Page 1: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

FELLERT ACOUSTICAL PLASTERINSTALLATION GUIDE 5.1

Fellert Acoustical Ceilings ABKyrkängsgatan 6503 38 Borås, SwedenTel: 46 33 4302202

www.fellert.com

mini
Maskinskriven text
12015001 ver.1.0 1(52)
Page 2: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB2 09/30/14

INTRODUCTION 3

GENERAL CONDITIONS FOR INSTALLATION Limitations & Guidelines 4 Job Conditions 4 Control Joints 5 Effects Of Lighting 5

MOCK UP CONDITIONS 6

STANDARD FINISHES 7

INSTALLATION TYPES 8 MATERIALS 9

TOOLS & EQUIPMENT 13

CHECKLIST 19

PRINCIPLES OF INSTALLATION OF FELLERT EVEN BETTER PLASTER SYSTEMS (EB1 & EB2) FellertAcousticalBoard&SubstratePreparation 20 A. GWB B.Plasteronly(noFellertAcousticalboard) C.CeilingGrid400mmc/c(16”o.c.)(noGWB) Coverage and Mixing Guide 30 ApplicationofStandardFinishes 31 A.EB1“Basecoat”Plaster B.EB1“Finish”PlasterforSecern(formerlyknownasNatural) C.EB2“Finish”PlasterforSahara(formerlyknownasTroweled) D.EB2“Finish”PlasterforSilk(formerlyknownasUltra) VerticalSurfaces 39 CurvedSurfaces 41 CustomColorsandTechniques 42 KEY INSTALLATION NOTES 43

HEALTH & SAFETY GUIDELINES 44

FINAL APPEARANCE 45

DRY STAINS - ALL FELLERT FINISHES 46

SOLUBLE STAINS - ALL FELLERT FINISHES 47

HOLES, DAMAGES, & WATER DAMAGED AREAS 48

CONSTRUCTION DETAILS 51

TABLEOFCONTENTS

mini
Maskinskriven text
12015001 ver.1.0 2(52)
Page 3: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB3 09/30/14

INTRODUCTION

Fellertisaseamlessacousticalplastersystemwithaestheticdesigncapabilities.Themaincomponentsareacousticalboardandacousticalplaster.Boththesecomponentsindividuallycontributetowardssoundabsorption. ThepurposeofthisinstallationguideistoprovidethereaderwiththebasicfundamentalsofhowtoinstallFellert.Theguideconsistsofmainlypictures,descriptions,andnotes.

Thisdocumentservesasaguideandnotaspecificinstructionmanual.Asalmostnoconstructionprojectisidentical,eachFellertinstallationwillhavedifferentcircumstances;however,thebasicprinciplesofinstallingtheproductremainthesame.

AllFellertapplicatorsarerequiredtoattendatrainingclasspriortopurchasingmaterialsandapplyingtheFellertsystem.ApplicatorsarerequiredtoperformqualityinstallationsoftheFellertsystemoneveryproject.

TheFellertspecificationsandpolicydocumentsstatetherequirementofaprojectmockup.Applicatorsneedtoobtainapprovalofaprojectmockuppriortocommencingwiththeinstallation.Theapplicatoris100%responsibleforthequalityoftheprojectinstallation.

Notice: Fellert retains the right to edit, modify, or delete the contents of this document and other related installation information without the consent or approval from any other party. Please contact Fellert to ensure you have the latest installation and/or technical information on the Fellert system.

mini
Maskinskriven text
12015001 ver.1.0 3(52)
Page 4: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB4 09/30/14

GENERALCONDITIONSFORINSTALLATION

LIMITATIONS & GUIDELINES

Aswithanyhand-craftedplaster,thefinalappearanceoftheFellertacousticalsystemmayvaryslightlythroughouttheexpanseofthesurfaceareaespeciallyundercriticallightingconditions.Theinstallershouldalwaysfollowlocalbuildingcodesandregulationsandisfullyresponsibleforthequalityoftheinstallation.

JOB CONDITIONS

• Allwindowsandexteriordoorsshallbeinplaceandglazed.Thebuildingshallbewater-tightpriortothestartoftheinstallation.Thisconditionshouldbemaintainedduringandaftertheinstallation.AllGWBsubstratesmustbe“sealedairtight”toalevelonefinish.AllHVAC,electrical,firesprinklerandotherpenetrationsshallbesealedwithtraditionaldrywalltapeoraself-adhesivefire-tapetopreventairmovementbetweentheoccupiedspaceandtheplenum.FordirectattachmenttoceilinggridapplicationsensurethattheHVACsystemintheoccupiedspaceisproperlybalanced.• FixturessuchasMEP,lighting,sprinklers,ventilation,etc.,shouldbeinplacepriortothestartoftheinstallation.• TheFellertacousticalmaterialsareforinterioruseonly.Theinstallationshouldbedonewithintypicaloccupancytemperaturerangesof15–32°C(60–90°F)andatamaximumof70%relativehumidity.• Acousticalboardsshallbeprotectedfromexposuretosunlight.Keeptheboardsinthepackaginguntilreadyforuse.EnsurethatthetherearenodelaysinsprayingthefirstcoatofFellertacousticalplastertotheboards.• Itisnotrecommendedtohavecoldjointsinthefinishplaster.ThefinalapplicationoftheFellertacousticalplasterhastobecompletedinasingleworkstep—donecorner-to-cornerortoabreakstoppingpoint.

mini
Maskinskriven text
mini
Maskinskriven text
12015001 ver.1.0 4(52)
Page 5: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB5 09/30/14

GENERALCONDITIONSFORINSTALLATION

CONTROL JOINTS

Fundamentallyspeaking,theelasticnatureoftheFellertplastersystemmeansthatthereisnoengineeringrequirementofcontroljointsexceptwhenabuildingisunderexcessivestructuralstress.Structuralexpansionsjointsareobservedhowever.TherearepracticallimitationsofhowlargeofanexpansetheFellertcontractorcancompleteinasingleworkday.

Thefollowingareguidelines:• Upto232M2(2,500sqft)achievablewithaFellertcontractorundernormalworkingconditions.• Upto465M2(5,000sqft)achievablewithanexperiencedFellertcontractor;however,additionalspraycrewswillberequired.Additionalworkinghoursmayberequired.• Over465M2(5,000sqft)achievablewithanexperiencedFellertcontractor;however,additionalspraycrewswillberequired.Additionalworkinghourswillberequired.Properplanningisrequiredwhenattemptingverylargeexpanses.

EFFECTS OF LIGHTING

Itisadvisabletoconsiderthatthelightingselectedbecomplementarytotheceilingfinish.Themostcriticalfactoristhedirectionofthelightsource.Acriticalhorizontallightthatstrikesanyceilingsurfaceatanacuteangleaccentuatesnormalceilingirregularities,affectingthefinalappearanceofanyfinish.Exteriorlightingfromwindowscanhighlightthenaturalvariationsofhand-craftedplaster.

mini
Maskinskriven text
12015001 ver.1.0 5(52)
Page 6: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB6 09/30/14

MOCKUPCONDITIONS

MOCKUP CHECKLIST:Per the Fellert specifications and installation guide a mockup must be approved by the architect or client prior to the commencement of the installation. The mockup can be part of the scope of work. The contractor is fully responsible for ensuring a quality installation of the Fellert system.

□ InstallerhasattendedaFellerttrainingseminarandiscurrentlylistedasanauthorizedinstallerwithFellert.

□ InstallerhascontactedFellertatleastthreeweeksinadvanceifonsitelaborassistanceifneededforthemockup.

□ SamplesoftheFellertfinish,colorandthicknesshavebeenapproved.

□ LocationofFellertmockuphasbeenconfirmedwithgeneralcontractorwhichshouldbeatleast9m2(100sqft)insize.Themockupshallremainintactthroughouttheproject.

