f-1058 supplier quality requirements - l3 technologies supplier quality requirements.pdf ·...

24
1 L-3 PROPRIETARY Supplier Quality Requirements Page 1 of 24 Number Rev Date F-1058 H 5/13/14   AMI 3724 West Vancouver St. Broken Arrow, OK, 74012 Tel: (918) 258-0707 Fax: (918) 258-0051 www.L-3com.com/AMI             SUPPLIER QUALITY REQUIREMENTS

Upload: doandien

Post on 07-Jul-2018

252 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

1

L-3 PROPRIETARY

Supplier Quality Requirements

Page 1 of 24

Number Rev Date

F-1058 H 5/13/14  

 

AMI

3724 West Vancouver St. Broken Arrow, OK, 74012

Tel: (918) 258-0707 Fax: (918) 258-0051 www.L-3com.com/AMI

 

           

SUPPLIERQUALITY

REQUIREMENTS

Page 2: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

2

L-3 PROPRIETARY

Supplier Quality Requirements

Page 2 of 24

Number Rev Date

F-1058 H 5/13/14  

 

  

 

Quality Note  

Title Date Revision Revision Made By

 

All  

Quality Requirements 5/13/2014 H S. Hernandez    

 

RevisionSummary: 

Revision H Updated to utilize Link document                                                             

Page 3: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

3

L-3 PROPRIETARY

Supplier Quality Requirements

Page 3 of 24

Number Rev Date

F-1058 H 5/13/14  

 

 

QN‐10 QUALITYSYSTEMREQUIREMENTS 

QN‐10A QualityManagementSystem 

TheSellershallimplementandmaintainaqualityinspectionsystemacceptabletotheBuyer’sQualityAssuranceorganizationbaseduponISO9001.TheSellershallappointamanagementrepresentativewhoshallhavedefinedauthorityandresponsibilityforensuringcontractrequirementsaresatisfied.ThequalityprogramshallbesubjecttoreviewbytheBuyer,orBuyer’sCustomer,(bothreferredtohereafterasBuyer)atanytimeduringtheexecutionofthiscontract.TheBuyerreservestherighttoaudittheSellerforcompliancewiththerequirementscontainedherein.TheBuyermayevaluate,inspect,orauditanywork,records,ordocumentationpertainingtothispurchaseorder.TheBuyerwillnotifytheSeller72hoursinadvanceofavisitwithanintendedagenda.

 

QN‐10B QualityPlanning 

Afterinitialreceiptoforder,theSeller’sQualityOrganizationshallreviewthecontractrequirementstoensureprovisionshavebeenmadetocomplywitheachrequirement.

 

QN‐10C QualityRecords 

TheSellershallmaintainasystemforidentification,collection,indexing,filing,storage,andmaintenanceofqualityrecords.QualityrecordsincludereportsconductedattheSeller'sincominginspection,in‐processinspection,andfinalinspection/testpoints.

 

Qualityrecordsshallbelegibleandidentifiabletotheproductinvolved.Recordsshallincludeinformationrelatingtothenature/numberofevaluationsmadealongwithinformationonthetypesandquantityofanynonconformancefound.Allrecordsshallbemaintainedataminimumof5yearsafterdeliveryofthefinalproductandshallbemadeavailableperBuyer’srequest.

 

QN‐10D SupplierInspectionSystem(AS9100RevisionC) 

SellershallbeincompliancewiththerequirementsofAS9100RevisionC,QualityManagementSystems‐RequirementsforAviation,SpaceandDefenseOrganizations.SupplierdoesnothavematerialreviewauthorityunlessrequestedandapprovedinwritingbytheAMIQualityAssuranceDepartment.

 

QN‐10E QualityandDeliveryRating 

SellerisresponsibleforcorrectinganynegativetrendsinproductQualityorDeliverythatareidentifiedbytheBuyer’sSupplierRatingSystem. SellermustmaintainaQualityRatingofatleast95percentandaDeliveryRatingofatleast90percentinamonththatthereisactivity. Seller’swhofailtomaintaintheselevelsofproductandserviceperformancewillberequestedtotakethenecessaryactionsneededtoresolvetherootcauses. Sellerisencouragedtoconductaninternalassessmentandimplementactionsdeemedappropriatetopreventfurtherdegradationinperformanceandpossibleformalcorrectiveaction.

Page 4: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

4

L-3 PROPRIETARY

Supplier Quality Requirements

Page 4 of 24

Number Rev Date

F-1058 H 5/13/14  

 

  

QN‐10F SSOW 

SellershallcomplywiththeQualityAssurancerequirementsspecifiedintheSubcontractorStatementofWork(SSOW)orTaskDescriptiondocumentfortheproductorservicesuppliedonthepurchaseorder

 

 

INSPECTIONANDIDENTIFICATIONREQUIREMENTS 

QN‐20A GovernmentSourceInspection 

Onreceiptofthisorder,promptlynotifytheGovernmentRepresentativewhonormallyservicesyourplantsothatappropriateplanningforGovernmentInspectioncanbeaccomplished. TheSupplierisresponsibleforprovidingtheGovernmentInspectorwithobjectiveevidencethatsuppliesmeettherequirementsofthePurchaseOrder.GovernmentsourceinspectiondoesnotconstituteacceptancebyAMIanddoesnotrelievetheSupplierofcompliancewithallrequirementsofthePurchaseOrder.

 

QN‐20B FinalSourceInspection 

ArepresentativeoftheBuyer’sQualityOrganizationmayperformsourceinspectionofthefinaldeliverableProduct(s)asspecifiedinthepurchaseorderattheSupplier’sfacility. Thefinalsourceinspectionmaybeincremental,ifwarranted,subjecttoBuyerapproval. SellershallnotifyBuyeraminimumoffive(5)workingdaysinadvanceofthedatewhenthematerialwillbereadyforBuyerinspection/test.SellershallwithholdshipmentpendingnecessaryactionbytheBuyer’sQualityorganization.TheSuppliershallprovideallrecords,facilities,equipment,personnel,andassistancetoperformthefollowing:

 

a. Areviewofallverificationrecordsrelatingtoallsub‐tierproduct(s)suppliedonthispurchaseordertoverifythatthedeliverableproductbeingsuppliedmeetsthepurchaseorderrequirements. Ifthereareanyshortagesornon‐conformances,theBuyershallmakethedeterminationifthesourceinspectionwillproceed.

b. Aphysicalinspectionoftheproducttodeterminecompliancewiththeworkmanship,dimensionaland“as‐built”configurationrequirementsindrawingsandgoverningspecifications. ThesuppliershallrecordalldimensionalmeasurementsandinspectionattributesonthefirstarticleProductonly.

