   12  2   ‐   ‐   ‐ 77,710 60  Laligurash  Dolakha  IGA   17   10   25   ‐   ‐   ‐  ‐61  Lamidanda boldesetidevi  Dolakha IGA 14  12  3   ‐   ‐  ‐ 200,100 62  Magargaun  Dolakha  IGA  6  8  9   ‐   ‐   ‐  ‐63  Manetar  Dolakha  IGA   14   11  7   ‐   ‐   ‐ 17,100 64  Milijuli  Dolakha IGA 23  10  3   ‐   ‐  ‐ 95,200 65  Nagthan  Dolakha  IGA   13  7  2   ‐   ‐   ‐  ‐66  Nigale Setidevi   Dolakha  IGA   34   20   15   ‐   ‐   ‐  ‐67  Nigalebhanjyang  Dolakha IGA 6  9  1   ‐   ‐  ‐ ‐68  Odare   Dolakha IGA 12  21  7   ‐   ‐  ‐ 37,240 69  Sadung  Dolakha  IGA   11  7  1   ‐   ‐   ‐ 6,600 70  Sarswoti  Dolakha IGA 9  3   12   ‐   ‐  ‐ 12,280 71  Setidevi  Dolakha  IGA  8  7  9   ‐   ‐   ‐  ‐72  SotreGhurmise  Dolakha  IGA   19  9  5   ‐   ‐   ‐ 25,500 73  Srijana poor Grop  Dolakha IGA 4  13   17   ‐   ‐  ‐ ‐74  Srijanshil  Dolakha IGA 1  17  3   ‐   ‐  ‐ 32,160 75  Sunsari  Dolakha  IGA   30  5  3   ‐   ‐   ‐  167,150 76  Suspa  Dolakha IGA 6  ‐ 6   ‐   ‐  ‐ ‐77  Tallokitnibhir  Dolakha IGA 9  14  2   ‐   ‐  ‐ 19,505 78  Thuldhunga   Dolakha  IGA  5   20  1   ‐   ‐   ‐ 41,910 79  Yarsa  Dolakha  IGA   14  8  7   ‐   ‐   ‐ 55,700 80  Amili Tipne  Myagdi Lokta 6  1  4   ‐   ‐  ‐ 12,533 81  Bansrate  Myagdi  Lokta  6  1  1   ‐   ‐   ‐ 89,175 82  Barahatal  Myagdi Lokta 5  3  4   ‐   ‐  ‐ 60,000 83  Jaljala  Myagdi Lokta 7  ‐ 2   ‐   ‐  ‐ 18,500 84  Khola Kharka  Myagdi  Lokta  6  1  1   ‐   ‐   ‐ 2,150 85  Mareni  Myagdi  Lokta  5  2  1   ‐   ‐   ‐ 21,530 86  Parbati Mahila  Myagdi Lokta ‐ 7  3   ‐   ‐  ‐ 25,517 87  Rukum Rakharka  Myagdi  Lokta  5  2  1   ‐   ‐   ‐ 11,518 88  Syangzibhan  Myagdi  Lokta  4  3   ‐   ‐   ‐   ‐ 8,512 89  Laligurans sub group  Parbat NTFPs ‐ 25   ‐   ‐   ‐  ‐ ‐90  Raniban Allo sub‐group  Parbat  Allo products   ‐  17   17   ‐   ‐   ‐ 54,000 

91 Simaltechaur wintergreen sub group 

Parbat  NTFPs   ‐  25   ‐   ‐   ‐   ‐  ‐

92  Ahaldanda  Sindhupalchok IGA 7  12  3   ‐   ‐  ‐ ‐93  Bhumisthan  Sindhupalchok  IGA  3   10   ‐   ‐   ‐   ‐  ‐94  Birta  Sindhupalchok  IGA   15  7  7   ‐   ‐   ‐  ‐95  Jaleswori  Sindhupalchok IGA 10  18  7   ‐   ‐  ‐ ‐96  Mathillo tole   Sindhupalchok  IGA  6  3   ‐   ‐   ‐   ‐  ‐97  Pari tole  Sindhupalchok  IGA  6  3   ‐   ‐   ‐   ‐  ‐98  Rato tole  Sindhupalchok IGA 6  1   ‐   ‐   ‐  ‐ ‐99  Sansaridevi  Sindhupalchok IGA 12  20  5   ‐   ‐  ‐ ‐100  Sayapatri  Sindhupalchok  IGA  4   10  3   ‐   ‐   ‐  ‐Subtotal  1,265  987  459   ‐   ‐  ‐ 4,960,090 D  Enterprise development revolving fund in FUGs and CBOs

1  Binayak  Bajhang General forest and agriculture based micro‐enterprises 

5               43,082 

2  Daya   Bajhang  General forest and agriculture based micro‐enterprises  4               48,540 

3  Dhalpura  Bajhang  General forest and agriculture based micro‐enterprises  2               18,100 

4  Ghataldeva  Bajhang  General forest and agriculture based micro‐enterprises  4               39,065 

5  Jutebhantmaya  Bajhang  General forest and agriculture based micro‐enterprises  2               32,065 

6  Kholelek  Bajhang  General forest and agriculture based micro‐enterprises  1               6,700 

7  Lahare  Bajhang  General forest and agriculture based micro‐enterprises  4               25,867 

8  Latuna  Bajhang  General forest and agriculture based micro‐enterprises  2               9,962 

9  Mastamandu  Bajhang  General forest and agriculture based micro‐enterprises  1               12,344 

10  Nimori  Bajhang  General forest and agriculture based micro‐enterprises  3               23,250 

11  Pariban   Bajhang  General forest and agriculture based micro‐enterprises  7               34,567 

12  Patal   Bajhang  General forest and agriculture based micro‐enterprises  7               67,659 

13  Patal potal  Bajhang  General forest and agriculture based micro‐enterprises  1               5,645 

Page 23: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 21 

14  Barausepani  Darchula  General forest and agriculture based micro‐enterprises 5               62,285 

15  Childhungra mahila  Darchula  General forest and agriculture based micro‐enterprises  4               66,865 

16  Dauthi  Darchula  General forest and agriculture based micro‐enterprises  7               78,605 

17  Dauthinala   Darchula  General forest and agriculture based micro‐enterprises  4               42,116 

18  Kholteraula  Darchula  General forest and agriculture based micro‐enterprises  4                116,540 

19  Aclepakha  Dolakha  General forest and agriculture based micro‐enterprises   13               32,500 

20  Bhitteripakha   Dolakha  General forest and agriculture based micro‐enterprises  1                148,000 

21  Boldesetidevi  Dolakha  General forest and agriculture based micro‐enterprises  1                111,310 

22  Chanedanda  Dolakha  General forest and agriculture based micro‐enterprises   15               22,094 

23  Chitre pakha   Dolakha  General forest and agriculture based micro‐enterprises  2                ‐

24  Daichedhunga  Dolakha  General forest and agriculture based micro‐enterprises  5               13,069 

25  Damarthami  Dolakha  General forest and agriculture based micro‐enterprises  1               20,000 

26  Dhandeshing devi  Dolakha  General forest and agriculture based micro‐enterprises  1               15,000 

27  Gairi  Dolakha  General forest and agriculture based micro‐enterprises  7               35,550 

28  Golmeswor  Dolakha  General forest and agriculture based micro‐enterprises  4               80,000 

29  Jugedarkha  Dolakha  General forest and agriculture based micro‐enterprises  5               5,350 

30  Kalidevi  Dolakha  General forest and agriculture based micro‐enterprises   12               55,000 

31  Kitani Bhir   Dolakha  General forest and agriculture based micro‐enterprises  14               12,300 

32  Lang Thapa   Dolakha  General forest and agriculture based micro‐enterprises   10               10,942 

33  Mahadevstan   Dolakha  General forest and agriculture based micro‐enterprises  8                ‐

34  Phalam Pokhari  Dolakha  General forest and agriculture based micro‐enterprises  4               17,100 

35  Sanubolde  Dolakha  General forest and agriculture based micro‐enterprises 9               41,830 

36  Shanu Bodla   Dolakha  General forest and agriculture based micro‐enterprises  3               28,500 

37  Sirjana  Dolakha  General forest and agriculture based micro‐enterprises   12               33,500 

38  Tharlange  Dolakha  General forest and agriculture based micro‐enterprises   17               42,335 

39  Bodlekharka  Sindhupalchok  General forest and agriculture based micro‐enterprises  1               22,000 

40  Kalapani  Sindhupalchok  General forest and agriculture based micro‐enterprises  1               15,000 

41  Patle  Sindhupalchok  General forest and agriculture based micro‐enterprises  1               45,000 

42  Tamche  Sindhupalchok  General forest and agriculture based micro‐enterprises  1               8,000 

Subtotal   215   ‐  ‐   ‐   ‐   ‐ 1,547,637 Total  2,495  1,599  1,147  306  299  179  63,154,282 

Note: * indicates the number of economic participants which is already counted in other enterprise entities. 

 

Page 24: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 22 

ANNEX 7: LIST OF PROJECT SUPPORTED COMMUNITY FOREST USER GROUPS SN  CF name  Address (VDC, Ward) District Area 

(Ha.) HHs Male  Female DAG 

HHs 1  Bongakhani  Bungadovan‐5‐6  Baglung  767 109 611  583 1082  Chilbhir  Khunga‐1  Baglung  40.68 154 405  425 993  Dare  Khungkhani‐6 Baglung 10 55 148  133 554  Deurali Mahila  Khunga‐1  Baglung  27.43 96 267  243 795  Dhurkhola  Taman‐7‐9  Baglung  38.24 324 645  582 2476  Gorucharan  Taman‐1‐5  Baglung 10.8 164 454  411 487  Lamdanda  Adhikarichaur‐5  Baglung  19.5 33 128  96 248  Mahila Jagriti  Khunga‐2  Baglung  21.6 74 195  183 499  Mela Bhungeni  Khungkhani‐8 Baglung 63.5 54 144  139 3310  Salina  Khungkhani‐9 Baglung 111.85 37 119  103 3111  Setipahara  Adhikarichaur‐5  Baglung  50.37 50 161  329 2712  Sinaka  Khunga‐2  Baglung 72 83 220  214 6013  Talbot  Khungkhani‐7 Baglung 21.25 89 221  239 5614  Watawaran 

Samrackchhen Adhikarichaur‐5  Baglung  1,031 105 608  309 80

15  Bhumiraj  Shivling ‐7  Baitadi  180.05 75 217  225 516  Bhumiraj Sunuwagadi  Bhumiraj ‐8  Baitadi 80.93 70 219  214 817  Kailpal  Chaukaham ‐8  Baitadi  177.99 93 257  263 2618  Mahadev  Shivling‐ 8  Baitadi  277.72 119 336  342 2919  Mhadev Digakot  Bhumiraj ‐5  Baitadi 82.7 131 401  395 920  Paharol  Chaukham ‐1,2,3  Baitadi  10 184 545  515 2021  Shigash  Bhumiraj ‐6  Baitadi  128.92 56 161  163 822  Shigash Sangada  Shivling ‐9  Baitadi 95.82 178 526  559 2623  Binayak  Gadaraya 9  Bajhang  1606 149 331  337 024  Chadichhadapatal 

Jaicunathum Seinpasela ‐6,7  Bajhang  43.5 42 86  89 0

25  Dalit Janagati  Dahabagar ‐ 9 Dalkot   Bajhang  9.9 25 35  42 2026  Daya  Rilu 1  Bajhang 1093 203 357  366 027  Dhalpura   Masta 9  Bajhang  8.79 76 167  176 028  Ghataldev  Masta 8  Bajhang  11.62 23 82  99 029  Hemantawada  Hemantawada 1‐9 Bajhang 1665 467 1917  1861 13530  Jutebhatmaya  Dahabagar ‐1Goechan  Bajhang  47.1 80 145  190 031  Kalika  Saydi‐8, Bithad  Bajhang  83.8 345 925  889 4532  Kedar  Syadi‐3, Lim Bajhang 53.3 56 555  436 3333  Kholelek   Rilu 5  Bajhang  10 64 124  128 034  Lahare  Gadaraya 9  Bajhang  458 501 1173  1079 035  Lamaleg Harikharka  Syadi‐4  Bajhang 22 78 584  519 3236  Lataun  Rilu 4  Bajhang  728 78 184  200 137  Liche  Dahabagar ‐8 Bamor  Bajhang  15 105 225  240 038  Mandau Patal  Masta 6, 7  Bajhang 5.2 129 268  296 039  Martinaula   Kotdewal 4, 5, 6  Bajhang  451 255 592  585 4240  Mastamandu  Patadewal 7  Bajhang  28 89 208  211 1341  Nimori  Dahabagar ‐1Sola Bajhang 23.27 115 211  205 042  Pariban  Masta 6, 7  Bajhang  469 278 482  495 1443  Paripatal  Rilu 3  Bajhang  72.71 138 267  271 044  Patal  Deulikot‐9   Bajhang 72.1 149 1094  1105 13345  Patal Potal  Dahabagar ‐4   Bajhang  28.7 25 50  65 046  Patevere  Seinpasela ‐3  Bajhang  25.3 134 129  156 2047  Petarimela  Rilu 7  Bajhang 64.4 130 314  326 4048  Phulangkot hariyali  Pipalkot‐1, Loga  Bajhang  23.9 23 85  93 049  Ranada  Kotdewal 1‐3  Bajhang  1981 319 622  638 2750  Sallipatan trisakti  Luwata 1‐7  Bajhang 660 524 1211  1223 4451  Sharda  Deulikot‐3  Bajhang  11.88 95 280  295 2552  Shree Binayak  Kailash 1‐7  Bajhang  1425 242 787  786 3853  Thagunna  Rilu 2, 3  Bajhang 93.7 69 270  262 054  Thulamela  Dahabagar‐1  Bajhang  24 76 78  83 055  Bajani Kilaupad  Latinath‐7,8 Bajani,Ril  Darchula  121 143 473  455 16

Page 25: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 23 

56 Barausepani 

Khandeshwori‐8 Chaubisan 

Darchula  32 52 154  170 2

57  Bishandhar  Khandeshwori‐4Jhusku  Darchula  8 11 41  35 ‐58  Chadepani  Khandeshwori‐5,6   Darchula  8.7 30 92  94 659  Childhungra Mahila  Khandeshwori‐9  Darchula 78 37 125  105 360  Damkuri  Guljar‐7,8 Gholjar  Darchula  33.5 120 370  330 2461  Dauthi  Khandeshwori‐7 Khalkot Darchula  8.36 30 101  120 ‐62  Dauthinala  Khandeshwori‐7 0upata Darchula 10.8 32 107  110 ‐63  Dheurukh  Khandeshwori‐8   Darchula  25.95 16 43  4964  Gauri  Guljar‐4 , 5, 6 Taku  Darchula  16 152 520  480 2165  Herana  Guljar‐4 Airada Taku Darchula 5.6 37 170  130 666  Joldhara  Khandeshwori‐6   Darchula  5 38 128  132 1167  Kalenjar  Guljar‐7,8 Gholjar  Darchula  15.5 120 370  330 2468  Kholte Raula  Khandeshwori‐5,6  Darchula 11.8 64 228  240 1169  Lidke  Guljar‐5, 6 Taku  Darchula  6 87 360  340 1070  Meldhunga  Khandeshwory‐3   Darchula  28.03 13 51  5571  Salyadi  Guljar‐2, 3 Jude Darchula 18 67 304  255 672  Shree Dalauna  Latinath‐7,8 Sallethum  Darchula  38.59 65 145  170 673  Surmabhawani   Khandeshwori‐8 Khatti  Darchula  33.54 31 101  11374  Tileli  Latinath 1‐6 Darchula 64.4 305 1,540  1,460 10275  Aclepakha  Lakuridanda, 4,5,6  Dolakha  320.4 319 985  960 3476  Bhitteripakha  Boch 1, 2, 3  Dolakha  362 237 656  642 2877  Bhumistan  Sailungeswar, 3,4 Dolakha 350 140 375  352 2078  Boldesetidevi  Boch 4, 5, 6  Dolakha  171 225 570  585 1679  Chane Danda   Katakuti 1,7,8,9  Dolakha  55.61 203 865  890 1280  Charnabati   Fasku, 1  Dolakha 125.25 180 540  540 ‐81  Charnawoti  Vi.0.Pa. 13  Dolakha  385 315 874  875 1482  Chitre pakha  Bhusafeda, 6  Dolakha  118.8 189 327  297 1283  Damarthami  Kshamawoti 2 Dolakha 147 191 584  561 1084  Dhandesinghdevi  Boch 7, 8,9  Dolakha  335 311 633  655 1085  Dhungreswari   Vedpu, 4,6,7,8,9  Dolakha  700 456 956  940 1886  Doiche Dhunga   Sailungeswar, 7 Dolakha 128.75 265 425  415 4087  Falampokhari  Sailungeswari,1,5,9  Dolakha  54.14 162 441  433 2588  Gairi  Fasku, 6,7,9  Dolakha  135.68 345 941  918 3289  Ghumaunepani  Bhusafeda, 2 Dolakha 82.25 135 390  340 1090  Golmeswar  Katakuti 6  Dolakha  263 890 2,287  2,148 4591  Jhareni  Kshamawoti 4, 5  Dolakha  208 186 481  484 2792  Jugedarkha  Katakuti, 1,8,9 Dolakha 154 287 942  895 993  Kalibhumi   Ghang 6,7  Dolakha  500 331 912  855 25094  Kalidevi   Dandakharka, 2,3,4,5  Dolakha  105 160 355  372 1395  Kalobhir  Jiri 7, 8  Dolakha 545 215 553  53596  Kitani Bhir  Fasku, 9,4  Dolakha 61 140 345  421 3197  Lang thapa   Bhusafeda, 4  Dolakha  64.35 289 627  615 1298  Mahadevstan  Sailungeswari,4 Dolakha 206.72 157 338  308 1899  Majkharkalisepani  Vi.0.Pa. 13  Dolakha 146 206 524  540 23100  Napkeyanmara  Lakuridanda 1  Dolakha  160 140 428  411 13101  Sanubodle  Katakuti 1   Dolakha  35.64 68 211  199 6102  Setidevi  Lakuridanda, 9 Dolakha 351 249 618  694 11103  Shankhadevi  Lakuridanda 9  Dolakha  301 211 645  620 14104  Sirjana  Katakuti, 1,2 Dolakha 206 258 818  791 24105  Suspa  Kshamawoti 6, 8, 9 Dolakha 635 321 769  833 26106  Thansadeurali  Vi.0.Pa. 12  Dolakha  286 287 878  843 57107  Tharlange  Mangapauwa, 1  Dolakha  214.45 364 1,069  1,105 55108  Thulonagi  Jiri 9  Dolakha 239 257 617  668 24109  Walemdamji  Marbu 3, 4, 5, 6  Dolakha  495 133 407  391110  Bage Dhunga   Darma 1, 2  Humla  1896 107 328  283 69111  Dhaulapani  Rodikot 4,5,6 Humla 300 145 464  456 18112  Gorakhto  Simikot 7,8  Humla  35.41 81 190  205 13113  Himali  Sarkideu 1,2,3,10  Humla  123 140 324  432 40114  Jadekausi  Darma 7 to 9 Humla 2141 86 264  252 23115  Lapchedungsile  Melcham 1 to 9  Humla  2520 135 385  368 25

Page 26: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 24 

116  Majh Patal   Sarkideu 1,2,3,9  Humla  230 140 324  432 40117  Mauri  Raya 1 to 4  Humla  982.89 135 321  257 34118  Paksi Bada  Rodikot 7,8,9 Humla 769.4 130 351  375 38119  Rahadev  Rodikot 1,2,3  Humla  2000.2 111 246  281 63120  Raniswara women  Darma 1, 2  Humla  51 107 328  283 69121  Rip   Sarkideu 1,2,3,9 Humla 2603.96 140 324  432 40122  Rocha  Mimi 1,2  Humla  1890 36 87  92 7123  Salikochani  Mimi 3,4  Humla  993.33 43 115  106 10124  Takpafuk  Bargaun 7,8,9 Humla 396.21 47 114  132 5125  Thali  Raya 5 to 9  Humla 994.27 138 332  349 25126  Torpahutic  Bargaun 5,6  Humla  112.57 43 116  121 3127  Zhagri dada  Mimi 3,4  Humla 45 30  15 ‐128  Amili Tipne  Lulang‐7,8,9  Myagdi  407.7 136 408  408 107129  Bansrate  Ruma‐6  Myagdi  486 159 477  477 88130  Barahatal  Ruma‐7,8,9  Myagdi 497 384 1,152  1,152 191131  Jaljala  Lulang‐1,2,3,4 Myagdi 395 84 252  252 38132  Khola Kharka  Lulang 5,6  Myagdi  131 76 228  228 29133  Mareni  Lulang‐5,6  Myagdi 492.7 76 228  228 29134  Parbati Mahila  Lulang 1,2,3,4 Myagdi 315 79 237  237 36135  Rukum Rakharka  Ruma‐3,4,5  Myagdi  385.5 327 981  981 209136  Syangzibhan  Ruma‐1,2  Myagdi  90.5 177 531  531 99137  Barahtal than  Kyang‐9  Parbat 315 89 245  249 39138  Chhipchhipe 

silingepakho Kyang‐1‐4, Parbat  Parbat  15.04 205 523  490 104

139  Devisthan  Salija‐8  Parbat  7.12 54 115  106 28140  Gurasenikharka  Salija‐1,3,4,5,6,8 Parbat 70.45 369 995  1,025 102141  Hampal  Salija &Lekhphant  Parbat  331 867 2,839  3,203 484142  Judda bir  Salija‐6  Parbat  39.93 100 289  277 24143  Kamerepanichhaharepa

kha Kyang 5‐7  Parbat  12.8 129 412  400

144  Laligurans  Lekhphant‐8 Parbat 37 28 103  94 10145  Lekali  Lekhphant‐9  Parbat  180 63 189  189146  Lose chisakharka  Kyang‐8,9  Parbat  212.09 109 307  316 56147  Patalkharka  Salija‐7  Parbat 39 79 202  188 23148  Raniban  Dharing‐1,6‐9,Salija‐9  Parbat  144.25 207 600  579 140149  Simaltechaur   Lekhphant‐7  Parbat  72.32 63 175  138 28150  Bhageli Chhap  Jethal, 4,5,6 Sindhupalchok 242.42 182 470  486 25151  Bhnjyang  Attrapur,8  Sindhupalchok  34 32 92  92 6152  Botle kharka  Attrapur &Thulopakhar  Sindhupalchok  93.8 111 318  335 36153  Bulbule  Attarpur, 8  Sindhupalchok 28.625 64 221  201 ‐154  Chiple  Lisankhu 9  Sindhupalchok  45 39 99  96 7155  Deupokhari  Thulo dhading,9  Sindhupalchok  169.11 93 316  306 ‐156  Durumthali  Jethal, 7  Sindhupalchok 7 18 51  57 3157  Ghang Namsa  Lisankhu, 2  Sindhupalchok  21.768 75 209  213 70158  Golyang  Thulo dhading  Sindhupalchok  63.32 155 677  631 30159  Kalapani  Jethal, 7  Sindhupalchok 34.2 20 45  52 4160  Khalte  Attrapur, 4  Sindhupalchok  35.06 73 189  176 9161  Mulkharka  Jethal, 8, 9  Sindhupalchok  422 351 711  693 25162  Okhareni  Jethal, 7  Sindhupalchok 153 155 488  443 45163  Pachang  Lisankhu 1,4  Sindhupalchok  36.25 117 296  289 13164  Patle  Attrapur,8  Sindhupalchok  81.47 56 149  173 9165  Peukharka  Atterpur, 8  Sindhupalchok 15.75 24 67  80 5166  Tamche  Atterpur,7  Sindhupalchok  100.23 25 80  84 5

Grand total        48,148 24,946 70,244  69,741 5,654 

 

Page 27: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 25 

 ANNEX  8:  LIST  OF  ACTIVITIES  AND  RESOURCES  LEVERAGED  FOR  PROJECT ACTIVITIES  Activities implemented in collaboration  Partners Amount (Rs.)

