expedient repair of andrews afb runway 01l/19r air force research laboratory air base technology...

27
EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD, PE Principal Engineer Airfields &Pavements Group

Upload: sandra-chandler

Post on 22-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

EXPEDIENT REPAIR OF ANDREWS AFBRUNWAY 01L/19R

Air Force Research Laboratory

Air Base Technology Branch

AFRL/MLQC

Tyndall AFB FL

Randall W. Brown, PhD, PEPrincipal Engineer

Airfields &Pavements Group

Page 2: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

OVERVIEW

• Background

• Findings/Solutions

• Repair Process

• Summary

• Conclusions

Page 3: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

EXPEDIENT REPAIR OF ANDREWS AFBRUNWAY 01L/19R

Background

Page 4: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

BACKGROUND

KEY EVENTS:• 2 FEB 99 AFRL/MLQC contacted by HQ AMC on

behalf of 89 CES, Andrews AFB MD

• 10-13 MAR 99 Ground Penetrating Radar (GPR) Investigation

• 13-15 APR 99 Follow-on GPR Investigation

Cone Penetrometer Testing (CPT)

Video inspection of airfield culvert

• 9-20 AUG 99 Repair of “Dip” in Runway 01L/19R at

Andrews AFB MD

Page 5: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

PROBLEM:A 2” dip in Andrews’ runway 1L/19R (The Air Force One Runway) was causing operational problems, particularly for small aircraft.

BACKGROUND

Page 6: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

BACKGROUND

APPROACH:

Identify the Source of the Problem Using: A) Ground Penetrating Radar B) Cone Penetration Testing C) Optical Scan of Drainage Culvert

(1)

Develop a Suite of Alternative Solutions Considering Cost, Runway Downtime, and Effectiveness

(2)

Page 7: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

EXPEDIENT REPAIR OF ANDREWS AFBRUNWAY 01L/19R

Findings/Solutions

Page 8: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

FINDINGS/SOLUTIONS

FINDINGS:

Water Infiltration

Poor Backfill Material

Leaking Underlying Culvert

Loss of Fines Through Culvert

Weakened Pavement Support

Settlement

Page 9: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

FINDINGS/SOLUTIONS

ALTERNATIVES:

SOLUTION SELECTED - FOAM JACKING:

Reconstruction(1)Foam Jacking (By-product of FY 98 AFRL research)(2)

“Do Nothing”(3)

Reduced Downtime (Conservatively 50%)(1)

Reduced Cost (Conservatively 50%)(2)

Effective Based on Private Sector and AFRL/MLQC Data(3)

Page 10: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

FINDINGS/SOLUTIONSKEY ELEMENTS

• Initial Slab Lifting Using Polyurethane Foam• Deep Injection Stabilization (Compaction Grouting with Polyurethane Foam)• Repair Leaking Culvert• Final Slab Alignment Using Polyurethane Foam• Route and Seal Joints

Page 11: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

EXPEDIENT REPAIR OF ANDREWS AFBRUNWAY 01L/19R

Repair Process

Page 12: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

REPAIR PROCESSPRE-TREATMENT CONE TESTING

Page 13: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

REPAIR PROCESSPRE-TREATMENT CONE TESTING

Page 14: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

REPAIR PROCESSDRILLING INJECTION HOLES

Page 15: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

REPAIR PROCESSSEVERITY OF THE RUNWAY “DIP”

Page 16: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

REPAIR PROCESSPREPARATION FOR INITIAL

LIFTING OF RUNWAY SURFACE

Page 17: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

REPAIR PROCESSINITIAL INJECTION

Page 18: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

REPAIR PROCESSPREPARATION FOR DEEP

INJECTION

Page 19: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

REPAIR PROCESSSOIL STABILIZATION THROUGH

DEEP INJECTION

Page 20: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

REPAIR PROCESSEXTRACTION OF COPPER TUBES

Page 21: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

REPAIR PROCESSFINAL ALIGNMENT

Page 22: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

EXPEDIENT REPAIR OF ANDREWS AFBRUNWAY 01L/19R

Summary

Page 23: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

SUMMARY

• 106• 19,172 lbs• 2,500 lbs• 282.00 hrs - 22.25 hrs 259.75 hrs• 126.50 hrs

• Fri 20 Aug 99, 2400 required completion• Fri 20 Aug 99, 1030 actual completion

holes injecteddeep injection foamslab lifting foamgross time availabletime lost due to ramp freezesnet time availableactual time working on airfield

Page 24: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

EXPEDIENT REPAIR OF ANDREWS AFBRUNWAY 01L/19R

Conclusions

Page 25: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

CONCLUSIONS

Estimated Savings (50%)

Estimated Downtime Savings (60%)• 12 days -- actual repair time using foam• 30 days -- optimistic estimate for reconstruction

Page 26: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

CONCLUSIONKEEP HER FLYING!

Page 27: EXPEDIENT REPAIR OF ANDREWS AFB RUNWAY 01L/19R Air Force Research Laboratory Air Base Technology Branch AFRL/MLQC Tyndall AFB FL Randall W. Brown, PhD,

EXPEDIENT REPAIR OF ANDREWS AFBRUNWAY 01L/19R

Air Force Research Laboratory

Air Base Technology Branch

AFRL/MLQC

Tyndall AFB FL

Randall W. Brown, PhD, PEPrincipal Engineer

Airfields &Pavements Group