 

TheSuppliershallhaveperformedallevaluationsnecessarytoverifythattheproductbeingsuppliedmeetsthepurchaseorderrequirementspriortonotifyingtheBuyerofreadinessforsourceinspection. TheSuppliershallnotifytheBuyerQualityOrganizationthroughtheBuyer’sProcurementOrganizationatleastseventy‐twohoursinadvanceoftheproduct’sreadinessforsourceinspection. TheSuppliershallnotshiptheproductuntil

Page 5: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

5

L-3 PROPRIETARY

Supplier Quality Requirements

Page 5 of 24

Number Rev Date

F-1058 H 5/13/14  

 

  

allinspectionsandtestshavebeensuccessfullycompletedandtheBuyer’sQualityOrganizationhasgivenauthorization.

 

SourceinspectiondoesnotconstituteacceptancebytheBuyeranddoesnotrelievetheSellerofcompliancewithalltherequirementsofthePurchaseOrder.

 

QN‐20C FirstArticleInspection/TestReport(SDRLQA‐4) 

TheSellershallsubmitafirstarticleforinspectionandtestasapplicable.AllassembliesandcomponentsshallhavebeenproducedbytheSellerorfurnishedbyasub‐tierandshallhavebeenmanufacturedusingthesameproductionprocesses,proceduresandequipmentwhichwillbeusedinfulfillingthecontract.Priortosubmission,theSellershallinspectthecomponentorassemblythedegreenecessarytoensurethatitconformstotherequirementsofthecontractandsubmitarecordofthisinspectionwiththeitem,includingstatementsoffindingsformaterials,processesandtests.

 

AllinspectionmeasurementsortestdataasapplicablemustberecordedonadocumentnormallyusedbytheSeller.Inlieuofaninspectiondocument,acopyoftheapplicabledrawingcanbeusedtorecordactualdimensions.Ineithercase,thedimensionssubmittedshallbevalidatedwithanappropriateinspectionstamporsignature.TheapplicableparametersshallbedocumentedonaFirstArticleInspection/TestReport(AS9102FAIformsorsupplierequivalent).One(1)copyofthisdatawiththeBuyerpartnumberandpurchaseagreement/ordernumberreferencedthereonmustaccompanythedeliveryofeachfirstarticleitemtobedeliveredhereunder.Afirstarticlesample,orportionthereof,asdirectedbyBuyer,shallalsobesubmittedwheneverthereisalapseinproductionforaperiodinexcessofoneyearorwheneverachangeoccursinmanufacturingprocesses,materialused,drawingorspecification,whichsignificantlyaffectstheproductuniformityasdeterminedbyBuyer.

 

ElectricalandElectro‐MechanicalComponents/Assemblies: TheFAIRdatashallbecomprisedofthefollowing. ATTRIBUTES,specification,test/inspection,testdataandrequiredscreeningdatainaccordancewiththeapplicablespecificationshallbefurnishedwitheachshipmentagainstthisPO. Thetestdatashallbeartheapprovalsignatureofanauthorizedrepresentativeofthesupplier. VARIABLES,testdata(readandrecord)inaccordancewiththeapplicablespecificationsofeachlotcodeagainstthesubjectPO. Thetestdatashallbeartheapprovalsignatureofanauthorizedrepresentativeofthesupplier.CERTIFICATION,acertificateofcompliancebearingthesignatureofanauthorizedrepresentativeofthesupplierandreferencingtheAMIPO,partnumber,lotidentification(whereapplicable)shallbefurnishedwitheachshipment. AlltestdatashallberetainedinsuchamannerthatitshallbeavailabletoL‐3AMIuponrequestforaminimumoffive(5)years.

 

MechanicalComponents/Assemblies: TheFAIRdatashallincludeallsupportingdocumentationincludingtheoriginalmanufacturer'srawmaterialcertifications,specifications,hardwarecertificationsetc.Wherespecified,theFAIRshalldocumentmeasurementsusingGeometricDimensioningandTolerance.

Page 6: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

6

L-3 PROPRIETARY

Supplier Quality Requirements

Page 6 of 24

Number Rev Date

F-1058 H 5/13/14  

 

 

Note:Somecommoditiesmaypertaintobothoftheprecedingcategoriesandaretobeaddressedaccordingly.TheSellershallsubmittheinformationaboveinaccordancewithSDRLQA‐4concurrentwithhardwaredelivery.

 

QN‐20D CertificateofConformance(SDRLQA‐1) 

TheSellershallsubmitwithallshipmentsaCertificateofConformance(CofC),whichindicatesallprocessesand/orrequirementsasdenotedhereinhavebeenmet.Adulyauthorizedrepresentative,whosesignatureshallbeconsideredasbindingforthecompany,shallsigntheCofC.Allcertificationsshallcontainafraudandfalsificationstatementinaccordancewiththecontracttermsandconditions.TheSellershallsubmittheCertificateofConformanceinaccordancewithSDRLQA‐1concurrentwithhardwaredelivery.

 

QN‐20E Mechanical/ElectricalInspectionData(SDRLQA‐3) 

MechanicalInspectionandElectricalInspectionmeasurements,whereapplicable,reflectingtherequirementsofthespecificationshallberecorded.TheInspectiondatapertinenttoeachshipmentofthesubjectcommodityagainstthisPOshallbeincludedwiththeshipment.Thedatashallasaminimuminclude:

• Partnumberandrevision• L‐3AMIPOnumber• Seller'stestprocedurenumberandrevision,ifapplicable• Parameterstestedorinspected• 100%mechanical*/electricalresultsofeachcomponentunlessotherwisespecified

withinthePO• Dateoftestcompletion• EvidenceoftestacceptancebyauthorizedSeller'srepresentative

TheSellershallsubmittheinformationaboveinaccordancewithSDRLQA‐3concurrentwithhardwaredelivery

 

QN‐20F AcceptanceTestProcedure(ATP) 

Thesuppliershallperformfunctionaltestandsupplydataaspertheengineeringdrawingsand/orapprovedacceptancetestproceduresasspecifiedonthePurchaseOrder. Actualreadingsaretobesuppliedforallquantitativemeasurements.

 

QN‐20G CertificateofTest 

Adocument,signedbyanauthorizedsupplierrepresentative,statingthatallsupplierfunctionaltestrequirementshavebeenverifiedincomplianceofpurchasedocumentrequirements.

Page 7: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

7

L-3 PROPRIETARY

Supplier Quality Requirements

Page 7 of 24

Number Rev Date

F-1058 H 5/13/14  

 

 

QN‐20H SupplierTechnicalData 

TheSuppliershallprovidedatanecessaryforidentificationandverificationoftheitem(s)withtheshipment. Thedatamayconsistofassemblydrawings,schematics,partslistsorcommercialcatalogsheetsthatcanbeusedtoverifythatthesuppliesconformtotherequirementsofthePurchaseOrder.