Year 1  Year 2  Year 3  Total Resources leveraged from national programs of other stakeholders and ANSAB’s other projects Staff for field implementation in Humla and marketing  SIMI (ANSAB 

project) 2,680,000 1,538,708  4,218,708 

Local initiatives for conservation of biodiversity and threatened economic species in Nepal Himalaya in Parbat 

MHS (ANSAB project) 

1,700,000 1,857,047   450,000  4,007,047 

ANSAB‐LFP partnership agreement for enterprise development and marketing in 3 districts 

LFP  1,500,000  994,723    2,494,723 

Regular collection and dissemination of market price of NTFPs 

MIS (ANSAB program) 

300,000  300,000   300,000  900,000 

FSC forest management certification annual audit of FECOFUN 

CECI/WWF/LFP  469,000      469,000 

FORD‐ICIMOD and ANSAB partnership agreement for Enhancing livelihood & Reducing Poverty of Mountain People by Linking High Value Products & Services (HVPS) to Value Chain Development Project in Darchula district 

FORD‐ICIMOD       2,250,000  2,250,000 

Baglung Skill training on furniture making in Baglung  LFP 3,850  14,700  18,550 Material support to Allo enterprise in Adhikarichaur  LFP/BYC     14,700    14,700 Material support to Allo enterprise in Khunkhani  LFP/HMC  30,000  48,000   130,000  208,000 CFUG forest management plan revision  LFP 20,000    20,000 Allo processing training  LFP 17,310    66,150  83,460 Myagdi Skill development training for Lokta processing in Ruma LFP 163,741  20,000  183,741 Skill development training for Lokta processing in Ruma REDP 5,000  5,000 Skill development training for Lokta processing in Lulang  LFP/HRDC     20,000    20,000 Pro‐poor share support in Ruma  DFO     80,000    80,000 Pro‐poor share support in Ruma  LFP/Himawanti  40,000  40,000 Pro‐poor share support in Lulang  DFO     50,000    50,000 Pro‐poor share support in Lulang  LFP/HRDC 125,000  125,000  250,000 CF OP revision in Ruma and Lulang  DFO  80,000  80,000 Pro‐poor share support in Lulang  DFO  50,000  50,000    100,000 Enterprise startup capital for handmade paper making enterprise in Ruma and Lulang 

LFP  220,000      220,000 

CF OP revision in Ruma and Lulang  DFO    10,000  10,000 Infrastructure development support to paper enterprise, Ruma 

CSIDB        100,000  100,000 

Parbat Skill development training for lokta processing in Salija and Dhairing 

CSIDB    8,000    8,000 

Material support to Allo enterprise in Dhairing DFO  37,000  38,000  75,000 Material support to Allo enterprise in Dhairing  VDC     50,000    50,000 Pro‐poor share support Salija  DFO     56,000    56,000 Pro‐poor share support to Salija paper enterprise VDC  45,000  45,000 CF OP revision in Salija  DFO  30,000  30,000 Skill development training for Allo processing  LFP/HMC     25,000  8,000  33,000 Materials support to Wintergreen essential oil distillation unit 

LFP  100,000  100,000 

Infrastructure development support to Wintergreen essential oil distillation unit 

DDC     644,000  644,000 

Bajhang Training on quality control in handmade paper production   WUPAP   60,000    40,000  100,000 Handmade paper Production training   CSIDB 45,000    45,000 Account keeping and fund mobilization training  DFO 1,500    1,500 Facilitate to access finance for enterprise development   CARE  39,000      39,000 Enterprise development revolving fund  CARE  21,000      21,000 CFUG management plan revision  DFO 7,500    7,500 

Page 28: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 26 

Provide revolving fund to subgroups  PAF     95,000    95,000 Material support to Lokta paper enterprise in Dahabagar  PAF     452,508    452,508 Material support to Lokta paper enterprise in Dahabagar VDC  20,000  20,000 Skill development training to Lokta paper enterprise in Dahabagar 

HANDPASS       16,000  16,000 

Darchula Material support to Sibukthron Juice Enterprise in Khandeswori 

PAF     100,000    100,000 

Provide revolving fund to subgroups  PAF  365,840  365,840 Material support to Malikarjun Natural products Pvt.Ltd.   DFO       40,000  40,000 Baitadi Identification of possible micro enterprise for pro‐poor/women (PRA) 

MEDEP 3,800    3,800 

PRA/wellbeing ranking   MEDEP 7,500    7,500 SIYB training  MEDEP  25,160      25,160 Humla Establishment of NTFP seedling production nursery DFO 25,000    25,000 Renewal of CFUG forest management plans (6)  DFO  18,000      18,000 NTFP inclusion in CFUG OP  DFO  7,000      7,000 NTFPs sustainable management training (3)  DFO 140,000    140,000 Business plan preparation (4)  REAP  4,000      4,000 Traders Meeting  CCO  30,000      30,000 Dolakha Material support to Lokta enterprise in Sailung  DRSP  100000  100,000    200,000 Skill training to Lokta enterprise in Sailung  CSIDB       40,000  40,000 Material support (Mixture and boiler) to Lokta enterprise in Sailung and boach 

CSIDB    40,000  40,000 

Infrastructure development to briquette enterprise MEDEP     225,000  225,000 Infrastructure development to briquette enterprise  DDC and Other 

stakeholders      41,000  41,000 

Support to subgroup for Argeli plantation and IGA activities  DFO       25,000  25,000 Support to subgroup for Argeli plantation and IGA activities ECARDS    50,000  50,000 Infrastructure development support to paper enterprise, Bigu 

ECARDS        150,000  150,000 

Sindhupalchok Skill development training to briquette enterprise, Okhreni  CSIDB       15,000  15,000 Infrastructure development support to briquette enterprise, Sikre 

CSIDB    27,200  27,200 

Infrastructure development support to briquette enterprise, Okhreni 

MEDEP       77,000  77,000 

Total     7,809,511  6,711,376  4,797,050  19,317,937   

 

 

 

   

Page 29: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 27 

ANNEX  9:  LIST  OF  TRAININGS,  WORKSHOPS  AND  OTHER  EVENTS  IN  THE PROJECT DISTRICTS SN  Description of Activities Completed  Date Venue District Total 

participation Male Female DAG

1  Pro‐poor, community based enterprise development and networkingi  Identification of enterprise  

1  Identification of group enterprise   Jun, 08 Khungkhani  Baglung 82  27  55 2  Identification of group enterprise (CBEs)  Feb, 08 Ruma, Lulang Myagdi ‐ 3  Identification of group enterprises  Dec‐Jun, 08 Salija & Lekhphant Parbat ‐ 4  Identification of group enterprises  Mar, 08 Khandeshwori Darchula  120  83  37  48 5  Identification of group enterprises  Mar, 08 Latinath Darchula 92  83  9  32 6  Identification of group enterprises  Jan, 08 Humla  156  120  36 7  Identification of group enterprises  Apr, 08 Humla  182  137  45 8  Identification of group enterprises  Jun, 08 Humla 64  57  7 9  Identification of group enterprises  Jun, 08 Humla  104  81  23 10  Identification of group enterprises  Humla 26  26 11  Identification of group or private enterprise/

Hand made paper enterprise sailung Apr, 08 Katakuti Dolakha 85  60  25 

12  Identification of group or private enterprise/Indrabati essential oil enterprise 

Feb, 08 Dandakharka Dolakha 60  45  15  8 

13  Identification of possible micro enterprises for pro‐poor / women 

Jan, 08 Humla  195  153  42 

14  Identification of possible micro‐enterprise for pro‐poor/women 

Jan, 08 Khunga Baglung  169  99  70 

15  Identification of possible micro‐enterprise for pro‐poor/women 

Mar, 08 Salija Parbat  2  2  ‐

16  Identification of possible micro‐enterprise for pro‐poor/women 

8 Apr, 08 Salija Parbat  5  ‐ 5 

17  Identification of possible micro‐enterprise for pro‐poor/women 

Jun, 08 Kyang Parbat  6  3  3 

18  Identification of possible micro‐enterprise for pro‐poor/women 

May, 08 Kyang Parbat  8  ‐ 8 

19  Identification of possible micro‐enterprise for pro‐poor/women 

May, 08 Kyang Parbat  8  ‐ 8 

20  Identification of possible micro‐enterprise for pro‐poor/women 

Feb, 08 Ruma, Lulang Myagdi ‐ 

21  Identification of possible micro‐enterprise for pro‐poor/women 

Apr, 08 CFUGs Bajhang  351  281  70  102 

22  Identification of possible micro‐enterprise for pro‐poor/women 

Apr, 08 Latinath,Gulajar Darchula 55  55  10 

23  Identification of possible micro‐enterprise for pro‐poor/women 

Apr, 08 Humla  191  137  54 

24  Identification of possible micro‐enterprise for pro‐poor/women 

Apr, 08 Humla 96  61  35 

25  Identification of possible micro‐enterprise for pro‐poor/women 

Apr, 08 Humla  110  77  33 

26  Identification of possible micro‐enterprise for pro‐poor/women 

Jun, 08 Humla  161  115  46 

27  Identification of possible micro‐enterprise for pro‐poor/women 

Jun, 08 Humla 49  33  16 

28  Identification of possible micro‐enterprise for pro‐poor/women 

8 Mar, 08 Katakuti Dolakha 18  10  8  5 

29  Identification of possible micro‐enterprise for pro‐poor/women 

15 Mar, 08 Katakuti Dolakha 25  18  7  7 

30  Identification of possible micro‐enterprise for pro‐poor/women 

12 Apr, 08 Katakuti Dolakha 21  9  12  7 

31  Identification of possible micro‐enterprise for pro‐poor/women 

4 Apr, 08 Katakuti Dolakha 19  ‐ 19  8 

32  Identification of possible micro‐enterprise for pro‐poor/women 

12 May, 08 Katakuti Dolakha 24  2  22  5 

33  Identification of possible micro‐enterprise for pro‐poor/women 

16 Apr, 08 Katakuti Dolakha 29  16  13  4 

34  Identification of possible micro‐enterprise for pro‐poor/women 

23 Mar, 08 Katakuti Dolakha 20  6  14  20 

35  Identification of possible micro‐enterprise for pro‐poor/women 

8 May, 08 Katakuti Dolakha 17  7  10  17 

36  Identification of possible micro‐enterprise for pro‐poor/women 

4 May, 08 Jethal Sindhupalchok   8  7  1  2 

Page 30: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 28 

37  Identification of possible micro‐enterprise for pro‐poor/women 

26 April, 08 Thulopakhar Sindhupalchok  13  11  2  ‐

38  Identification of possible micro‐enterprise for pro‐poor/women 

22 March, 08 Attarpur Sindhupalchok   8  5  3  ‐

39  Identification of possible micro‐enterprise for pro‐poor/women 

6 Jun, 08, 08 Jethal Sindhupalchok   111  71  40  19 

40  Identification of possible micro‐enterprise for pro‐poor/women 

28 May, 08 Thulodhading Sindhupalchok  40  22  18  6 

41  Identification of possible micro‐enterprise for pro‐poor/women 

25 April, 08 Jethal Sindhupalchok   6  4  2  ‐

42  Identification of possible micro‐enterprise for pro‐poor/women 

28‐May‐08 Thulodhading Sindhupalchok  22  15  7  4 

43  Identification of possible micro‐enterprise for pro‐poor/women 

20 March, 08 Jethal Sindhupalchok  16  16  ‐ 2 

44  Identification of possible micro‐enterprise for pro‐poor/women 

25 March, 08 Attarpur Sindhupalchok  16  13  3  2 

45  Identification of possible micro‐enterprise for pro‐poor/women 

16 April, 08 Attarpur Sindhupalchok   8  3  5  ‐

46  Identification of possible micro‐enterprise for pro‐poor/women 

25 April, 08 Thulopakhar Sindhupalchok   8  5  3  1 

47  Identification of possible micro‐enterprise for pro‐poor/women 

3 Feb, 08 Lisankhu Sindhupalchok  18  18  ‐ 2 

48  Identification of possible micro‐enterprise for pro‐poor/women 

Feb, 08 Attarpur Sindhupalchok  10  10  ‐ ‐

49  Identification of possible micro‐enterprise for pro‐poor/women 

2‐May‐08 Thulodhading Sindhupalchok   6  4  2  ‐

50  Identification of possible micro‐enterprise for pro‐poor/women 

3 Jun, 08, 08 Jethal Sindhupalchok   8  5  3  2 

51  Identification of possible micro‐enterprise for pro‐poor/women 

3 Jun, 08, 08 Jethal Sindhupalchok   7  7  ‐ ‐

52  Identification of possible micro‐enterprise for pro‐poor/women 

9 Jun, 08, 08 Attarpur Sindhupalchok   5  2  3  ‐

53  Identification of possible micro‐enterprise for pro‐poor/women 

15 April, 08 Attarpur Sindhupalchok   9  4  5  1 

54  Identification of possible micro‐enterprise for pro‐poor/women 

7 March, 08 Jethal Sindhupalchok  48  27  21  6 

55  Identification of possible micro‐enterprise for pro‐poor/women 

4 May, 08 Jethal Sindhupalchok  16  12  4  ‐

56  Identification of possible micro‐enterprise for pro‐poor/women 

6 May, 08 Jethal Sindhupalchok  16  6  10  1 

57  Identification of possible micro‐enterprise for pro‐poor/women 

24 April, 08 Attarpur Sindhupalchok  13  5  8  ‐

58  Identification of possible micro‐enterprise for pro‐poor/women 

March to Jun, 08 Attarpur Sindhupalchok   270  175  95  40 

59  Identification of possible micro‐enterprise for pro‐poor/women 

Feb to Jun, 08 Attarpur Sindhupalchok  ‐ 

60  Identification of possible micro‐enterprise for pro‐poor/women 

Feb to Jun, 08 Attarpur Sindhupalchok  48  27  21  9 

61  Identification of possible micro‐enterprise for pro‐poor/women for Bee keeping 

April, 08 Sivling 7, 8, 9 Baitadi 30  5  25 

62  Identification of possible micro‐enterprise for pro‐poor/women for Chiuri enterprise 

May, 08 Mahadev CFUG Baitadi 40  26  14 

63  Identification of possible micro‐enterprise for pro‐poor/women for Chiuri enterprise 

May, 08 Shigash Sangada  Baitadi 55  36  19 

64  Identification of possible micro‐enterprise for pro‐poor/women for Chiuri enterprise 

May, 08 Bhumiraj Baitadi 25  16  9 

65  Detail information collection for possible enterprises 

Mar‐Jun, 09 Taman Baglung ‐ 

66  Detail Information collection for possible enterprises 

Jan, 08 Humla  373  316  57 

67  Detail Information collection for possible enterprises 

Apr, 08 Humla  503  408  95 

68  Detail Information collection for possible enterprises 

Jun, 08 Humla 73  71  2 

69  Detail Information collection for possible enterprises 

Jun, 08 Humla 26  26 

70  Identification ofmicro enterprises  10 July, 08 Salija Parbat 25  14  11 71  Identification group enterprise  20‐22 Oct, 08 Bhimgithe, Burtibang Baglung 18  15  3 72  Identification ofmicro enterprises  Oct, 08 Dhairing Parbat  3  ‐ 3 73  Identification ofmicro enterprises  March, 09 Khungkhani Baglung  2  2 

Page 31: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 29 

74  Identification ofmicro enterprises for Lokta collection and sale 

Jun, 09 Dhairing Parbat 16  16  13 

75  Identification ofmicro enterprises  4‐Jul‐08 Kyang 8‐9 Parbat  7  2  5 76  Identification ofmicro enterprises  10 July, 08 Salija 8 Parbat 25  11  14  2 77  Identification ofmicro enterprises  24 Aug, 08 Dhairing Parbat 10  ‐ 10 78  Identification ofmicro enterprises  Oct, 08 Dhairing Parbat  3  ‐ 3 79  Identification ofmicro enterprises‐Subgroup 22 July, 08 Nagi Dolakha 25  7  18  ‐80  Identification ofgroup enterprises‐Essential oil 

processing enterprise 25 July, 08 Dandakharka Dolakha 17  17  ‐ 2 

81  Identification ofmicro enterprises‐Subgroup 16‐18 Jul, 08 Sirjana CF Dolakha 44  12  32  4 82  Identification ofmicro enterprises‐Subgroup 19 July, 08 Jugedarkha Dolakha 17  10  7  ‐83  Identification ofgroup enterprises‐Paper 

enterprise  31 Aug. 08 Katakuti Dolakha 15  15  ‐ ‐

84  Identification ofmicro enterprises‐Subgroup 10‐20 Aug, 08 Gairi Dolakha 94  45  49  15 85  Identification ofmicro enterprises  Aug, 08 new area Dolakha  110  80  30  15 86  Identification ofgroup enterprises‐Briquitte 

enterprise  9 to11 Sep. 08 new area  Dolakha 20  14  6  20 

87  Identification ofmicro enterprises‐Subgroup 5,14,16 Sep. 08 Gairi,Kitnibhir Dolakha 97  42  55  9 88  Identification ofmicro enterprises  9 to 25 Sep, 08 new area  Dolakha 20  14  6  1 89  Identification ofmicro enterprises‐Subgroup  17 to 22 Sep.08 Sirjana CF Dolakha 38  18  20  8 90  Identification ofgroup enterprises‐

Wintergreen enterprise 25 to26 July 08 Sikre Sindhupalchok  13  13  ‐ ‐

91  Identification ofgroup enterprises‐Wintergreen enterprise 

3 Aug. 08 Sikre Sindhupalchok  11  5  6  ‐

92  Identification ofmicro enterprises‐Subgroup 11 Aug. 08 Jethal Sindhupalchok   7  4  3  ‐93  Identification ofmicro enterprises‐Subgroup 18 Aug. 08 Patle Sindhupalchok   8  5  3  ‐94  Participate and facilitate to organize 

agriculture cooprative 20 Aug. 08 Jethal Sindhupalchok  26  15  11  ‐

95  Identification ofmicro enterprises‐Subgroup 21 Aug. 08 Golyang Sindhupalchok  11  11  ‐ ‐96  Meeting for wintergreen enterprise 

ragistration 25 Aug. 08 Sikre Sindhupalchok   7  7  ‐ ‐

97  Identification ofgroup enterprises‐Vegetable production 

19 Sep. 08 Jethal Sindhupalchok  24  9  15  ‐

98  Observation of Argeli cultivation land  16,17,18 July, 08 Sirjana CF Dolakha 28  18  10  8 99  Identification ofmicro enterprises‐Subgroup  16,17,18 July, 08 Sirjana CF Dolakha 28  18  10  8 100  Identification of micro enterprises‐Subgroup  4 to7 July, 08 Kalinchock Dolakha 50  30  20  20 101  Identification ofgroup enterprises‐Timber 

depot 24 to28 Aug. 08 Bodle Dolakha 13  10  3  1 

102  Identification ofmicro enterprises‐Subgroup July to Sep. 08 Sailung Dolakha 90  50  40  20 103  Identification ofmicro enterprises‐Subgroup 9 to12 Sep. 08 Sirjana CF Dolakha  134  65  69  18 104  Charcoal production group identification  17 to 22 Oct. 08 Sailung Dolakha 20  12  8  4 105  Identification ofmicro enterprises‐Subgroup 12 Oct. 08 Attarpur Sindhupalchok  10  9  1  ‐106  Identification ofmicro enterprises‐Subgroup 13 Oct. 08 Tamche Sindhupalchok  14  5  9  1 107  Identification ofmicro enterprises‐Mask 

enterprise 3 Nov. 08 Pamchet Sindhupalchok   8  7  1  ‐

108  Organize meeting of choarcoal production group 

7 Nov. 08 Patle Sindhupalchok   9  9  ‐ ‐

109  Identification ofmicro enterprises‐Cardamum 10 Nov. 08 Sikre Sindhupalchok  12  8  4  ‐110  Identification ofmicro enterprises  12 to 15 Nov, 08 Sailung Dolakha  2  2  ‐ ‐111  Identification ofmicro enterprises‐Vegetatable 

production 19 Nov.08 Jethal Sindhupalchok  19  12  7  2 

112  Identification ofmicro enterprises‐Subgroup 20 to25 Dec. 08 Boach, Fasku Dolakha 62  20  42  7 113  Identification ofmicro enterprises‐Enterprise 

development revolving fund March, 09 Sailung, Charikot, 

Sikre Sindhupalchok  33  25  8  5 

114  Identification ofgroup enterprises‐Timber depot 

3 Dec. 08 Attarpur Sindhupalchok  13  11  2  ‐

115  Identification ofmicro enterprises‐Subgroup 17 Dec. 08 Jethal Sindhupalchok  13  7  6  2 116  Identification ofgroup enterprises‐Timber 

depot 18 Dec. 08 Jethal Sindhupalchok  14  8  6  1 

117  Identification ofmicro enterprises‐Subgroup 30 Dec. 08 Kalapani Sindhupalchok   9  7  2  1 118  Identification ofgroup enterprises‐Timber 

depot 18 to 20 Jan. 09 Katakuti Dolakha 10  8  2  2 

119  Identification ofmicro enterprises‐Subgroup 20 Jan. 09 Jethal Sindhupalchok  11  6  5  2 120  Identification ofgroup enterprises‐Timber 

depot 22 Jan. 09 Jethal Sindhupalchok  12  8  4  1 

121  Identification ofmicro enterprises‐Subgroup 15 Feb, 09 Katakuti Dolakha 58  20  38  12 122  Identification of enterprises‐Timber depot  12, 15 Feb. 09 Katakuti Dolakha 23  15  8  4 123  Identification ofmicro enterprises‐Enterprise 

development revolving 12 Feb. 09 Katakuti Dolakha 15  10  5  6 

Page 32: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 30 

124  Identification ofmicro enterprises‐Subgroup 23 to 27 Feb. 09 Sailung Dolakha 35  15  20  10 125  Identification ofgroup enterprises‐Timber 

depot 13 March, 09 Attarpur Sindhupalchok  20  11  9  3 

126  Identification ofmicro enterprises‐Essential oil 28 April, 09 Katakuti Dolakha 14  12  2  4 127  Identification ofgroup enterprises‐Lokta 

processig 18‐Aug Bamor Bajhang 33  18  15  3 

128  Identification ofgroup enterprises‐Lokta processig 

13‐Sep Goiechan Bajhang 31  18  13  5 

129  Identification ofgroup enterprises‐Dhatelo oil 1‐Sep Putlek Bajhang 21  11  10  1 130  Identification ofgroup enterprises‐Dhatelo oil 13‐Sep Goiechan Bajhang 31  18  13  5 131  Identification ofgroup enterprises‐Dhatelo oil 26‐Aug Ranlek Bajhang 23  13  10  3 132  Identification ofgroup enterprises‐Dhatelo oil 5‐Sep Bittahad Bajhang 62  31  31  ‐133  Enterpriseregistration (on the process)  22‐Mar Chainpur Bajhang  6  3  3  ‐134  Identification ofgroup enterprise  Nov,08 Patha Darchula 24  19  5 135  Identification ofgroup enterprise  Nov,08 Tolimandu Darchula 10  9  1 136  Identification ofgroup enterprise  Nov,08 Gholjar Darchula 25  16  9  2 137  Identification ofgroup enterprise  Nov,08 Tothi Darchula 34  15  19 138  Identification ofgroup enterprise  Nov,08 Ghanjir Darchula 18  12  6 139  Identification ofgroup enterprise  Nov,08 Ranghadi Darchula 23  19  4  5 140  Identification ofallo therad making enterprise  Mar, 09 Khungkhani Baglung 17  17  17 141  Identification ofallo therad making enterprise  Nov, 09 Bongkhani Baglung 16  16  14 142  Identification offurniture enterprise  5 Dec, 09 Darbang Myagdi  5  1  4 143  Identification ofmicro enterprises‐Subgroup Jun, 09 Dhairing Parbat 16  16  13 144  Identification ofmicro enterprises‐Subgroup 4 Aug, 09 Kyang 8‐9 Parbat  7  2  5 145  Identification of possible micro enterprise for 

pro‐poor/women 10 Jul, 09 Salija 8 Parbat 25  11  14  2 

146  Identification of possible micro enterprises for pro‐poor / women 

24 Aug, 09 Dhairing Parbat 10  ‐ 10 

147  Identification of possible micro‐enterprise for pro‐poor/women 

Oct, 09 Dhairing Parbat  3  ‐ 3 

148  Meeting with LicheCFUC for lokta enterprise development 

18 Aug, 09 Bamor Bajhang 33  18  15  3 

149  Meeting with Jutevatmaya CFUC for lokta enterprise development 

13 Sep, 09 Goiechan Bajhang 31  18  13  5 

150  Identification of enterprise optiuon‐Dhatelo oil  

1 Sep, 09 Putlek Bajhang 21  11  10  1 

151  Identification of enterprise optiuon‐Dhatelo oil  

13 Sep, 09 Goiechan Bajhang 31  18  13  5 

152  Identification of enterprise optiuon‐Dhatelo oil  

26 Aug, 09 Ranlek Bajhang 23  13  10  3 

153  Identification of enterprise optiuon‐Dhatelo oil  

5 Sep, 09 Bittahad Bajhang 62  31  31  ‐

154  Identification of micro‐enterprise‐Subgroup 22 Oct, 09 Suspa Dolakha 25  14  11  16 155  Identification of micro‐enterprise‐Subgroup 19 Jan, 10 Kahare Dolakha 23  12  11  7 156  Identification and organize a vegetable 

production group in Tamche 22 Aug, 09 Tamche Sindhupalchok  19  12  7  6 

157  Identification of micro‐enterprise‐Subgroup 13 Aug, 09 Nagina Darchula 79  45  34  21 158  Identification of micro‐enterprise‐Subgroup 14 Aug, 09 Thadmala Darchula 24  19  5  ‐159  Identification of micro‐enterprise‐Subgroup 9 Aug, 09 Kholsi Darchula 30  23  7  5 160  Identification of micro‐enterprise‐Subgroup 11 Aug, 09 Barmude Darchula 26  21  5  ‐161  Identification of micro‐enterprise‐Subgroup 19 Aug, 09 Dubedi Darchula 61  44  17  10 162  Identification of micro‐enterprise‐Subgroup 5 Sep, 09 Madhu CFUG Darchula 21  15  6 163  Identification of micro‐enterprise‐Subgroup 6 Sep, 09 Maheshor CFUG Darchula 31  23  8  7 164  Identification of micro‐enterprise‐Subgroup 8 Sep, 09 Shigas CFUG Darchula 47  33  14  12 