Ensurethefollowingsiteconditionshavebeenmetpriortomockupinstallation:□ Allwindowsandexteriordoorsshallbeinplaceandglazed.Thebuildingshallbewatertightpriortothestartoftheinstallation.AllGWBsubstratesmustbe“sealedairtight”toalevelonefinish.AllHVAC,electrical,firesprinklerandotherpenetrationsshallbesealedwithtraditionaldrywalltapeoraself-adhesivefire-tapetopreventairmovementbetweentheoccupiedspaceandtheplenum.FordirectattachmenttoceilinggridapplicationsensurethattheHVACsystemintheoccupiedspaceisproperlybalanced.□ Theinstallationshouldbedonewithintypicaloccupancytemperaturerangesof15–32°C(60–90°F)andatamaximumof70%relativehumidity.□ Allpermanentfixturessuchaslights,diffusers,speakers,etc.aretobeincludedinthemockup.□ Theintendedlightingconditionsforthebuildingaretobeusedorsimulatedinthemockup.□ EnsurethatthebuildingisventilatedtoassistwiththedryingprocessiftheHVACisnotoperational.

□ Delivermaterialstoprojectsiteinoriginal,unopenedpackagesandstoretheminafullyenclosedspacewheretheywillbeprotectedagainstdamagefrommoistureandotherharmfulconditions.Protectmaterialsfromfreezing.

□ Installerhasrecommendedtoolsandequipmentonsite

□ Installerhasaccesstopotablewater.

□ InstallthemockuppertherecommendationslistedintheFellertinstallationguide.

□ Mockupapprovedbyarchitect/client.

AnyadditionalcostsincurredtoFellertasaresultofchangestothemockupscheduleand/orscopeofworkwillbebornebytheinstallingcontractor.TheFellertsystemmustbeinstalledperthespecificationsandmanufacturer’sinstallationguideinordertoqualifyfortheproductwarranty.

mini
Maskinskriven text
mini
Maskinskriven text
mini
Maskinskriven text
12015001 ver.1.0 6(52)
Page 7: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB7 09/30/14

STANDARDFINISHES

SILK (Smooth)

Thisfinishresemblesasmoothmonolithichand-craftedfinish.

Two-coatapplication:1xEB1(basecoat)1xEB2(finishcoat)

SAHARA (Fine Textured)

Thisfinishresemblesalightlytexturedmonolithichand-craftedfinish.

Two-coatapplication:1xEB1(basecoat)1xEB2(finishcoat)

SECERN (Textured)

Thisfinishresemblesatexturedmonolithichand-craftedfinish.

Two-coatapplication:1xEB1(basecoat)1xEB1(finishcoat)

mini
Maskinskriven text
12015001 ver.1.0 7(52)
Page 8: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB8 09/30/14

INSTALLATIONTYPES

A. New GWB (FullyAdheredSystem)

Thisisthepredominantapplicationmethod.TheFellertAcousticalBoardisadheredtoGWBsubstratethatmustbe“sealedairtight”toalevelonefinish.AllHVAC,electrical,firesprinklerandotherpenetrationsshallbesealedwithtraditionaldrywalltapeoraself-adhesivefiretapetopreventairmovementbetweentheoccupiedspaceandtheplenum.MeshtapeandFellertPrimerareappliedtotheplasticCchannel,GWBrippers,cornerbeads,etc.TheFellertAcousticalBoardisthensprayedwiththeFellertacousticalplaster.

AlternativesubstratestheFellertmaybeappliedtoare:concrete,existingplaster,GFRGsurfaces,andpreviouslypaintedGWB.Thesesubstrateswillneedtobetestedforbondstrength,cleanedandsandedsmooth.TheFellertAcousticalBoardisattachedtothesubstrateswiththeFellertAdhesiveandsecuredwithaminimalamountofFellertSpringWashersifrequired.

B. Ceiling Grid (DirecttoFraming–NoGWB)

TheFellertacousticalplastersystemcanbeinstalledto406mmc/c(16”o.c.)drywallgrid.ThesubstrateisconstructedwithoutalayerofGWB.TheFellertacousticalboardsaremechanicallyattachedtodrywallgridtherebyeliminatingtheneedandcostforalayerofGWB.Thereisanincreaseinsoundabsorptionperformanceinthelowfrequencyrangewiththedirect-togridinstallationmethodwhichiscommonlyreferredtoastheE-400mountand/orairgapbehind.TherearelimitationstowhattypesofsubstratedesignsthatcanbedonewiththeFellertdirect-to-gridmethod.Thefollowingareguidelines:

• FlatshapesareachievablewiththenormalFellertdirect-togridinstallationmethod.Thisincludesangledceilingsandwalls1.82M(6ft)aboveFFL.ThisisthestandardFellertdirect-to-gridapplicationmethodandisexpectedfromalltrainedinstallers.• Barrelvaultedceilingsarepossibleprovidingthedrywallgridis406mmc/c(16”o.c.).However,notethatthisinstallationmethodwillbemoretimeconsumingasmoreFellertSpringWasherswillbeneeded.ConsultwithyourlocalFellertagentpriortospecifyingtheFellertdirect-to-gridsystemonabarrelshapedceiling.• Domesandvaultedceilingsarenotpossiblewiththedirect-to-gridsystem.• NotethattheHVACsystemintheoccupiedspaceistobeproperlybalanced.

C. Plaster only (NoFellertAcousticalBoard)

FellertPrimerisappliedtoadrywallsubstratepreparedtoalevel4standard.TheprimedsurfaceisthensprayedwiththeFellertacousticalplaster.Alternativesubstratessuchasconcrete,existingplasterandpreviouslypaintedGWBwillneedtobepreppedaccordinglyandensuretheyaresoundandfreefromcracking.

mini
Maskinskriven text
12015001 ver.1.0 8(52)
Page 9: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB9 09/30/14

MATERIALS

USE ONLY PROPRIETARY MATERIALS AND ACCESSORIES DISTRIBUTED OR RECOMMENDED BY FELLERT.

Plastic C Channel

ThisproductisusedtofinishtheFellertAcousticalBoardandFellertPlastertoanadjacentsurface.Theproductcanbecuttoflexandfitaroundgradualshapesandangles.

TheCchannelisnotdesignedtobeaself-finishedexposededgedetail,e.g.cloudsorexposedreturnangles:soldin3M(10ft)lengths.

Fellert Acoustical Board

The25mm(1”)or39mm(1.5”)122x122cm(4’x4’)FellertAcousticalBoardisthemaincomponentoftheFellertsystemthatabsorbssound.Donotremovefromthepackagingorexposetosunlightuntilreadytoapply.AlwaysapplythefirstlayerofFellertplasterwithin24hoursofinstallingtheacousticalboardprovidinganyapplicationofFellertprimerhasfullydried.Alwaysstoreflat,donotstackonedge.The25mm(1”)sizehas8boardsperboxand39mm(1.5”)sizehas6boardsperbox.

Coverage:1.5M2(16sqft)perpanel

Fellert Spring Washers

OnlytheFellertSpringWashersandthe50mm(2”)FellertZincotecZNscrewsaretobeusedtoanchortheacousticalboardsinthedirect-to-gridapplicationon406mmc/c(16”o.c.)drywallgrid.TheFellertSpringWashers(andotherflatdisc-shapedwashers)arealsousedtotemporarilyholdthefiberglassboardinpositiononcurvedsurfaces.

Coverage:approx.8washersper1M2(10sqft)

mini
Maskinskriven text
12015001 ver.1.0 9(52)
Page 10: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB10 09/30/14

Fellert Caparol Adhesive

UsedforbondingtheFellertAcousticalBoardtodrywall,existingplaster,concreteorpreviouslypaintedsurfaces.AdhesiveisappliedonbackoftheFellertAcousticalBoardwith6.35mmx6.35mm(1/4”x1/4”)notchedtrowel.