QN‐20E Repair\FailureAnalysisReport(FAR) 

TheSuppliershallprovidearepairreportwitheachshipment. Thereportshallidentifythecauseofthefailure,documenttheactiontakentocorrecttheproblemandincludeactualresultsofexaminationsandteststoverifythatthefailurewascorrected. Thereportshallfurtherincludethesignatureofanauthorizedcompanyrepresentative.

 

QN‐20J GovernmentFurnishedEquipmentRepairParts 

Allpartsremovedasaresultofrework/repairfromtheGovernmentpropertysuppliedwiththisordermustbereturnedtothisfacility. Supplierdoesnothavetheauthoritytoscraporotherwiseusesuchparts. TheSuppliershallplaceanidentifyingtagoneachremovedpartandidentifywiththePurchaseOrdernumber,eachpieceparttakenfromtheassemblies. Therequirementisconsideredvoidiftheitemisexchangedinsteadofrework/repaired.

 

QN‐20K CustomerFurnishedMaterial(CFM) 

TheSuppliershallinspect,uponreceipt,allmaterialsorpartsfurnishedbytheBuyerorBuyer’scustomer.Inspectionshallincludequantity,damage,corrosion,deterioration,andcompliancetoanyapplicablepurchaseorderrequirements.TheSuppliershallprovidewrittennotificationtotheBuyerthroughtheBuyer’sProcurementOrganizationofanydiscrepanciesfoundduringinspection.TheSuppliershallsegregateandwithholdfromuseallmaterialsandpartsfoundtobediscrepantpendingwrittendispositionfromtheBuyer.

 

QN‐20L RadiographicInspectionReport 

AllradiographicfilmsaresubjecttofinalreviewandapprovalbytheBuyerandshallbeaccompaniedbytheSellerscompletedradiographicreviewform.Therecordshallidentifythespecificprocedureemployed(includingprocedurenumber,dateand/orrevisionnumber)andthespecificBuyerapprovaldocumentationwhenapplicable.TheBuyerreservestherighttoreviewthefilmonitspremisesorothersuchplacesasmaybedesignated.Insuchcases,shipmentoffilmsshallberequestedoftheSellerinwritingbytheBuyer.Submittaloffilmandradiographicreviewformshallbebyregisteredmail.TheBuyerwillassumeresponsibilityforthefilmstotheextentofliabilityforre‐radiography,untiltheyarereturnedtotheSeller.AcopyoftheradiographicinspectionrecordandradiographictechniquesheetshallbesubmittedwiththeSeller’sdatapackagetotheBuyer,whenapplicable.

   

Page 8: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

8

L-3 PROPRIETARY

Supplier Quality Requirements

Page 8 of 24

Number Rev Date

F-1058 H 5/13/14  

 

 

Thesuppliershallfurnishx‐rayfilmandlaboratoryreportsforthiscommoditywitheachshipmentagainstthisPO.Thex‐rayfilmandlaboratoryreportshallrepresentthelotorderedandshallbesoidentified.

 

QN‐20M UltrasonicTestingDocumentation 

UltrasonictestproceduresshallbedetailedtotheextentthattheBuyerisabletodeterminetheadequacyandextentofthetestingtobeperformed.Whenadditionalinformationsuchaspositioncharts,sketches,etc.,arepertinent,theyshallbesubmittedwiththeprocedures.Objectiveevidenceofultrasonictestperformance(tapes,traces,charts,etc.)shallberetainedbytheSeller,andshallbemadeavailableforreviewbytheBuyeruponrequest.DocumentationofapprovalsandqualificationshallbemaintainedintheSellersrecords.Ataminimum,thetestreportshallidentifytheSellersultrasonictestprocedureemployed(includingprocedurenumber,dateand/orrevisionnumber),personnelperformingtheinspection,andtheresultsoftheultrasonictestincludingaccept/rejectdispositionanddescriptionofindicationsbysizeandnumber,andbesubmittedwiththeSellersdatapackagetotheBuyer.

 

QN‐20N PartTraceability(JAN,JANTS,JANTV,JANS) 

ProcurementtraceabilityofJAN,JANTS,JANTVandtheJANSmarkeddevicesshallbeprovidedbyaccompanyingdocumentationasdescribedbelow. Whensourcesotherthanthemanufacturerareinvolved,theirdocumentationshallbeinadditiontoandincludethatdocumentationprovidedbythemanufacturerandpreviousdistributors. ShelflifeofJANmarkeddevicesshallbecontrolledinaccordancewiththelatestrevisionofMIL‐S‐38510.ACTIVEasof10/09/08,however,checkwithEngineeringbeforeflowingtosupplier.

 

Requiredocumentation: 

1. Manufacturer’sDocumentation;a. manufacturer’snameandaddress;b. devicetypeandqualityassurancelevel(JAN,JANTS,JANTV,JANS);c. lotdatecodeincludingassemblyplantcode;d. inspectiondateoflatestre‐inspectiondate;e. quantityofdevicesinshipmentfrommanufacturer;f. signatureanddateoftransaction.

 2. Distributor’sDocumentation;

a. distributor’snameandaddress;b. nameandaddressofcustomer;c. quantityofdevicesinshipment;d. latestre‐inspectiondate,ifapplicable;e. certificationthatthisshipmentisapartoftheshipmentcoveredbythe

manufacturer’sdocumentation;f. signatureanddateoftransaction

Page 9: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

9

L-3 PROPRIETARY

Supplier Quality Requirements

Page 9 of 24

Number Rev Date

F-1058 H 5/13/14  

 

 

QN‐20O IdentificationofParts

 

TheSellershallidentifytheproductfurnishedunderthispurchaseorderandtheindividualfabricatedassembliesmakinguptheproduct,perMIL‐STD130methodoptional.Allinformationshallbeidentifiedonthepartandshallbeviewablewithoutdisassemblyoftheunit.

 

Iftheproductorassemblieshavenosuitableoradequatemarkingsurfaces,identificationshallbebymeansofatagoridentificationonthecontainer.Identificationshallconsistofaminimumthefollowing:

 

1. Buyer’spartnumber2. Partordrawingrevision3. MFGpartnumberand/orcagecode4. Engineeringordersordeviations,ifapplicable.

QN‐20P MaterialAuthenticity

 

OnlynewandauthenticmaterialsaretobeusedinproductsdeliveredtoBuyer.Nocounterfeitorsuspectcounterfeitpartsaretobecontainedwithinthedeliveredproduct.PartsshallbepurchaseddirectlyfromtheOCMs/OEMs,orthroughtheOCM/OEMsFranchisedDistributor.DocumentationmustbeavailablethatauthenticatestraceabilitytotheapplicableOCM/OEM.IndependentDistributors(Brokers)shallnotbeusedwithoutwrittenconsentfromBuyer(L‐3).