Subtotal ‐‐ Total: 6924; Male: 4570; Female: 2354; DAG: 772ii  Pro poor and women focused awareness raising meetings and orientation in community gathering

1  Awareness package focused to pro poor/women enterprise  

Mar0Jun, 08 Adhikarichaur Baglung  277  151  126 

2  Awareness package focused to pro poor/women enterprise in HH level 

Jan, 08 Humla 7,346   3,637  3,709 

3  Awareness package focused to pro poor/women enterprise in HH level 

Apr, 08 Humla 7,346   3,637  3,709 

4  Awareness package focused to pro‐poor/women enterprises (HH level) 

Jan, 08 Jhilibarang Parbat 55  25  30 

5  Awareness package focused to pro‐poor/women enterprises (HH level) 

2 May, 08 Lekhphant Parbat 45  25  20 

6  Awareness package focused to pro‐poor/women enterprises (HH level) 

2 May, 08 Lekhphant Parbat ‐ 

7  Awareness package focused to pro‐ 25 May, 08 Halhale, Kyang Parbat 20  13  7 

Page 33: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 31 

poor/women enterprises (HH level) 8  Awareness package focused to pro‐

poor/women enterprises (HH level) 10‐12 Feb, 08 Ruma Myagdi 24  3  21  6 

9  Awareness package focused to pro‐poor/women enterprises (HH level) 

17‐19 Feb, 08 Ruma Myagdi 19  4  15  4 

10  Awareness package focused to pro‐poor/women enterprises (HH level) 

12‐13 March, 08 Ruma Myagdi 31  26  5  2 

11  Awareness package focused to pro‐poor/women enterprises (HH level) 

14‐15 Mar, 08 Ruma Myagdi 17  1  16  15 

12  Awareness package focused to pro‐poor/women enterprises (HH level) 

15‐16 Feb, 08 Lulang Myagdi 25  13  12  ‐

13  Awareness package focused to pro‐poor/women enterprises (HH level) 

17‐18 Feb, 08 Lulang Myagdi 28  16  12  28 

14  Awareness package focused to pro‐poor/women enterprises (HH level) 

5 Apr, 08 Lulang Myagdi 28  11  17  24 

15  Awareness package focused to pro‐poor/women enterprises (HH level) 

Apr‐Jun, 08 CFUGs Bajhang  446  359  87  123 

16  Awareness package focus to pro‐poor and women enterprise 0 Aclepakha CFUG 

Mar to Apr, 08 Lakuridanda Dolakha 40  30  10  5 

17  Awareness package focus to pro‐poor and women enterprise 0 Chanedanda CFUG 

Mar to Apr, 08 Katakuti Dolakha 25  18  7  8 

18  Awareness package focus to pro‐poor and women enterprise 0 Chitrepakha CFUG 

Mar to Apr, 08 Bhusafeda Dolakha 27  20  7  4 

19  Awareness package focus to pro‐poor and women enterprise 0 Ghumaune pani CFUG 

Mar to Apr, 08 Bhusafeda Dolakha 24  15  9  8 

20  Awareness package focus to pro‐poor and women enterprise 0 Gugedarkha CFUG 

Mar to Apr, 08 Katakuti Dolakha 48  38  10  9 

21  Awareness package focus to pro‐poor and women enterprise 0 Langthapa CFUG 

Mar to Apr, 08 Bhusafeda Dolakha 26  18  8  7 

22  Awareness package focus to pro‐poor and women enterprise 0 Tharlange CFUG 

Mar to Apr, 08 Maga Dolakha 50  35  15  10 

23  Awareness package focus to pro‐poor and women enterprise 0Bhumistan Conservation group 

Mar to Apr, 08 Sailung Dolakha 72  50  22  10 

24  Awareness package focus to pro‐poor and women enterprise 0Dhungredevi Conservation group 

Mar to Apr, 08 Bhedpu Dolakha 66  45  21  12 

25  Awareness package focus to pro‐poor and women enterprise 0Fhalam pokhari CFUG 

Mar to Apr, 08 Sailung Dolakha 20  15  5  4 

26  Awareness package focus to pro‐poor and women enterprise 0Gairi CFUG 

Mar to Apr, 08 Fasku Dolakha 25  18  7  5 

27  Awareness package focus to pro‐poor and women enterprise 0Golmeswor CFUG 

Mar to Apr, 08 Katakuti Dolakha 49  37  12  7 

28  Awareness package focus to pro‐poor and women enterprise 0Kalibhumi Conservation group 

Mar to Apr, 08 Ghayng Dolakha 58  40  18  15 

29  Awareness package focus to pro‐poor and women enterprise 0Kalidevi CFUG 

Mar to Apr, 08 Dandakharka Dolakha 32  24  8  5 

30  Awareness package focus to pro‐poor and women enterprise 0Kitani Bhir CFUG 

Mar to Apr, 08 Fasku Dolakha 22  15  7  3 

31  Awareness package focus to pro‐poor and women enterprise 0Mahadevstan CFUG 

Mar to Apr, 08 Sailung Dolakha 39  28  11  5 

32  Awareness package focus to pro‐poor and women enterprise 0Sanubodle CFUG 

Mar to Apr, 08 Katakuti Dolakha 36  23  13  6 

33  Awareness package focus to pro‐poor and women enterprise 0Sirjana CFUG 

Mar to Apr, 08 Katakuti Dolakha 64  42  22  15 

34  Awareness package focused to pro poor/women enterprise in HH level 

11 Jul, 08 Khunga Baglung 40  10  30 

35  Awareness package focused to pro poor/women enterprise 

Jul, 08 Ruma, Lulang Myagdi ‐ 

36  Awareness package focused to pro poor/women enterprise‐Sisno powder 

27 Oct, 08 Khunga Baglung  7  ‐ 7 

37  Awareness package focused to pro poor/women enterprise‐share collection 

Oct, 08 Salija Parbat 18  14  4 

38  Awareness package focused to pro poor/women enterprise‐share collection 

July, 08 Ruma, Lulang Myagdi 13  7  6  ‐

39  Awareness package focused to pro poor/women enterprise‐share collection 

10‐12,15‐20, Aug, 08 

Ruma, Lulang Myagdi  121  99  22  ‐

40  Awareness package focused to pro poor/women enterprise‐Wintergreen & Allo 

1, 17, Aug 08 Arman, Takam Myagdi 51  26  25  ‐

Page 34: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 32 

enterprise awareness 41  Awareness package focused to pro 

poor/women enterprise‐Enterprise maagement 

20‐25 July, 09 Ruma, Lulang Myagdi  269  152  117  30 

42  Awareness package focused to pro poor/women enterprise‐Enterprise management 

2,24,26,31Oct, 08 Ruma, Lulang Myagdi 33  28  5  ‐

43  Awareness package focused to pro poor/women enterprise 

9,12 Nov.08 Ruma, Lulang Myagdi  183  103  80  ‐

44  Awareness package focused to pro poor/women enterprise 

11,July,08 Khunga Baglung 40  10  30 

45  Awareness package focused to pro poor/women enterprise 

17,July,08 Khunga Baglung 10  ‐ 10 

46  Awareness package focused to pro poor/women enterprise‐Enterprise management 

20,July,08 Khunga Baglung 11  9  2 

47  Awareness package focused to pro poor/women enterprise‐Enterprise management 

5,Aug,08 Khunga Baglung  6  1  5  5 

48  Awareness package focused to pro poor/women enterprise‐Timber depot 

4, Aug,08 Khunga Baglung 44  1  43  27 

49  Awareness package focused to pro poor/women enterprise 

18‐Jul‐08 Lekhphant 7 Parbat 19  2  17 

50  Awareness package focused to pro poor/women enterprise‐Enterprise management 

11,13,Aug,08  Salija, Lekhphant Parbat 63  27  36 

51  Awareness package focused to pro poor/women enterprise‐share collection 

27,Aug,08 Salija Parbat  179  97  82 

52  Awareness package focused to pro poor/women enterprise 

25 & 30,Aug,08 Lekhphant Parbat  155  69  86 

53  Awareness package focused to pro poor/women enterprise‐Enterprise management 

9, 21 & 26 Sep, 08 Salija, Lekhphant Parbat 83  58  25 

54  Awareness package focused to pro poor/women enterprise‐share collection 

21 & 26 Sep., 08 Salija Parbat 62  47  15 

55  Awareness package focused to pro poor/women enterprise‐share collection 

Oct, 08 Salija Parbat 18  14  4 

56  Awareness package focused to pro poor/women enterprise‐Enterprise management 

18 Dec, 08 Lekhphant Parbat 29  17  12 

57  Awareness package focused to pro poor/women enterprise‐sub group 

22 Dec, 08 Dhairing Parbat 18  2  16 

58  Awareness package focused to pro poor/women enterprise‐Enterprise management 

15,21,29 Nov, 08 Salija, Lekhphant Parbat 95  65  30 

59  Awareness package focused to pro poor/women enterprise‐share collection 

Nov, 08 Salija Parbat ‐ 

60  Awareness package focused to pro poor/women enterprise‐Enterprise management 

7&11 Mar, 09 Lekhphant Parbat 22  19  3 

61  Awareness package focused to pro poor/women enterprise‐Enterprise management 

18 Dec, 08 Lekhphant Parbat 29  17  12 

62  Awareness package focused to pro poor/women enterprise‐sub group 

22 Dec, 08 Dhairing Parbat 18  2  16 

63  Awareness package focused to pro poor/women enterprise‐sub group 

22,26,27 July,08 Sirjana CF Dolakha 58  15  43  16 

64  Awareness package focused to pro poor/women enterprise‐timber depot 

21 Sep. 08 Bodlesetidevi Dolakha 16  9  7  ‐

65  Awareness package focused to pro poor/women enterprise‐Briquette 

22 Aug. 08 Attarpur Sindhupalchok  14  8  6  ‐

66  Awareness package focused to pro poor/women enterprise‐Briquette 

8 Sep. 08 Attarpur Sindhupalchok  21  14  7  ‐

67  Awareness package focused to pro poor/women enterprise‐Briquette 

9 Sep. 08 Tamche Sindhupalchok   9  6  3  ‐

68  Awareness package focused to pro poor/women enterprise‐Briquette 

10 Sep. 08 Jethal Sindhupalchok   8  5  3  ‐

69  Awareness package focused to pro poor/women enterprise‐Briquette 

11 Sep. 08 Peukharka Sindhupalchok  10  7  3  ‐

70  Awareness package focused to pro  16 to 17 Sep 08 Ktm Center  2  ‐ 2  ‐

Page 35: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 33 

poor/women enterprise‐Briquette 71  Awareness package focused to pro 

poor/women enterprise 1 to 3 Oct. 08 Boach Dolakha 16  12  4  3 

72  Awareness package focused to pro poor/women enterprise 

24 Oct. 08 Charikot Dolakha 20  16  4  1 

73  Awareness package focused to pro poor/women enterprise 

16 Oct. 08 Jethal Sindhupalchok  18  11  7  1 

74  Awareness package focused to pro poor/women enterprise‐sub group 

15 to 22 Nov. 09 Sailung Dolakha 68  38  30  15 

75  Awareness package focused to pro poor/women enterprise 

25 to 28 Nov. 08 Boach Dolakha 12  8  4  ‐

76  Awareness package focused to pro poor/women enterprise‐sub group 

28 to 30 Nov. 08 Lankuri danda Dolakha 32  20  12  10 

77  Awareness package focused to pro poor/women enterprise 

27‐Nov‐08 Attarpur Sindhupalchok  12  7  5  ‐

78  Awareness package focused to pro poor/women enterprise‐Lokta paper 

12 Dec. 08 Katakuti Dolakha 22  21  1  3 

79  Awareness package focused to pro poor/women enterprise‐sub group 

15 to20 Dec. 08 Sailung Dolakha 13  8  5  2 

80  Awareness package focused to pro poor/women enterprise‐sub group 

20 to28 Dec. 08 Sailung Dolakha 75  30  45  15 

81  Awareness package focused to pro poor/women enterprise‐Lokta paper 

16 to 24 Dec. 08 Katakuti Dolakha 10  10  ‐ 3 

82  Awareness package focused to pro poor/women enterprise‐sub group 

1 to 8 Dec. 08 Boach Dolakha 14  6  8  4 

83  Awareness package focused to pro poor/women enterprise 

5 Dec. 08 Sikre Sindhupalchok  12  9  3  ‐

84  Awareness package focused to pro poor/women enterprise‐cardamum 

21 Dec. 08 Attarpur Sindhupalchok  12  10  2  2 

85  Awareness package focused to pro poor/women enterprise 

31 Dec. 08 Jethal Sindhupalchok  11  9  2  ‐

86  Awareness package focused to pro poor/women enterprise‐Lokta paper 

31, Jan. 09 Katakuti Dolakha 22  21  1  3 

87  Awareness package focused to pro poor/women enterprise 

6 Jan. 09 Lankuri danda Dolakha  4  4  ‐ ‐

88  Awareness package focused to pro poor/women enterprise‐sub group 

19 Jan. 09 Charnabati Dolakha  7  2  5  3 

89  Awareness package focused to pro poor/women enterprise 

21 Jan. 09 Charnabati Dolakha 15  9  6  2 

90  Awareness package focused to pro poor/women enterprise 

11 Jan. 09 Tamche Sindhupalchok  22  15  7  6 

91  Awareness package focused to pro poor/women enterprise 

18 Jan. 09 Jethal Sindhupalchok  11  7  4  1 

92  Awareness package focused to pro poor/women enterprise 

4 Jan. 09 Jethal Sindhupalchok   107  78  29  6 

93  Awareness package focused to pro poor/women enterprise‐Briquette 

5 Jan. 09 Sikre Sindhupalchok   7  7  ‐ 4 

94  Awareness package focused to pro poor/women enterprise‐sub group 

25 Jan. 09 Tamche Sindhupalchok  25  16  9  6 

95  Awareness package focused to pro poor/women enterprise‐Mask making 

2 Jan. 09 Attarpur Sindhupalchok   8  7  1  ‐

96  Awareness package focused to pro poor/women enterprise‐sub group 

Feb. 09 Sailung Dolakha  182  62  120  45 

97  Awareness package focused to sub group  2 Feb. 09 Makaibari Dolakha  5  4  1  1 98  Awareness package focused to pro 

poor/women enterprise‐Lokta paper 3 Feb. 09 Boach Dolakha  2  2  ‐ ‐

99  Awareness package focused to pro poor/women enterprise‐wintergreen 

11 Feb. 09 Lankuri danda Dolakha  9  4  5  3 

100  Awareness package focused to pro poor/women enterprise 

12 Feb. 09 Suspa Dolakha  9  7  2  2 

101  Awareness package focused to pro poor/women enterprise 

3 to 4 March, 09 Sailung Dolakha  4  4  ‐ ‐

102  Awareness package focused to pro poor/women enterprise 

18, 26 March, 09 Deurali Dolakha 12  8  4  3 

103  Awareness package focused to pro poor/women enterprise‐sub group 

27, 28 March, 09 Katakuti Dolakha 17  5  12  5 

104  Awareness package focused to pro poor/women enterprise 

26 March, 09 Danda Kharka Dolakha 19  12  7  4 

105  Awareness package focused to pro poor/women enterprise‐Lokta paper 

1 March, 09 Boach Dolakha  3  3  ‐ ‐

Page 36: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 34 

106  Awareness package focused to pro poor/women enterprise‐wintergreen enterprise  

3 to 4 March, 09 Suspa Dolakha  5  5  ‐ 1 

107  Awareness package focused to pro poor/women enterprise‐sub group 

7 March, 09 Makaibari Dolakha  9  6  3  2 

108  Awareness package focused to pro poor/women enterprise‐Lokta paper 

29 March, 09 Charikot Dolakha  4  4  ‐ ‐

109  Awareness package focused to pro poor/women enterprise 

4, 11, 24 March, 09 

Jethal Sindhupalchok  19  9  10  2 

110  Awareness package focused to pro poor/women enterprise‐Briquette 

5, 14 March, 09 Sikre Sindhupalchok  11  4  7  2 

111  Awareness package focused to pro poor/women enterprisesub group 

9, 23March, 09 Tamche Sindhupalchok  20  12  8  4 

112  Awareness package focused to pro poor/women enterprise‐Lokta paper 

7 April , 09 Boach Dolakha  5  5  ‐ ‐

113  Awareness package focused to pro poor/women enterprise 

9 Apri. 09 Boach Dolakha 10  7  3  2 

114  Awareness package focused to pro poor/women enterprise 

20 Apri., 09 Makaibari Dolakha  8  5  3  ‐

115  Awareness package focused to pro poor/women enterprise 

24 April, 09 Boach Dolakha  165  115  50  20 

116  Awareness package focused to pro poor/women enterprise‐timber depot 

28, 29 Apri. 09 Boach Dolakha 55  50  5  7 

117  Awareness package focused to pro poor/women enterprise‐Briquette 

10 April, 09 Sikre Sindhupalchok  45  25  20  6 

118  Awareness package focused to pro poor/women enterprise 

23 Aug. 08 Aklepakha Dolakha 75  50  25  15 

119  Awareness package focused to pro poor/women enterprise‐wintergreen enterprise 

17 July, 08 Sikre Sindhupalchok  10  6  4  ‐

120  Awareness package focused to pro poor/women enterprise‐Lokta paper 

19‐Aug Daha Bajhang 22  15  7  2 

121  Awareness package focused to pro poor/women enterprise‐Lokta paper 

30‐Aug Taldyan Bajhang 47  24  23  7 

122  Awareness package focused to pro poor/women enterprise‐Lokta paper 

30‐Aug Bagada Bajhang 18  18  ‐ 11 

123  Awareness package focused to pro poor/women enterprise‐Lokta paper 

27‐Aug Baddijyaban Bajhang 11  8  3  ‐

124  Awareness package focused to pro poor/women enterprise‐Lokta paper 

28‐Aug Lekgaon Bajhang 18  18  ‐ ‐

125  Awareness package focused to pro poor/women enterprise‐Lokta paper 

18‐Aug Dalkot Bajhang 16  11  5  16 

126  Awareness package focused to pro poor/women enterprise‐Yarsagumba 

10‐Oct Goiechan Bajhang 39  30  9 

127  Awareness package focused to pro poor/women enterprise‐Yarsagumba 

2 oct,Nov,08 Bamor Bajhang 73  68  5  ‐

128  Awareness package focused to pro poor/women enterprise‐Yarsagumba 

24 Jan,09 Basti Bajhang  114  88  26  ‐

129  Awareness package focused to pro poor/women enterprise‐Yarsagumba 

20 Jan,09 Kachali Bajhang 87  54  33  ‐

130  Awareness package focused to pro poor/women enterprise‐Yarsagumba 

17 Apr,09 Khandeshori Darchula  500  400  100  100 

131  Awareness package focused to pro poor/women enterprise‐Yarsagumba 

16 Apr,09 Khandeshori Darchula 70  55  15  10 

132  Meeting on furniture enterprise development 11 Jul, 09 Khunga Baglung 40  10  30 133  Enterprise management committee formation 

meeting 20 Jul, 09 Khunga Baglung 11  9  2 

134  Enterprise management committee meeting 5 Aug, 09 Khunga Baglung  6  1  5  5 135  Entrepreneurship development package‐

hands on training 17 Jul, 09 Khunga Baglung 10  ‐ 10 

136  Facilitate timber depot establishment  4 Aug, 09 Khunga Baglung 44  1  43  27 137  Meeting with VFCC for Chiuri enterprise 

initiation 1 Aug, 09 Burtibang Baglung 12  9  3 

138  Meeting with VFCC for Chiuri enterprise initiation 

31 Sep, 09 Burtibang Baglung 16  14  2 

139  Meeting on enterprise management  4 Mar, 10 Ruma, Lulang Myagdi 45  36  9 140  Meeting on enterprise management  28 Jul, 09 Ruma, Lulang Myagdi 50  19  31 141  Meeting on enterprise management  1‐15 Sep, 09 Ruma, Lulang,Fullbari Myagdi 37  28  9 142  Meeting on enterprise management  10,25 Oct 09 Ruma, Lulang Myagdi 26  19  7 143  Meeting on enterprise management  1 Nov, 09 Adhibara Myagdi 15  13  2 

Page 37: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 35 

144  Enterprise management committee meeeting 13 Aug, 09 Lekhphant Parbat 29  24  5 145  Enterprise management committee meeeting 20 May, 10 Salija Parbat 22  15  7 146  Enterprise management committee meeeting 3 Nov, 09 Salija Parbat 11  9  2 147  Enterprise management committee meeeting 8 Nov, 09 Salija Parbat 17  14  3 148  Enterprise management committee meeeting 20 Nov, 09 Dandakateri Parbat 13  11  2 149  Enterprise management committee meeeting 22 Feb, 10 Salija Parbat 13  10  3 150  Enterprise management committee meeeting 8 Feb, 10 Salija Parbat 16  13  3 151  Enterprise management committee meeeting 2 Feb, 10 Salija Parbat  8  6  2 152  Enterprise management committee meeting 

facilitation 11 Aug, 09 Salija, Lekhphant Parbat 63  27  36 

153  Enterprise management committee meeting facilitation 

21‐26 Sep, 09 Salija, Lekhphant Parbat 83  58  25 

154  Enterprise management committee meeting facilitation 

18 Dec, 09 Lekhphant Parbat 29  17  12 

155  Enterprise management committee meeting facilitation 

15,21,29 Nov, 09 Salija, Lekhphant Parbat 95  65  30 

156  Enterprise management committee meeting facilitation 

11 Mar, 09 Lekhphant Parbat 22  19  3 

157  Enterprise management committee meeting facilitation 

18 Dec, 09 Lekhphant Parbat 29  17  12 

158  Enterprise share collection meeting  Oct, 09 Salija Parbat 18  14  4 159  Enterprise share collection meeting   27 Aug, 09 Salija Parbat  179  97  82 160  Enterprise share collection meeting   21 Sep, 09 Salija Parbat 62  47  15 161  Enterprise share collection meeting   Nov, 09 Salija Parbat 19  10  9 162  Meeting with sub group and facilitation  22 Dec, 09 Dhairing Parbat 18  2  16 163  Meeting with sub group and facilitation  23 Dec, 09 Dhairing Parbat 18  2  16 164  Meeting with PatalCFUG for lokta ent 

establishment 13 Mar, 10 Daha Bajhang 22  15  7  2 

165  Meeting with Chandichhada patal Cfug for lokta ent establishment 

24 Mar, 10 Taldyan Bajhang 47  24  23  7 

166  Meeting withLekgaon Villgersfor lokta ent establishment 

25 Mar, 10 Bagada Bajhang 18  18  ‐ 11 

167  Meeting with Khadgade villegarsfor lokta ent establishment 

27 Aug, 09 Baddijyaban Bajhang 11  8  3  ‐

168  Meeting withSurpalvillegars for lokta ent establishment 

22 Mar, 10 Lekgaon Bajhang 18  18  ‐ ‐

169  Meeting with Dalit Janjati CFUGfor lokta ent establishment 

18 Aug, 09 Dalkot Bajhang 16  11  5  16 

170  Orientation training subgroup on Yarsagumba management 

10 Oct, 09 Goiechan Bajhang 39  30  9 

171  Orientation training subgroup on Yarsagumba management 

2 Oct, 09 Bamor Bajhang 73  68  5  ‐

172  Orientation training subgroup on Yarsagumba management 

24 Jan, 10 Basti Bajhang  114  88  26  ‐

173  Orientation training subgroup on Yarsagumba management 

20 Jan, 10 Kachali Bajhang 87  54  33  ‐

174  Awareness campaign on Yarsagumba conservation 

17 Apr, 10 Khandeshori Darchula   

175  Meeting with collectors for Yarsagumba conservation 

16 Apr, 10 Khandeshori Darchula 70  55  15  10 

176  Awareness campaign on DalechukJuice promotion 

Mar, 10 Ganna Darchula   

177  Awareness campaign on DalechukJuice promotion 

Feb, 10 Gokuleshor Darchula   

178  Support to regular meeting to sub group  17 Jul, 10 Charikot Cluster Dolakha  165  50  115  35 179  Support regular meetings of sub groups  16‐18 Aug, 09 Katakuti Dolakha 75  25  50  23 180  General assembly of Sailung paper enterprise 12 Aug, 09 Charikot Cluster Dolakha 30  22  8  5 181  Meeting with Sanubodle CFUG  5 Sep, 09 Katakuti Dolakha  7  7  ‐ ‐182  Meeting with Subgroup of Kande  9 Sep, 09 Kande Dolakha 25  7  18  ‐183  Meeting with subgroup  13 Sep, 09 Owlsharpa Dolakha 23  4  19  8 184  Meeting with subgroup  6 Oct, 09 Dhunge Dolakha 21  18  3  2 185  Participate in general assembly of 