Coverage:10M2(110sqft)Soldin25kg(55lb)bags

50 mm (2”) self-adhesive mesh tape

TheGrabberGMT200self-adhesivemeshtapeorequivalent,isusedtobridgethejoiningoftheCchannelandanydrywall“rippers”totheFellertAcousticalBoard:soldinsinglerolls.

Useonlywhiteorclearcoloredmeshtape.

Coverage:90linearmeters(300linearfeet)

MATERIALS

Fellert Styrobond Adhesive - North America only

UsedforbondingtheFellertAcousticalBoardtodrywall,existingplaster,concreteorpreviouslypaintedsurfaces.AdhesiveisappliedonbackoftheFellertAcousticalBoardwith6.35mmx6.35mm(1/4”x1/4”)notchedtrowel.

Coverage:7M2(75sqft)Soldin23kg(50lb)bags

mini
Maskinskriven text
12015001 ver.1.0 10(52)
Page 11: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB11 09/30/14

Fellert Alcro Primer

Theproductismixedwithone(1)containerofthesandadditive.UsedforprimingthemeshtapejoiningofthewallchanneltrimandFellertAcousticalBoardanddrywallinitsentiretywhendoingnonacousticalboardinstallations.Theprimerisalsousedtocoatplasticbeadsandanydrywallrippers.

Primercoverage:56LM(185lft)fortrimtransitionsor24M2(260sqft)forgeneralapplication

MATERIALS

Fellert Sand Finish Additive

TheFellertPrimerandsandadditivearealwayspurchasedtogether.

Primerwithsandcoverage:101LM(366lft)fortrimtransitionsor16M2(180sqft)forgeneralapplication

Fellert Sand Finish Additive - North America only

Thisproductismixedonsitewithone4Lcontainerofprimer.TheFellertPrimerandsandadditivearealwayspurchasedtogether.

Primerwithsandcoverage:101LM(366lft)fortrimtransitionsor16M2(180sqft)forgeneralapplication

mini
Maskinskriven text
12015001 ver.1.0 11(52)
Page 12: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB12 09/30/14

MATERIALS

Fellert Even Better 2 (EB2)

TheFellertEB2plasterismadefromrecycledcottonfibersandperlite.ThisisthefinishcoatfortheSilkandSaharafinishsystems.Itissprayedonapprox.1.5mm(1/16”)wetthickness:Soldin5kg(11pounds)bags.

SilkFinishCoverage:20M2(200sqft)perbagSaharaFinishCoverage:40M2(430sqft)perbag-notethatahigherconsumptionratemayoccurwhendoingmidtodarkcolors.

Calculatedwaste:5%

Fellert Even Better 1 (EB1)

Madefromrecycledcottonfibersandperlite.Useasbasecoatforallthefinishes.UseasthefinishcoatfortheSecernfinish.Theplasterissprayedonapprox.3mm(1/8”)wetthickness:soldin5kg(11pounds)bags.

BasecoatCoverage:10M2(100sqft)perbagSecernFinishCoverage:15-30M2(150-300sqft)perbagCalculatedwaste:5%

PROPRIETARYMATERIALSLISTEDABOVEAREONLYAVAILABLETOORDERVIAFELLERT. USEONLYMATERIALSLISTEDINMANUALINORDERTOCOMPLYWITHWARRANTY.

Sanding Pads

Fullsized(hook&loop)sandingpadsanddiscsthatareusedwiththe#7800orbitalstylevacuumsander.Usedinthesandingoftheacousticalboardandthebasecoat.Soldinfive(5)sandingdiscsperpack.Thepowerpadstheysticktoaresoldindividually.

80grade:sandingtheacousticalboard220grade:sandingthebasecoats

mini
Maskinskriven text
mini
Maskinskriven text
mini
Maskinskriven text
mini
Maskinskriven text
mini
Maskinskriven text
12015001 ver.1.0 12(52)
Page 13: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB13 09/30/14

TOOLS&EQUIPMENT

Listed below are typically the tools and equipment you will need to install the Fellert system. USE ONLY TOOLS AND EQUIPMENT AS DISTRIBUTED OR RECOMMENDED BY FELLERT.

Tools for attaching C channel:A. Screw gun B.Straightcuttingsnippers(belowpictureforexamplepurposesonly)

Tools for mixing and applying Fellert Adhesive:C. Bucket D.PaddleE. Drill F.6mm(¼”)notchedtrowelG.Scoop

Tools for cutting Fellert Acoustical Board:H.Knife-IdealforcuttingandtrimmingFellertAcousticalBoard,soldbyFellert.

A B

C D E F

G

mini
Maskinskriven text
12015001 ver.1.0 13(52)
Page 14: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB14 09/30/14

TOOLS&EQUIPMENT

Tools for detailed cutting & installation of Fellert Acoustical Board:I.TapemeasureJ.T-squareK.Scissors(notpictured)L.SmallutilityknifeM.Sprayadhesive(mayusedouble-sidedtapewhenapplicable)N.SandingspongeO.PuttyknifeP.JointknifeQ.TapeR.Chalklinereel

I J L M

N O P Q

R

Tools for applying Fellert Primer:S.PaintBrush

S

mini
Maskinskriven text
12015001 ver.1.0 14(52)
Page 15: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB15 09/30/14

TOOLS&EQUIPMENT

Fellert Whisk

OnlytheFellertMixingPaddlecanbeusedtomixtheFellertPlaster.Theproductmustbemixed to an even consistency.

DonotleavethepaddleintheFellertPlasterafterinitialmixing,removeandrinseoff.

FellertWhiskissoldbyFellert.

Flat Base Mixing Container

Usewhiteornaturalcoloredplasticmixingcontainerswithaflatbase.

200L(55gal)containerssoldbyFellert.

Graco RTX 1500

TheonlyrecommendedspraymachineforinstallingtheFellertsystemistheGracoRTX1500.Theunitisportableandrelativelysimpletouse.Thisselfcompressingportableelectricunithasa55L(15gal)capacityhopper.TheGracoRTX1500comeswith7.5M(25ft)ofhoselengthandastandardspraygun.

GracoRTX1500issoldbyFellert.

mini
Maskinskriven text
12015001 ver.1.0 15(52)
Page 16: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB16 09/30/14

TOOLS&EQUIPMENT

Fellert Trowel

UsedforapplyingtheFellertPlaster.TheFellertTrowelisalsousedininstallingtheFellertAcousticalBoard.Usuallyapplicatorshavetwosetsoftrowels:onefortheboardinstallationandonefortheplasters.

TheFellertTrowelissoldbyFellert.

Flexible Finishing Trowel

This1mmthickplastictrowelisalotmoreflexibleallowingthefinishingtrowelpassestocloseintheplastersurfacewithlesseffortonthefinishingpasses.Thesewillbeextremelyhelpfuloncurvedandradiussurfaces.TheFellertTrowelisstillusedtocloseintheplastersurfaceoncesprayedandtoremovetheexcessplasteronthesurface.

280mmlongx120mmwidex1mmthick

*different colors but same trowel

Flexogrip Trowel

Availablein800mmand1200mm.

UsedforapplyingtheFellertplaster.ItisimperativethatyouonlyusetheFellertFlexogripTroweland/orthestandardFellertTrowelshownbelow.

TheFlexogripTrowelissoldbyFellert

mini
Maskinskriven text
12015001 ver.1.0 16(52)
Page 17: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB17 09/30/14

TOOLS&EQUIPMENT

Usedmixingdrillsthatcanoperateataminimumof300rpm.