 

QN‐20Q InspectionandTestRequirements 

TheSellershallperforminspectionsandtestsofproductstobedeliveredunderthetermsofthepurchaseorder.Inspectionandtestingshallassuretheproductstobedeliveredconformtoalldrawing,specificationandpurchaseorderrequirements.Inspectionandtestingshallincludematerial,parts,assembly,andend‐itemproductreceiving,processing,fabrication,assembly,andfinalproductinspectionsandtestsasrequiredherein.Exceptasotherwisespecified,theSellermayusehisownfacilitiesoranycommerciallaboratoryacceptabletotheBuyer.TheBuyerreservestherighttoperformanyinspectionsortestsdeemednecessarytoassureproductconformstoprescribedrequirements.FinalacceptanceoftheproductiscontingentuponitsdeliverytotheBuyer’sfacility,correctionofallproductdiscrepancies,andsatisfactoryinspection.

 

QN‐20R InspectionandTestStatus 

Theproduct’sinspectionandteststatusshallbeaffixedtotheproduct,itsassemblies,andpartsbyuseofmarkings,authorizedstamps,tags,labels,inspectionrecords,orothersuitablemeanswhichidentifytheproduct’sconformanceornonconformancebasedoninspectionsandtestsperformed.

Page 10: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

10

L-3 PROPRIETARY

Supplier Quality Requirements

Page 10 of 24

Number Rev Date

F-1058 H 5/13/14  

 

 

QN‐20S ReceivingInspection 

TheSuppliershallinspectallincomingmaterialtoensurethatthereisnodamageandthatthematerielconformstoalldrawing,specification,andpurchaseorderrequirements.

 

QN‐20T In‐ProcessInspection 

TheSuppliershallperformauditsofthequalitysystemprocessesandinspectionoftheworkin‐process,includingworkatLower‐TierSuppliersofcomplexormajorcomponents,ifanyarespecifiedbytheSupplier. TheSupplier’sprocessesandworkinprocessshallbesubjecttoreviewatanytimebytheBuyer’sQualityOrganization,includingworkatmajorLower‐Tiersupplierfacilities.

 

QN‐20U In‐ProcessInspectionSchedule 

TheBuyermayperformthein‐processinspectionsatanystageofSupplier’smanufacturingprocess. Buyerwillconfirmeachin‐processinspectionvisitthree(3)dayspriortoarrivalatSupplier’sfacility.

 

QN‐20V AcceptanceTests 

TheSellershallprepareandsubmitanAcceptanceTestProcedurefortheBuyer’sreviewandapprovalinadvanceofstartingacceptancetestthatcomplieswiththerequirementsofthisSSOW. Thetestprocedureshalldescribetheinspections,tests,anddemonstrationsnecessarytoverifythatthefinalproductbeingsuppliedmeetsalltherequirementsoftheproduct’sspecificationanddrawings. Thetestprocedureshalllistthesequenceoftesting,environmentalconditionsduringtest,methodsoftesting,equipmentand/orsoftwaretobeusedduringtest,andthecriteriafordeterminingacceptableversusunacceptableresults.Theprocedureshallincludeadatasheetforcollectingandrecordingallmeasurementsandobservationsmadeduringtest. Anychangestotheproceduremadeduringtestshallbeincorporatedintoafinalsubmittal.

 

TheSellershallperformaqualificationtestofallfinalproduct(s)IAWtheapprovedATPtoverifytheperformancerequirements. TheSellershallhavesuccessfullycompletedthefollowingcriteriabeforestartoftheATP:

 

a. TheSellershallhavecompletedallinspectionsandconfigurationvalidationsasspecified.

b. Allhardwareshallbefreeofshortagesandhavenoknownnon‐conformances. Ifthereareanyshortagesornon‐conformances,theBuyershallmakethedeterminationifthetestwillproceed.

c. TheSellershallhaveobtainedBuyerapprovaloftheATP.d. Burn‐Inhasbeencompletedasrequired.

 

ResultsofthesetestsshallbedocumentedandsubmittedtotheBuyer. CompletionofthetestsshallnotconstitutefinalacceptancebytheBuyer.

    

Page 11: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

11

L-3 PROPRIETARY

Supplier Quality Requirements

Page 11 of 24

Number Rev Date

F-1058 H 5/13/14  

 

     

QN‐20W FinalAcceptance 

Finalacceptanceofproduct(s)suppliedunderthispurchaseordershallbeattheBuyer’sfacility. FinalsourceinspectionshallnotrelievetheSupplieroftheresponsibilityoffurnishingacceptableproduct.

 

AlldiscrepanciesencounteredduringfinalsourceinspectionthathavenotbeensuccessfullycorrectedbeforeshipmenttotheBuyer’sfacilityshallbedocumentedinaclosureplanthatisapprovedbytheBuyer. BuyerQualityOrganizationapprovaloftheclosureplanshallbeconsideredconditionalacceptanceoftheproductandgroundsforshippingtheproducttotheBuyer’sfacility.

 

Finalacceptanceshallbegrantedwhenallproduct(s)suppliedunderthispurchaseorderhavebeenreceivedattheBuyer’sfacilityundamagedandtheSupplierhasfullysatisfiedallactionsintheclosureplantotheBuyer’ssatisfaction.

 

QN‐20X ItemReturnedtoVendorforReworkorRepair 

Sellerisrequestedtoincludewiththereturneditemresultsofanyfailureanalysistheyelecttoperformtodeterminecause. PleaseNote: 1)WhenthereturneditemfailureisdocumentedonaNonconformanceMaterialReportthathasbeenassignedastheSeller'sresponsibility,thatfailurewillnegativelyaffecttheSeller’squalityapprovalrating. SellerfailureanalysesthatidentifytherootcauseofthefailurewasnotcausedbytheSellerwillhavetheresponsibilityre‐assigned,therebyimprovingtheSeller'squalityrating. 2)PartrevisionsstatedinthePOareforreferenceonly,unlessotherwisespecified.3) Anyreworkorrepairofthereturneditemthatwouldchangetheas‐built/receivedconfigurationmustbeapprovedinadvance.

 

QN‐20Y ItemsContainingSoftwareorFirmware 

WhensoftwareorfirmwareiscontainedinahardwaredeliverablelineitemofthePO,itshallclearlybeidentifiedonthepackinglistandCertificateofConformance,includingitsversionorrevision.

 

QN‐20Z QualityEngineerNotification(ForinternalusebyAMIonly) 

InspectorshallnotifytheprogramQualityEngineerviae‐mailwhenproducthascompletedReceivingInspection.