Napkeyanmara CFUG 9 Nov, 09 Lankuridanda Dolakha  183  75  108  53 

186  Meeting with subgroup of Dhandchaur  19 Dec, 09 Makaibari Dolakha 17  8  9  2 187  Participate in general assembly of 

Bodlesetidevi CFUG 20 Dec, 09 Lankuridanda Dolakha  220  150  70  45 

188  Cordination meeting with sub group and CFUG of Majh Kharka 

4 Aug, 09 Makaibari Dolakha 26  19  7  2 

189  Support for account keeping to the sub groups Sep. 09 Charikot, Sailung Dolakha 1,250  500  750  250 

Page 38: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 36 

190  Meeting with Gairi CFUG committee  5 Nov, 09 Fasku Dolakha 11  9  2  2 191  Subgroup strengthening in Gairi CFUG  13 Feb, 10 Charikot Cluster Dolakha 71  62  9  13 192  Support to Majhakharka CFUG for annual 

audit 31 Jan, 10 Makaibari Dolakha  7  4  3  2 

193  CFUG activities follow up support  1‐7 Feb, 10 Sailung cluster Dolakha 10  5  5 194  Support to Farmer to Farmer Program in Sub 

groups 8 Jul, 09 Sailung Cluster Dolakha  100  25  75  15 

195  Interaction meeting withcommunity enterpreneurs 

26 Feb, 10 Charikot Dolakha 23  14  9  7 

196  meetings with NTFP production and processing co‐oprative,Sikre 

11 Aug, 09 Sikre Sindhupalchok  26  17  9  5 

197  Participate general assembly of Patle CFUG, Sikre 

17 Aug, 09 Sikre Sindhupalchok  44  26  18  7 

198  Participate general assembly of Peukharka CFUG, Sikre 

20 Aug, 09 Attarpur Sindhupalchok  25  14  11  5 

199  Meeting with Sikre wintergreen and briquette ent. 

10 Sep, 09 Sikre Sindhupalchok  12  5  7  3 

200  Meeting with Sub groups of Peukharka CFUG 14 Sep, 09 Attarpur Sindhupalchok  12  4  8  6 201  Meeting with Mulkharka CFUG for sub group 

formation 17 Sep, 09 Jethal Sindhupalchok  26  18  8  5 

202  Visit Khalte CFUG and discuss about wintergreen collection sub group formation 

18 Sep, 09 Attarpur Sindhupalchok   9  6  3 

203  Meeting with Okreni Briquette enterprise  1 Nov, 09 Jethal Sindhupalchok  11  5  6  4 204  Meeting with worker of okreni Briquette  2 Nov, 09 Thulopakhar Sindhupalchok   8  3  5  5 205  Meeting with Bhagelichap CFUGs for Okreni 

Briquette ent. restarts 4 Nov, 09 Jethal Sindhupalchok   6  6  ‐

206  Meeting with Mulkharka CFUGs for Okreni Briquette ent. restarts 

5 Nov, 09 Jethal Sindhupalchok   9  9 

207  Meeting Okreni CFUGs for Briquette enterprise start. 

11 Nov, 09 Jethal Sindhupalchok   3  2  1 

208  Meeting with Okreni Briquette enterprise  16 Nov, 09 Jethal Sindhupalchok  11  8  3  4 209  Meeting about Allo collection enterprise  19 Nov, 09 Attarpur Sindhupalchok  10  6  4  4 210  Meeting with Okreni Briquette enterprise  27 Nov, 09 Okreni Sindhupalchok  10  7  3  3 211  Meeting with Sikre Briquette enterprise  9 Dec, 09 Sikre Sindhupalchok  12  3  9  7 212  General assembly of Mulkharka CFUG   9 Jan, 10 Jethal Sindhupalchok   215  157  58  48 213  General assembly of Patle CFUG   16 Jan, 10 Sikre Sindhupalchok  39  23  16  8 214  Meeting with Charcoal production group of 

Mulkharka CFUG 18 Jan, 10 Sikre Sindhupalchok   7  7 

215  Meeting with Okreni Jwala Briquette enterprise 

24 Jan, 10 Okreni Sindhupalchok   8  3  5  5 

216  Meeting with Bhagelichap Sub group  26 Jan, 10 Sildhunga Sindhupalchok  11  7  4  4 217  Meeting with Charcoal production group of 

Mulkharka CFUG 28 Jan, 10 Jethal Sindhupalchok   7  5  2  7 

218  Meeting with Ahaldanda sub group   29 Jan, 10 Sikre Sindhupalchok  19  11  8  8 219  Meeting with Sildhunga Subgroup  30 Jan, 10 Sildhunga Sindhupalchok  15  9  6  8 220  Meeting with Mahadevkhola Subgroup  4 Feb, 10 Sikre Sindhupalchok  20  14  6  5 221  Meeting with Wintergreen enterprise  5 Feb, 10 Sikre Sindhupalchok   5  3  2  2 222  Meeting with Okreni Briquette enterprise  6 Feb, 10 Sikre Sindhupalchok   7  3  4  5 223  Meeting with subgroup of PatleSubgroup  8 Feb, 10 Sikre Sindhupalchok  15  9  6  6 224  Meeting with Deurali subgroup  9 Feb, 10 Kalapani Sindhupalchok  15  9  6  3 225  Meeting with Bhagelichap CFUG for sub group 

formation and charcoal production 10 Feb, 10 Sildhunga Sindhupalchok   6  4  2 

226  Meeting with sub group of Tamche CFUG  28 Feb, 10 Tamche Sindhupalchok  21  12  9  6 227  Facilitate to strengthen anthening of Okreni 

Bio‐briquette enterprise 8 Sep, 09 Jethal Sindhupalchok  13  5  8  5 

228  Meeting with sub groups of Mulkharka CFUG 25 Nov, 09 Jethal Sindhupalchok  15  10  5  8 229  Meeting with sub groups of Mulkharka CFUG 16 Dec, 09 Jethal Sindhupalchok  16  9  7  6 230  Sub group identification meeting in Mulkharka 

CFUGs 30 Dec, 09 Jethal Sindhupalchok  15  8  7  5 

231  Meeting with Okreni CFUG for Subgroup formation 

5 Jan, 10 Okreni Sindhupalchok   6  5  1  1 

232  Meeting with Patle CFUG for sub group formation 

12 Jan. 10 Sikre Sindhupalchok  41  26  15  13 

233  Meeting with Bhagelichap CFUGs for sub group formation 

14 Jan, 10 Jethal Sindhupalchok   8  5  3  2 

234  Meeting with Bhagelichap CFUG for sub group formation 

17 Jan, 10 Sildhunga Sindhupalchok  19  11  8  3 

235  Meeting with Bhagelichap CFUG for Sub group formation 

24 Jan, 10 Jethal Sindhupalchok  17  9  8  5 

Page 39: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 37 

236  Meeting with community for dalechuk ent establishment 

5 Jul, 09 Laune Bajhang 17  14  3  1 

237  Meeting of dalechuk resources inventory  2 Aug, 09 Laune Bajhang 18  18  ‐ 2 238  Meeting with community for infrastructure 

development of dalechuk ent  26 Aug, 09 Laune Bajhang 15  12  3  3 

239  Meeting with community for lokta collectoin  20 Oct, 09 Bamor Bajhang 22  12  10  1 240  Meeting of Lokta collection training.  23 Jul, 09 Sainpasela Bajhang  9  6  3 241  Meeting with Jutevatmaya CFUGs for OP 

review 18 Sep, 09 Goiechan Bajhang 29  20  9  4 

242  Meeting of Lokta collection training.  5 Sep, 09 Paudi  Bajhang 11  7  4  ‐243  Meeting with community for Hand made 

paper ent development  15 Oct, 09 Goichan Bajhang 19  11  8  ‐

244  Meeting with community for Juneli Hand made paper ent development.  

23 Dec, 09 Goichan Bajhang 25  16  9  o 

245  Meeting with community for Juneli Hand made paper ent registration  

23 Sep, 09 Goichan Bajhang 21  11  10  ‐

246  Meeting of Yarsagumba conservation comittee 

2 Jul, 09 Paudi Bajhang 30  30  ‐ 3 

247  Meeting with Jutevatmaya CFUGs for Forest sartification. 

24 Dec, 09 Goichan Bajhang 31  20  11  ‐

248  Meeting with community for sustenable harvesting of kutki 

5 Aug, 09 Bamor Bajhang 19  12  7  2 

249  Meeting with community for sustenable harvesting of kutki 

9 Aug, 09 Goichan Bajhang 22  13  9  3 

250  Meeting with Yarshagumba conservation Committee  

9 Mar, 10 paudi Bajhang 13  13  ‐ 1 

251  Meeting with community for sustainable harvesting of kutki 

15 Aug, 09 Daha Bajhang 22  15  7  8 

252  Organize assembly of Juneli Handmade Paper Enterprise 

11 Mar, 09 Goichan Bajhang 53  53  ‐ ‐

253   Metting with Juneli hand made paper ent  22 Dec, 09 Goiechan Bajhang 55  40  15  ‐254  Paper Making Training  3‐18 Dec, 09 Goiechan Bajhang 15  8  7  ‐255  Metting with community for revilbing fund 

movilizition. 1 Feb, 10 Goichan Bajhang 13  9  4  ‐

256  Metting with Community for Forest Certification  

10 Jan, 10 Goiechan Bajhang 21  18  3  ‐

257  Metting with Community for Forest Certification  

5 Feb, 10 Bamore Bajhang 36  21  15  ‐

258  Metting with DFO for forest certification  18 Feb, 10 Chainpur Bajhang  5  5  ‐ ‐259  Metting with PAF  19 Feb, 10 Chainpur Bajhang  4  4  ‐ ‐260  Metting with CFUG for Account Keeping 

System Dev. 24Feb, 10 Sola Bajhang 16  11  5  ‐

261  Technical Assitance for ResourceManagement  25 Feb, 10 Bamor Bajhang 21  15  6  ‐262  Metting with community for lokta callection  26 Feb, 10 Bamore Bajhang 22  15  7  ‐263  Metting with CFUG for Account Keeping 

System Dev. 2 Feb, 10 Bamor Bajhang 19  11  8  ‐

264  Metting with Yarshagumba conservation Committeefor Collecated Fund Mobilizion 

1 Mar, 10 Paudi Bajhang 14  12  2  2 

265  Metting with Juneli handmade paper Ent.for Account keeping System Dev. 

7 Mar, 10 Goichan Bajhang  5  5  ‐ ‐

266  Metting with Juneli handmade paper Ent.for Account keeping System Dev. 

8 Mar, 10 Goichan Bajhang  4  4  ‐ ‐

267  Metting with YCC for making activity planning. 9 Mar, 10 Paudi Bajhang 13  13  ‐ 3 268  Metting with CFUGs for account keeping 

system Dev. 10 Mar, 10 Goichan Bajhang 16  15  1  ‐

269  Organaize janeral essembly of Liche CFUGs 12 Mar, 10 Bamore Bajhang 57  40  17  ‐270  Organaize Rap‐up of transformetion programe  22 Mar, 10 Chainpur Bajhang 22  18  4  1 271  Metting with co‐opertive  28 Mar, 10 Khodpe,Baitadi Bajhang 17  16  1  ‐272  Metting with Yarsagumba conservetion 

committee 21 Mar, 10 Paudi Bajhang 15  15  ‐ 3 

273  Metting with JHMP Ent  29 Mar, 10 Goichan Bajhang 21  18  3  ‐274  Metting with community for lokta callection  31 Mar, 10 Bhamchaur VDC Bajhang 36  28  8  ‐275  Facilitation to JHMP Ents manager for account 

keeping system 5 Apr, 10 Goichan Bajhang  3  3  ‐ ‐

276  Facilitation to JHMP Ents manager for account keeping system 

6 Apr, 10 Goichan Bajhang  3  3  ‐ ‐

277  Facilitation to JHMP Ents manager for account keeping system 

7 Apr, 10 Goichan Bajhang  3  3  ‐ ‐

278  Metting with JHMP Ent   8 Apr, 10 Goichan Bajhang 24  19  5  ‐

Page 40: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 38 

279  Metting with sub group  14 Apr, 10 Bamore Bajhang 33  23  10  ‐280  Metting with sub group  16 Apr, 10 Kachali Bajhang 21  13  8  ‐281  Meeting with sub group  17 Apr, 10 Kada Bajhang 21  10  11  ‐282  Meeting with sub group  18 Apr, 10 Daha Bajhang 29  27  2  5 283  Meeting with sub group  19 Apr, 10 Dalkot Bajhang 32  19  13  32 284  Meeting with YCC  21 Apr, 10 Gierau Bajhang 36  36  ‐ ‐285  Meeting with JHMP Ent.   22 Apr, 10 Goichan Bajhang 30  30  ‐ ‐286  Meeting with sub group  2 May, 10 Takare ‐8 ‐Baitadi Bajhang 18  14  4  ‐287  Meeting with sub group  3 Apr, 10 Madhu  Bajhang 17  17  ‐ ‐288  Meeting with sub group  4 Apr,010 Maheshowr  Bajhang 16  9  7  ‐289  Meeting with Shigas herbel production, 

persesing and marketing co‐opertive 5 Apr, 10 Khodpe,Baitadi Bajhang 17  15  2  ‐

290  Meeting with Yarsagumba callectors an other VDC 

24 Apr, 10 Dhauladhunga Bajhang 61  61  ‐ ‐

291  Meeting with Yarsagumba callectors.   26 Apr, 10 thade Bajhang  206  206  ‐ ‐292  Meeting with community for lokta callection  24 Apr, 10 Bamore Bajhang 20  7  13  ‐293  Meeting with community for lokta callection  26 Apr, 10 Pipalkot  Bajhang 24  16  8  ‐294  Meeting with MalikarjunNatural Products Pvt 

ltd 19 Sep, 09 Gokule Darchula 15  12  3  ‐

295  Teacher’s workshop  1 Apr, 10 Gokuleshor Darchula 10  10 296  Orientation on legal documents for company 

members 28 Feb, 10 Gokuleshor Darchula  5  4  1  ‐

297  Orientation onkeeping Records  26 Apr, 10 Gokuleshor Darchula  4  3  1 298  Orientation on Sub Groups Management 

systems 27 Mar, 10 Gokuleshor Darchula  7  7 

299  Sub Group orientation  9 Apr, 10 Dubedi Darchula 29  23  6 300  Sub Group orientation  11 Apr, 10 Naugaun Darchula 13  8  5 301  Planning meeting for income generation  29 Apr, 10 Nagini Darchula 40  18  22 302  Awareness package focused to pro‐

poor/women enterprises (HH level) 16 Jan, 09 Burtibang Baglung 21  19  2 

303  Trail production and inaguration of Hampal forest product processing pvt. Ltd. 

4 Feb, 09 Salija Parbat 44  36  8 

Subtotal ‐‐ Total: 26771; Male: 14803; Female: 11968; DAG: 1615iii  Meetings and techincal support activities for business plan prepration

1  Business plan preparation support to group or private enterprise 0 Sailung handmade paper enterprise  

10 to11 Jun, 08, 08 

Katakuti Dolakha 22  22  ‐ 2 

2  Business plan preparation support to micro enterprise 0 SimghaderiSub group 

29 April, 08 Katakuti Dolakha 23  15  8  14 

3  Business plan Preparation Workshop  19020, May, 08 Ruma Myagdi 28  23  5  3 4  Business plan Preparation Workshop  23024, May Lulang Myagdi 29  22  7  9 5  Business plan preparation support  May0Jun, 08 CFUGs Bajhang  225  189  36  6 6  Business planning support for Cardamom 

enterprise0Gairi CFUG Apr, 08 Fasku Dolakha 11  7  4  5 

7  Business planning support for Cardamom enterprise0Golmeswor CFUG 

March, 08 Katakuti Dolakha 12  5  7  8 

8  Business planning support to group   May,08 Khandeshwori Darchula 90  75  15  5 9  Business planning support to group and 

Network Jun, 08 Khunga, Baglung  6  1  5  2 

10  Business Planning Support to group and Network 

May, 08 Salija Parbat  6  6 

11  Business Planning Support to group and Network 

May, 08 Humla 39  27  12 

12  Business Planning Support to group and Network 

Jun, 08 Humla 30  25  5 

13  Business Planning Support to group and Network 

Humla 30  23  7 

14  Business planning support to group or private enterprise0 Briquitte  

18 Jun, 08, 08 Attarpur Sindhupalchok  13  8  5  ‐

15  Business planning support to group or private enterprise0 wintergreen 

10 may, 17 Jun, 08, 08 

Attarpur Sindhupalchok  15  12  3  ‐

16  Business planning support to micro‐enterprises 

Apr0Jun, 08 Bongadovan Baglung 23  19  4  14 

17  Business planning support to timber depot0 Langthapa 

March, 08 Bhusafeda Dolakha 20  18  2  4 

18  Business planning support to timber depot0 phalam pokhari 

May, 08 Sailung Dolakha 12  9  3  2 

19  Business planning support to timber depot0 Sirjana 

March, 08 Katakuti Dolakha 19  15  4  5 

Page 41: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 39 

20  Business planning support to group‐enterprise 10 July, 08 Khunga Baglung  7  6  1 21  Business planning support to micro‐ 

enterprise 13‐20 July, 08 Khungkhani Baglung 11  ‐ 11 

22  Business Planning Support to group and Network enterprise 

18 July, 08 Lekhphant Parbat 19  17  2 

23  Business plan preparation of group enterprise 15‐17 Oct, 08 Khunga Baglung  6  6  ‐24  Business plan support to Micro‐enterprise  1‐6 Oct, 08 Ruma Myagdi 36  9  27 25  Business planning support to micro‐ 

enterprise 12,Aug,08 Lulang Myagdi 24  16  8  ‐

26  Business planning support to Micro‐enterprises 

1,6 Oct,08 Ruma Myagdi 36  9  27  ‐

27  Business planning support to Allo enterprise 10‐20 April 2009 Darbang Myagdi  9  7  2  ‐28  Business planning support to Allo enterprise 16 jan ,09 Burtibang Baglung 21  19  2 29  Business planning support to Chiuri enterprise Feb, 09 Butwal, Pyuthan Baglung ‐ 30  Business planning support to Chiuri enterprise 14‐17 Mar, 09 Bhingithe‐9 Baglung 11  11  2 31  Business planning support to group‐enterprise 10,July,08 Khunga Baglung  7  6  1 32  Business planning support to micro‐ 

enterprise 13‐20,July,08 Khungkhani Baglung 11  ‐ 11 

33  Business planning support to group‐enterprise 6‐7, Aug, 08 Khunga Baglung  6  1  5  4 34  Business planning support‐micro‐ enterprise 13,16,1,18 Aug,08 Khungkhani Baglung 26  26  5 35  Business planning support to Hampal paper 

enterprise 4Feb, 2009 Salija Parbat 44  36  8 

36  Business planning support to group enterprise Dec, 08 Salija Parbat ‐ 37  Business planning support  8 Sep., 08  Dhairing  Parbat 12  9  3  3 38  Business plan preparation support for 

