exploration exchange macao conference presentation€¦ · exploration exchange macao conference...

25
ASX Announcement 4 June 2008 Exploration Exchange Macao Conference Presentation The attached presentation will be made today at the Exploration Exchange Macao Conference, by Mr Greg Runge of D’Aguilar Gold Limited. On behalf of the Board DP Cornish Company Secretary For further information contact: Mr Nicholas Mather Managing Director Ph: 07 3303 0680 or 0417 880 448 Mr Greg Runge General Manager Ph: 07 3303 0680 or 0418 546 739 Mr Duncan Cornish Company Secretary Ph: 07 3303 0680 or 0407 623 302 Email: [email protected] Electronic copies and more information are available on the Company website: www.daguilar.com.au

Upload: duongnhi

Post on 15-Jul-2018

244 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

 

 

  

ASX  Announcement   

4  June  2008   

Exploration Exchange Macao Conference Presentation  

 The  attached  presentation  will  be  made  today  at  the  Exploration  Exchange  Macao Conference, by Mr Greg Runge of D’Aguilar Gold Limited.   On behalf of the Board DP Cornish Company Secretary     For further information contact:  Mr Nicholas Mather Managing Director Ph: 07 3303 0680 or 0417 880 448  Mr Greg Runge General Manager Ph: 07 3303 0680 or 0418 546 739  Mr Duncan Cornish Company Secretary Ph: 07 3303 0680 or 0407 623 302  Email: [email protected]  Electronic copies and more information are available on the Company website: www.daguilar.com.au  

Page 2: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

XX Macao and XX Macao and Asia Miner Conference

A resourcefactfact

ASX DGRASX : DGR

company p ytorytory

June 2008

Booth Number MO7

Page 3: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

Forward LookiForward Looki

Whilst this document and presentatiosources which are considered reliabemployees and consultants do notexpressly or impliedly that the iexpressly or impliedly , that the ipresentation is complete or accurateby law , D'Aguilar Gold Ltd disclai

i i t f thi d t drecipient of this document andsubsequently comes to its noticeinformation contained in this docume

ng Statementng Statement

on is based on the information fromle , D'Aguilar Gold Ltd , its directors,t represent, warrant or guarantee,nformation in this document andnformation in this document ande. To the maximum extent permittedims any responsibility to inform any

t ti f tt th tpresentation of any matter that, which may affect any of the

ent and presentation.p

June 2008

Page 4: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

C tCorporate

145.6m shares24.1m unlisted optioG h $3 7Group cash - $3.7mMarket cap $21 7mMarket cap $21.7mSix companies in onpSolomon Gold plc in

S h te Snapshot

ons m

nenvestment

June 2008

Page 5: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

We make resourWe make resour

Define the project straon commodity directioon commodity directioCreate subsidiaryIdentify & secure the aRaise seed capitalRaise seed capitalProve the modelEngage accomplishedIPO & Li t b idi (IPO & List subsidiary (sp

rce companies:rce companies:

tegy and model based onsons

asset

d managementi ff)pin-off)

June 2008

Page 6: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

Project ChaProject ChaLarge scale: extenLarge scale: extenlarge upside: statelarge upside: statesignificancegNew geological mNew areas, proveRe-evaluation

aracteristicsaracteristicsnsive tenurensive tenuree or national e or national

models or en models

June 2008

Page 7: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

What's hapCamt

DrilNewdiscdisc

$7m$7mPho

New

A A n

OnSolomon Gold plc On

ppeningpex estimates in Prep for feasibility 33 @ 0.06 % Mo

ling Oxide Ni at Mt cobaltw high grade copper silver coveries Silver Valleycoveries – Silver Valley

m IPO in July 08m IPO in July 08osphate & copper assets

w silver - gold discoveries at Rannes

l t it I P inew laterite Iron Province

going drilling following 32 m@ 9 45g/t going drilling following 32 m@ 9.45g/t June 2008

Page 8: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

Project specific subsidiaries

June 2008

Page 9: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

Aggressive drilling prograams

June 2008

Page 10: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

17,500m drillingg- underway:

Target MarCompany Prospect

Target Metal/s

Mar

AusNiCo BlacksnakeCu Ni Au Ag

PtMt C b ltMt Cobalt-

RidleysNi Co

Central MineralsRannes Au Ag

Gayndah Au Ag CuCl t A (M )Clermont Au (Mo)