 

QN‐20AA ConfigurationManagement 

The Seller shall maintain a configuration management program that ensures configuration indexing, change management, change control and configuration auditing is applied to all products delivered for further integration at the Buyer’s facility.

 

The Seller shall conduct a Physical Configuration Audit (PCA) prior to the Buyer’s initial acceptance of each device. This shall occur at the Seller’s facility. The PCA shall be performed to verify that the trainer design configuration and as-built configuration conform to the

Page 12: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

12

L-3 PROPRIETARY

Supplier Quality Requirements

Page 12 of 24

Number Rev Date

F-1058 H 5/13/14  

 

contractually required product configuration. Successful completion of the PCA establishes the Customer Product Baseline.

 

QN‐30 WORKMANSHIPREQUIREMENTS 

QN‐30A PreparationandSolderingofElectricalConnections(ANSI/IPC/J‐STD‐001)

 

RequirementsforSolderedElectricalandElectronicAssemblies: appliestothisPurchaseOrderandtheSuppliershallcomplywiththelatestrevisionineffectonthedateofthisorder. TheSuppliermusthavedocumentationandwrittenprocessestoimplementthisspecification. ClassificationlevelwillbeunderstoodtoClass3unlessotherwisespecifiedinthePurchaseOrder.

 

QN‐30B WorkmanshipControl 

TheSellershallestablish,implement,andmaintaincontroloverallworkperformedonproductssuppliedunderthispurchaseorderinaccordancewithcurrentrevisionofClass3requirementsof:

• IPC‐A‐610AcceptabilityofElectronicAssemblies• IPC‐A‐620RequirementsandAcceptanceforCableandWireHarnessesAssemblies• J‐STD‐001RequirementsforSolderElectricalandElectronicAssemblies

 

TheBuyerencouragestheuseofBestCommercialPractices(BCP)andinvitestheSellertoidentifyandsubmitforBuyer’sreviewandapprovalpracticesemployedbytheSellerthatcouldbeusedinlieuoftheabovelisteddocuments.

 

In the event of conflicts in referenced Buyer documentation or interpretation of requirements, the Seller shall obtain clarification from the Buyer’s Quality organization. Seller’scompliancewiththeaboverequirementsshallbesubjecttotheBuyer’sQualityOrganizationauditandapproval.

 

QN‐30C PrintedWiringBoardRequirementsforHotAirSolderLeveledBoards 

Solderthicknessshallbeaminimumof.0003inchesatfive(5)samplelocationsacrosstheboardsurface. Measurementdatashallbeprovidedforeachsample.Ioniccontaminationmustbecheckedandadataprintoutsuppliedwitheachlot.Eachboardshallbeindividuallypackagedinaself‐sealingantistaticbagwithadesiccantinaccordancewithMIL‐D‐3464andhumidityindicatorinaccordancewithMIL‐I‐8835. Thehumidityindicatorshallbevisibleforinspectionwithoutopeningthepackage. Inaddition,dataforsolderthicknessinthebarrelistobesuppliedwitheachlotshipped.

 

QN‐30D RequirementsforWeldingandBrazingProcedureandPerformanceQualification(SDRLQA‐5)

 

AllweldingproceduresandweldersshallbequalifiedtothelatestreleaseofNAVSEAS9074‐AQ‐GIB‐010/248,ortheirreplacementorcommercialequivalent.Allinspectionsandworkcriteriashallbeperthistechnicalspecificationandtheprovideddrawings.

Page 13: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

13

L-3 PROPRIETARY

Supplier Quality Requirements

Page 13 of 24

Number Rev Date

F-1058 H 5/13/14  

 

 

Workperformedunderthisworkscopeshallexhibitgoodworkmanship.Surfacestobejoinedshallbeuniformandfreeofcracks.Surfacesadjacenttoajointshallbefreeofloosescale,rust,orforeignmaterial.

 

Inspectionsofallweldsshallbevisualwithoutaidofmagnification.TheSellershallconductperiodicinspectionstoassureconformancetotheacceptancecriteriaofNAVSEAS9074‐AQ‐GIB‐010/248,ortheirreplacementorcommercialequivalent.TheBuyershallhavetheoptiontoperformaninspectionofcomponents,subassemblies,panels,orgageboardspriortopainting,attheSeller’sfacilitytoassureconformancetothesameacceptancecriteria.TheresultsoftheseinspectionsandanycertificationshallbedocumentedandkeptonfileforreviewbytheBuyer.

 

Controlsonsurfacefinishingtools,handtools,andhandlingequipmentshallbecleanpriortouse,andshallnotbepreviouslyusedonlowmeltingpointmetals.Carbon,lowalloy,ortollsteelsmaycontactcorrosionresistanthardwareprovidedtheyarehardenedandfreeofrustpriortouseandtheiruseisfollowedbyavisualinspectiontoverifynotransferofmaterialfromthetoolorhandlingequipmenttothehardware.Anindependentinspectionisnotrequired.Iftransferisdetected,itshallberemovedbyasuitablemeanswhichwillnotresultintheviolationofsurfaceroughnessrdimensionalrequirements.Wirebrushesmadefromcarbon,lowallow,ortollsteelshallnotbeusedoncorrosionresistanthardware.TheSellerandtheirsubcontractorsshallmaintainpositivecontroltoprecludetheuseoftoolsandhandlingequipmentthatwerepreviouslyusedonlowmeltingpointslistedbelow:

• Antimony• Bismuth• Cadmium• Lead• Tin• Zinc

 

TheSellershallsubmittheinformationaboveinaccordancewithSDRLQA‐5concurrentwithhardwaredelivery

 

QN‐30E HydrostaticTesting 

The Seller shall submit required hydrostatic test procedures for approval. Each procedure shall identify the applicable code/standard used to prepare the procedure. The documentation shall be submitted at least 30 days prior to the performance of any actual work. Hydrostatic testing may not be performed unless waived by the Buyer. The results of hydrostatic testing for compliance with acceptance criteria shall be submitted to the Buyer for information within 60 days following completion of testing.

Page 14: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

14

L-3 PROPRIETARY

Supplier Quality Requirements

Page 14 of 24

Number Rev Date

F-1058 H 5/13/14  

 

QN‐30F NondestructiveTesting(NDT)andQualificationofNondestructiveExaminationPersonnel

 

Certified NDT procedures and NDT qualification criteria shall be submitted for Buyer approval. Each procedure shall identify the applicable code/standard used to prepare and certify the procedure. The documentation shall be submitted at least 30 days prior t the performance of any actual work. Pressure equipment NDT may not be performed until Buyer approval has been obtained unless waived by the Buyer. NDT qualification and certification records for all manufacturer personnel required to perform NDT and examine the results NDT shall be submitted to the Buyer for information. The results of NDT for compliance with qualifications criteria shall be submitted to the Buyer for information with 60 days following completion of NDT inspection or prior to performance of any required hydrostatic testing, whichever occurs earlier. Hydrostatic testing shall not be performed until the Buyer acknowledges receipt of NDT unless waived by the Buyer. The following reporting requirements are additionally applicable to the specific type of NDT testing performed. Other nondestructive testing and examination required prior Buyer approval.