Attarpur Briquette enterprise 10 to 11 Sep. 08 Sikre Sindhupalchok  11  5  6  2 

39  Business plan preparation support for Sikre Dhasingare processing enterprise 

10 to 11 Sep. 08 Sikre Sindhupalchok  10  7  3  3 

40  Business plan preparation support for Sankhadevi Briquette enterprise 

14 Sep. 08 Lankuri Danda Dolakha  5  3  2  2 

41  Business plan preparation support for Sankhadevi Briquette enterprise 

3 to 4 Sep. 08 Katakuti Dolakha  8  6  2  1 

42  Business plan preparation support for Jiri Briquette enterprise 

8 Jan. 09 Jiri Dolakha 24  20  4  2 

43  Business plan preparation support to paper enterprise of Sailung 

21 Nov. 08 Katakuti Dolakha 24  23  1  ‐

44  Business plan preparation support to wintergreen enterprise, Dandakharka 

28 April, 09 Danda Kharka Dolakha  9  7  2  2 

45  Business plan preparation support to Briquette enterprise, Katakuti 

7 to 8 Apri, 09 Katakuti Dolakha 21  15  6  5 

46  Business planning meeting with katuki collectors 

20 oct,08 Goichen  Bajhang 79  37  42  7 

47  Business planning meeting with lokta collectors 

24 Dec,08 Baddijyaban Bajhang 37  32  5  4 

48  Business planning meeting with Lokta collectors 

28Dec,08 Chakanda Bajhang 24  21  3  12 

49  Business planning meeting with Juneli HP Ent 4 Oct,08 Goichen  Bajhang  104  84  20  ‐50  Business planning meeting with katuki 

collectors 14Nov,08 Bamor Bajhang 15  15  ‐ ‐

51  Business planning meeting with katuki collectors 

16 Nov,08 Basthi Bajhang 54  45  9  ‐

52  Business planning meeting with katuki collectors 

18 Nov,08 Daha Bajhang 28  23  5  ‐

53  Business planning meeting with katuki collectors 

20Nov,08 Dalkot Bajhang  9  3  6  9 

54  Business planning meeting‐ Dalechuk collectors 

20 mar,09 Laune Bajhang 20  12  8  ‐

55  Business planning meeting with katuki collectors 

9 oct,08 Patha Darchula 34  20  14 

56  Business planning meeting with lokta collectors 

2 Dec,08 Tolimandu Darchula 43  32  11 

57  Business planning meeting with Lokta collectors 

7Dec,08 GHoljar Darchula 32  11  21 

58  Business planning meeting with Juneli HP Ent 4 Oct,08 Tothi Darchula 44  8  36 59  Business planning meeting with katuki 

collectors 4Nov,08 Childhungra Darchula 33  22  11  5 

60  Business planning meeting with katuki collectors 

8 Nov,08 Jhusku Darchula 55  47  8 

61  Business planning meeting with katuki collectors 

11 Nov,08 Khatti Darchula  9  6  3 

Page 42: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 40 

62  Business planning meeting with katuki collectors 

2Nov,08 Daha Darchula 15  15 

63  Business planning meeting with Dalechukcollectors 

30 mar,09 Guljar Darchula ‐ 

64  Business planning support to furniture enterprise 

10 Jul, 09 Khunga Baglung  7  6  1 

65  Business planning support to allo enterprise 13‐20 Jul, 09 Khungkhani Baglung 11  ‐ 11 66  Business planning support to group‐enterprise 6‐7 Aug, 08 Khunga Baglung  6  1  5  4 67  Business planning support to micro‐ 

enterprise 13‐18 Aug, 09 Khungkhani Baglung 26  26  5 

68  Business planning support to furniture enterprise 

10 Aug, 09 Khunga Baglung  4  4 

69  Support for enterprise registration  Nov‐Dec, 09 Baglung, Khunga Baglung  4  4 70  Facilitate business plan preparation  5 Dec, 09 Ruma, Lulang Myagdi  6  6  3 71  Facilitate for Enterprise registration  Dec, 09 Salija Parbat  2  2 72  Business planning meeting with katuki 

collectors 20 oct, 09 Goichen  Bajhang 79  37  42  7 

73  Business planning meeting with lokta collectors 

24 Dec, 09 Baddijyaban Bajhang 37  32  5  4 

74  Business planning meeting with Lokta collectors 

28 Dec, 09 Chakanda Bajhang 24  21  3  12 

75  Business planning meeting with Juneli HP Ent 4 Oct,09 Goichen  Bajhang  104  84  20  ‐76  Business planning meeting with katuki 

collectors 14 Nov, 09 Bamor Bajhang 15  15  ‐ ‐

77  Business planning meeting‐katuki collectors 16 Nov, 09  Basthi  Bajhang 54  45  9  ‐78  Business planning meeting with katuki 

collectors 18 Nov, 09 Daha Bajhang 28  23  5  ‐

79  Business planning meeting with katuki collectors 

20Nov, 09 Dalkot Bajhang  9  3  6  9 

80  Business planning meeting with Dalechukcollectors 

20 Mar, 09 Laune Bajhang 20  12  8  ‐

81  Business planning meeting with katuki collectors 

9 oct, 09 Patha Darchula 34  20  14 

82  Business planning meeting with lokta collectors 

2 Dec, 09 Tolimandu Darchula 43  32  11 

83  Business planning meeting with Lokta collectors 

7 Dec, 09 Ghanjir Darchula 32  11  21 

84  Business planning meeting with Juneli HP Ent 4 Oct, 09 Tothi Darchula 44  8  36 85  Business planning meeting with katuki 

collectors 4 Nov, 09 Childhungra Darchula 33  22  11  5 

86  Business planning meeting with katuki collectors 

8 Nov, 09 Jhusku Darchula 55  47  8 

87  Business planning meeting with katuki collectors 

11 Nov, 09 Khatti Darchula  9  6  3 

88  Business planning meeting with katuki collectors 

2Nov, 09 Daha Darchula 15  15 

89  Business planning meeting with Dalechukcollectors 

30 mar, 09 Guljar Darchula  5  5 

90  Meeting with CFUGs and Bhimeswor paper enterprise 

3 Dec, 09 Boach Darchula 37  17  20  9 

91  Business planning meeting with Suspa wintergreen processing enterprise 

3 Dec, 09 Charikot Cluster Dolakha  6  6  ‐ 3 

92  Business planning meeting with Briquette and Wintergreen enterprise, Lankuridanda 

1 Aug, 09 Lankuridanda Dolakha 12  5  7 

93  Business planning meeting with Suspa wintergreen processing enterprise 

8 Aug, 09 Suspa Dolakha 17  13  4  3 

94  Business planning meeting with Sailung Paper enterprise 

10 Aug, 09 Katakuti Dolakha 27  20  7  4 

95  Business planning meeting among CFUG and enterprise of wintergreen in Suspa CFUG 

6 Oct, 09 Suspa Dolakha 17  10  7  4 

96  Business planning meeting with Bhimeswor paper enterprise 

24 Oct, 09 Boach Dolakha  7  5  2  3 

97  Business planning meeting with Sankhadevi Briquette enterprise 

1 Nov, 09 Lankuridanda Dolakha  9  5  4  ‐

98  Business planning meeting with Silung Briquette enterprise 

3 Nov, 09 Bodle Dolakha  6  5  1  2 

99  Business planning meeting with Sailung Paper enterprise 

14 Nov, 09 Bodle Dolakha 21  16  5  7 

100  Business planning meeting with Sailung Briquette enterprise 

15 Nov, 09 Bodle Dolakha 22  16  6  12 

Page 43: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 41 

101  Business planning meeting with Sankhadevi Briquette enterprise 

25 Dec, 09 Lankuridanda Dolakha 11  5  6  3 

102  Business planning meeting with Sailung Paper enterprise 

12 Dec, 09 Bodle Dolakha 20  14  6  5 

103  Business planning meeting with Briquette production group 

15 Dec, 09 Bodle Dolakha  5  4  1  4 

104  Business planning meeting with Bhimeswor paper ent. 

18 Dec, 09 Charikot Dolakha  9  6  3  1 

105  Business planning meeting with Bhimeswor paper ent. 

23 Dec, 09 Charikot Dolakha  7  6  1  1 

106  Business planning meeting with Sailung Paper enterprise 

26 Dec, 09 Bodle Dolakha  4  3  1  1 

107  Business planning meeting with Shankha Devi Briquette enterprise 

2 Jan, 10 Lankuridanda Dolakha 13  3  10  6 

108  Meeting with Shankha Devi Briquette enterprise 

17 Feb, 10 Shankhini Dolakha 21  6  15  12 

109  Meeting with Bhimeswor paper enterprise mgt. committee 

23 Feb, 10 Makaibari Dolakha  9  3  6  3 

110  Meeting with Sailung Briquette enterprise  25 Feb, 10 Bodle Dolakha  8  6  2  2 111  Business plan preparation support to Tamche 

Agriculture group 22 Aug, 09 Tamche Sindhupalchok  19  12  7  6 

112  Business plan preparation support to Ghyangnamsa CFUG, Attarpur 

22 Nov, 09 Attarpur Sindhupalchok   4  3  1  1 

113  Business planning of chiuri enterprise  27 Apr, 10 Gokuleshor Darchula  9  8  1 114  Business planning of Company for Ritha 

enterprise 22 Mar, 10 Gokuleshor Darchula  9  7  2 

115  Business Planning Support to group and Network 

18 Jul, 09 Lekhphant 7 Parbat 19  2  17 

116  Business Planning Support to group and Network enterprise 

25 & 30 Aug, 09 Lekhphant Parbat  155  69  86 

Subtotal ‐‐ Total: 2895; Male: 1928; Female: 967; DAG: 288iv  Enterprise development trainings 

1  Enterprise development training  10, May, 08 Ruma Myagdi 10  9  1  1 2  Enterprise development training  15, May, 08 Lulang Myagdi 36  25  11  14 3  Entrepreneurship development package 

(hands on training to community entrepreneurs) 

Apr, 08 Khunga, Khungkhani, Bongadovan,  

Baglung 90  37  53 

4  Entrepreneurship development package (hands on training to community entreprenur)

28‐31 May, 08 Salija Parbat ‐ 

5  Entrepreneurship development package (hands on training to community entreprenur)

8 Jun, 08 Lekhphant Parbat 18  17  1 

6  SIYB training  March, 08 Sivling Baitadi 30  5  25  5 7  Entrepreneurship development training  17 July, 08 Khunga Baglung 10  ‐ 10 8  Entrepreneurship development training‐

Furniture enterprise Feb, 09 Khunga, Butwal Baglung ‐ 

9  Entrepreneurship development training‐Furniture enterprise 

Feb, 09 Khunga, Butwal Baglung ‐ 

10  Entrepreneurship development training  8 & 10 Feb, 09 Khunga Baglung 14  14  ‐ 8 11  Entrepreneurship development training‐Chiuri 

enterprise Feb, 09 Butwal, Pyuthan Baglung ‐ 

12  Entrepreneurship development training  8 Sep., 08 Dhairing Parbat 12  9  3  3 13  Entrepreneurship development training  4Feb, 2009 Salija Parbat 44  36  8 14  Entrepreneurship development training  Dec, 08 Salija Parbat ‐ 15  Entrepreneurship development training‐

Furniture enterprise Feb, 09 Khunga, Butwal Baglung ‐ 

16  Entrepreneurship development training  4Feb, 2009 Salija Parbat 44  36  8 17  Entrepreneurship development training  Dec, 08 Salija Parbat ‐ 18  Entrepreneurship development training  22 Oct. 09 Sikre Sindhupalchok  23  16  7  5 19  Entrepreneurship development training  18,21 jan '09 Khunga Baglung  6  4  2 20  Entrepreneurship development training‐

timber depot 23 jan, '09 Khunga Baglung  6  6  ‐

21  Entrepreneurship development training  6 jan, '09 Adhikaricahur Baglung 12  ‐ 12 22  Entrepreneurship development training‐

timber depot 21‐22 May,08 Khunga Baglung 49  30  19 

23  Entrepreneurship development training  10 to 15 Jan. 09 Sailung Dolakha 15  6  9  5 24  Training to furniture enterprise management 

committee 8‐10 Feb, 09 Khunga Baglung 14  14  ‐ 8 

25  Chiuri enterprise data collection for BP preparation 

Feb, 09 Butwal, Pyuthan Baglung  2  2 

Page 44: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 42 

26  Support for infrastructure development and marketing support for furniture machinary purchasing. 

Feb, 09 Khunga, Butwal Baglung  3  3 

27  Facilitate to establish timber depot  23 Jan, 09 Khunga Baglung  6  6  ‐28  Facilitate and support enterprise registration 18‐21 Jan 09 Khunga Baglung  6  4  2 29  Machinary support   6 Jan, 09 Adhikaricahur Baglung 12  ‐ 12 30  Facilitate enterprise planning and 

management training 14 Dec, 09 Ruma, Lulang Myagdi 93  46  47  39 

31  Facilitate enterprise planning and management training 

20 Jan, 10 Ruma, Lulang Myagdi 31  24  7 

32  Entrepreneurship development package( hands ontraining to community or enterprise group) 

8 Sep, 09 Dhairing Parbat 12  9  3  3 

33  Inaguration of Hampal forest product processing pvt. Ltd. 

4Feb, 2009 Salija Parbat 44  36  8 

34  Facilitate for Enterprise registration.  Dec, 09 Salija Parbat ‐ 35  Inaguration of Hampal forest product 

processing pvt. Ltd. 4 Feb, 09 Salija Parbat 44  36  8 

36  Facilitate for Enterprise registration.  Dec, 08 Salija Parbat ‐ 37  Exposure visits to enterprise members for 

observation of successenterprise in Dolakha 13 Jul, 09 Dolakha Parbat  2  2 

38  Enterprise establishment support..  Aug, 09 Lekhphant Parbat ‐ 39  Support to inagurate wintergreen enterprise 15 Aug, 09 Lekhphant Parbat  238  185  53 40  Enterprise establishment and trial production Aug, 09 Lekhphant Parbat 15  15 41  Support on enterprise registration  Feb, 09 Kushma Parbat ‐ 42  Facilitate to form subgroup  8 Sep, 09 Dhairing Parbat 12  9  3  3 43  Facilitate to form subgroup  Aug, 09 Lekhphant Parbat  106  55  51  98 44  Inter CFUG shairing visit for Briquette 

enterprise development, for shankha devi briquette ent. 

20 Jul, 09 Charikot Cluster Dolakha 37  22  15  12 

45  Inter CFUG shairing visit for Briquette enterprise development for Sailung Briquette enterprise 

28 Nov, 09 Sikre and Okreni Dolakha  4  3  1  4 

Subtotal ‐‐ Total: 1100; Male: 721; Female: 379; DAG: 208v  Skill Development training for enterprises

1  Handmade paper productiontraining  MarJun kailash Bajhang 10  3  7 2  Quality control on handmade paper 

production kailash Bajhang  8  6  2 

3  Skill Development training  19‐26, May Ruma Myagdi 12  7  5  4 4  Skill Development training  15‐29, May Lulang Myagdi 12  5  7  10 5  Skill training to participants to start enterprise 9013 May, 08 Salija Parbat  3  3  ‐6  Hand made paper quality improvement 

workshop May, 08 Taman Baglung 48  46  2  ‐

7  Skill development training on Allo processing May‐Jun, 08 Adhikarichaur Baglung 15  15  ‐ 15 8  Skill development training‐Lokta processing 

enterprise 9 Nov to 10 Dec.,08 

Ruma, Lulang Myagdi 32  2  30  ‐

9  Skill development training‐Machine oporation and mangement 

22‐23 Jan 09 Ruma Myagdi  3  3  ‐ ‐

10  Skill development training‐timber harvesting 12 Feb, 09 Khunga Baglung  3  3 11  Skill development training‐Allo processing  23‐29Mar,09 Khungkhani Baglung 14  14  11 12  Skill development training‐handmade paper 

making 22Jan‐4 feb,09 Salija Parbat 13  4  9  10 

13  Skill development training‐Allo processing  4‐18 feb, 09 Dhairing Parbat 17  17  17 14  Skill development training‐Wintergreen oil 

processing Aug. 08 Sikre Sindhupalchok   6  5  1  ‐

15  Skill development training‐choarcoal production 

21 to 23 Sep. 08 Attarpur Sindhupalchok  23  11  12  ‐

16  Skill development training‐Briquette making 20 to 22 Oct. 08 Sikre Sindhupalchok  13  6  7  3 17  Skill development training‐choarcoal 

production 21 to 26 Nov. 08 Katakuti Dolakha 42  28  14  10 

18  Skill development training‐choarcoal production 

1 to 3 Dec. 08 Lankuri danda Dolakha  6  6  ‐ 4 

19  Skill development training‐choarcoal production 

1 to 3 Dec. 08 Boach Dolakha  7  7  ‐ 3 

20  Skill development training‐choarcoal production 

19 to 21, Jan.09 Jiri Dolakha 14  11  3  5 

21  Skill development training‐handmade paper making 

19 to 20 Jan. 09 Katakuti Dolakha  3  3  ‐ ‐

22  Skill development training‐Briquette making Jan. to Feb. 09 Lankuri danda Dolakha  9  5  4  2 

Page 45: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 43 

23  Skill development training‐Briquette making Jan. to Feb. 10 Sikre Sindhupalchok  17  9  8  3 24  Skill development training‐handmade paper 

making March to May, 09 Katakuti Dolakha 12  4  8  4 

25  Skill development training‐Briquette making 2 to 4 April, 09 Katakuti Dolakha 13  5  8  3 26  Skill development training‐handmade paper 

making 1Jun,09 Goichen Bajhang  8  2  6  ‐

27  Skill development training‐Sibukthron juice making 

5‐8 Feb,09 Gulfar Darchula  6  6  ‐ ‐

28  Hands on training to Timber depot manager 12 Feb, 09 Khunga Baglung  3  3 29  Explore technology for Chiuri enterprise  Feb, 09 Butwal Baglung ‐ 30  Allo processing training.  23‐29 Mar ,09 Khungkhani Baglung 14  14  11 31  Timber depot establishment facilitation  21‐22 May, 09 Khunga Baglung 49  30  19 32  Hands on training to furniture enterprise 

worker 23 May, 10 Burtibang Baglung ‐ 

33  Training on AllO Processing   7‐13 Jan, 10 Bongkhani Baglung 16  16 34  Training on handmade paper making  22 Jan, 10 Salija parbat 13  4  9  10 35  Training on allo processing and thread making 4‐18 Feb, 10 Dhairing parbat 17  17  17 36  Training for wintergreenoil production  8‐20 Aug, 09 Lekhphant Parbat  5  5 37  Training on Allo thread making  21 Sep, 09 Dhairing Parbat 15  15  15 38  Refresher training on Allo thread making  Mar, 10 Dhairing Parbat ‐ 39  Handmade Paper making training  1 Jun, 09 Goichen Bajhang  8  2  6  ‐40  Juice production training  5‐8 Feb, 09 Guljar Darchula  6  6  ‐ ‐41  Refresher training of Juice production and 

marketing 14 Nov, 09 Daramghar Darchula 12  11  1 

42  Charcoal production training in Lankuridanda 10 Oct, 09 Lankuridanda Dolakha 10  5  5  3 43  Charcoal production follow up, Sailung   30 Jan, 10 Bodle Dolakha  3  ‐ 3  3 44  Charcoal making training to Okreni Briquette 

ent. 38 Nov, 09 Jethal Sindhupalchok   8  6  2  8 

45  Briquettemaking training in Okreni  14 Nov, 09 Okreni Sindhupalchok  13  8  5  6 46  Quality improvement training of Briquette in 

Okreni 2Dec, 09 Okreni and Sikre Sindhupalchok  20  15  5  12 

47  Charcoal making training in Tamche  19 Jan, 10 Tamche Sindhupalchok   6  6  6 Subtotal ‐‐ Total: 587; Male: 306; Female: 281; DAG: 195vi  Enterprise groups and networks formations

1  Enterprise network formation meeting between collector & processer 

15,Jun, 08 Lulang Myagdi  7  4  3  3 

2  Enterprise network formation meeting between collector & processer 

17, Jun, 08 Lulang Myagdi 16  13  3  6 

3  Enterprise network formation meeting between collector & processer 

18, Jun, 08 Ruma Myagdi 13  11  2  7 

4  Enterprise network formation meeting between collector & processer 

16, Jun, 08 Ruma Myagdi 20  18  2  8 

5  Sub group formation  Apr‐Jun, 08 CFUGs Bajhang  191  148  43  28 6  Enterprise management committee formation 

workshop Jun, 08 Adhikarichaur Baglung 19  1  18 

7  Yarsagumba conservation committee formation 

Jun, 08 Dahabagar Bajhang 41  38  3 

8  Enterprise management committee formation meeting 

20 July, 08 Khunga Baglung 11  9  2 

9  Timber depot establishment  21‐22 May, 08 Khunga Baglung 49  30  19 10  Micro‐enterprise group formaiton meeting 4 July, 08 Kyang Parbat  7  5  2 11  Enterprise management committee formation 

meeting 20&25 July, 08 Ruma, Lulang Myagdi 50  44  6 

12  Timber depot establishment meeting  24‐26 Oct, 08 Khunga Baglung 18  18 13  Enterprise management committee formation 

meeting 18‐27 Oct Ruma, Lulang Myagdi  4  2  2 

14  Sub group formation  1‐11 Jan 09 Ruma, Lulang  Myagdi  107  82  25  ‐15  Enterprise management committee formation 

meeting 5‐30 Jan 09 Ruma, Lulang Myagdi 13  7  6  1 

16  Sub group formation  15‐19 March 09 Lulang Myagdi 49  33  16  ‐17  Sub group formation  15‐19 March 09 Ruma Myagdi 37  30  7  ‐18  Sub group formation  15‐19 March 09 Ruma Myagdi 37  30  7  ‐19  Facilitate Enterrprise registration   10‐24 April 2009 Ruma,Lulang, Beni Myagdi 26  22  4  ‐20  Facilitate Enterrprise registration   10‐24 April 2009 Ruma,Lulang, Beni Myagdi 48  26  22  4 21  Sub group formation  8 Sep., 08 Dhairing Parbat 12  9  3  3 22  Enterprise management committee formation 

meeting 27 Dec. 08 Attarpur Sindhupalchok  20  13  7  3 

23  Assembly of Sailung paper enterprise   20 July, 08 Bodle Dolakha 17  16  1  ‐24  Ritha Traders NetworkingMeeting  1‐Oct Pipalkot khula Dhar  Bajhang 14  14  ‐ ‐

Page 46: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 44 

25  Yarsagumba Networking Meeting  18 Apr,09 Dahabagar Bajhang 25  25  ‐ ‐26  VDC assembly for Yarsagumba conservation 

committee formation Apr,09 Dahabagar Bajhang  765  725  40  10 

27  Rittha Network formation workshop  Oct,08 Latinath Darchula 32  29  3  ‐28  Networking between CFUG & Enterprises  9 Nov, 09 Lulang Myagdi  9  7  2 29  Networking between CFUG & Enterprises  22‐28 Nov, 09 Devisthan Myagdi 14  14  ‐30  Networking between CFUG & Enterprises  14‐15 Dec, 09 Muna Myagdi  9  8  1 31  Networking between CFUG & Enterprises  19‐28 Jan, 10 Darbang Myagdi  6  5  1  ‐32  Networking between CSSI & Enterprizes  26 Apr, 10 Beni Myagdi 44  33  11 33  Ritha Traders NetworkingMeeting  16 Apr, 10 Pipalkot khula Bajhang 14  14 0 034  Yarsagumba Networking Meeting  18 Apr, 10 Dahabagar Bajhang 25  25 0 035  VDC assembly  Apr, 10 Dahabagar Bajhang  765  725  40  10 36  Ritha Networking meeting  Oct, 09 Latinath Darchula 32  29  3  ‐37  Linkage malikarjun Natural products PVT for 

Ritha marketing 10 Jan, 10 Latinath Darchula 43  43 

38  Organize meeting for agriculture co‐oprative formation of sub group of Thangsa Deurali CFUG 

19 Nov, 09 Makaibari Dolakha 25  18  7  5 

39  Meeting for of Dhurbatara agriculture co‐oprative, Thangsa deurali CFUG 

7 Jan, 10 Makaibari Dolakha 29  14  15  11 

40  Meeting for of Dhurbatara agriculture co‐oprative, Thangsa deurali CFUG 

28 Feb, 10 Makaibari Dolakha 25  14  11  8 

41  Support saving credit co‐oprative ragistration preparation 

21‐30 Jan, 10 Bodle Dolakha 36  19  17  7 

42  Support saving credit co‐oprative ragistration preparation 

27 Feb, 10 Bodle Dolakha 36  22  14  5 

Subtotal ‐‐ Total: 2760; Male: 2392; Female: 368; DAG: 119vii  Well being ranking in CFUGs 

1  Well being ranking  Mar‐April, 08 CFUG Bajhang  351  281  70  102 2  Well being ranking  March,08 Khandeshwori Darchula  245  188  57  45 3  Well being ranking in 3 VDCs (PRA)  Feb, 08 3 VDCs Baitadi 30  28  2  5 4  Well being ranking of Selected CFUG  Feb, 08 Humla 52  35  17 5  Well being ranking of Selected CFUG  Feb, 08 Humla 38  25  13 6  Well being ranking of Selected CFUG  Feb, 08 Humla  7  7  ‐7  Well being ranking  10‐12 March 09 Ruma,Lulang Myagdi ‐  ‐ ‐ ‐8  Well being ranking  Junaury, 09 Dhairing Parbat ‐ 9  Well being ranking  13 Mar,09 Baddijytaban Bajhang 41  31  10  ‐10  Facilitate well being ranking  14‐15 Dec, 09 Muna Myagdi 34  19  15  10 11  Raniban CFUG  Jan, 10 Dhairing Parbat ‐ 12  Laligurans CFUG  Jul, 09 Lekhphant‐8 Parbat 30  13  17  24 13  Simaltechaur CFUG  Jul, 09 Lekhphant‐7 Parbat 81  42  39  53 14  well being ranking Baddijytaban  13 Mar, 10 Baddijytaban Bajhang 41  31  10  ‐15  Well being ranking of Shankhadevi CFUG  4 Jan, 10 Lankuridanda Dolakha 18  11  7  9 

Subtotal ‐‐ Total: 968; Male: 711; Female: 257; DAG: 2482  Enterprise oriented production and management of natural products i  FUG identification and recruitment 

1  Identification FUGs & recruitment for project acivities 

Feb, 08 Ruma, Lulang Myagdi ‐ 

2  Identification of CFUG and recruitment for project acivities 

Feb, 08 Humla 94  81  13 

3  Identification of CFUG and recruitment for project acivities 

Feb, 08 Humla  920  464  456 

4  Identification of FUG and recruitment   Feb‐Jun, 08 Adhikarichaur Baglung ‐ 5  Identification of FUG and recruitment   Dec.‐Jun, 08 Salija, Lekhphant, 

Dhairing, Kyang Parbat ‐ 

6  Identification of FUG and recruitment 0 Aklepakha 

Feb. to April, 08 Lankuridanda Dolakha 22  15  7  2 

7  Identification of FUG and recruitment 0 Chanedanda 

Feb. to April, 08 Katakuti Dolakha 21  15  6  4 

8  Identification of FUG and recruitment 0 Chitrepakha  

Feb. to April, 08 Bhusafeda Dolakha 25  18  7  5 

9  Identification of FUG and recruitment 0 Gairi Feb. to April, 08 Fasku Dolakha 13  8  5  3 10  Identification of FUG and recruitment 0 