D'Aguilar Gold

Peenam Au Cu

Ban Ban Cu Zn Ag Mo

Bathurst Au Ag Cu

Apr May Jun Jul Aug Sep OctApr May Jun Jul Aug Sep OctPlanned drilling meters

800m

4,000m

4,000m 3,000m800m

1 0001,000m

300m

800m

2,000mJune 2008

Page 11: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

New CEO – Peter SpierC O Sp$7m IPO/ ASX listing in DGR 48.2%One of the most minerOne of the most minerworld

iNew IOCG province –Olympic Dam* style taOlympic Dam style taSubstantial phosphate

*not assets of the company

rs (ex Western Mining) ( g)July 2008

ralised terrains in the ralised terrains in the

i i irapid drillingrgetsrgets project

June 2008

Page 12: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

Gregory ProjectSignificant scale of oppor

Gregory ProjectMultiple Targets

Mre

strinteBulls-eye gravity

anomalyanomaly

Ernest Henry Structural Analogue

2M Gal gravanomaly at 300

depth spatiadepth spatiaseparated fromagnetic hig

10kmMetasomatic system 84m of 30% to 50% magnetite to EOH.

*not assets of the company

rtunity

Comparative Size IOCG D itDeposits

Carrapateena*

Major egional ructural ersection

Hematite Breccia Envelope(800m x 600m)

Olympic Dam8H i B i E l

ity 0m (?) ally Hematite Breccia Envelope

(~5km x ~2.5km)

ally om gh

June 2008

Page 13: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

Gregory Project

World-class mineral World class mineral provinceProject overlies a major

fmineralising fault systemMt Oxide* (>0.2 Mt Cu)

Mt Gordon* (>0.7 Mt Cu)

Valhalla* / Skal (U)

Mt Isa *Cu (8 Mt Cu)

Hilton* Pb Zn Ag (>200Mt @ 15% Hilton Pb Zn Ag (>200Mt @ 15%

Zn+Pb)

Isa* Pb Zn Ag (>250Mt @ 15% Zn+Pb)Isa Pb Zn Ag (>250Mt @ 15% Zn+Pb)

One drill hole in 1,900 km2*not assets of the company

GregoryGregoryGregory ProjectGregory Project

GunpowderGunpowderGunpowder Fault

Gunpowder Fault

40km

Sources company reports.

June 2008

Page 14: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

A Phosphate Surprise aInferred Resource 169 Average grade 15 9% Average grade 15.9% Previous exploration mby International Miningby International Mining15 km strike phosphoritwide on Mt Isa Metals Up to 10 m thick, averaUp to 10 m thick, averaFurther exploration up250k f th t250km from the coast,

at D-Tree West deposit mt @ 3.1:1 strip ratio P2O5 (P2O5 cutoff 10%) P2O5 (P2O5 cutoff 10%)

more than 150 drillholesg Corp mid 1960sg Corp mid 1960ste horizon,1.4 to 3.4km (DGR 48%) groundage 5m thickage 5m thickside to west 120k th Mt I, 120km north Mt Isa

June 2008

Page 15: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

EPMA 15763EPMA 15763 Georgina Georgina BasinBasin

Historical lease Historical lease boundaryboundary

Priority Target Areas (high grade zones)grade zones)

5km

Mount Isa Mount Isa InlierInlier

Schematic EW Cross Section

200:1 (H:V)

Drill holes

IMC (1967-68)

Continental Oil (1966)

CRA Expl’n (1994)

Phosphate MineralisationPhosphate Mineralisation

+10% P2O5

+15% P2O5June 2008

Page 16: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

DGR 90%DGR 90%New Nickel provincNew Nickel provincExtensive 0.8% NickeNew copper silver d

ll 4 @ 2% CValley 14m @1.2% CsilversilverNickel, copper & silv

e – 40km2e 40kmel mineralisationdiscovery at Silver C d 2 8 /t Copper and 2.8 oz/t

ver price re-ratingsJune 2008

Page 17: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

E t i O id Ni k l MExtensive Oxide Nickel M- Mt C

Mi li ti t Ridl Mineralisation at Ridleys Cobalt

June 2008

Page 18: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

June 2008

Page 19: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

New gold province1m oz historical prod120km south120km southGold mineralisationTrend, Nevada USADGR t l ti DGR controls entire 30km x 15km30km x 15km