Suitabledrills:

Makita DA4031DeWalt DWD460KMilwaukee 1676 (Holehawg)Flex R 500 FR Festool MX 1000

Porter Cable 7800 “Orbital” Vacuum Sander - North America Only

UsedforsandingtheFellertAcousticalBoardsubstrateandtheFellertAcousticalPlasterbasecoat.Youmustusethefullsizehookandloopsandingdiscsandpadscompatibleforthe7800modeltoensureconsistentsanding.

SanderandvacuumaresoldbyFellert.

Festool Long-reach sander PLANEX LHS

UsedforsandingtheFellertAcousticalBoardsubstrateandtheFellertAcousticalPlasterbasecoat.Youmustusethefullsizehookandloopsandingdiscsandcompatiblepadstoensure consistent sanding.

SanderandvacuumaresoldbyFellert.

mini
Maskinskriven text
12015001 ver.1.0 17(52)
Page 18: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB18 09/30/14

TOOLS&EQUIPMENT

Graco Fine Finish Kit

Consistofanextendernozzle,4outerspraytips(A,B,C,D),andacovercap.TheattachmentsarenecessarytocreateacontrolledfanspraypatternforthefinishcoatsofFellertplaster.Partialcontentofthekitispicturedright.Theextendernozzlekit“FineFinishKit”screwsontothestandardGracospraygun,picturerightbelow.GenerallyyouwillusethefinefinishkitonlywhensprayingtheFellertfinishcoat.

Graco Spray Gun

AttachsprayguntospraymachineforinstallingFellertsystem.Sixstandardsizeorifices(Sizes 3, 4, 6, 8, 10, & 12) areincludedwiththeGracospraygun.

mini
Maskinskriven text
12015001 ver.1.0 18(52)
Page 19: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB19 09/30/14

CHECKLIST

Sold Only by Fellert• PlasticCChannel• FellertAcousticalBoard• FellertSpringWashers• FellertBoardAdhesive• FellertAlcroPrimer• FellertEvenBetter1-basecoatforall

andfinishcoatforSecern• FellertEvenBetter2-finishcoatforSahara&Silk• FellertMixingPaddle• FlexogripTrowel• Fellert Trowel• FlexibleFinishingTrowel• Knife

Available to order by Fellert• SandingPads–80&220grit• 6mm(¼”)notchedtrowel• FellertMixingPaddle• PorterCable7800“giraffe”vacuum

sander • MakatiDA4031Drillwith300rpm• 200L(55gal)whiteornaturalplastic

mixing containers • GracoRTX1500Spraymachine• Finefinishspraykit• 50mm(2”)Self-Adhesivemeshtape• 122cm(48”)mesh(forvertical

applicationsbelow3M(10ft))• Powerpad

PRIORTOSTARTINGANYINSTALLATIONVERIFYTHATYOUHAVETHECORRECTMATERIALS,TOOLSANDEQUIPMENTFORYOURPROJECT.

Sundry items• maskingtape• plasticmaskingfilm• floorprotectionifapplicable• rags(usewhitecoloredragsonly)• 400gritsandpaper/sandingsponges• brushesforprimer• dustmasksandrespirators• trashbags• drywallscrewstoattachplasticC

channeltostudwork

Typical tools and equipment• Screw gun• Straightcuttingsnippers• Smallplasticbreakawayutilityknifes• tapemeasure• ChalkLine• straightedge• Measuringbuckets• Fivegallonbuckets

mini
Maskinskriven text
12015001 ver.1.0 19(52)
mini
Maskinskriven text
Page 20: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB20 09/30/14

PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation

1. GWB -TheGWBsubstratemustbe“sealedairtight”toalevelonefinish.AllHVAC,electrical,firesprinklerandotherpenetrationsshallbesealedwithtraditionaldrywalltapeoraself-adhesivefiretapetopreventairmovementbetweentheoccupiedspaceandtheplenum.

ScrewtheplasticCchanneltrimintotheperimeterwall400mmc/c(16”o.c.)studdingandnottheceiling.

It’snotrecommendedtousetheCChanneltrimonexposededgedetails.(i.e.soffits)

Usethestraight-edgedsnipperstobendtheplasticCchannelaroundanycurvesandangles.

Fortightercurvesaplasticflexiblearchwaybeadmaybeused.

FortheFellertCaparolAdhesive,mixcontentsofbagwithapproximately5-6litersofwater.Allowtosetfor5minutesandremixpriortouse.

FortheFellertStyrobondAdhesivemixcontentsofbagwithapproximately1.5gallonsofwater.Allowtosetfor5minutesandremixpriortouse.

Youmustremixtheadhesiveafterthesettimeaswithmostcementbasedproducts.

mini
Maskinskriven text
12015001 ver.1.0 20(52)
Page 21: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB21 09/30/14

PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation

WhereverpossibleinstalltheFellertacousticalboardssothelongestrunsofjointlinesflowintoandawayfromthestrongestsourceoflight.Thisprocessisdeemeda“bestpractice”onlyandnotanabsoluterule.Itisasimpleandalogicalapproachtohelpminimizeanyshadowingeffectswhichcanbeexacerbatebycriticallighting.

Markastraightlineforyourstartingpointtoensurethatthefirstrunofacousticalboardswillbestraightaspossible.

OnanyboardsthatwillslotintotheplasticCchannelyouneedtobeveltheedgebytrimmingthebackedgeofthefiberglassboardasthiswillenableiteaseintothechannel;keepthesesliversforjointpreparationwork.

EnsurethepresslinesonthebackoftheFellertacousticalboardallflowinthesamedirectionduringtheinstallation.Theselineswillflowperpendiculartothelongrunsofjointlinesasdepicted.

ApplytheFellertAdhesivetothebackoftheboardevenly.Donotleaveanyspotsuncoveredandensureyouapplytheadhesiveallthewaytotheedges.

strongest source of light

mini
Maskinskriven text
12015001 ver.1.0 21(52)
Page 22: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB22 09/30/14

PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation

Finishofftheadhesiveapplicationbystraighteningthe6mm(¼”)notchedlines.Thiswillensureanevenlayerofadhesiveonthedrywallceiling.

Ensurenoadhesivegetsontothesidesorthefaceoftheacousticalboard.

SlottheFellertacousticalboardintotheCchannelwithoutexertinganysignificantpressureandusetheFellertTroweltosteadytheboardasyoupositionitcorrectly.

UsetheFellertTroweltoapplyfirmpressuretosecuretheacousticalboardintoplacefor1-2minutesastheadhesivebeginstoset.

WhenapplyingadhesivetotheboardensurenottogetanyFellertAdhesiveonthefaceoftheboard.

Useroundtemporarywashers,asshown,toholdtheboardinplaceuntiladhesivecures.WashersareoftenusedonsitebyapplicatorstotemporaryleveloffanyunevennessinthejoiningoftheFellertAcousticalBoard,especiallyoncurvedsurfaces.

mini
Maskinskriven text
12015001 ver.1.0 22(52)
Page 23: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB23 09/30/14

PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation

Asyouprogresswiththeinstallationoftheacousticalboardsyoumayhavetoperiodically“straightentheline”asdepicted.TheFellertAcousticalBoardsaremanufacturedtoatoleranceof3mm(1/8”);therefore,thisstraighteningprocessis normal.

Useastraightedgetoensureacutisstraightaspossible.Thisinsuresagoodboardinstallation.

Applythe50mm(2”)self-adhesivemeshtapetobridgetheplasticCchannel,plastictrims,drywallrippersandboardtransitionstoothersubstrates.

MixtheFellertAlcoPrimerwiththesandadditive.Ensuretocoverallofthechannel,plastictrim,drywallripperorboardtransitionincludingthemeshtapewiththeprimer.ItisrecommendedtobrushapplytheFellertprimerinacontinuousdirection.Removeanysandgrainsfromtheplasterstopflangeofanytrimpieces.