Ghumaune pani Feb. to April, 08 Bhusafeda Dolakha 15  12  3  5 

11  Identification of FUG and recruitment 0 Golmeswor 

Feb. to April, 08 Katakuti Dolakha 21  14  7  3 

12  Identification of FUG and recruitment 0 Gugedarkha  

Feb. to April, 08 Katakuti Dolakha 21  13  8  6 

13  Identification of FUG and recruitment 0  Feb. to April, 08 Dandakharka Dolakha 13  9  4  3 

Page 47: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 45 

Kalidevi  14  Identification of FUG and recruitment 0 Kitani 

Bhir Feb. to April, 08 Fasku Dolakha 17  14  3  2 

15  Identification of FUG and recruitment 0 Lang thapa  

Feb. to April, 08 Bhusafeda Dolakha 22  16  6  4 

16  Identification of FUG and recruitment 0 Mahadevstan  

Feb. to April, 08 Sailung Dolakha 19  15  4  4 

17  Identification of FUG and recruitment 0 Phalampokhari 

Feb. to April, 08 Sailung Dolakha 23  17  6  4 

18  Identification of FUG and recruitment 0 Sanubolde  

Feb. to April, 08 Katakuti Dolakha 23  18  5  6 

19  Identification of FUG and recruitment 0 Sirjana 

Feb. to April, 08 Katakuti Dolakha 19  14  5  2 

20  Identification of FUG and recruitment 0 Tharlange 

Feb. to April, 08 Maga Dolakha 16  12  4  4 

21  Identification FUGs & recruitment for project activities 

10 Mar,09 Sainpasela Bajhang 87  78  9  ‐

22  Identification FUGs & recruitment for project activities 

14 Mar,09 Sainpasela Bajhang 82  65  17  7 

23  Identification FUGs & recruitment for project activities 

3 Mar,09 Dahabagar Bajhang 46  34  12  ‐

24  Identification FUGs & recruitment for project activities 

10 Mar,09 Deurukh Darchula 87  78  9  ‐

25  Identification FUGs & recruitment for project activities 

14 Mar,09 Khatti Darchula 82  65  17  7 

26  Identification FUGs & recruitment for project activities 

3 Mar,09 Sambhad Darchula 46  34  12  ‐

27  Identification FUGs & recruitment for project activities 

8 Dec, 09 Devisthan Myagdi  4  3  1  1 

28  Identification FUGs & recruitment for project activities 

10 Dec, 09 Okharbot Myagdi  3  2  1  2 

29  Identification FUGs & recruitment for project activities 

14‐15 Dec, 09 Muna Myagdi 34  19  15  10 

30  Identification of chandichahadapatal CFUG 10 Mar, 09 Sainpasela Bajhang 87  78 9 031  Identification of PatevereCFUG  14 Mar, 09 Sainpasela Bajhang 82  65  17  7 32  Identification of Thulamela CFUG  3 Mar, 09 Dahabagar Bajhang 46  34  12  ‐33  Identification of Deurukh CFUG  10 Mar, 09 Deurukh Darchula 87  78  9  ‐34  Identification of Surma BhabaniCFUG  14 Mar, 09 Khatti Darchula 82  65  17  7 35  Identification of Meldhungda CFUG  3 Mar, 09 Sambhad Darchula 46  34  12  ‐36  Meeting with Ghyangnamsa CFUG  23 Oct, 09 Attarpur Sindhupalchok  12  9  3  1 37  Meeting with Deupokhari CFUG  25 Oct, 09 Thulodhading Sindhupalchok  15  11  4  2 

Subtotal ‐‐ Total: 2232; Male: 1507; Female: 725; DAG: 101ii  CFUG support to management plan improvement

1  Operational plan revision assembly meeting and inventory 

Jun, 08 Dahabagar Bajhang  108  80  28  20 

2  Operational plan revision assembly meeting and inventory 

Jun, 08 Deuliket Bajhang  111  89  22  23 

3  Operational plan revision assembly meeting and inventory 

Jun, 08 Syadi Bajhang  109  84  25  19 

4  Reviewand improvement of FUGs OP  May, 08 Taman Baglung 58  13  45 5  Reviewand improvement of FUGs OP  Dec‐Jun, 08 Salija Parbat ‐ 6  Review and improvement of FUG OP of 

Phalam Aklepakha May‐Jun, 08 Lankuridanda Dolakha 22  14  8  3 

7  Review and improvement of FUG OP of Phalam pokhari 

May‐Jun, 08 Sailung Dolakha 15  11  4  2 

8  Revision of CFUG OP  May, 08 Humla  593  307  286 9  Revision of CFUG OP  May, 08 Humla  753  385  368 10  Revision of CFUG OP  May, 08 Humla  221  115  106 11  Revision of CFUG OP  May, 08 Humla  518  264  254 12  Revision of CFUG OP  May, 08 Humla  498  360  138 13  Revision of CFUG OP  May, 08 Dhaulapani CF Humla 12  11  1 14  Revision of CFUG OP  May, 08 Humla 48  38  10 15  Technical and Management support to CFUG 23 July, 08 Khunga Baglung 17  6  11 16  Operational plan revision assembly meeting 

and inventory 21‐23 Oct, 08 Ruma Myagdi 20  20  ‐

17  Operational Plan revision  18‐27 Oct.08 Ruma Myagdi 20  20  ‐ ‐18  Operational Plan revision  5‐14 Jan 09 Ruma Myagdi 38  37  1  ‐19  Operational Plan revision  17‐19 Feb, 09 Ruma Myagdi 10  9  1  ‐20  Operational Plan revision  Feb, 09 Lulang Myagdi 57  51  6  ‐

Page 48: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 46 

21  Operational Plan revision  28‐31 Mach 09 Ruma,Lulang,Beni Myagdi 19  18  1  ‐22  Operational Plan revision  Sep Dhairing Parbat ‐ 23  Operational plan revision assembly meeting 

and inventory Regular Parbat ‐ 

24  Operational Plan revision  Jan‐Feb, 09 Parbat ‐ 25  Handover of Improved operational plan  4Feb, 09 Salija Parbat ‐ 26  Handover of Improved operational plan  25 Mar, 2009 Dhairing Parbat 26  7  19 27  Operational plan revision assembly meeting 

and inventory 18 th Oct. 08 Sailung Dolakha 95  65  30  4 

28  CF boundry Survey  22 Oct. 08 Katakuti Dolakha 16  12  4  2 29  Operational plan revision assembly meeting 

and inventory 13 to 22 Nov. 09 Katakuti Dolakha  7  5  2  2 

30  Support to CFUG to OP preparation  18 to 24 Jan. 09 Charikot Dolakha  3  3  ‐ ‐31  Support to CFUG OP preparation of 

Phalampokhari 6 to 8 April, 09 Charikot Dolakha  2  2  ‐ ‐

32  Operational plan revision assembly meeting and inventory 

27 July, 08 Dhungre devi  Dolakha 35  25  10  6 

33  Operational plan revision assembly meeting and inventory 

13 to 28 Sep. 08 Mahadevstan Dolakha  170  110  60  15 

34  Operation guideline preparation of Yarsagumba conservation committee 

18 Apr,09 Paudi  Bajhang 56  52  4  6 

35  Operational Plan revision and handover  11‐13 Sep, 09 Ruma Myagdi 20  17  3 36  Operational Plan revision and handover  28 Nov, 09 Ruma Myagdi  5  5  ‐ ‐37  Facilitate CFUG Management trainig  19‐28 Jan, 10 Myagdi  131  101  30 38  Operational Plan revision and handover  29 Jan, 10 Ruma Myagdi  3  2  1 39  Operational Plan revision and handover  Sep, 09 Dhairing Parbat ‐ 40  Operational Plan revision and handover  Feb, 10 Salija, Dhairing Parbat ‐ 41  Operational Plan revision and handover  4 Feb, 10 Salija Parbat ‐ 42  Operational Plan revision and handover  25 Mar, 09 Dhairing Parbat 26  7  19 43  Technical and management support to CFUG 4 Jul, 09 Lekhphant Parbat  106  55  51 44  Support on CF OP improvement  Jul‐Aug, 09 Lekhphant Parbat  106  55  51 45  Technical support to CFUG on forest inventory 22‐25 Jan, 10 Dhairing Parbat ‐ 46  Conservation planning with Yarsa Con 

committee 18 Apr, 09 Paudi  Bajhang 56  52 4 6

47  NTFP cultivation support to subgroup  26 Jul, 09 Charikot Cluster Dolakha 23  5  18  8 48  Juneli Hand Made Paper Enterprise 

registration 16 Nov, 09 Chainpur  Bajhang  4  4  ‐ ‐

49  Support to forest certification  24Apr, 10 Bamore Bajhang 13  13  ‐ ‐50  Support to forest certification  25 Apr, 10 Bamore Bajhang 13  13  ‐ ‐51  Chiuri resource assessment  3 May, 10 Amtoli Darchula  9  9  ‐52  Chiuri resource assessment  4 May, 10 Paparthala Darchula  9  9  ‐53  Chiuri resource assessment  5 May, 10 Bagjebala Darchula  7  7  ‐54  Chiuri resource assessment  5 May, 10 Ankur Darchula 11  11  ‐55  Chiuri resource assessment  6 May, 10 Pida Darchula 14  13  1 56  Chiuri resource assessment  7 May, 10 Maikholi Darchula 11  9  2 57  Chiuri resource assessment  9 May,010 Ganna Darchula 17  7  10 58  Chiuri resource assessment  9 May, 10 Mate Darchula  8  5  3 59  Chiuri resource assessment  10 May, 10 Seri Darchula 14  9  5  ‐60  Chiuri resource assessment  11 May, 10 Chuirani Darchula 22  15  7  4 61  Chiuri resource assessment  12 May, 10 Melbisa Darchula 24  19  5  1 62  Chiuri resource assessment  13 May, 10 Latinath Darchula 11  9  2  ‐

Subtotal ‐‐ Total: 4320; Male: 2664; Female: 1656; DAG: 121iii  Sustainable NTFPs harvesting training and technical assistance

1  Sustainable NTFPs harvesting training  May, 08 Humla 20  19  1 2  Sustainable NTFPs harvesting training  May, 08 Humla 21  16  5 3  Hands on training to FUG on 

NTFPmanagement, conservation and Sustainable harvesting  

May, 08 Taman Baglung 13  6  7 

4  Technical and managementsupport to FUGs , Boldekharka 

6 March, 08 Thulodhading Sindhupalchok  95  55  40  25 

5  Technical and managementsupport to FUGs , Kalopani 

21 April, 08 Jethal Sindhupalchok  26  19  7  4 

6  Technical and managementsupport to FUGs , Okhreni 

21 April, 08 Jethal Sindhupalchok  42  27  15  3 

7  Technical and managementsupport to FUGs , Patle 

3 May, 08 Attarpur Sindhupalchok  62  41  21  7 

8  Technical and management support to CFUG May, 08 Humla  809  608  201 9  Technical and management support to CFUG May, 08 Humla  155  120  35 10  Technical and management support to CFUG May, 08 Humla  176  137  39 

Page 49: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 47 

11  Technical and management support to CFUG May, 08 Humla  276  220  56 12  Technical and management support to FUG Ongoing Parbat ‐ 13  Technical and management support to FUG 0 

Aclipakha Feb. to May, 08 Lankuridanda Dolakha 61  46  15  12 

14  Technical and management support to FUG 0 Ghumaunepani 

Feb. to May, 8 Bhusafeda Dolakha 57  38  19  9 

15  Technical and management support to FUG 0 Gugedarkha 

Feb. to May, 8 Katakuti Dolakha 38  28  10  6 

16  Technical and management support to FUG 0 Phalampokhari 

Feb. to May, 8 Sailung Dolakha 35  27  8  5 

17  Technical and management support to FUG 0 Sirjan 

Feb. to May, 08 Katakuti Dolakha 52  36  16  12 

18  Technical and management support to FUGs AprJun Program Aria Bajhang 2,445   1,415  1,030  250 19  Yarsagumba conservation committee 

formation May,08 Khandeshwori Darchula 55  45  10 

20  Lokta Harvesting training  27 Feb ‐ 1 Mar 09 Lulang Myagdi 16  9  7  ‐21  Lokta Harvesting training  23‐25 March 2009 Ruma Myagdi 25  17  8  ‐22  Allo harvesting training  23, July, 08 Khunga Baglung 17  6  11 23  Forest management training  Khunga 20 jan, '09 Baglung 64  28  36 24  NTFP management, conservation and 

sustainable harvesting training 29Nov, 08 Salija Parbat ‐ 

25  Lokta inventory and harvesting training  22‐25Jan, 09 Dhairing Parbat ‐ 26  Facilitated general assembly of Raniban CFUG 24Jan, 2009 Dhairing Parbat  135  72  63 27  Forest management training  30 Jan. 09 Katakuti Dolakha 17  12  5  4 28  Forest management training  15 Jan. 09 Jethal Sindhupalchok  14  11  3  2 29  Forest management training  2 to4 April, 09 Katakuti Dolakha 16  4  12  5 30  Lokta Harvesting training  29 April, 09 Ghang, Bhedpu Dolakha 35  25  10  8 31  Wintergreen collection training  30 July, 08 Sikre Sindhupalchok  24  10  14  ‐32  Wintergreen collection training  10 Aug. 08 Tamche Sindhupalchok   9  7  2  ‐33  Forest management training  14 Aug. 08 Patle Sindhupalchok  10  7  3  ‐34  Lokta Harvesting training  22‐Nov Dahabagar sola Bajhang 24  9  15  6 35  Lokta Harvesting training  28‐Dec Baddijyaban Bajhang 28  23  5 36  Lokta Harvesting training  13‐Mar Chakanda Bajhang 36  26  10 37  Lokta Harvesting training  28‐Jan Bamor Bajhang ‐  ‐38  Lokta Harvesting training  14‐Mar Bamor Bajhang 11  11 39  Lokta Harvesting training  14‐Mar Bamor Bajhang 11  11 40  Lokta Harvesting training  15‐Mar Chakanda Bajhang 40  37  3 41  Lokta Harvesting training  14‐Nov Bijgada Bajhang  4  4  ‐42  Sibukthron harvesting training  Dec,08 Khan‐1 Darchula 41  17  24  ‐43  Sibukthron harvesting training  Dec,08 Khan‐2 Darchula 51  40  11  ‐44  Sibukthron harvesting training  Dec,08 Khan‐1 Darchula 18  14  4  ‐45  Sibukthron harvesting training  Dec,08 Ghusa‐1 Darchula 25  8  17  ‐46  Facilitate sub group formation in CFUG  24‐30 Jul, 09 Ruma, Lulang Myagdi  148  89  59 47  Orientation on Lokta collection  1‐22 Dec, 09 Myagdi 55  30  25  20 48  Technical and Management support to CFUG 23, Jul, 09 Khunga Baglung 17  6  11 49  Resource management training  20 Jan, 10 Khunga Baglung 64  28  36 50  Hands on training to CFUG and collector group 

on NTFP management, conservation and sustainable harvesting. 

29 Nov, 09 Salija Parbat ‐ 

51  Training on Sustainable harvesting of wintergreen. 

12‐17 Aug, 09 Lekhphant Parbat  165  56  109  125 

52  Training on Lokta and allo collection  24 Jan, 10 Dhairing Parbat  135  72  63 53  LoktaSustainable harvestingTraining  25 Jan, 10 Dahabagar sola Bajhang 24  9  15  6 54  LoktaSustainable harvestingTraining  26 Jan, 10 Baddijyaban Bajhang 28  23  5 55  LoktaSustainable harvestingTraining  27 Jan, 10 Chakanda Bajhang 36  26  10 56  LoktaSustainable harvestingTraining  28 Jan, 10 Bamor Bajhang ‐  ‐57  Practicle training for lokta collectors  29 Jan, 10 Bamor Bajhang 11  11 58  Practicle training for lokta collectors  30 Jan, 10 Bamor Bajhang 11  11 59  Practicle training for lokta collectors  1 Feb, 10 Chakanda Bajhang 40  37  3 60  Lokta harvestingTraining   2 Feb, 10 Bijgada Bajhang  4  4  ‐61  Dalechuk sustainable harvesting   Dec, 09 Khan‐1 Darchula 41  17  24  ‐62  Dalechuk sustainable harvesting   Dec, 09 Khan‐2 Darchula 51  40  11  ‐63  Dalechuk sustainable harvesting   Dec, 09 Khan‐1 Darchula 18  14  4  ‐64  Dalechuk sustainable harvesting   Dec, 09 Ghusa‐1 Darchula 25  8  17  ‐65  Dalechuk sustainable harvesting training  15 Dec, 09 Chhetti  Darchula 12  5  7  ‐66  Dalechuk sustainable harvesting training  8 Dec, 09 Ghansir Darchula 17  8  9  ‐67  Dalechuk sustainable harvesting training  24 Dec, 09 Patha  Darchula 19  10  9  ‐68  Dalechuk sustainable harvesting training  25 Dec, 09 Ranghadi Darchula 13  7  6  ‐69  Dalechuk sustainable harvesting training  20 Dec, 09 Kasauti Darchula  9  5  4  ‐

Page 50: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 48 

70  Meeting about sustainable harvesting of Lokta in Ghang and Vhedpu 

9 Oct, 09 Ghang, Vedpu Dolakha  9  6  3  1 

71  Wintergreen collection hands on training in Kalte CFUG 

19 Aug, 09 Attarpur Sindhupalchok  15  8  7  5 

72  Nursery management training  29 Apr, 10 Dubedi, Dethala Darchula 13  8  5 73  Nursery management training  29 Apr, 10 Nageni, Baitadi Darchula 35  4  31 74  Lokta management and harvesting training  1 Apr, 10 Bhamchaur Bajhang 20  9  11  ‐75  Lokta management and harvesting training  2 Apr, 10 Bhamchaur Bajhang 23  12  11  1 76  Lokta management and harvesting training  11 Apr, 10 Goichan Bajhang  3  3  ‐ ‐77  Lokta management and harvesting training  20 Apr, 10 Goichan Bajhang  3  3  ‐ ‐78  Lokta management and harvesting training  21 Apr, 10 Goichan Bajhang  3  3  ‐ ‐79  Lokta management and harvesting training  22 Apr, 10 Goichan Bajhang  3  3  ‐ ‐80  Cardamum cultivation training to Katakuti 

subgroup 2 Aug, 09 Katakuti Dolakha 13  5  8  2 

81  Facilitate CFUGs account adudit  11‐13 Nov, 09 Sailung cluster Dolakha  9  9  ‐ ‐82  Support to development record keeping 

system of subgroup 18 Nov, 09 Charikot Cluster Dolakha 73  38  35  18 

83  CFUG account keeping support  28 Oct, 09 Sailung cluster Dolakha 13  13  ‐ ‐84  Support to development record keeping 

system of subgroup 19 Dec, 09 Boach Dolakha 78  35  43  17 

85  Support to development record keeping system of subgroup 

27 Jul, 09 Charikot Cluster Dolakha 12  9  3  2 

Subtotal ‐‐ Total: 6377; Male: 3995; Female: 2382; DAG: 5553  Community resource center and local capacity buildingi  Identification and strengthining 

1  Identification and selection of BDS provider (LRP) 

Mar‐Jun, 08 Baglung 10  5  5  4 

2  Identification and selection of BDS provider (LRP) 

Feb, 08 Myagdi  3  1  2 

3  Identification and selection of BDS provider (LRP) 

Salija & Kyang Parbat 10  1  9 

4  Identification & slection of BDS provider  Feb, 08 Gurja, Lulang Myagdi 10  5  5  2 5  Hands on training to FUGs on Account and 

fund mobilization 19,Jun, 08 Lulang Myagdi 31  17  14 

6  Hands on training to FUGs on Account and fund mobilization 

16, Jun, 08 Lulang Myagdi 61  34  27  63 

7  Hands on training to FUGs on Account and fund mobilization 

19, Jun, 08 Ruma Myagdi 11  10  1  ‐

8  Hands on training to FUGs on Account and fund mobilization 

16, Jun, 08 Ruma Myagdi 12  8  4  1 

9  Identification and selection BDS (Provider) LRP Humla  1  1 10  Identification and selection BDS (Provider) LRP Humla  2  2 11  Identification and selection BDS (Provider) LRP Humla  2  2 12  Identification and selection of BDS provider 

(LRP) Feb, 08 Dolakha Dolakha  3  3  ‐

13  Introduction workshop for resource center (FERDC) 

23 Jun, 08, 08 Shahilekh Baitadi 41  39  2 

14  Identify LRP ( CFUG & Enterprize personnel) 28‐30 Nov, 09 Ruma, Lulang Myagdi 11  8  3  2 15  Orientation to LRP  19‐28 Jan, 10 Ruma, Lulang Myagdi 10  9  1 16  LRP selection and coaching  4 Oct, 09 Bodle Dolakha  6  3  3  ‐17  Facilitate to CFUGs annual aduit through LRPs Oct, 09 Sailung Cluster Dolakha ‐ 

Subtotal ‐‐ Total: 224; Male: 148; Female: 76; DAG: 724  Financial services  i  Facilitate to access finance for enterprise start up

1  Facilitate to access finance for enterprise start up0 Handmade paper making  

March0April, 08 Lulang Myagdi 30  18  12  5 

2  Facilitate to access finance for enterprise start up0 Handmade paper making  

March0April, 08 Ruma Myagdi 25  15  10  5 

3  Facilitate to access finance for enterprise start up0 Wintergreen esseantioal oil  

April to May 08 Attarpur Sindhupalchok  27  18  9  ‐

4  Facilitate to access finance for enterprises development 

Jan Bajhang 45  24  21  2 

5  Facilitate to access finance for enterprise start up‐ essential oil 

Dec,08 Myagdi  5  5  ‐

6  Facilitate to access finance for enterprise start up‐ Handmade paper 

2009 January  Ruma& Beni Myagdi  3  3  ‐ ‐

7  Facilitate to access finance for enterprise start up‐ Handmade paper 

11‐Mar Ruma,Lulang Myagdi  5  5  ‐

8  Facilitate to access finance for enterprise start  November Dhairing Parbat 15  15 

Page 51: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 49 

up‐ Allo processing 9  Facilitate to access finance for enterprise start 

up‐ Allo processing November Parbat Parbat ‐ 

10  Facilitate to access finance for enterprise start up‐ Handmade paper 

Jan, 09 Salija Parbat ‐ 

11  Facilitate to access finance for enterprise start up‐ Allo processing 

Jan, 09 Dhairing Parbat ‐ 

12  Facilitate to access finance for enterprise start up‐ Allo processing 

Jan, 09 Dhairing Parbat ‐ 

13  Facilitate to access finance for enterprise start up‐ Briquette making 

4 Oct. 08 Sikre Sindhupalchok  13  8  5  ‐

14  Facilitate to access finance for enterprise start up‐ Handmade paper 

Jan. 09 Sailung Dolakha 10  10  ‐ ‐

15  Facilitate to access finance for enterprise start up‐ EDRF 

25 April, 09 Deurali Dolakha 19  15  4  ‐

16  Facilitate to access finance for enterprise start up‐ Handmade paper 

19‐Nov Bamor Bajhang 37  36  1  ‐

17  Facilitate to access finance for enterprise start up‐ Handmade paper 

13‐Nov Bijgada Bajhang  4  4  ‐ 1 

18  Facilitate to access finance for enterprise start up‐ Handmade paper 

24‐Nov Chainpur  Bajhang  8  8  ‐ 2 

19  Facilitate to access finance for enterprise start up‐ EDRF 

19‐Dec Pimi Bajhang 83  68  15  18 

20  Facilitate to access finance for enterprise start up‐ EDRF 

7‐Dec G0ichen Bajhang 30  30  ‐ ‐

21  Facilitate to access finance for enterprise start up‐ EDRF 

25‐Dec Bamor Bajhang 24  24  ‐ ‐

22  Facilitate to access finance for enterprise start up‐ EDRF 

20‐Dec sola Bajhang 14  9  5 

23  Facilitate to access finance for enterprise start up‐ EDRF 

16‐Feb G0ichen Bajhang 34  34  ‐ ‐

24  Facilitate to access finance for enterprise start up‐ EDRF 

19‐Dec Pimi Bajhang 20  18  2 

25  Facilitate to access finance for enterprise start up‐ Handmade paper 

25 Dec&29 Dec Chainpur  Bajhang  5  5  ‐ ‐

26  Facilitate to access finance for enterprise startup‐ EDRF 

Dec,08 Khan‐7 Darchula 31  25  6  ‐

27  Facilitate to access finance for enterprise start up‐ EDRF 

Dec,08 Khan‐9 Darchula 28  14  14  ‐

28  Facilitate to access finance for enterprise start up‐ EDRF 

Dec,08 Khan‐6 Darchula 51  31  20  ‐

29  Facilitate to access finance for enterprise start up‐ Handmade paper 

Jan,09 Darchula Darchula  3  3  ‐ ‐

30  Facilitate to access finance for enterprise start up‐ EDRF 

july, 08 Darchula Darchula 24  15  9  ‐

31  Facilitate enterprise to link Funding Agency for Infrastructure development 

25 Jan, 10 Darbang Myagdi  5  5 

32  Facilitate enterprise to link Funding Agency for Infrastructure development 

20 & 29 Jan, 10 Ruma, Lulang Myagdi 16  12  4 

33  Link enterprises with DFO  29 Mar, 10 Ruma, Lulang Myagdi  2  2 34  Coordination with HMC for material suport to 

Allo enterprise. Mar, 10 Khungkhani Baglung ‐ 

35  Coordination with LFP for material suport to Allo enterprise. 

Dec, 09 Bongadovan Baglung ‐ 

36  Support to develop operation and managmenet guideline forsub‐group 

Nov, 09 Dhairing Parbat 15  15 

37  Facilitate to access Finance to enterprisestart up 

Nov, 09 Parbat Parbat ‐ 

38  Coordinate with DFO to sopport on Pro‐poor share on lokta enterprise 

Jan, 10 Salija Parbat ‐ 

39  Enterprise development revolving fund establishment and development 

Jan, 10 Dhairing Parbat ‐ 

40  Enterprise development revolving fund establishment and development 

Jan, 10 Dhairing Parbat ‐ 

41  Facilitate to access Finance to enterprisestart up 

Mar, 10 Kushma Parbat ‐ 

42  Meeting with licheCFUG for Fund collection  19 Nov, 09 Bamor Bajhang 37  36  1  ‐43   Meetingwith SAPROS ,PAF for financial 

agreement 13 Nov, 09 Bijgada Bajhang  4  4  ‐ 1 

44  consultationMeetingwith WUPAP forpaper  24 Nov, 09 Chainpur  Bajhang  8  8  ‐ 2 

