Fire & Explosion Risk Assessment

RoslinormansyahEHS Manager PT. Alstom

Power ESI

Page 3: FERA RISZA

Outline of Lecture

1. Understanding Fire and Explosion

3. Selection safeguard for Fire and Explosion’ s Risk Control

2. Framework of Risk Assessment on Fire and Explosion Hazard

Page 4: FERA RISZA

Understanding Fire and Explosion

Page 5: FERA RISZA

Understanding Fire and Explosion

History of Fire and Explosion Incident

Carbide Industries, Fire & Explosion

March , 2011

Page 6: FERA RISZA

Understanding Fire and Explosion

History of Fire and Explosion Incident

Kleen Energy, Explosion

June, 2009

Page 7: FERA RISZA

Understanding Fire and Explosion

Definition

1. Fire : A slow combustion that significant without overpressure

2. Explosion : A release of energy that causes a blast

3. Flammability Limit : The minimum (lower,LFL) and maximum concentration of combustible vapor in

air that will propagate a flame

(source : Guidelines CPQRA, AIChE, 2000)

Page 8: FERA RISZA

Understanding Fire and Explosion

Basic Philosophy

Page 9: FERA RISZA

Understanding Fire and Explosion

Philosophy of FERA

Flammability Limits range

Objective of FERA

Page 10: FERA RISZA

Understanding Fire and Explosion

Flammability Limits (FL) = ƒ (suhu, tekanan, inert gas)

Flammability Limits (FL)

Page 11: FERA RISZA

Understanding Fire and Explosion

Combusation = ƒ (FL, Minimum Ignition Energy (MIE), Surface Area)

Philosophy of Combustion

Page 12: FERA RISZA

Understanding Fire and Explosion

Fire occurance step

1. Jet Fire2. Flash Fire3. Pool Fire4. Fireball

Page 13: FERA RISZA

Understanding Fire and Explosion

Explosion occurance step

Explosion

Physical Explosion Chemical Explosion

1. Overpressure2. BLEVE - Fireball3. RPT 4. UVCE/CVE

1. Runway reaction

Page 14: FERA RISZA

Understanding Fire and Explosion

Physical Properties Key Factor of Flammable

1. Boiling Point2. Vapor Pressure3. Flash Point4. Autoignition5. Enthalphy of Combustion (ΔHc)6. MIE7. Density8. Conductivity of material9. Size of material

Page 15: FERA RISZA

Understanding Fire and Explosion

Environmental Properties Key Factor of Fire /Explosion

1. Operational Parameter (Pressure, Flowrate, Temp, etc)

2. Lay-out of unit process/equipment

3. Installation (congested, confined, etc)

4. Source of heat (open fire, conductive heat, static electric, etc)

5. Meteorogical condition (Wind speed, direction, etc)

6. Leakage dimension (bore, rupture, hole, etc)

Page 16: FERA RISZA

Understanding Fire and Explosion

Impact of Fire & Explosion

1. Breakage the molecular bond

2. Heat Flux / Heat Radition

3. Poisonous Gas

4. Blast Wave/Shock Wave

5. Debris trajectory/projectile

Page 17: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazard

Page 18: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Overall Risk Assessment Process

Page 19: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Detail Risk Assessment Process

Page 20: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Step 1 – Describe system and identify hazards

Scenario Development

Screening Method

Credible Scenario

Potential Accident Scenario

Page 21: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Step 1 – Describe system and identify hazards

Scenario Development

– Merupakan “critical step” dalam FERA - Key word : Loss of Containment- Tool yang umum dipergunakan

What-If HAZOPs FMEA Incident Analysis Tie-Bow Analysis

Page 22: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Step 1 – Describe system and identify hazards

Screening Method

– Mencari scenario yang memiliki tingkat “rangking/index” yang besar

- Umumnya berbagai scenario tersebut dibandingkan

- Metode yang umumnya dipergunakan : Kualitatif : Risk Rating, Expert Adviser Semi-kuantitatif : TNO-Purple Book Method, DFEI, DCEI

AHP (expert judgement), SWeHI, MaxCred Method

Page 23: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Step 1 – Describe system and identify hazards

Credible Scenario

Merupakan scenario yang akan dianalisis lebih lanjut tingkat “consequences” dan “probability”-nya