 

QN‐40 MATERIAL,TOOLING,CALIBRATION,DOCUMENTATION,SUPPLIERPROCESSCONTROL

 

QN‐40A MaterialSafetyDataSheet 

MaterialSafetyDataSheets(MSDS)arerequiredforeachshipmentonthisorder.TheMSDSmustreferencethisPurchaseOrdernumber.

 

QN‐40B Tooling 

Anyspecialtoolingdevelopedunderthisprocurementshallbesubjecttofirstarticleverificationforcompliancewiththedrawingrequirementsandacceptabilityforproducingacceptablefinishedparts.

 

QN‐40C CertificateofAnalysis/ChemicalandPhysicalTestReports 

Sellermusthaveonfile,athisplantorhissupplier’splant,certificate(s)ofanalysis/physicalandchemicaltestreportscoveringmaterialusedonthisorder. RecordssubstantiatingtheforegoingshallbeavailableforexaminationbyBuyerQualityAssurance. 

QN‐40D CalibrationandControlofMeasuringandTestEquipment 

Calibratedequipmentandtoolsshallbeusedforallinspectionsandtestusedtodeterminetheacceptabilityoftheproduct.Equipmentandtoolsshallhaveanaccuracyandrangesuitablefortheintendeduse.Toensurevalidresults,QualityAssurancemaintainsasystemforthecalibration,verificationorboth,ofallmeasuringandtestequipmentandmeasurementstandardsusedinthefulfillmentofcontractualrequirements.EquipmentandtoolsshallbecalibratedagainstreferencestandardstraceabletotheNationalInstitute

Page 15: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

15

L-3 PROPRIETARY

Supplier Quality Requirements

Page 15 of 24

Number Rev Date

F-1058 H 5/13/14  

 

ofStandardsandTechnology;obtainedfromindependentreproduciblestandards;derivedfromtheratiotypeofself‐calibrationtechniques;oranindustryconsensusstandard,wherenosuitablestandardexists.Equipmentandtoolsshallbecalibratedatestablishedintervals.

 

QN‐40E CalibrationCertificateofConformance(SDRLQA‐2) 

Acertificate,report,ordatasheetattestingtothedate,accuracyofthestandardsused,andtheenvironmentalconditionunderwhichtheresultsfurnishedwereobtainedshallbesuppliedforeachitemcalibratedunderthispurchaseorder.ThisreportorcertificatemustattesttothefactthattheaccuracyofthestandardsusedinobtainingtheresultshasbeencomparedatplannedintervalswiththeNIST,WWVB,hasbeenderivedfromacceptedvaluedofNaturalPhysicalConstants,orhasbeenderivedbytheratio‐typeofself‐calibrationtechniques.Theaccuracyofthestandardsmustbeatleastfourtimestheaccuracyoftheequipmentbeingcalibrated. TheSellershallsubmittheCalibrationCertificateofConformanceinaccordancewithSDRLQA‐2concurrentwithhardwaredelivery.

 

QN‐40F ElectrostaticDischargeProtection 

Selleragreesthatallstatic‐sensitiveelectricalandelectronicparts,assembliesandequipmentshallbehandledandprotectedtoeffectivelypreventdamagefromelectrostaticdischargeusinganElectrostaticDischarge(ESD)controlsystemwhichencompassesprotectedareas,handlingprocedures,protectivecovering,qualityprecautions,auditandreview,trainingofemployees,andpackingandpackagingfordelivery.

 

QN‐40G AgeSensitive/ShelfLifeMaterial 

MaterialidentifiedonthisPurchaseOrderisconsideredagesensitive. Suppliershallprovidethefollowingdataupondelivery:

 

  a. manufacturingdate;b. shelflifeand/orexpiration date;c. rubbercuredatefor gasket material;d. materialshallhaveat least 3/4 (75%)of its shelf liferemainingatthe

  

QN‐40H

  shipment 

CertificationofMercuryExclusion

EachshipmentmadeagainstthisPurchaseOrdermustcontainastatementcertifyingthefollowing:

“TheitemfurnishedunderthisordercontainsnometallicmercuryormercurycompoundsandI,asaSupplier,havetakenreasonablestepstoensurethatthesuppliesfurnishedunderthisorderarenotcontaminatedwithmetallicmercuryormercurycompounds.”

 

ThiscertificationmustreferencethePurchaseOrdernumber,partnumber,descriptionandquantityoftheshipment.

 

Page 16: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

16

L-3 PROPRIETARY

Supplier Quality Requirements

Page 16 of 24

Number Rev Date

F-1058 H 5/13/14  

 

QN‐40I Lower‐Tier‐Suppliers

 

TheSellerisresponsiblefortheperformanceofhislower‐tiersuppliersandshallmaintainasystemtoassurethatallpurchasedmaterials,equipment,andservicesconformtoorderrequirements,including:

 

a. Selectionofqualifiedsuppliersb. Passdownoforderrequirementsc. Qualitysurveillanceprocessandproductverificationprocureditemsandservices,

includingdetailreviewofallmaterialtestreports,inspectionandtestdata,andpersonnelandprocedurequalificationdocumentationreceivedfromalllower‐tiersupplierstoassurethatallapplicablecodes,specificationsandstandardsinvokedinthepurchaseorderrequirementshavebeenfullymetfortheproductsandservicesprovidedbythelower‐tiersuppliers

 

Effectiveinformationfeedbackandcorrectionofnon‐conformances 

QN‐40J BuyerAccesstoSeller’sFacility 

TheSeller’s(andSeller’slowertiersuppliers)systems,facilities,personnel,equipmentanddocumentationassociatedwiththeproductorservicebeingprocuredshallbesubjecttoaudit,in‐processsurveillance,and/orsourceinspectionbytheBuyerand/orGovernmentRepresentativesatnoadditionalcost.TheSellerwillreceiveadvancenotificationofthedateplannedforaudit.

 

QN‐40K MaterialReviewBoard(MRB)Authority 

TheSupplierisnotauthorizedMRBauthorityfornonconformancethataffectsspecificBuyerrequirements.