Page 52: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 50 

making Training  45  Public Auditing in Malika paper enterprise  19 Dec, 09 Pimi Bajhang 83  68  15  18 46  Fund initiation meeting with Jutevatmaya 

CFUG 7 Dec, 09 G0ichen Bajhang 30  30  ‐ ‐

47  Fund initiation meeting with LICHE CFUG  25 Dec, 09 Bamor Bajhang 24  24  ‐ ‐48  Fund initiation meeting with Jutevatmaya 

CFUG 22 Dec, 09 sola Bajhang 14  9  5 

49  Fund initiation meeting with Paribartansil Cos 16 Feb, 10 G0ichen Bajhang 34  34  ‐ ‐50  Meeting with PAFSAPROS and WUPAP   25‐29 Dec, 09 Chainpur  Bajhang  5  5  ‐ ‐51  Fund initiation meeting  Dec, 09 Khan‐7 Darchula 31  25  6  ‐52  Fund initiation meeting  Dec, 09 Khan‐9 Darchula 28  14  14  ‐53  Fund initiation meeting  Dec, 09 Khan‐6 Darchula 51  31  20  ‐54  Coordination meeting with PAF  Jan, 09 Darchula Darchula  3  3  ‐ ‐55  Meeting with PAFs field Staff's for Revolving 

Fund Mobilization 4 Jan, 10 Khandeswori Darchula  5  5  ‐

56  Meeting with Shankha Devi Briquette enterprise 

12 Oct, 09 Lankuridanda Dolakha  9  5  4  2 

57  Financial linkage with Bhimeswor paper and BoK 

Oct, 09 Kathmandu Center  2  2  ‐ ‐

58  Meeting with Bhimeswor paper enterprise 23 Jan, 10 Charikot Dolakha 11  11  ‐ ‐Subtotal ‐‐ Total: 1010; Male: 778; Female: 232; DAG: 56ii  Hands on training to FUGs on Account and fund mobilization

1  Hands on training to FUGs on Account and fund mobilization 

Mar0Jun, 08 Baglung  104  28  76 

2  Hands on training to FUGs on Account and fund mobilization 

Jun, 08 Jhapa Bajhang 21  14  7 

3  Hands on training to FUGs on Account and fund mobilization 

19,Jun, 08 Lulang Myagdi 31  17  14 

4  Hands on training to FUGs on Account and fund mobilization 

16, Jun, 08 Lulang Myagdi 61  34  27  63 

5  Hands on training to FUGs on Account and fund mobilization 

19, Jun, 08 Ruma Myagdi 11  10  1  ‐

6  Hands on training to FUGs on Account and fund mobilization 

16, Jun, 08 Ruma Myagdi 12  8  4  1 

7  Hands on training to FUGs on Account and fund mobilization 

10 Jun, 08 Salija Parbat 11  8  3 

8  Hands on training to FUG on account and Fund mobilization 

12&27 May, 08 Taman, Khunga Baglung 13  4  9 

9  Enterprise Account management  18‐22 April 2009 Ruma Myagdi  3  2  1  ‐10  Hands on training to FUG on Account and 

Fund mobilization 12,27 May 08 Taman, Khunga Baglung 13  4  9 

11  Hands on training to FUG on Account and Fund mobilization 

14, 15 Aug, 08 Khungkhani Baglung  8  2  6  4 

12  Hands on training to FUG on account and Fund mobilization 

9 March, 09 Jethal Sindhupalchok   6  4  2  ‐

13  Hands on training to FUG on account and Fund mobilization 

31 March ,09 Attarpur Sindhupalchok  14  8  6  2 

14  Hands on training to FUG on account and Fund mobilization 

27 April, 09 Danda Kharka Dolakha 12  8  4  2 

15  Hands on training to FUG on account and Fund mobilization 

6 to 20 Aug. 08 Sailung Dolakha  117  87  30  10 

16  Hands on training to FUG on account and Fund mobilization 

12 to 13 Aug. 08 Katakuti Dolakha 20  20  ‐ ‐

17  Hands on training to FUG on account and Fund mobilization 

22 to 27 Sep, 08 Sailung Dolakha 20  14  6  1 

18  Hands on training to FUG on account and Fund mobilization 

10 may,09 Khandeshori Darchula 16  10  6  ‐

19  Conduct account management training  Sep, 09 Darbang Myagdi  1  1 20  Hands on training to FUG on Account and 

Fund mobilization 27 May, 10 Taman, Khunga Baglung 13  4  9 

21  Hands on training to FUG on Account and Fund mobilization 

14‐15 Aug, 09 Khungkhani Baglung  8  2  6  4 

22  Account and record keeping to FUG members 10 May, 10 Khandeshori Darchula 16  10  6  ‐23  Meeting with Mulkharka CFUGsfor account 

keeping, fund mobilization and Audit 21 Oct, 09 Jethal Sindhupalchok   5  3  2 

24  Meeting with Golyang CFUGsfor account keeping, fund mobilization and Audit 

22 Oct, 09 Nigale Sindhupalchok   7  4  3 

25  Meeting with Patle and Peukharka CFUGsfor account keeping, fund mobilization and Audit 

23 Oct, 09 Attarpur Sindhupalchok  10  7  3 

26  Facilitate to CFUGs for account and record  20 Nov, 09 Thulopakhar Sindhupalchok  13  9  4  2 

Page 53: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 51 

keeping and Fund mobilization, Bodle and Okreni CFUG 

27  Facilitate CFUG annual audit   3‐4 Dec, 09 Sikre, Sildhunga Sindhupalchok  14  14 Subtotal ‐‐ Total: 580; Male: 336; Female: 244; DAG: 89iii  Trainings to staff, stakeholders and LRPs (BDS providers)

1  Programme orientation and value chain analysis training to local staff and BDS providers  

Humla 19  17  2 

2  Programme orientation and value chain analysis training to local staff and BDS providers  

Feb, 08 Humla 19  17  2 

3  Programme orientation and value chain analysis training to local staff and BDS providers  

Humla 19  17  2 

4  Support to Implemententerprise development Revolving fund 

May pariban ,Ranrda , binayak 

Bajhang 41  41  41 

5  VCA training to Local BDS providers & staff Dec chainpur Bajhang  8  8  1 6  VCA training to NGO staffs , Fecofun 

member,CFUGs members and Rangepost staffJan, 08 Darchula 11  11 

7  Enterprise development and business plan preparation training 

13 to 16 May, 09 Charikot Dolakha 35  25  10  2 

8  Exposure visit to Malika   22‐Mar Kailash Bajhang 10  5  5  ‐9  Exposure visit to Lekgaun for Lokta 

verification 2‐Feb Lekgaun Bajhang  4  2  2  ‐

10  Exposure visit to Malika   Aug, 09 Kailash Bajhang 10  5  5  ‐11  Exposure visit to Lekgaun for Lokta 

verification Nov, 09 Lekgaun Bajhang  4  2  2  ‐

12  Orientation to LRPs  14 Nov, 09 Daramghar Darchula  4  4 Subtotal ‐‐ Total: 184; Male: 154; Female: 30; DAG: 445  Value chain promotion and marketing linkagesi  Market information collection, compilation and dissimination

1  Collection, compilation and dissimination of price information 

Aug 070July 08 Kathmandu Center ‐  ‐ ‐ ‐

2  Dissimination of NTFP price list market information to districts 

Aug 070July 08 Center ‐  ‐ ‐ ‐

3  Market Information services (m/s)  Humla  126  91  35 4  Market information Support  Ongoing Parbat ‐ 5  Market information support  Jan. to Jun, 08, 08 Dolakha ‐ 6  Market information support  Jan. to Jun, 08, 08 Sindhupalchok  ‐ 7  MIS information dessimination  Ongoing chainpur Bajhang ‐ 8  Mis display  19, Jun, 08 Darbang, Lilang Myagdi 33  18  15 9  NTFP market information sheet display  Jun, 08 Baglung ‐ 10  Market information support  4,5&9 July, 08 Baglung ‐ 11  Marketing support to Allo entrepreneurs  13‐23 July, 08 Khungkhani Baglung 11  11 12  Market information support  July, 08 Salija Parbat ‐ 13  Market information support  July, 08 Takam, Darbang Myagdi ‐ 14  Market information support  Oct, 08 Baglung ‐ 15  Market information support  Oct, 08 Darbang Myagdi ‐ 16  Market information support  Oct, 08 Salija, Lekhphant Parbat ‐ 17  Market information support  Aug, 08 Myagdi ‐  ‐ ‐18  Marketing support to Allo entrepreneurs  13‐23, July, 08 Khungkhani Baglung 11  11 19  Market information support  4, 5&9, July, 08 Baglung ‐ 20  Market information support  March '09 Baglung ‐ 21  Allo thread marketing support   Oct, 08 Baglung ‐ 22  Market information support  Dec 08, Jan‐Feb 

09 Parbat ‐ 

23  Exposure visit for Sailung paper enterprise 2 to 3Dec. 08 Boach, Jiri Dolakha  6  6  ‐ ‐24  Market information support  23 to 24 Sep. 08 Daduwa Dolakha 17  15  2  ‐25  Study visit of briquette enterprise  14 to 15 Sep. 08 Dolakha Dolakha  2  1  1  ‐26  Study visit of briquette enterprise  6 Dec. 08 Dolakha Dolakha  8  8  ‐ ‐27  Market information support  20Dec,08 Paudi Bajhang 24  23  1  1 28  Marketing support to Yarsagumba collector Aug,08 Chainpur  Bajhang  9  9  ‐ 1 29  Meeting between Collectors & 

YarsagumbaTraders Aug,08 Bamor Bajhang 45  45  ‐ ‐

30  Marketing support to Yarsagumba collector Aug,08 Daha Bajhang 35  20  15  25 31  Marketing support to Yarsagumba collector Aug,08 Daha Bajhang 82  55  27  15 32  Hoarding board demonstration   12 May,09 Kaligad Bajhang 5,400   4,800  600  40 33  Boardcasted by FM on Yarshagumba 

collection 12‐17 May,09 Chainpur  Bajhang  10,000   5,000  5,000  400 

Page 54: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 52 

34  Marketing campaign of Sibukthron juice  28 May,09 Gokule Darchula 43  40  3  ‐35  Marketing campaign of Sibukthron juice  14 may,09 Latinath Darchula 22  18  4  ‐36  Marketing campaign of Sibukthron juice  18 may,09 Ganna Darchula 56  40  16  ‐37  Collect and distribute NTFPs market 

information Sep, 09 Darbang Myagdi  3  3 

38  NTFPs price list distribution  Sep, 09 Myagdi  150  150 39  Market support to Allo entrepreneurs  13‐23 Aug, 09 Khungkhani Baglung 11  11 40  MIS board establishment and dissimination Mar, 10 Bongadovan and 

Burtibang Baglung ‐ 

41  Allo thread marketing support   Oct, 09 Baglung ‐ 42  Collect and distribute NTFPs market 

information Ongoing Salija, Lekhphant, 

Dhairing Parbat ‐ 

43  Meeting with CFUG ,Cos ,Investors& Traders 20 Dec, 09 Paudi Bajhang 24  23  1  1 44  Yarsagumba MarketingMeeting   Aug, 09 Chainpur  Bajhang  9  9  ‐ 1 45  Meeting between Collectors & 

YarsagumbaTraders Aug,09 Bamor Bajhang 45  45  ‐ ‐

46   C D ( Kire khojneko dhukha casting withPatal CFUG 

Aug, 09 Daha Bajhang 35  20  15  25 

47   C D ( Kire khojneko dhukha casting withMahendra high school  

Aug, 09 Daha Bajhang 82  55  27  15 

48  Hoarding board demonstration   12 May, 10 Kaligad Bajhang ‐  All  All  All 49  Boardcasting advertises about Yarsa collection 

informations local FM 12‐17 May, 10 Chainpur  Bajhang ‐  All  All  All 

50  Marketing campaign of Dalechuk  28 May, 10 Gokule Darchula 43  40  3  ‐51  Marketing campaign of Dalechuk  14 May, 10 Latinath Darchula 22  18  4  ‐52  Marketing Campaign in Gokulesor  12‐17 Feb, 10 Gokule Darchula ‐  All  All  All 53  Pampleting ofDale Chuk   12 ‐17 Feb, 10 Gokule Darchula ‐  All  All  All 54  Marketing campaign of Dalechuk  18 May, 09 Ganna Darchula 56  40  16  ‐55  Marketting through Journal  13 Nov, 09 Sailung, Charikot  Dolakha  2  2  ‐ ‐56  Meeting among CFUGs and sailung paper 

enterprise 27 Feb, 10 Sailung, Charikot  Dolakha 17  14  3  5 

Subtotal ‐‐ Total: 16429; Male: 10608; Female: 5821; DAG: 529ii  Enterprsie and value chain information collection

1  Identification of primary clients, base line survey and VC analysis. 

Jan, 08 Humla  478  351  127 

2  Identification of primary clients, base line survey and VC analysis. 

Feb, 08 Humla  494  337  157 

3  Identification of primary clients, base line survey and VC analysis. 

Jan, 08 Lekhphant, Salija, Bhuktangle, Dhairing, Kyang 

Parbat ‐ 

4  Identification of primary clients, base line survey and VC analysis. 

Jan, 08 Lekhphant, Salija, Bhuktangle, Dhairing, Kyang 

Parbat ‐ 

5  Identification of primary clients, base line survey and VC analysis. 

March,08 Khandeshwori,Gulajar and Latinath 

Darchula  230  180  50  65 

6  Identification of primary clients, base line survey and VC analysis. 

Dec. 07 to Feb. 08 Dolakha ‐ 

7  Identification of primary clients, base line survey and VC analysis. 

Dec. 07 to Feb. 08 Sindhupalchok  ‐ 

8  Identification of primary clients, base line survey and VC analysis. 

Dec, 070Feb, 08 Baglung ‐ 

9  Identification of primary clients, base line survey and VC analysis. 

Jan, 08 Myagdi ‐ 

10  Identification of primary clients, collection of baseline information and value chain analysis 

Jan, 08 Malkabang, Lulang, Gurja, Lulang, Ruma 

Myagdi ‐ 

11  Value chain analysis workshop  Jan, 08 Humla 11  10  1  1 12  Value chain data collection in CFUGs  Dec,07 to Jan. 08 Sindhupalchock Sindhupalchok   469  318  151  128 13  Communicate with Tibetan Handicraft  Juy, 09 Ruma, Lulang Myagdi  3  3 14  Linkage Nepalgunj traderswith juice 

enterprise Feb, 10 Paribagar Darchula  6  4  2 

15  Linkage Nepalgunj traderswith Ritha collectors Nov, 09 Khadeshori Darchula 30  28  2 16  Participate in District level workshop about 

paper enterprise 20 Nov, 09 Charikot Dolakha 23  20  3  1 

17  Visit with media persons for marketting of briquette through FM and Journel 

25 Nov, 09 Lankuridanda Dolakha  4  3  1  ‐

18  Visit with media persons for marketting promotion of Briquette enterprise 

26 Jan, 10 Lankuridanda Dolakha 13  6  7  5 

SubtotalTotal: 1761; Male: 1260; Female: 501; DAG: 200iii  Communication and linkage building between community enterprises and buyers

Page 55: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 53 

1  District level traders's meetings  Humla 17  17 2  Linkage ktm traders with local enterpreneurs May Dahabagar Bajhang  351  281  70  102 3  Market linkage of Lokta paper  Ongoing Baglung Baglung ‐ 4  Meeting among CBFEs FUG and others market 

actors Humla 85  64  21 

5  Meeting among CBFEs FUG and others market actors 

Humla 64  47  17 

6  Meeting among CBFEs, FUG and others market actors 

Humla 49  37  12 

7  Meeting among CBFEs, FUG and others market actors 

Humla 28  21  7 

8  Meeting among CBFEs, FUG and others market actors 

Humla 76  51  25 

9  Meeting among CBFEs, FUG and others market actors 

Humla 44  37  7 

10  Meeting among CBFEs, FUGs and others market actors 

Jan, 08 Humla 85  64  21 

11  Meeting among CBFEs, FUGs and others market actors 

Feb, 08 Humla 64  47  17 

12  Meeting between Allo thread makers and buyers 

Oct, 08 Baglung ‐ 

13  Meeting between paper enterprise and BCP Feb1‐2 09 Ruma, Lulang and Baglung 

Myagdi  6  6  ‐ ‐

14  Meeting between paper enterprise and BCP 14‐Mar‐09 Lulang Myagdi 19  6  13  ‐15  Meeting between paper enterprise and BCP 26‐Mar‐09 Ruma Myagdi 14  7  7  ‐16  Meeting between paper enterprise and BCP 9‐Mar‐09 Salija Parbat 13  8  5 17  Meeting among CBFEs FUG and others market 

actors Dec08 to Feb. 09 Ktm. Center  3  3  ‐ ‐

18  Meeting among CBFEs FUG and others market actors 

2 to 5 Jan. 09 Ktm. Center  3  3  ‐ ‐

19  Meeting among CBFEs FUG and others market actors 

25 to 27 Jan. 09 Ktm. Center  2  2  ‐ ‐

20  Meeting among CBFEs FUG and others market actors 

3 to 4 Jan. 09 Boach Dolakha  4  4  ‐ ‐

21  Meeting among CBFEs FUG and others market actors 

30 April, 09 Sailung Dolakha 21  15  6  3 

22  Participate exhibhition  1 to 6 April, 09 Charikot Dolakha  5  1  4 23  Linkage local traders with Nepalgunj traders Mar,09 chainpur Bajhang  3  3  ‐ ‐24  Linkage local traders (Ritha)with Nepalgunj 

traders Feb,09 Jhapa Bajhang  5  5  ‐ ‐

25  Linkage collectors with katuki traders  15 ‐mar,09 Paudi Bajhang  8  8  ‐ ‐26  Linkage local traders with Nepalgunj traders 15 Mar,09 Dahabagar from 

phone Bajhang  1  1  ‐ ‐

27  Linkage Yarsagumba conservation committee with District line agencies 

15 may,09 chainpur Bajhang  3  3  ‐ ‐

28  Organize visit of Tibetian Handicraft representive 

July, Sepember, November, December 

Ruma, Lulang Myagdi  4  4 

29  Meeting between paper enterprise and BCP 9 Mar, 10 Salija Parbat 13  8  5 30  Exposure visits to enterprise members for 

market survey and contract 6‐13 Jul, 09 Dolakha Parbat  2  2 

31  Meeting between HBTL and wintergreen enterprise 

Nov, 09 Kathmandu Center  1  1 

32  Linkage local traders (katuki)with Nepalgunj traders 

Mar, 09 chainpur Bajhang  3  3  ‐ ‐

33  Linkage local traders (Ritha)with Nepalgunj traders 

Feb, 09 Jhapa Bajhang  5  5  ‐ ‐

34  Linkage collectors with katuki traders  15 Mar, 09 Paudi Bajhang  8  8  ‐ ‐35  Linkage local traders with Nepalgunj traders 15 Mar, 09 Dahabagar from 

phone Bajhang  1  1  ‐ ‐

36  Linkage Yarsagumba con committee with District line agencies 

15 May, 09 chainpur Bajhang  3  3  ‐ ‐

37  Meeting with Briquette producer groups and marketting company 

Dec, 09 Kathmandu Center 18  18  ‐ 1 

38  Meeting of Briquette producer groups of Dolakha and Sindhupalchock 

29 Aug, 09 Jethal Sindhupalchok  14  6  8  3 

39  Meeting with Mulkharka CFUG for co‐ordination with Okreni Jawala briquette enterprise 

17 Dec, 09 Mude Sindhupalchok  11  8  3  3 

40  Facilitation to charcoal collection Okreni  25 Jan, 10 Tamche Sindhupalchok   5  5 

Page 56: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 54 

Briquette enterprise 41  Market linkages of LUNELI Hand made paper 

ent. 5 Oct, 09 Chainpur  Bajhang  4  4  ‐ 1 

42  Metting with local traders and JHMP Ent.   21 Feb, 10 Chainpur  Bajhang  6  6  ‐ ‐43  Support to business plane making for JHMP 

Ent . 11 Apr, 10 Goichan Bajhang  5  5  ‐ ‐

44  Marketingsupport for paper Seleing   9 Dec, 09 Chainpur  Bajhang  2  2  ‐ 1 45  Local traders meeting  14 Aug, 09 Gokule Darchula  5  5  ‐ ‐46  Traders and farmers mass meeting  7 Sep, 09 Gokule Darchula 43  43  ‐ 3 47  Workshop for setting quality and market price 

on briquette 25 Jul, 10 Sildhunga Sindhupalchok   6  6  ‐ 6 

Subtotal ‐‐ Total: 1132; Male: 884; Female: 248; DAG: 123iv  Promoting linkage between enterprises in value chains

1  Market study visit for Bhimeswor briquite enterprise 

Jan.08 Kathmandu Dolakha  2  2  ‐

2  Market study visit for Wintergreen enterprse Jan.08 Kathmandu Center  2  2  ‐ ‐3  Meetings for signing MoU with BCP  Jun Kathmandu Center ‐ 4  Meetings for signing MoU with Bio0supplier  May Kathmandu Center ‐ 5  Sample preparation and quality check up  Salija Parbat ‐ 6  Support to Aveda and HBTL team for 2008 

Aveda hoiday line story Feb0Mar, 07 Boch, Jiri, Cherdung Center 23  15  8  5 

7  Yarsagumba Network Formation  Jun, 08 Dahabagar Bajhang  9  9 8  Market linkage to paper enterprise with BCP 29‐Apr Ruma Myagdi 17  11  6  ‐9  Linkage to paper enterprise with BCP  3‐5 May Baglung Myagdi 11  10  1  ‐10  Market linkage to paper enterprise  Feb. 09 Sailung Dolakha  8  6  2  2 11  Market linkage to briquette enterprise  10 Feb. 09 Lankuri danda Dolakha 10  7  3  2 12  Market linkage to paper enterprise  28 to 31 March, 