Merupakan model yang memiliki tingkat “kemiripan” yang tinggi bila terjadi accident

Tidak menggambarkan secara keseluruhan (each system has particular credible scenario)

Page 24: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Step 2 – Determination of frequency and consequences

Frequency

Menggambarkan tingkat “failure” setiap peralatan yang terlibat dalam Credible Scenario

Memiliki satuan (……../waktu)

Page 25: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Step 2 – Determination of frequency and consequences

Frequency

Fault Tree Analysis

Page 26: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Frequency

Event Tree Analysis

Page 27: FERA RISZA

Framework of Risk Assessment on Fire and Explosion HazardsFrequency

Page 28: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Consequences

Page 29: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Consequences

Page 30: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

ConsequencesImpact Calculation of Explosion

TNT Method

TNO Method

BST Method

Page 31: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Consequences

Impact Calculation of Explosion

TNT Method

Page 32: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

ConsequencesImpact Calculation of Explosion

TNO Method

Page 33: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

ConsequencesImpact Calculation of Explosion

BST Method

Page 34: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

ConsequencesImpact Calculation of Fire

Fire Ball Effect

Pool Fire Effect

Jet Fire Effect

Page 35: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

ConsequencesImpact Calculation of Fire

Fire Ball Effect

Page 36: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

ConsequencesImpact Calculation of Fire

Pool Fire Effect

Page 37: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

ConsequencesImpact Calculation of Fire

Jet Fire Effect

Page 38: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Estimating the Risk Analysis

Explosion Frequency

Page 39: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Estimating the Risk Analysis

Fire Ball Frequency

Page 40: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Estimating the Risk Analysis

Pool Fire Frequency

Page 41: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Estimating the Risk Analysis

Individual Risk Calculation

Page 42: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Estimating the Risk Analysis

Societal Risk Calculation

Page 43: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Risk Criteria

Page 44: FERA RISZA

Framework of Risk Assessment on Fire and Explosion Hazards

Fire and Explosion Risk Assessment Result

Page 45: FERA RISZA

Selection safeguard for Fire and Explosion’ s Risk Control

Page 46: FERA RISZA

Selection safeguard for Fire and Explosion’ s Risk Control

Startegy Prevention and Mitigation

Prevention Barrier

Mitigation Barrier

Page 47: FERA RISZA

Selection safeguard for Fire and Explosion’ s Risk Control

Prevention Barrier

1. Inherently Safe Practice Principles Minimize: Reducing the amount of hazardous material present at

any one time Substitute: Replacing one material with another of less hazard Moderate: Reducing the strength of an effect Simplify: Designing out problems rather than adding additional

equipment or features to deal with them2. Engineering consideration

Hazardous Area Zone Classification (IEC/EN 60079, NFPA 479, API 500)

Heating Venting Air Circulation (HVAC) system Electric Static Discharge (ESD) system Maximum Allowable Working Pressure (MAWP) Design Emergency Shut Down Valve (ESDV) System Lay-out facility (lokasi, jarak, dll) Mechanical Protection (Material, Coating, dll) Inerting System

Page 48: FERA RISZA

Selection safeguard for Fire and Explosion’ s Risk Control

Prevention Barrier

3. Operation Consideration Preventive Maintenance Program (inspeksi rutin, testing

peralatan, dll) Standard Operating Procedure (SOP) (operating parameter

controlling, alarm system, dll) Housekeeping Kompetensi Personel Implementasi Sistem Manajemen Pengendalian Kerugian

(Manajemen resiko) Permit System Storage and handling management system Cooling system (Deluge water system, vessel cooling system,

dll) Accident Investigation and Lesson Learned Electrical Connection System (Lighting Protection,

Grounding, dll)

Page 49: FERA RISZA

Selection safeguard for Fire and Explosion’ s Risk Control

Mitigation Barrier

1. Engineering Consideration Hydrant & Sprinkle System Purging system (PSV, Rupture Disc, Flare System, dll) Dikes Network Water Curtain System CO2/Inert Gas Suppression System Blast-Wall

Page 50: FERA RISZA

Selection safeguard for Fire and Explosion’ s Risk Control

Mitigation Barrier

2. Operation Consideration Fire Extinghuisers (APAR) Foam system Emergency Response Plan (assembly area) Personal Protective Equipment (APD) Community Emergency Response