*not an asset of the company

duction at Cracow*,

style similar to Carlin yA

t system

June 2008

Page 20: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

Rannes – An new goldd and silver provinceFirst pass drilling program – 16 holesCrunchie Prospect32m from surface @ 1.84 g/t Au & 41g/t Ag and g/t Au & 41g/t Ag and 40 m from 12m @1.17 g/t Au and 76g/t Agg gKauffmans Prospect38 m from 28m @ 1.78g/t Au & 25g/t AgPorcupine Prospect8 f 4 @ 6 23 /t 8m from 4m @ 6.23g/t Au & 5.9g/t Ag

June 2008

Page 21: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

A new iron ore provinA new iron ore province with a railway linece with a railway line• Ridge Exploration

(DGR 100%)(DGR 100%) Exploration Permit applicationsapplications

• Evergreen Formation – potential for sedimentary uranium and iron ore

• Supported by airborne• Supported by airborne geophysical data

June 2008

Page 22: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

i iExtensive laterite i iron prospectsJune 2008

Page 23: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

New resource estimoptimisation total roptimisation - total r32Mt @ 0.06% Mo eqCapital cost estimaMetallurgy underwa

*refer footnote

mation and pit resource resource q*.tes in preparation

ay

June 2008

Page 24: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

ConConNick Math

0417 880 448 oDuncan Cornish (SecDuncan Cornish (Sec

Greg Runge (GM+61 418

Stuart Ballyhoo Marketing a

+61 414 +61 414

www.daguigASX : ThankThank

tacttacther (CEO) or 07 3303 0680cretary) 07 3303 0680cretary) 07 3303 0680M) 07 3303 0680 546739 Crow nd Communications449 442449 442

ilar.com.au DGRk youk you

June 2008

Page 25: Exploration Exchange Macao Conference Presentation€¦ · Exploration Exchange Macao Conference Presentation ... pex estimates in Prep for feasibility 33 ... 2008.06.04 - XX Macau

FOOTNOTE:

Molybdenum equivalents (“Mo Eq”) assumptions:

Cut-off grades are based on Molybdenum Equivalence (“Mo Equiv”) and

1 troy ounce (oz) = 31.103477 grams (gm)

1 pound (lb) = 453.5924 grams (gm)

Metal*Prices (US$)

Feb 2007 outlookUnits

Price (US$) per gram (gm)

Ratio

Where Mo = Molybdenum, Ag = Silver and Cu = Copper (all in ppm)

Mo $25.00 / lb $0.055 / gm 1.00Ag $13.50 / troy ounce $0.434 / gm 7.88Cu $2.50 / lb $0.006 / gm 0.1

In the Company’s opinion all elements included in the metal equivalents calculathe proportions of 70% to 85% for Mo, 75% to 85% for Ag and 70% to 80% for Cu bmay change as testwork proceeds. On this basis, the formula used to calculate Mcalculation):

Mo Equiv = Mo + 7.88xAg + 0.1xCu

Competent Perso

The information in this report that relates to Exploration Results and Mineral Resources is based onInstitute of Mining and Metallurgy Mr Mather is employed by Samuel Holdings Pty Ltd which providInstitute of Mining and Metallurgy. Mr. Mather is employed by Samuel Holdings Pty Ltd which providD’Aguilar Gold Ltd (and a director of D’Aguilar Gold Ltd’s subsidiaries).

Mr. Mather has sufficient experience which is relevant to the style of mineralisation and type of depodefined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Minerals Rein this report of the matters based on the information in the form and context in which it appears.

d the inputs for this calculation are:

Today’s Spot Prices for comparison withthe February outlook prices used

US$33.20lbUS$16.91/ozUS$3.59/lb

ation have a reasonable potential to be recovered, approximately in ased on preliminary metallurgical testwork results to date. Recoveries Mo Equiv is as follows (note no recoveries have been included in this

ons Statement

information compiled by Nicholas Mather B.Sc (Hons) Geol., who is a Member of The Australianes certain consultancy services including the provision of Mr Mather as the Managing Director ofes certain consultancy services including the provision of Mr. Mather as the Managing Director of

osit being reported and to the activity which he is undertaking to qualify as a Competent Person asesources and Ore Reserves’ (the JORC Code). Mr. Mather has consented in writing to the inclusion