fd22 metal wall cap flashing detail - fields internet resource,...
TRANSCRIPT
Fields Roof Systems Manual • (253) or (800) 627-4098 • www.fieldscorp.com
FD22 Metal Wall Cap Flashing Detail
Notes
1. This detail shall be installed when the roof deckis supported by the wall. See “Post SupportedRoof Deck Flashing Detail FD19”.
2. Attach treated wood nailer to deck with suitablefasteners.
3. A fiber cant may be adhered in ambient or hotasphalt in place of wood cants.
Wood cant fastened to nailers
Sheet metal joint cover plate min 6”wide set in 2 beads of sealant
Sheet metal parapet cap
High domed, capped, & gasketed fasteners 18” oc, depend-ing on wind zone and local conditions
Continuous membrane liner
Extend M60 RubrPoly flashing sheets
Seal top of flashing with a 3 layer application: 2 layers ofM300 RubrMastic and 1 layer of P74 PolyWeb
Install fasteners 8” oc
Install continuous beveled cedar siding tapered shim
Install treated wood nailers
Prime concrete with M400 RubrPrime
Extend Fields roof membrane sheets a min of 2” above topof cant
Install M60 RubrPoly flashing sheetsbetween 8” min to 14” max height
Fields roof membrane sheets
Coverboard insulation
Thermal insulation
Roof deck
12’ max f
or each len
gth of
parapet sh
eet metal
cap
1” m
in b
elow
blo
ckin
g
.5” gap
1” m
in b
elow
blo
ckin
g
1/2” gap
Side View
Sheet metal parapet cap
Continuous membrane liner
Continuous beveled cedar siding tapered shim
M60 RubrPoly flashing sheets
High domed, capped, & gasketed fasteners 18” ocdepending on wind zone and local conditions
Fasteners 8” oc
Fields roof membrane sheets extended a min of 2”above top of cant
M60 RubrPoly flashing sheets to a min height of 8”
Fields roof membrane sheets
Coverboard insulation
Thermal insulation
Roof deck
Wood cant fastened to nailers
Continuous cleat