feacal sludge and septage management€¦ · concentration, stabilization, spread ability) quality...

27
मल गाद ( कीचड़ ) और सेेज बंधन Feacal Sludge and Septage Management By Bhitush Luthra Programme Manager, CSE Online Training Offsite and Onsite Management of Sewage for Citywide Sanitation, 13-14 August 2020

Upload: others

Post on 19-Oct-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

  • मल गाद(कीचड़) और सेपे्टज प्रबंधन

    Feacal Sludge and Septage Management

    By Bh i tush Lu th ra

    Programme Manager, CSE

    Online Training ‘Offsite and Onsite Management of Sewage for Citywide Sanitation, 13-14 August 2020

    http://localbodies.up.nic.in/http://localbodies.up.nic.in/

  • स्वच्छता श्रंखला

  • स्वच्छ भारत अभभयान की उप्लभ्धधयााँ

    ODF से ODF+ और ODF++ का सफर शुरू हो चूका है

    ODF

    भदन के भकसी भीसमय कोई खुले मेंशौच करता हुआ नपाया जाये

    ODF+

    सार्वजभनक औरसामुदाभयक शौचालयसही चल रहे हों औरउनका रख रखार् भीहो रहा हो

    ODF++

    मल गाद/ सेपे्टजऔर अपभशष्टजल का सहीउपचारण औरप्रबंधन

    4,378 मैं से 4,324

    शहरों को ODF

    करार भकया गया

    5,93,338 CT / PT बने

    (100 % कर्रेज)

    6,160,812IHHL बने

    (93% कर्रेज )

  • शहरी उत्तर प्रदेश के मल मूत्रप्रबंधन का मूल्ांकन

  • शहरी उत्तर प्रदेश का ऐस ऐफ डी

  • मल गाद और सेपे्टज प्रबंधनक्या है

    कने्टनमेंट खाली करना पररवहन उपचार और ननपटान

  • सेपे्टज प्रबंधन का बढ़ता महत्व

  • र्त्तवमान भ्थिभत

  • कने्टनमेंट

  • खाली करना

  • पररवहन

  • उपचार औरननपटान

  • कने्टनमेंट

  • खाली करना

    • कने्टनमेंट प्रणाली को यांभत्रक और

    मैनु्यअली दोनों तरह से खाली भकया

    जाता है

    • प्राइरे्ट ऑपरेटर का पंजीकरण

    • आम जनता में जागरूकता अभभयान

    (मलासुर कैं पेन)

    • PPE का उपयोग सुभनभित करें

    1 ) ऑन भडमांड 2 ) भनयभमत रूप से

  • पररवहन

    • मागव तय करना

    • प्राइरे्ट ऑपरेटर का प्रभशक्षण

    • आम जनता में जागरूकता अभभयान (मलासुर कैं पेन)

    • भनगरानी के भलए जीपीएस

  • उपचार और ननपटान

  • TREATMENT OBJECTIVES

    Organic Load Reduction

    Pathogen Removal

    Reuse

    Selection of treatment options

    Priority

    Highest

    Lowest

  • SELECTION OF TREATMENT

    MECHANISM

    Performance

    Effluent wastewater

    and solid:

    Meet the discharge /

    reuse standards

    Local context

    Characteristics of sludge

    (de-waterability, solids

    concentration,

    stabilization, spread

    ability)

    Quality & Frequency of

    the sludge received at

    treatment facility

    Climate

    Land availability

    End-use

    O&M requirements

    ULB has human

    resources and can

    finance O&M

    Availability of skilled

    persons for more

    complex technology

    Investment

    O&M

    Affordability for

    households and

    ULB

    Cost

  • 1

    State FSSM

    Policy,

    Strategy

    and

    Investment

    Plan ready.

    FSSM WAY FORWARD

    2

    Capacity

    Building

    support to

    ULBs and

    Para State

    Agencies on

    FSSM

    Enabling

    State level

    Policies,

    Norms and

    Regulations

    3

    Scheduled or

    demand

    desludging of

    Septic Tanks.

    Explore Co-

    treatment of

    Septage with

    STPs and

    setting up new

    FeSTPs to

    treat septage

    4

    Focus on

    both

    treatment

    and Re-

    use of

    treated

    solid and

    liquid

    waste

    F a e c a l S l u d g e a n d S e p t a g e M a n a g e m e n t ( F S S M ) a s a n i n t e g r a l c o m p o n e n t o f

    U r b a n S a n i t a t i o n f o r a l l To w n s a n d C i t i e s

  • Opera

    tional

    Devanhalli

    Bansberia

    Cochin

    Leh

    1. Kanchipuram

    2. Adiragatty Town

    Panchayat

    3. Ketti Town Panchayat

    4. Ooty

    5. Ponampatti

    6. Periyanaicken-palayam

    1. Puri

    2. Bhubneshwar

    3. Sambalpur

    4. Bharamapur

    5. Roukela

    6. Dhenkanal

    7. Cuttack

    8. Baripada

    Sircilla

    Warangal Nasrapur

    Tenali

    Jhansi

    Unnao

    1. Shahganj

    2. Jabalpur

    (3 FSTPs)

    Ambikapur

    Rajnandhg

    aonMaharasthra has

    72 operational

    FSTPs

    State Operational Under

    Construction

    Maharashtra 74 94

    Odisha 10 31

    Telangana 8 16

    Tamil Nadu 6 58

    Andhra Pradesh 6 10

    Madhya Pradesh 4 0

    Rajasthan 3 0

    Uttar Pradesh 2 5

    Chhattisgarh 2 0

    Jammu and

    Kashmir

    1 0

    Karnataka 1 0

    Kerala 3 0

    West Bengal 1 0

    Nagaland 1

    Total 121 215

    Under

    Const

    ruct

    ion

    भारत में ऍफ़ ऐस टी

    पी ननमााण की स्थिनत

    Note: There are around a 100 more FSTPs and co-

    treatment facilities in tendering stage

  • उत्तर प्रदेश में ऍफ़ ऐस टी पी ननमााण की स्थिनत

    Operational 2

    Under construction 5

    LOA issued (FSTPs) 31

    LOA issued (Co-Treatment) 4

    Tender Open (Co-Treatment) 17

    Name of City Status Jhansi, Unnao Operational

    Loni, Lakhimpur, Rae Bareli,

    Chunar, Modinagar

    construction

    started

    Aligarh, Moradabad, Shahjahanpur,

    Ayodhya, Pilibhit, Pt. Deen Dayal

    Upadhyay Nagar, Shamli, Baraut,

    Hapur, Khurja, Chandousi, Hathras,

    Amroha, Budaun, Shikohabad,

    Farrukhabad, Hardoi, Sitapur,

    Bahraich, Gonda, Orai, Jhansi,

    Lalitpur, Banda, Fatehpur,

    Akhbarpur, Basti, Deoria,

    Azamgarh, Juanpur, Maunath

    Bhanjan.

    Letter of

    Award

    Issued :

    FSTP

    Saharanpur, Mathura, Rampur,

    Muzaffarnagar

    Letter of

    Award

    Issued : Co-

    Treatment

    in STP

    Lucknow, Kanpur, Agra, Meerut,

    Varanasi, Allahabad, Ghaziabad,

    Gorakhpur, Etawah, Mirzapur,

    Firozabad, Mainpuri, Sultanpur,

    Ballia, Bulandshahr, Ghazipur,

    Ayodhya-Faizabad.

    Tenders

    floated (Co-

    Treatment):

  • Thank you