09 Sailung Dolakha  9  6  3  ‐

13  Market linkage to briquette enterprise  17 Aug.08 Tamche Sindhupalchok   6  4  2  ‐14  Market linkage to briquette enterprise  21 Aug. 08 Golyang Sindhupalchok  11  11  ‐ ‐15  Market linkage to paper enterprise  19 July,08 Bodle Dolakha 13  12  1  ‐16  Market linkage to wintergreen enterprise  20 July, 08 Sikre Sindhupalchok  18  13  5  ‐17  Market linkage to paper enterprise  May,09 Dahabagar Bajhang 80  50  30  ‐18  Market linkage to paper enterprise with 

Tibetan Handicraft Dec, 09 Ruma, Lulang Center  1  1 

19  Market linkage to paper enterprise with local stationeries suppliers 

21 Mar, 10 Beni Myagdi ‐ 

20  Exhibition Support  22 Apr, 10 Kathmandu Center  3  3 21  Linkages to Allo thread enterprise with cloth 

weaving enterprise of Salija Jan, 10 Bongadovan Baglung ‐ 

22  Market linkage to wintergreen enterprise with HBTL 

Nov, 09 Center  1  1 

23  Infrastructure develoment of Juneli HMP enterprise 

May, 09 Dahabagar Bajhang 80  50  30  ‐

24  Meeting with Kanpo Nepal about Argeli fiber 19 Feb, 10 Charikot Dolakha 65  45  20  23 25  Meeting with Himalayan green energy Pvt.Ltd. May, 10 Kathmandu Center 10  10 26  Interaction and business development 

planning meeting  Kathmandu Center 10  10  ‐ 1 

27  Research and product development  Kathmandu Center  3  3 28  Meeting with HBTL, Briquette producer and 

Private investors Kathmandu Center 12  12 

29  Enterprise registration  Kathmandu Center  1  1 30  Support to manage marketing campaign  Kathmandu Center  6  3  3 31  Marketing training to briquette sales 

representatives Kathmandu Center  5  2  3 

32  Marketing campaign  Kathmandu Center  7  4  3 33  Value chain workshop 23 May, 10 Kathmandu Center 14  14  ‐

Subtotal ‐‐ Total: 437; Male: 317; Female: 120; DAG: 336  Project maagment, coordination and linkagei  Staff training and workshop 

1  Enterprise development training  8012 Oct, 07 Dhulikhel Center  9  9  ‐ 1 2  VCA training to staffs  14017 Nov, 07 Dhulikhel Center 12  12  ‐ 1 3  Workshop on enterprise options, Value chain 

and enterprise planning 18021 Feb, 08 KTM Center 10  9  1  1 

4  SIYB training  March, 08 Sivling Baitadi 30  5  25  5 5  VCA training to staffs  22 to 26 Jan.08 Charikot Dolakha  6  5  1  1 6  VCA training to staffs (area level activity)  Jan‐08 Kusma Parbat 10  8  2  1 7  VCA training to staffs  Dec, 08 Shahilekh Baitadi 12  9  3  1 8  Staff oreantation on project   Dec. 07 Charikot Dolakha  5  4  1 

Page 57: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 55 

9  Staff orientation on project  8 Oct, 07 Dhulikhel Center 10  10  ‐ 1 10  Account management training  27 Apr, 10 Gokule Darchula  3  2  1 

Subtotal ‐‐ Total: 107; Male: 73; Female: 34; DAG: 12ii  Annual review and planning meetings and workshops

1  Annual review and planning workshop  305 July, 08 Budol Center 20  17  3  1 2  District level Annual reveiew and planning 

workshop 24, Jun, 08 Beni Myagdi 20  16  4  ‐

3  District level Annual review and planning workshop 

Jun, 08 Baglung Baglung 20  2  18 

4  District level annual review and planning workshop  

29 Jun, 08, 08 Charikot Dolakha 20  20  ‐

5  District level annual review and planning workshop  

1 July, 08 Chautara  Sindhupalchok  ‐ 

6  District level Review and planning w/s workshop 

27‐Jun‐08 Kushma Parbat 16  12  4 

7  Planning with stakeholders  Jun, 08 Dahabagar Bajhang 20  15  5  3 8  Project Coordination Committee meeting  10‐11 Feb 09 Lulang Myagdi 12  12  ‐ ‐9  Project Coordination Committee meeting  Sep,09 Chainpur  Bajhang 11  9  2 10  Project Coordination Committee meeting  26 mar,09 Chainpur  Bajhang 13  11  2 11  Project Coordination Committee meeting  30‐Mar Chainpur  Bajhang 11  10  1 12  District level annual reveiew and planning 

workshop Bajhang 20  17  3 

13  District level annual reveiew and planning workshop 

Darchula 20  16  4 

14  District level annual reveiew and planning workshop 

Baglung 20  2  18  2 

15  District level annual reveiew and planning workshop 

Myagdi 20  18  2  2 

16  District level annual reveiew and planning workshop 

Parbat 16  12  4 

17  District level annual reveiew and planning workshop 

Dolakha 16  12  4  1 

18  District level annual reveiew and planning workshop 

Sindhupalchok  20  15  5  1 

19  Project level annual reveiew and planning workshop 

6‐7 Jul, 09 Kathmandu Center 20  18  2  1 

20  Project review workshop  29 Mar, 10 Baglung Baglung ‐ 21  Project Review workshop  28 Mar, 10 Kushma Parbat ‐ 22  Program monitoring visit  24‐25 Mar, 10 Salija, Lekhphant Parbat ‐ 23  Project Review workshop  30 Mar, 10 Beni Myagdi 28  22  6 24  Program monitoring visit  1‐3 Apr, 10 Lulang & Ruma Myagdi 39  29  10 25  Program monitoring visit  26 Mar, 10 Ruma Myagdi 13  13  ‐26  Project Review workshop  22 Mar, 10 Chainpur Bajhang ‐ 27  Project Review workshop  18 Mar, 10 Darchula Darchula 28  22 628  Program monitoring visit  18march,010 Darchula  Darchula  7  7 29  Program monitoring visit  16 Mar, 10 Okreni, Sikre Sindhupalchok  22  14  8  3 30  Project Review workshop  22 Mar, 10 Chautara Sindhupalchok  17  15  2 31  Program monitoring visit  27 Mar, 10 Sailung Dolakha 22  14  8  3 32  Project Review workshop  30‐Mar‐10 Charikot Dolakha 17  15  2 33  Project level lesson learnt workshop  7‐8 Jul, 10 Kathmandu Center 21  21  ‐

Subtotal ‐‐ Total: 529; Male: 406; Female: 123; DAG: 17iii  District level program inception workshop 

1  District level program inception workshop  1 Jan.08 Charikot Dolakha 25  22  3 2  District level program inception workshop  3 Jan.08 Chautara  Sindhupalchok  17  15  2 3  District level Programme Inceptionworkshop Dec, 07 Khalanga Darchula 25  23  2 4  District level Programme Inception and 

Project Coordination Committee (PCC) formation workshop 

Dec, 07 Baglung Baglung 38  7  31 

5  District Level Programme inception and project coordination Committee formation meeting 

Jan, 08 Humla 23  21  2 

6  District level Programme Inception and Project Coordination Committee(PCC) formation workshop 

Dec, 07 Beni Myagdi 22  5  17  1 

7  District level Programme Inception and Project Coordination Committee(PCC) formation workshop 

27‐Dec‐07 Kushma Parbat 28  20  8  2 

8  District level Programme Inception and Project Coordination Committee(PCC) 

20 Dec, 08 Shahilekh Baitadi 30  26  4 

Page 58: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 56 

formation workshop 9  District level Programme Inception and 

Project Coordination Committee(PCC) formation workshop 

Dec Chainpur Bajhang 27  25  2  1 

10  Inception of Rittha and Timur VC/Ford‐ICIMOD project 

Darchula 28  22 6

Subtotal ‐‐ Total: 263; Male: 186; Female: 77; DAG: 4iv  District level project management and coordination meetings

1  District project management team meeting Apr, 08 Kushma Parbat  4  2  2 2  District project management team meeting Dec to Jun, 08, 08 Charikot Dolakha  5  4  1 3  District project management team meeting Dec to Jun, 08, 08 Charikot Sindhupalchok  ‐ 4  District project management team meeting Dec, 08 Shahilekh Baitadi  4  3  1 5  District project management team meeting Apr, 08 Shahilekh Baitadi  4  3  1 6  District project management team meeting Dec, 07 Kushma Parbat  5  3  2 7  District project management team meeting Feb, 08 Kushma Parbat  4  2  2 8  District project management team meeting Jan, 08 Kushma Parbat  5  3  2 9  District project management team meeting 8‐Jun‐08 Kushma Parbat  4  2  2 10  District project management team meeting 1 Jun, 08, 08 Beni Myagdi  8  3  5 11  District project management team meeting 27‐Mar‐08 Kushma Parbat  4  2  2 12  District project management team meeting 30‐Apr‐08 Kushma Parbat  4  2  2 13  District project management team meeting 3‐Jun‐08 Kushma Parbat  5  2  3 14  District project management team meeting 6/23024/08 Kushma Parbat  4  2  2 15  District project management team meeting 30,Dec Beni Myagdi  4  2  2 16  District project management team meeting 1, Feb Beni Myagdi  6  3  3 17  District project management team meeting 29, Feb Beni Myagdi  8  5  3 18  District project management team meeting 31, March Darbang Myagdi  6  4  2 19  District project management team meeting 30, April Beni Myagdi  6  5  1 20  District project management team meeting 1, Jun, 08 Beni Myagdi  8  5  3 21  District project management team meeting 25, Jun, 08 Beni Myagdi  6  5  1 22  District project management team meeting Jan, 08 Khalanga Darchula  5  5 23  District project management team meeting April, 08 Khalanga Darchula  5  5 24  District project management team meeting May, 08 Khalanga Darchula  5  5  ‐25  District project management team meeting 8‐Jun‐08 Khalanga Darchula  5  5 26  District project management team meeting Dec, 07 Beni Myagdi  4  2  2  1 27  District project management team meeting Jan, 08 Myagdi ‐ 28  District project management team meeting 27 Feb, 08 Kushma Parbat  5  3  2 29  District project management team meeting Jan0Jun, 08 Burtibang Baglung 30  12  18 30  District project management team meeting 28 Jan, 08 Kushma Parbat  5  3  2 31  District project management team meeting Sindhupalchok  ‐ 32  District project management team meeting Dolakha  5  4  1 33  Interaction and progress sharing meeting with 

core stakeholders March0April, 08 Baglung Baglung 12  2  10 

34  Program coordination meeting (Linked with DEDC meeting) 

Dec, 08 Shahilekh Baitadi 25  22  3 

35  Program coordination meeting (Linked with DEDC meeting) 

May, 08 Shahilekh Baitadi 25  22  3 

36  Co‐ordination meeting with PCC  Jan, 08 Humla  7  7  ‐37  District partner assisment and orientation  Oct0Dec 07 Center Center ‐ 38  District project management team meeting 12,Sept 08 Beni Myagdi  4  3  1  ‐39  Program sharing meeting  18,Sept 08 Durbang Myagdi  4  2  2  ‐40  District project management team meeting 4,5 Dec,08 Beni Myagdi  6  5  1  ‐41  Program sharing meeting  27,Oct,08 Durbang Myagdi  4  3  1  ‐42  District project management team meeting 3,4 January 09 Beni Myagdi  6  4  2  ‐43  District project management team meeting 27,28 January 09 Beni Myagdi  5  5  ‐ ‐44  District project management team meeting 4‐5 March 2009 Beni Myagdi  4  4  ‐ ‐45  District project management team meeting April 2,09 Beni Myagdi  6  6  ‐ ‐46  District project management team meeting 24‐ 25 April 09 Beni Myagdi  4  4  ‐ ‐47  District project management team meeting 4‐5Mar, '09 Baglung Baglung  3  3 48  District project management team meeting 4‐5 Apr, '09 Baglung Baglung  3  3 49  District project management team meeting 2,3 feb, '09 Baglung Baglung  7  6  1 50  District project management team meeting 24‐25 Aug,08 Baglung Baglung  4  2  2 51  District project management team meeting 4Mar, 09 Kushma Parbat  5  3  2 52  District project management team meeting 31Mar, 09 Kushma Parbat  5  3  2 53  District project management team meeting 1Jan, 09 Kushma Parbat  3  2  1 54  District project management team meeting 1‐Jul‐08 Kushma Parbat  5  3  2 55  District project management team meeting 31,Aug,08 Salija Parbat  3  2  1 56  District project management team meeting 1Sep, 31Aug, 08 Salija Parbat  3  2  1 57  District project management team meeting 2‐3 feb, 09 Salija Parbat  3  2  1 

Page 59: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 57 

58  District project management team meeting 3‐4Oct, 08 Kushma Parbat  6  2  4 59  District project management team meeting 1‐2 Nov, 08 Kushma Parbat  6  2  4 60  District project management team meeting Salija Parbat  3  2  1 61  District project management team meeting 1and 2 Aug. 08 Charikot Dolakha  7  6  1  ‐62  District project management team meeting 29 to 30 Sep. 08 Charikot Dolakha  7  6  1  ‐63  District project management team meeting 9, Nov.16 Dec. 08 Charikot,  Dolakha   7  6  1  ‐64  District project management team meeting 9 Feb, 17 March, 

09 Charikot Dolakha  7  6  1  ‐

65  District project management team meeting 22 April, 11 May 09 

Charikot Dolakha  7  6  1  ‐

66  District project management team meeting Sep,09 Chainpur  Bajhang  6  3  3  ‐67  District project management team meeting Sep,09 Jhapa  Bajhang  6  3  3  ‐68  District project management team meeting Jan,09 Bijgada Bajhang  8  4  4  ‐69  District project management team meeting April,09 Bijgada Bajhang  4  2  2  ‐70  District project management team meeting 24 Mar,09 Chainpur  Bajhang  8  4  4 71  District project management team meeting 20 May,09 Paudi Bajhang  6  3  3  ‐72  District project management team meeting 20 July,08 Darchula Darchula 11  11  ‐73  District project management team meeting 16 sep,08 Darchula Darchula  8  8  ‐74  District project management team meeting 20 may,09 Latinath Darchula  7  7  ‐75  District project management team meeting 1 june,09 Darchula Darchula 18  18  ‐76  PMT meeting   12 Aug, 09 Beni Myagdi  5  5  ‐77  PMT meeting   21 Sep, 09 Beni Myagdi  5  4  1 78  Planning & coordination meeting  8 Dec, 09 Adhibara Myagdi  6  5  1 79  Facilitate to cordinate FM Radiio  26 Dec, 09 Beni Myagdi  5  5 80  PMT meeting   27‐28 Dec, 09 Beni Myagdi  8  4  4 81  Media Coverage  2‐3 Mar, 10 Ruma Myagdi  3  3  ‐82  Stake holder visit  31 Jan, 10 Ruma Myagdi  7  7  ‐83  PMT meeting   8‐9 Feb, 10 Beni Myagdi  6  5  1 84  Monitoring Visit  1‐2 Mar, 10 Lulang Myagdi  9  7  2 85  PMT meeting  4‐5 Mar, 09 Baglung Baglung  3  3 86  PMT meeting  4‐5 Apr, 09 Baglung Baglung  3  3 87  PMT meetings at district office  2‐3 Feb, 09 Baglung Baglung  7  6  1 88  PMT meeting at district  24‐25 Aug, 09 Baglung Baglung  4  2  2 89  PMT meeting  6‐7 Feb, 10 Baglung Baglung  4  4 90  PMT meeting   4 Mar, 09 Kushma Parbat  5  3  2 91  PMT meeting   31 Mar, 09 Kushma Parbat  5  3  2 92  PMT meeting at district  1 Jan, 09 Kushma Parbat  3  2  1 93  PMT meeting at district  1‐Jul‐08 Kushma Parbat  5  3  2 94  PMT meeting at district  31 Aug, 09 Salija Parbat  3  2  1 95  PMT meeting at district  1 Sep, 09 Salija Parbat  3  2  1 96  PMT meeting   2‐3 Feb, 09 Salija Parbat  3  2  1 97  PMT meeting at district  3‐4 Oct, 09 Kushma Parbat  6  2  4 98  PMT meeting at district  1‐2 Nov, 09 Kushma Parbat  6  2  4 99  PMT meeting at district  23 Aug, 09 Salija Parbat  3  2  1 100  PMT meeting  24 Aug, 09 Kushma Parbat  4  2  2 101  PMT meeting  21 Sep, 09 Kushma Parbat  3  2  1 102  PMT meeting  3 Dec, 09 Kushma Parbat  3  2  1 103  PMT meeting  4‐5 Feb, 10 Kushma Parbat  3  2  1 104  PMT Meeting  Sep, 09 Chainpur  Bajhang  6  3  3 105  PMT Meeting  Sep, 09 Jhapa  Bajhang  6  3  3 106  PMT Meeting  Jan, 10 Bijgada Bajhang  8  4  4 107  PMT Meeting  Apr, 10 Bijgada Bajhang  4  2  2 108  PMT Meeting  24 Mar, 10 Chainpur  Bajhang  8  4  4 109  PMT Meeting  20 May, 10 Paudi Bajhang  6  3  3 110  PCC Meeting   Sep, 09 Chainpur  Bajhang 11  9  2 111  PCC Meeting   26 Mar, 10 Chainpur  Bajhang 13  11  2 112  Meeting with district line agencies  30 Mar, 10 Chainpur  Bajhang 11  10  1 113  PMTmeeting  20 Jul, 09 Darchula Darchula 11  11  ‐114  PMT meeting  16 Sep, 09 Darchula Darchula  8  8  ‐115  PMT meeting  20 May, 09 latinath Darchula  7  7  ‐116  PMT meeting  9 Nov, 09 Ganna  Darchula  3  3 117  PMT meeting  1 Jun, 09 Darchula Darchula 18  18  ‐118  PMT meeting  5 Mar, 10 Darchula Darchula  3  3 119  PMT meeting  17 Mar, 10 Darchula Darchula  7  7 120  PMT meeting  13 Jan, 10 Gokuleshor Darchula  3  3 121  PMT meeting  5 Dec, 09 Gokuleshor Darchula  3  3 122  PCC meeting  June, 09 Darchula  Darchula ‐ 123  Meeting with ECARDS other project staffs  21 Jul, 09 Charikot Dolakha 21  16  5  3 

Page 60: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 58 

124  Monthly staff meeting  4 Aug, 09 Charikot Dolakha  7  5  2  ‐125  Monthly staff meeting  25 Oct, 09 Charikot Dolakha  5  4  1  ‐126  Staff meeting  8 Dec, 09 Charikot Dolakha  5  3  2  ‐127  Staff meeting   21‐22 Dec, 09 Charikot Dolakha  4  4  ‐ ‐128  Meeting with ECARDS   11‐12 Jan, 10 Charikot Dolakha 43  22  21  17 129  Project level shairing meeting with ECARDs 4‐5 Feb, 10 Charikot Dolakha 28  20  8  9 130  Co‐ordination meeting with key stakeholders 

on enterprise ragistration 28 Dec, 09 Chautara Sindhupalchok   8  8 

131  PMT Meeting  13 Sep, 09 Chainpur  Bajhang  3  3  ‐ ‐132  PMT Meeting  27 Jul, 09 Paudi Bajhang  2  2  ‐ ‐133  PMT Metting   18 Nov, 09 Chainpur  Bajhang  2  2  ‐ 1 134  PMT Metting  27 Dec, 09 Chainpur  Bajhang  3  3  ‐ 1 135  Coordination Mettingwith SPROS snd PAF   24 Nov, 09 Chainpur  Bajhang  3  3  ‐ 1 136  PMT Meeting  20 Feb, 10 Chainpur  Bajhang  3  3  ‐ ‐137  PMT Meeting  3 Mar, 10 Paudi Bajhang  2  2  ‐ ‐138  Coordination Meetingwith WUPAP forpaper 

product making Training  1 Dec, 09 Chainpur  Bajhang  2  2  ‐ 1 

139  Meeting with DFO and WUPAP  28 Oct, 10 Chainpur  Bajhang 10  10  ‐ ‐140  Metting with PAF and SAPPROS  29 Apr, 10 Chainpur  Bajhang  7  7  ‐ ‐

Subtotal ‐‐ Total: 442; Male: 343; Female: 99; DAG: 33Total   78,475  49,397  29,078  5,435 

   

Page 61: Final Narrative Report - Asia Network for Sustainable ... · Final Narrative Report ... Women micro‐entrepreneurs making allo ... rural community enterprises, now stands as the

ANSAB   Transforming Local Communities into Enterprises for Economic Security in Nepal 

Final Narrative Report 2010  Page 59 

ANNEX  10:  PRICE  LIST  OF  PRIORITIZED  NTFPS  AND  HIGH  VALUE  CROPS  IN DIFFERENT MARKETS 

Asia Network for Sustainable Agriculture and Bioresources (ANSAB) Market Information Service/ Price list of selected NTFP in Nepali and Indian Markets 

June 2010  SN   Nepali name   Botanicalname   Kathmandu  Nepalgunj  Delhi  Tanakpur  Lucknow  Kolkata 1   Aduwa   Zingiberofficinale  55  60  ***  ***  ***  *** 2   Alaichi   Amomumsubulatum   ***  ***  1264  ***  1280  1240 3   Amala   Phyllanthusemblica   55  61  72  ***  72  80 4   Amalbed   Rheumauatrale   ***  125  176  160  192  200 5   Atis   Delphiniumhimalayai   775  840  800  880  960 6   Barro (without seed)   Terminaliabellirica   26  ***  16  ***  16  *** 7   Bhutkesh   Selinum wallichianum  ***  140  ***  ***  ***  240 8   Bikhjara   Aconitum spicatum   150  125  ***  ***  ***  *** 9   Bojho   Acoruscalamus   50  40  61  ***  64  64 10   Chiraito   Swertiachirayita  350  375  432  384  400  416 11   Dalchini   Cinnamomumzeylanicum   ***  75  88  ***  80  80 12   Guchhichyau   Morchellaconica   ***  9000  11200  ***  ***  *** 13   Harro (without seed)   Terminalia chebula  25  ***  26  ***  26  26 14   Jatamansi*   Nardostachysgrandiflora   325  280  496  480  520  560 15   Jhyau*   Parmelianepalensis   ***  105  240  208  224  240 16   Kakarsinghi   Pistaciachinensis  325  95  376  320  400  400 17   Majitho (rato)   Rubiamanjith   52  60  120  104  112  112 18   Nirmansi (Jadwar)   Delphiniumdenudatum   1400  1300  2400  ***  ***  *** 19   Padamchal   Rheumaustrale   65  45  74  67  72  80 20   Pakhanbed   Bergeniaciliata   35  42  ***  56  64  72 21   Pipla (Lamo)   Piperlongum   380  290  456  ***  464  448 22   Pipla (Golo)   Piperpedicellatum  ***  ***  256  ***  272  240 23   Ritha   Sapindusmukorossi   ***  22  35  30  35  40 24   Satawari   Asparagusracemosus   525  570  800  ***  800  880 25   Satuwa   Parispolyphylla   1350  1450  1200  ***  ***  *** 26   Sikakai   Acacia rugata   13  26  21  27  29 27   Silajit*     250  384  384  400  400 28   Sugandwal*   Valerianajatamansii  150  175  248  224  240  256 29   Sughandhakokila*   Cinnamomumglaucescens   100  90  ***  ***  ***  *** 30   Suntho   Zingiberofficinale   275  305  328  304  336  360 31   Tejpat   Cinnamomumtamala  35  36  51  45  51  48 32   Timur (with seed)   Zanthoxylumarmatum  100  85  128  ***  128  112 

Note: For subscription, please send your/organization name and email address to: [email protected] 1. Prices indicated above are for dried parts offered by the buyers of particular market.  2. *Ban on export in crude form.  3. Prices for Delhi are from commission agent, a 6.5% to 7.5 % commission is deducted from supplier in the quoted 

price.  4. Above prices are indicative which need to be confirmed with the traders before making actual business transaction.  5. *** Not available  

 ANSAB  P.O. Box 11035, Kathmandu, Nepal  

Tel: 977‐1‐4497547, 4478412; Fax: 977 1 4476586 Email: [email protected]   Website: www.ansab.org