 

OnlyshipmentsofproductconformingtotherequirementsofthispurchaseorderwillbeacceptedunlessauthorizedinwritingbytheBuyer’sQualityOrganization.Anynonconformingmaterials,parts,orproductsaffectingspecificBuyerrequirementsimposedbythepurchaseorder,Buyer’sdrawing,oranyotherapplicablespecificationshallbesubmittedtotheBuyer’sProcurementOrganizationforBuyer’sMRBdisposition.Thisshallbeaccomplishedattheearliestpossibletimeandmustbepriortoshipment.Sellershallincludethereasonforthediscrepancyandthecorrectiveactiontakentopreventrecurrence.IftheSellerisuncertainastotheeffectofthenonconformanceonspecificrequirements,theconcurrenceofarepresentativeoftheBuyer’sQualityOrganizationshallbeobtained.

 

QN‐40L WorkinProcessHandling,Storage,andPackaging 

TheSellershallmaintainproceduresforhandling,storage,andpackagingduringthemanufacturingprocessthatpreventsdamageordegradationoftheproduct.

 

Appropriatemethodsforauthorizedreceiptanddispatchofproductsintheareashallbeestablished.

 

Page 17: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

17

L-3 PROPRIETARY

Supplier Quality Requirements

Page 17 of 24

Number Rev Date

F-1058 H 5/13/14  

 

QN‐40M SpecialProcesses

 

AqualityplanshallbeestablishedbytheSellertodefinethespecificactionsthatwillbetakentomeetthequalityrequirementsrelatedtospecialprocesses(e.g.,welding,brazing,plating,cleanliness,detrimentalmaterialcontrols,heattreating,hardfacing,nondestructivetest(NDT),electricdischargemachining,electromechanicalmachining,anodization,chem.film,coating,electrostaticdischarge(ESD),bonding)containedinthisorder.Theplanshallinclude,asaminimum,thefollowing:

 

Identificationofproductorservicestobeobtainedfromalower‐tiersupplierandtheidentificationofthelower‐tiersupplier

 

Adescriptionoftheinspectionsandteststhatwillbeperformedtocontrolandevaluatetheinvolvedspecialprocesses

 

Adescriptionofthepersonnelandprocedurequalificationprogramtoassurecompliancewithapplicablecodes,specifications,andstandards

 

AlldocumentationshallbeavailabletotheBuyeruponrequest. 

QN‐40N SellerProcessChangeControl 

TheSellershallobtaintheBuyer'sapprovalpriortoeither:• Relocationofworktoanotherproductionfacility;• Changingthedesign,manufacturingprocesses,materialsoractivitiesthataffectfit,

formorfunction. 

Ananalysisshallbeperformed,documented,andincludedwithanyrequestforchange.Adocumentedprocessshallbeinplacetoreview,identifyandsubmitarequestforchangetotheBuyer.Thisrequestshallbesubmitted14dayspriortotheplannedimplementation.ThechangewillnotbeimplementedunlessapprovedbytheBuyer.

 

QN‐40O DocumentControl 

TheSellershallmaintainproceduresforcontrolofalldocumentsanddatarelatingtotherequirementsofthiscontract. Documentsshallbereviewedandapprovedpriortoreleasetoensuretheiradequacy. Subsequentchangesormodificationsshallalsobecontrolledinasimilarmanner.

 

Drawingand/orspecificationsshallbemaintainedforcustomdesignedproducts. Thesedrawings/specificationsshallprovidesufficientdetailtoensuresuccessfulprocurementofadditionalunits. ThesedesigndocumentsshallbesubjecttotheBuyer’sreview. 

QN‐40P Purchasing 

TheSuppliershallensurethatallpurchasedproductsconformtotherequirementsofthiscontract.Suppliers/subcontractorsshallbeselectedforusebasedontheirabilitytoperforminaccordancewithestablishedrequirements.

 

Page 18: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

18

L-3 PROPRIETARY

Supplier Quality Requirements

Page 18 of 24

Number Rev Date

F-1058 H 5/13/14  

 

QN‐40Q ProductChanges

 

TheSuppliershallobtainBuyer’sconcurrenceinwritingpriortoincorporatinganydesign,material,process,ortechnicaldocumentationchanges(s)onitemsdeveloped.

 

QN‐40R MaterialControl 

TheSupplierisresponsibleforassuringthatallsuppliesandservicesprocuredfromtheirsuppliersconformtothecontractrequirements.

 

QN‐40S ControlofNonconformingProducts 

TheSuppliershallmaintainproceduresforidentification,control,anddispositionofnonconformingproducts.

 

QN‐40T ProcessImprovement 

TheSuppliershallnotifytheBuyerofanymodificationsthatcouldbemadetotherequirementsofthisorder,whichresultinsignificantcostsavings,schedulereduction,orproductqualityenhancement.

 

QN‐50 SOFTWARE/SYSTEMREQUIREMENTS 

QN‐50A GovernmentSoftwareQualityEvaluation 

TheSupplier’ssoftwarequalityprogramshallcomplywiththe“SoftwareQualityEvaluationRequirements”ofparagraph5.8ofDOD‐STD‐2167. DORMANT‐document,asof10/09/08wasultimatelysupersededbyIEEE12207. CheckwithEngineeringbeforeflowingtosupplier

 

QN‐50B GovernmentSoftwareQualityProgram 

TheSupplier’ssoftwarequalityprogramshallcomplywiththe“DefenseSystemSoftwareQualityProgramRequirements”ofDOD‐STD‐2168. ACTIVEASOF10/09/08.

 

QN‐50C CommercialSoftwareQualityProgram 

TheSupplier’ssoftwarequalityprogramshallcomplywiththerequirementsofIEEEStandardforSoftwareQualityAssuranceIEEEStandard730. ACTIVEasof10/09/08

 

QN‐50D CorrectiveAction 

TheSuppliershallmaintainproceduresforsecuringeffectiveandtimelycorrectiveactionsfornonconformance. Thisincludesnonconformancefoundduringincominginspection,inprocessorfinalinspection,sourceacceptance,andfieldreturns.

 

Page 19: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

19

L-3 PROPRIETARY

Supplier Quality Requirements

Page 19 of 24

Number Rev Date

F-1058 H 5/13/14  

 

Correctiveactionsshalladdressthefollowing:

 

a. Identificationoftheprimarycauseofthenonconformance.b. Analysisofprocessing,workoperations,qualityrecords,andcustomer

complaints,todetectandeliminatepotentialcausesofnonconformingproducts.

c. Initiationofpreventativeactionstoresolveproblemsatalevelconsistentwiththeriskencountered.

d. Applicationofcontrolstoensurethatcorrectiveactionstakenareeffective.Implementationandrecordingofchangesrequiredasaresultofthecorrectiveaction.