ImportantFellertAlcoPrimerapplicationinstructions:EnsurethattheAlcroprimerdries12hourspriortotheplasterapplication.

ForGWBorlevel4preppedsubstrate:Usea½”naprollertoapplytheAlcroPrimertothelevel4preppedsubstrate.Ensurethe Primercovers100%ofthesurface.

Fortrim/substratetransitions: Usea2”½naprollerora2”longbristlebrush.Whenusingabrushensuretoonlybrushinone directiontopreventthemeshtapefrommovingandbubbling.Covertheentiretrimandmesh tapesurfacetoensuretheplasterwillbondadequatelyandprovideasecuretransition.Always wipethesandadditiveofftheplasterflangetoprovideacleanappearancewhencompleted.

mini
Maskinskriven text
12015001 ver.1.0 23(52)
Page 24: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB24 09/30/14

PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation

Removemaskingtapewhencomplete.LeavetheFellertPrimertodryovernight.NeverapplyFellertPlasterandPrimerthesame day.

Fillinwhereyouhaveanygapsbetweentheacousticalboardswithwasteoffcuts.AnygapsbetweentheFellertAcousticalBoardsthatexceed0.8mm(1/32”)shouldbesplicedwithacousticalboard.

Ensurethesplicedmaterialiswedgedverytightlyintoanygapandcutflushinpreparationforsanding.YoucanusethebeveledcutshavingsfromtheboardsthatwereinsertedintotheCchannel.Itiscriticalthattheboardsareinstalledandpreppedcorrectly.

Removethebristleguardfromthevacuumsandersothatthebristlesdonotrestrictanysandingtothesurfacesandpreventsdamagetotheboardandbasecoatlayers.

mini
Maskinskriven text
12015001 ver.1.0 24(52)
mini
Maskinskriven text
Page 25: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB25 09/30/14

PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation

Sandtheentiresurfaceoftheacousticalboardinagradualcircularmotiontoensuretheboardjointsaresandedflushand all variances are sanded out, i.e.eliminatingvalleys,“lowpointsorlines”intheboardsubstrate.Use80gritfullsizesandingdiscpads.Thecompletedboardinstallationshouldappeartobeconsistentwithnovariancesinthickness.Ensurethecriticallightingisinplacepriortosandingtoensure any variances are sanded.

AlwaysapplythefirstlayerofFellertplasterwithin24hoursofinstallingtheacousticalboardprovidinganyapplicationofFellertprimerhasfullydried.

mini
Maskinskriven text
12015001 ver.1.0 25(52)
Page 26: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB26 09/30/14

PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation

B. Ceiling Grid 400mmc/c(16”o.c.)(noGWB)Thistypeofsystemiscommonlyreferredtoasthedirect-to-gridapplication.YoueliminatetherequirementofaGWBsubstratebyattachingtheacousticalboarddirectlytothe400mmc/c(16”o.c.)drywallgrid.

02/06/14

*General Notes: Not to Scale. This detail should be included in the project mock-up.

Fellert ABKyrkängsgatan 6, 50338 Borås, SwedenPhone: +46 33 430 23 10Fax: +46 33 430 22 19Email: [email protected]: www.fellert.com

5.2 Direct Attachment to Ceiling Grid with Air Gap (No GWB)

5.2

DIR

EC

T AT

TAC

HM

EN

T TO

CE

ILIN

G G

RID

with

Air

Gap

(NO

GW

B)

Drywall ceiling grid (for typical GWB application) @ 400 mm c/c (16” o.c.) (by others)

Fellert Acoustical Board 25 mm (1”) or 39 mm (1.5”)

Fellert Stainless Steel “Spring” Washer 50 mm (2”) Fellert Zincotech ZN screw

Fellert Acoustical Plaster approx. 3 mm (1/8”) thick

Fellert C Channel

GWB (by others)

6 mm (1/4”) Air Gap for proper air flow (insert backer during installation to allow constistent gap)

50 mm (2”) self-adhesive mesh tape

Fellert Primer

Fellert C Channel

Fellert Acoustical Plaster approx. 3 mm (1/8”) thick

A

A

Hanger Wire (by others)

Splay Wire (by others)

mini
Maskinskriven text
12015001 ver.1.0 26(52)
Page 27: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB27 09/30/14

PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation

WheninstallingtheFellertsystemdirect-to-grid,itisrecommendedtoleavea6mm(¼”)airgapalongthewallperimeter.Thisisaccomplishedbyinsertinga6mm(¼”)solidspaceralongthewallperimeter.Typically,apieceof6mm(¼”)GWB(orwoodtrim)actingasaspacer,willcreateanconsistentgap.ThenattachtheFellertC-Channeltotheceilingframingagainstthespacer.InstalltheFellertsystemandremovetheGWBspacerwhencomplete.

AnalternativeoptiontotheCChannel,wouldbetouseaselffinishedLtrimaftertheboardisinstalled.ReferenceTrim-Tex3510for25mm(1”)boardor3650for39mm(1.5”)board.

Basic Installation Steps

1.Screwwashertogridsoheadisjustbelowsurface.Alternateboardedgeswhenscrewingintoframingattheboardjointstokeeptensionconsistent(notinthejoint).

2.CutaroundFellertSpringWasher.Donotcuttoodeeporwasherswilllosetension.

3.Pullandtuckboardflushtothesurface.

4.Applyapre-fillofbasecoatwithahandtooltotheFellertSpringWashercutslitsandleavetodry.Spraythebasecoatasnormal.

mini
Maskinskriven text
12015001 ver.1.0 27(52)
Page 28: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB28 09/30/14

PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation

16’ x 16 (256sqft)4.9m x 4.9m (24m2)

ceiling grid at 16” o.c.400mm

example of Fellert Spring Washer layout

(washer size enlarged for viewing purposes)

ceiling grid

spring washer

C channel

206 washers used in 256sqft.23.75m2

1 washer every 1.24 sqft avg.0.12m2

Fellert Spring Washer Layout(washersizeenlargedforviewingpurposes)

ceilinggridat400mmc/c(16”o.c.)

256sqft(16’x16’)24M2(4.9Mx4.9M)

206washersusedin24M2(256sqft)

1washerevery0.12M2avg(1.24sqft)

mini
Maskinskriven text
12015001 ver.1.0 28(52)
Page 29: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB29 09/30/14

PRINCIPLESOFINSTALLATIONFellert Acoustical Board & Substrate Preparation

ApplytheFellertPrimertothedrywallsubstratewithashortnaproller.

C. Plaster onlyNoFellertAcousticalBoard

WhenyouareapplyingtheFellertEvenBetter1directlytoadrywallsubstratetherearefollowingrecommendationstonote:

• Ensurethedrywallsubstrateispreparedtoatleastalevel4standard.• ApplytheFellertPrimer(withsandadditive)withabrushandroller.• Leaveovernighttodrypriortoapplyingthebasecoat.• Spraythenextplasterlayerasnormal.

mini
Maskinskriven text
12015001 ver.1.0 29(52)
Page 30: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB30 09/30/14

PRINCIPLESOFINSTALLATIONCoverage Rates & Mixing Guide

Product Size Coverage WaterFellertCaparolAdhesive 25 kg

(55lb)10M2

(110sqft)5-6L

(1.3-1.6gal)FellertNorthAmericaAdhesive(StyrobondII)

23 kg(50lb)

7M2(75sqft)

5.7L(1.5gal)

FellertPrimer(Cchanneledging) 4 L 56 LM(185lft)

N/A

FellertPrimer(directdrywall) 4 L 24 M2 (260sqft)

N/A

FellertEvenBetter1(basecoat)calculated waste: 5%

5 kg 10M2(100sqft)

9gal(34L)

FellertEvenBetter1Finish(Secern)calculated waste: 5%

5 kg 15-30M2(150-300sqft)

9gal(34L)

FellertEvenBetter2Finish(Sahara)calculated waste: 5%

5 kg 40 M2(430sqft)

7gal(26.5L)

FellertEvenBetter2Finish(Silk)calculated waste: 5%

5 kg 20 M2 (200sqft)

8 gal(30.2L)

COVERAGERATESAREAVERAGESANDMAYVARYACCORDINGTOPROJECTCONDITIONS. 1.Put34L(9gal)ofwaterintoalargecleanmixingcontainerforFellertEvenBetter1.Use30.2L(8gal)fortheFellertEvenBetter2.Recommendusingaclearorwhitecoloredplasticcon-tainerformixingtheplaster.Youcanadd1.9L(½gal)ofwaterifdeemednecessaryfordesiredconsistency.