 

QN‐50E BuyerRequestedCorrectiveAction 

WhenproductspecifiedonthispurchaseorderarefoundtobenonconformingbytheBuyer,aCorrectiveActionRequest(CAR)willbesenttotheSupplier.

 

TheCARshallbecompletedandreturnedwithin15workingdays. UnauthorizeddelaysintheSupplier’sresponseshallbecauseforremovalfromtheBuyer’sApprovedSupplierList.TheSupplier’scorrectiveactionmustbeeffectiveandpermanentineliminatingtherootcauseofthenonconformance.

 

QN‐50F PackagingRequirements 

All material shall be packaged in accordance to industry standards unless otherwise stated in the Purchase Order

 

Cable,ConduitandHarnessPackaging–Allcableassemblies,conduits,andharnessassembliesshallbepackagedtopreventdeformationofconductorinsulationanddamagetoconnectorsandconnectorpins.Allconnectorsshallbeindividuallywrapped.

 

BoardPreservationandPackaging–Sellershallindividuallypackageeachprintedcircuit,printedwiring,multi‐wireorwirewrapboardfurnishedonthispurchaseorderinanESDshieldedbag.

Page 20: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

20

L-3 PROPRIETARY

Supplier Quality Requirements

Page 20 of 24

Number Rev Date

F-1058 H 5/13/14  

 

 

QAITR APPENDIX-1  

 CERTIFICATE OF CONFORMANCE

DATE:

COMPANY NAME:

ADDRESS:

   

PO NUMBER: PO LINE(S):

PART NUMBER:

REVISION: QUANTITY: SERIAL

NUMBER(S):

LOT NUMBER (If Applicable):

DESCRIPTION:

     

Seller hereby certifies all items (material, components, parts, assemblies, and/or final product(s)) furnished in this shipment of the Purchase Order meet the following requirements:

 

a. Items shall be in full compliance with the requirements of the Purchase Order, drawing(s), specification(s), and other applicable documents as specified in the L-3 Communications GENERAL TERMS AND CONDITIONS For Supply and Services Subcontracts, unless otherwise specified in the Purchase Order.

 

b. Items shall use only new and authentic components, parts, and materials that have been procured from the original component/equipment manufacturer (OCM/OEM), or through an OCM/OEM Franchised distributor.

 

c. Items shall use no component, part, or material that has been procured from an Independent Distributor (Broker), unless approved in writing by the Buyer.

 

d. Items shall have been inspected and tested to the current revisions of the standard. (Mark all that apply)  

IPC-A-610  

IPC-A-620  

J-STD-001  

f. Items shall have applicable supporting inspection records, test data, and certificates of conformance on file and available for Buyer review upon request.

 

CERTIFIED BY (An Authorized Company Official):    

 TITLE: DATE:

Page 21: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

21

L-3 PROPRIETARY

Supplier Quality Requirements

Page 21 of 24

Number Rev Date

F-1058 H 5/13/14  

 

   

1. SDRL Number:

QA-1

 

2. Title of Data Item:

Certificate of Conformance

 

3. SSOW Reference: Certificate of Conformance

   4. Buyer Approval: Required Information Only X

 

5. Buyer Review Time:  N/A working days

 

6. Initial Submittal:  Must be submitted with all shipments

 

7. Seller Incorporation Time:  N/A working days

 

8. Subsequent Submittals:  Must be submitted with all shipments

 

9. Submission Requirements:  

a. Seller may use format defined in QAITR Appendix-1.  

b. Provide one hard copy with hardware delivery.

Page 22: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

22

L-3 PROPRIETARY

Supplier Quality Requirements

Page 22 of 24

Number Rev Date

F-1058 H 5/13/14  

 

 

  

1. SDRL Number: QA-3  

2. Title of Data Item:

Mechanical/Electrical Inspection

Data 

3. SSOW Reference: Mechanical/Electrical Inspection Data

   4. Buyer Approval: Required Information Only X

 

5. Buyer Review Time:  N/A working days

 

6. Initial Submittal:  Must be submitted with all shipments

 

7. Seller Incorporation Time:  N/A working days

 

8. Subsequent Submittals:  Must be submitted with all shipments

 

9. Submission Requirements:  

a. Part number and revision  

b. L-3 AMI PO number   

c. Seller's test procedure number and revision, if applicable  

d. Parameters tested or inspected   

e. 100% mechanical*/electrical results of each component unless otherwise specified within the PO  

f. Date of test completion  

g. Evidence of test acceptance by authorized Seller's representative   

h. Provide one hard copy of the Mechanical/Electrical Inspection with hardware delivery.

Page 23: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

23

L-3 PROPRIETARY

Supplier Quality Requirements

Page 23 of 24

Number Rev Date

F-1058 H 5/13/14  

 

  

1. SDRL Number: QA-4  

2. Title of Data Item:

First Article

Inspection 

3. SSOW Reference: First Article Inspection

   4. Buyer Approval: Required Information Only X

 

5. Buyer Review Time:  N/A working days

 

6. Initial Submittal:  Must be submitted with first shipment

 

7. Seller Incorporation Time:  N/A working days

 

8. Subsequent Submittals:  Whenever there is a lapse in production for a period in excess of one year or whenever a change occurs in manufacturing processes, material used, drawing or specification, which significantly affects the product uniformity as determined by Buyer

 

9. Submission Requirements:  

a. Provide one hard copy with hardware delivery.

Page 24: F-1058 Supplier Quality Requirements - L3 Technologies Supplier Quality Requirements.pdf · Supplier Quality Requirements Page 1 ... The Buyer reserves the r ight to audit the Seller

24

L-3 PROPRIETARY

Supplier Quality Requirements

Page 24 of 24

Number Rev Date

F-1058 H 5/13/14  

 

  

1. SDRL Number: QA-5  

2. Title of Data Item:  Qualification and Acceptance Welding Procedures

 

3. SSOW Reference: Qualification and Acceptance Welding Procedures

   4. Buyer Approval: Required X Information Only

 

5. Buyer Review Time:  10 working days

 

6. Initial Submittal:  30 days before welding

 

7. Seller Incorporation Time:  5 working days

 

8. Subsequent Submittals:  Whenever there is a lapse in production for a period in excess of one year or whenever a change occurs in manufacturing processes, material used, drawing or specification, which significantly affects the product uniformity as determined by Buyer

 

9. Submission Requirements:  

a. All welding procedures and welders shall be qualified to NAVSEA S9074-AQ-GIB-010/248, or their replacement or commercial equivalent. All inspections and work criteria shall be per this technical specification and the provided drawing and are required to demonstrate compliance with the SSOW and Specification.

b. The Acceptance Welding Procedures and qualifications shall be subject to Buyer approval.

c. The Acceptance Procedures and qualifications shall be delivered

d. Provide one electronic copy.