2.Ifacustomcoloredfinishisrequiredaddcolorantvialtothewaterinthemixingcontainer,rinsethecolorantvialcleanandmixwellwiththewater.Fellertrecommendsthatbothcoatsofplasterbetinted.However,insomecasesitispossibletoonlytintthefinishcoatonverylightcolors.YourFellertagentwilladviseyouifthebasecoatshouldbetintedornot.

3.AddFellertPlastertowaterandmixuntildesired(oatmeal)consistency.Donotovermixasthismaycauseexcessiveclumpingofthematerial.Shouldonlytake3-4minutestomixtheplaster.

4.Leaveplastersetfor30minutes;thisistoletthecottonfibersexpandsoyoucanspraythematerialwithoutexcessiveclogging.

5.Remixtheplasterafterthesettimepriortospraying.

6.UsetheFellertWhiskwithmixingdrillspeednotexceeding300rpm.

7.NotethatahigherconsumptionrateofEB2plastermayoccurwhendoingtheSaharafinishinmid to dark colors.

mini
Maskinskriven text
12015001 ver.1.0 30(52)
Page 31: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB31 09/30/14

PRINCIPLESOFINSTALLATIONApplication of Standard Finishes

Forthebasecoatapplication,use#10Gracoorifice. Youwillnotusetheextendernozzleandouterspraytipwhensprayingthebasecoat.

SetthematerialflowcontrolontheGracoRTX1500spraymachinetothefollowingsettings:

• The4thdotforthebasecoat.• The3rddotforthefinishes.

Adjusttheairflowvalveasneeded.

A. EB1 “Basecoat” PlasterColoredfinishes:addandmixtintvialtothewaterinthemixingcontainerpriortoaddingandmixingthebaseplaster.Usetintguidelinesoutlinedonpage27.

mini
Maskinskriven text
12015001 ver.1.0 31(52)
Page 32: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB32 09/30/14

PRINCIPLESOFINSTALLATIONApplication of Standard Finishes

UsesandpapertoslightlyroundthecornersandsmooththeedgesoftheFellertTrowel.

TheobjectiveistosprayandtrowelthebasecoatontotheFellertAcousticalBoardat3mm(1/8”)wetthicknessasthedrythicknesswillbeapprox.1.5mm(1/16”).

Sprayinasmallcircularmotionapproximately3M2(30sqft)andhaveapplicatorsstarttotroweltheplaster.

Startsmoothingofftheplasterinneartheedges.

PositiontheFellertTrowelatalowangleandfirmbutnotexcessivepressureonthebasecoat.

mini
Maskinskriven text
mini
Maskinskriven text
12015001 ver.1.0 32(52)
Page 33: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB33 09/30/14

PRINCIPLESOFINSTALLATIONApplication of Standard Finishes

Itiscriticalyouonlytrowelthebasecoatplasternomorethan3–4timesasdepictedonthepicture.

Themoreyoutrowelthemoreuneventheplastersurfacebecomes.Donotexcessivelytrowelthebasecoatplaster.

Thisisthebasecoatbeinghandtroweled.

Leavetheminortrowellinesorimperfectionsonthesurfaceastheywillbesandedsmoothwhendry.

Allowthebasecoattofullydry.Thiswilltakeanaverageof2-3daysinmildconditions.UsefansinthedryingprocessandensuretheHVACisoperationalortheairintheareaisbeingrecirculated.

mini
Maskinskriven text
12015001 ver.1.0 33(52)
mini
Maskinskriven text
Page 34: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB34 09/30/14

PRINCIPLESOFINSTALLATIONApplication of Standard Finishes

Resin Spots: MustbetreatedbycuttingintotheaffectedbasecoatandFellertAcousticalBoardtoremovetheresindeposit.Filltheextractedareawithnewboard,basecoatandsandwhendry.

“Quick Patch” method: SprayasingleFellertAcousticalBoardatthesametimeyouapplythebasecoat.Oncedry,plug-intheextractedareawiththepre-sprayedboard.Lightlysand,fillwithbaseplasterandproceedwiththefinishcoat.

ThisisNOTaresinspot.

AnypotentialresinspottingmatterwillnotbevisibleontheFellertAcousticalBoardsurface.

Pre-fillingofanyjointsorvariancesinthebasecoatisveryimportant.SpotapplyEB1toanyrippers,beads,boardjoints,etc.asneededandletdry.Whendry,sandoutanyridgelinesorsurfaceunevennessfromthebasecoatapplication.Sandtheentiresurfaceofthebasecoatwith220gradesanding discs.

mini
Maskinskriven text
12015001 ver.1.0 34(52)
Page 35: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB35 09/30/14

PRINCIPLESOFINSTALLATIONApplication of Standard Finishes

Thematerialflowwouldnormallybesetthe3rdascendingdotontheGracoRTX1500.MixuptheEB1finishcoatinthesamemannerasthebasecoat.

Theobjectiveistospraythefinishdesiredtextureapprox.1.5mm(1/16”).Completetheentiresurfacecorner-to-cornerwiththeEB1finishinoneapplication.Leavetodry1-2days.

FortheEB1finishcoatuse#8orificewiththesecondlargestouterfanspraytip(C)nearright.Youmayneedtoadjustthecomponentstomatchthedesiredtexture.SomeapplicatorsprefernottousethefinefinishkitwhencreatingaNaturalfinish—the golden rule is to match the mock-up.

CompletedSecernfinish-the golden rule is to match the mock-up.

Drythicknessoftheplasterfinishwillbeapprox.3mm(1/8”).

B. EB1 “Finish” Plaster for SecernColoredfinishes:addandmixtintvialtothewaterinthemixingcontainerpriortoaddingandmixingthefinishplaster.Usetintguidlinesoutlinedonpage28.Useplasterthesamedayofmixing.

mini
Maskinskriven text
mini
Maskinskriven text
mini
Maskinskriven text
12015001 ver.1.0 35(52)
Page 36: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB36 09/30/14

PRINCIPLESOFINSTALLATIONApplication of Standard Finishes

TheobjectiveistospraytheEB2finishontothebasecoatleavingafinesprayedtexture,at1.5mm(1/16”)wetthickness.

Sprayconsistentandeliminatespatteringonplastersurfaceleavetodry1-2days.Drythicknessoftheplasterfinishwillbeapproximately3mm(1/8”).

FortheEB2finishcoatusesize3orificewiththesmallestouterfantip(A).Thematerialflowwouldnormallybesettothe4thascendingdotforfinetextureand5thascendingdotformediumtexture.Theairventisfullyopenandthematerialflowcontrolonthespraygun(seepicture)issettobealmostclosed.(Whenitisinaccuratepositionyouwillonlygetaspraymist,withoutanysplattering.)

C. EB2 “Finish” Plaster for SaharaColoredfinishes:addandmixtintvialtothewaterinthemixingcontainerpriortoaddingandmixingthebaseandfinishplaster.Usetintguidlinesoutlinedonpage28.Useplasterthesamedayofmixing.

mini
Maskinskriven text
12015001 ver.1.0 36(52)
Page 37: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB37 09/30/14

PRINCIPLESOFINSTALLATIONApplication of Standard Finishes

FortheSilkfinishusesize6orificewiththesecondlargestouterfanspraytip(C)nearright.ThematerialflowontheGracoRTX1500wouldtypicallybesettothe3rdascending dot.

MixtheSilkwith34L(8gal)ofwater.

SpraytheEB2Silkplasterontothesurfaceapprox.3mm(1/8”)wetthicknessandtrowelsmoothaspossible.Donotovertroweltheplaster.HavetwoapplicatorstrowelingtheSilkplastersmoothimmediatelyuponspraying.Closinginthesurfaceandremovingtheexcessplaster.Astheplastertakesup(surfacemoisturedecreases)youmayneed2-3separatepasseswiththetroweloverthesurfaceinordertoachieveaconsistentfinish,approx.4-5minuteinbetweenpasses.

TheSilkfinishconsistsofabaselayerofEB1andafinishcoatofEB2plaster.Sandthebaselayerapplicationwitha220gritsandingdiscandsandingsponges.Oncesandingiscompleteallimperfectionsshouldbeeliminatedincludinganyboardjoints,holes,ortrimdetails.

D. EB2 “Finish” Plaster for Silk Coloredfinishes:addandmixtintvialtothewaterinthemixingcontainerpriortoaddingandmixingthefinishplaster.Usetintguidlinesoutlinedonpage28.Useplasterthesamedayofmixing.

mini
Maskinskriven text
12015001 ver.1.0 37(52)
Page 38: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB38 09/30/14

PRINCIPLESOFINSTALLATIONApplication of Standard Finishes

CompletedSilkfinish—the golden rule is to match the mock-up.

DrythicknessofFellertSilkfinishwillbeapproximately3mm(1/8”)thick.TheSilkfinishisintendednottobesanded.

HavethirdapplicatormakeafinalpassovertheEB2Silkplasterwithin15–20minutesoftheinitialapplication.

Thiswillensureaconsistentlysmoothhand-craftedfinish

EnsuretokeepyourtrowelscleanatalltimesduringthetrowelingoftheSilkplasterbyconstantlywipingwithdamprags.

mini
Maskinskriven text
12015001 ver.1.0 38(52)
Page 39: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB39 09/30/14

PRINCIPLESOFINSTALLATIONVertical Surfaces

Asanoptionfiberglassmeshcanbeusedforverticalsurfacesorareaswhereimpactisaconcern.

PropertiesofthemeshthatFellertsuppliesare:• 1.22M(48”)widefiberglassmesh• 128grams(4.5oz)persquareyard• clear in color • .08mm(1/32”)thickness

Belowisanexampleofhowtoemploythe1.22M(48”)meshwithFellertonaverticalapplication.

mini
Maskinskriven text
mini
Maskinskriven text
mini
Maskinskriven text
12015001 ver.1.0 39(52)
Page 40: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB40 09/30/14

PRINCIPLESOFINSTALLATIONVertical Surface

Troweltheplaster1–2times.Youwillvisuallynoticethemeshwithinthebasecoat.

Sprayapproximately30%ofthebasecoatoverthemeshimbeddedbasecoatandlightlytrowel.

Youstillmaynoticethemeshstillatthispointespeciallyasthebasecoatproductisstillwet.

Leavethebasecoattofullydry,lightlysandandproceedwiththefinishcoatasnormal.

Applyapproximately70%ofthebasecoatasnormaltothesurface.Placeeachverticallengthofmeshasyouproceedalongthelengthofawallsprayingbasecoat.Donotoverlapthemesh.Tryandbuttthelengthsastightaspossible.Asmallgapof1.3cm(1/2”)isacceptable.

Sprayadditionalbasecoatplasteroverthesurfaceofthemeshtocompletetheappropriatethickness.

mini
Maskinskriven text
12015001 ver.1.0 40(52)
Page 41: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB41 09/30/14

PRINCIPLESOFINSTALLATIONCurved Surfaces

Whenestimatingprojectsthathavecurvedshapes,itisadvisabletoallowfortheapplicationofanadditionalbasecoatofFellertplaster,EB1basecoatforallfinishes.Thisadditionalcoatwillassistinachievingarelativelyevenbaselayer.

AnexampleofacurvedceilingdonewiththeFellertisdepictedbelow.Anapplicationoftwo(2)coatsofFellertAcousticalPlasterEB1BasecoatwasundertakenpriortotheapplicationoftheFellertSaharafinish.

Youwillachieveslightlymoreflexintheboardbycutting1.3cm(½”)every5cm–7.5cm(2”–3”)intotheboardfromtherear.UsetheFellertSpringWashersorotherdiscshapedwasherstoassistyouwithtemporarysecuringtheacousticalboardtothedrywallsubstrate.

InstallationofcurvedsurfacesistobedonewiththeadheredtoGWBmethod.

mini
Maskinskriven text
12015001 ver.1.0 41(52)
Page 42: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB42 09/30/14

PRINCIPLESOFINSTALLATIONCustom Color and Techniques

Multi-Color

Severalcolorscanbeincorporatedintotheacousticalfinishtocreatecustomdesigns.

TheSecern,Sahara,andSilkfinishesareavailableincustomcolors.AllcustomfinishesmustbemadeandapprovedbyFellert.

Duringthemixingprocessthecolorantismixedintothewaterpriortotheadditionoftheplasterproduct.Forapplicationswithcolorsofmoreintenseordeepcolorsitwilltendtohavemoremottlingoracolorvariancethroughouttheceilingsinceitisahandappliedplaster.Ifalighterormoremediumtoneofblueischosenthemottlingwillbeconsiderablylessbutwillalwayshaveaslightcolorvariance.Allcustomfinishtechniquesneedtobeapprovedbyallpartieswithamock-uppriortoinstallation.

AllcustomsamplesmustbemadebyFellert.

mini
Maskinskriven text
12015001 ver.1.0 42(52)
Page 43: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB43 09/30/14

PRINCIPLESOFINSTALLATIONKey Installation Notes

• Obtaintheapprovalofamock-uppriortocommencingwiththeinstallation—thegoldenrule of Fellert.Mock-upapprovalisFellertpolicyandisintheproductspecifications.

• Alwaysstagesufficientlightingtoilluminateworkareaasifduplicatingthetruecriticallightingenvironment.

• KeeptheFellertAcousticalBoardintheboxesuntiltheyreadyforinstallationtoensureedgesareprotectedfromdamageandexposuretosunlight.Alwaysstoreflat,donotstackon edge.

• Applytheadhesiveevenlytothebackoftheboard.

• Ensurethemanufacturingpresslinesonthebackoftheboardremainincontinuityonthesubstrate.

• IfpossiblealignthecontinuousjoinlinesofFellertAcousticalBoardstowardsthestrongestsourceoflight.

• Fillinboardjointgapsmorethan0.8mm(1/32”)widewithFellertAcousticalBoardsplices.

• SandtheentiresurfaceoftheFellertAcousticalBoard,notjustthejoints.

• Removetheprotectivemaskingtapeafterprimingthetransitionsandre-maskaccordingly.

• AlwaysleavetheFellertPrimertodryovernight.

• Donotovermixtheplaster.Addthecorrectamountofwatertoachievedesired consistency.

• AlwaysusetheFlexogriporFellertTrowel.

• Donotexcessivelytrowelthebasecoat,lessisbetter.

• SpotapplyEB1toanyrippers,beads,boardjoints,etc.asneededandletdry.

• Leavebasecoatuntilfullydrywhichisapprox.2-3daysbutmaybequickerwithforcedair.

• Alwaysspraythefinishplastercorner-to-cornerandsprayinanirregularpatterntoeliminateplastercoldjoints.

mini
Maskinskriven text
12015001 ver.1.0 43(52)
Page 44: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB44 09/30/14

HEALTH&SAFETYRECOMMENDATIONS

• Whenmixinganyofthedrypowderproductsweararespirator.

• WhenhandlingandinstallinganyFellertacousticalpanelsorothersystemcomponentsfollowregionalgovernmentenforcedhealthandsafetycodesincludingOSHA.

• WhenusinganyoftheFellertproductswearprotectiveclothingandavoidcontactwithyourskinwheneverpossible.

• Weareyeprotectionatalltimes.Ifeyecontactoccursirrigateeyewithcleanwaterandseekimmediatemedicalattention.

• Ifanyofthematerialsareswallowed,seekimmediatemedicalattention.

AllcurrentMSDSdocumentsareavailableonline.

mini
Maskinskriven text
12015001 ver.1.0 44(52)
Page 45: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB45 09/30/14

FINALAPPEARANCESTATEMENT

TheFellertAcousticalPlastersystemisdesignedtobeanacousticalsoundabsorptionsystemwitharchitecturalaestheticdesigncapabilities.Thevisualappearanceisintendedtobeamonolithicandnaturallookinghand-craftedplaster.

Astheplasterissprayedandhandtroweledproduct,itallowssoundtobeabsorbedwhileretaininganattractive,wall-to-wallseamlessappearance.

ThefinalappearanceofanyTextured,FineTextured,orSmoothfinisheswillvaryslightlythroughouttheexpanseofthesurfaceaswithanyhand-craftedplaster,especiallyundercriticallightingconditions.Theproductshouldbemonolithicandnaturalplasterlookinginfinalappearance.

AsperFellertpoliciesandspecifications,anapprovedprojectmockupisrequired.

mini
Maskinskriven text
12015001 ver.1.0 45(52)
Page 46: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB46 09/30/14

DRYSTAINS-ALLFELLERTFINISHES(NON-SOLUBLE)

Commence with step 1. Proceed to the other steps if needed.

Step #1Trybrushingthestainwithasoftuncoloredbrush.

Step #3Spraywatermist.

Step #4SaharaandSecern-formthesurfacetothedesiredappearancebyusingafirmbrush.

Silk-formthesurfacetothedesiredappearancebyusingasoftspongeoraplastictrowel.

Step #2Vacuumwithsoftbrushnozzle.Ifthereareremainingstains,lightlyscrapecarefullywithasharpedge.

mini
Maskinskriven text
12015001 ver.1.0 46(52)
Page 47: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB47 09/30/14

SOLUBLESTAINS-ALLFELLERTFINISHES

Step #1Dampasoftspongewithfreshwater.Pressthespongeonthestainandletthewatersoakintothesurface.Releasethepressure,lettingthewatersoakbackintothesponge.Rinsespongeandrepeatifnecessary.

Step #2SaharaandSecern-formthesurfacetothedesiredappearancebyusingafirmbrush.

Silk-formthesurfacetothedesiredappearancebyusingasoftspongeoraplastictrowel.

mini
Maskinskriven text
12015001 ver.1.0 47(52)
Page 48: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB48 09/30/14

HOLES,DAMAGES,&WATERDAMAGEDAREAS1. SILK

Step #1Cutoutthedamagedarea.Replacedamagedacousticalboard.Ifpossible,useanacousticalboardpreparedinadvancewithEvenBetter1plaster.Ifnot,buildupanEvenBetter1layerandleavetodry,byfillingthescratchwithasmallamountofEvenBetter1plaster.Moistenedgeofexistingplasterpriortoapplication.Useplasterwithsamebatchnumberastheoneusedfortheceiling.

Step #2SprayEvenBetter2plasterontherepairedareatothedesiredappearance.Moistenedgeofexistingplasterpriortoapplication.Handtroweltheplasterifnecessary.Leavetodry.Lightlysandwith400gritsandpaperandsoftsponge(moistenplasterwithwater),ifnecessarytoblend.

mini
Maskinskriven text
12015001 ver.1.0 48(52)
mini
Maskinskriven text
Page 49: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB49 09/30/14

HOLES,DAMAGES,&WATERDAMAGEDAREAS2. SAHARA

Step #1Cutoutthedamagedarea.Replacedamagedacousticalboard.Ifpossible,useanacousticalboardpreparedinadvancewithEvenBetter2plaster.Ifnot,buildupanEvenBetter2layerandleavetodry,byfillingthescratchwithasmallamountofEvenBetter2plaster.Moistenedgeofexistingplasterpriortoapplication.Useplasterwithsamebatchnumberastheoneusedfortheceiling.

Step #2Inacircularmotion,sprayEvenBetter2plasterontherepairedareatothedesiredappearance.Moistenedgeofexistingplasterpriortoapplication.Leavetodry.Lightlysandwith400gritsandpaperandbrush(moistenplasterwithwater),ifnecessarytoblend.

mini
Maskinskriven text
12015001 ver.1.0 49(52)
Page 50: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB50 09/30/14

HOLES,DAMAGES,&WATERDAMAGEDAREAS3. SECERN

Step #1Cutoutthedamagedarea.Replacedamagedacousticalboard.Ifpossible,useanacousticalboardpreparedinadvancewithEvenBetter1plaster.Ifnot,buildupanEvenBetter1layerandleavetodry,byfillingthescratchwithasmallamountofEvenBetter1plaster.Moistenedgeofexistingplasterpriortoapplication.Useplasterwithsamebatchnumberastheoneusedfortheceiling.

Step #2SprayEvenBetter1plasterontherepairedareatothedesiredappearance.Sprayincircularmovements,thinnerandthinnertoconnectthenewandtheoldsurfaces.Leaveto dry.

mini
Maskinskriven text
12015001 ver.1.0 50(52)
Page 51: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB51 09/30/14

TYPICALCONSTRUCTIONDETAIL

Customdetailsareavailableuponrequest.Installerisresponsibleforinstallationandtoensurerelevantdetailsareincludedintheprojectmock-up.Visitwww.fellert.comtoaccessallFellertconstructiondetails.

02/06/14

*General Notes: Not to Scale. This detail should be included in the project mock-up.

Fellert ABKyrkängsgatan 6, 50338 Borås, SwedenPhone: +46 33 430 23 10Fax: +46 33 430 22 19Email: [email protected]: www.fellert.com

Ceiling to Wall Interface with GWBFully Adhered System

5.1

5.1

CE

ILIN

G T

O W

ALL

INTE

RFA

CE

WIT

H G

WB

FU

LLY

AD

HE

RE

D S

YS

TEM

50 mm (2”) self-adhesive mesh tape

Fellert PrimerFellert C Channel Fellert Acoustical Plaster

approx. 3 mm (1/8”) thick

Drywall ceiling grid (for typical GWB application) @ 400 mm c/c (16” o.c.) (by others)

Fellert Acoustical Board 25 mm (1”) or 39 mm (1.5”)

GWB (by others)

GWB (by others)

Fellert Adhesive

mini
Maskinskriven text
12015001 ver.1.0 51(52)
Page 52: FELLERT ACOUSTICAL PLASTER ACOUSTICAL PLASTER INSTALLATION GUIDE 5.1 Fellert Acoustical Ceilings AB Kyrkängsgatan 6 503 38 Borås, Sweden Tel: 46 33 4302202 ... 2 © All igts eserved

© All Rights Reserved Fellert Acoustical Ceilings AB52 09/30/14

NOTES

mini
Maskinskriven text
12015001 ver.1.0 52(52)