A) PROFILE OF THE DEPARTMENT. :---- i) Year of Establishment :--- The P.W.D. Nalbari Building with its Office at Nalbari was established in the year-1979 and from the very beginning, the Division has been performing Construction, Repairing & Maintenance works of different buildings of different department of Greater Nalbari District in addition to the works of Rangia Civil Sub-Division and some major works of Baska District. In the year-2005 Barpeta Building Division was merged with Nalbari Building Division with all work load of Barpeta District. ii) Location of Office :----- The Nalbari Building Division discharging departmental functions with its three Sub-Divisions namely - 1. Nalbari Building Sub-Division with H.Q at Nalbari discharging departmental functions for Nalbari District & Baska District. 2. Mukalmua Building Sub-Division with H.Q at Mukalmua discharging departmental functions for Nalbari District. 3. Barpeta Building Sub-Division with H.Q at Barpeta discharging departmental functions for Barpeta District

Upload: lekien

Post on 01-Jan-2017

290 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Executive Engineer, PWD Building Division

A) PROFILE OF THE DEPARTMENT. :----

i) Year of Establishment :---

The P.W.D. Nalbari Building with its Office at Nalbari was established in the year-1979 and from the very beginning, the Division has been

performing Construction, Repairing & Maintenance works of different buildings of different department of Greater Nalbari District in addition to

the works of Rangia Civil Sub-Division and some major works of Baska District. In the year-2005 Barpeta Building Division was merged with

Nalbari Building Division with all work load of Barpeta District.

ii) Location of Office:-----

The Nalbari Building Division discharging departmental functions with its three Sub-Divisions namely -

1. Nalbari Building Sub-Division with H.Q at Nalbari discharging departmental functions for Nalbari

District & Baska District.

2. Mukalmua Building Sub-Division with H.Q at Mukalmua discharging departmental functions for

Nalbari District.

3. Barpeta Building Sub-Division with H.Q at Barpeta discharging departmental functions for Barpeta

District

Page 2: Executive Engineer, PWD Building Division

Schematic Chart of Office Organisation Structures under Civil Administrative District :----

The P.W.D. Building Wing of Assam Public Works Department in generally deals with the Construction of Civil works including Sanitary & Water

supply and Electrical works of almost all Govt. Buildings in the State of Assam.

The main objective of the department are: ----- As the State of Assam is in seismic Zone-V, Seismic Hazard is the main vulnerability & risk to the building structures in the district. More over the

district is flooded by river Brahmaputra and its tributaries at different places causing major threat to the buildings in the district.

PWDNalbari Building Division.

Nalbari.

PWD Nalbari Building

Sub-Division.Nalbari.

PWD Mukalmua Building

Sub-Division.Mukalmua

PWD Barpeta Building

Sub-Division. Barpeta

Civ

il A

dmin

istr

ativ

eD

istr

ict-

Bas

ka.

Civ

il A

dmin

istr

ativ

eD

istr

ict-

Nal

bari

Civ

il A

dmin

istr

ativ

eD

istr

ict-

Bar

peta

Page 3: Executive Engineer, PWD Building Division

The main objective of the department is to construct earthquake resistant building as mandated by the National Building Code-2005, EarthquakeResistant Building Code and other relevant safety code so that the building in the district may get severely damaged but would not collapse duringstrong earthquake and assures safety to the people and contents in it and disaster is avoided.

Secondly necessary adequate measures is to be taken so that the buildings are not overtopped during flood and erosion & damages to the buildingstructures is avoided..

To have response system in place to face any eventuality related damages to buildings.

To ensure active participation by the Government administration , communities , NGOs, CBOs and volunteers at all levels making optional utilization ofavailable human resources for prevention, mitigation, response for a probable disaster.

Page 4: Executive Engineer, PWD Building Division

Staff Details:-----

List of Employees of the Nalbari P.W.D. Building Division, Nalbari

Sl. No. Name of Employees Designation Date of joiningin the Division

Mobile No.

1 Sri Dipak Kumar

Barman

Executive

Engineer

26-04-2013 9435114856

2 Sri Ajoy Kr. Das A.E.E. (T/C) 24-02-2014 9435082586

3 Dhajendra Nath A.E. 10-03-2014 9435145479

4 Narendra Nr. Dutta J.E. 14-05-2014 (Attached to theDivision)

9435311375

5 Khalilur Rahman J.E. 31-10-2000 9435310108

6 Gautam Kr. Sarma Dy. A.O. 11-07-2012 9435510807

7 Pralay Kr. Deka Dy. A.O. 07-11-2013 9435325258

8 Nirupam Talukdar A.A.O. 25-02-2014 9864146804

9 Abanish Bhattacharjjya A.A.O. 12-02-2015 9864190573

Page 5: Executive Engineer, PWD Building Division

List of Employees of the Nalbari P.W.D. Building Sub-Division, Nalbari

Sl.No.

Name of Employees Designation Date of joiningin the Division

Mobile No.

1 Sri Madhusudhan Das AssistantExecutiveEngineer

07-03-2014 9435043632

2 Kashab NarayanBaruah

S.O. 27-05-1994 9435323044

3 Pramod Kalita S.O 01-12-1979 9435202351

4 Dipak Ch. Baishay S.O 22-08-2002 9707627391

5 Dipak Bharaly S.O 05-03-2014 9571197831

6 Gokul Ch. Patowary Head Asstt. 13-03-1980 9859034332

7 Nabajyoti Patowary Jr. Asstt. 31-12-2008 9508071571

8 Jonali Barman Jr. Asstt 01-02-1995 9864113703

9 Shohida Begum Jr. Asstt 07-03-1995 9957500676

10 Nilima Dutta Section Asstt. 09-04-1982 9706406622

11 Dipali Devi Section Asstt 22-10-1982 94O1334143

12 Jutika Dutta Baruah Section Asstt 22-10-1982 8751963430

13 Anowar Hussain Section Asstt. 08-03-1995 8876295724

Page 6: Executive Engineer, PWD Building Division

14 Chitra Lekha Das Tracer 14-08-1992 9859210736

15 Sri JoychandraRajbongshi

Section Asstt 06-05-1986 9864334203

16 Faznor Ali Sub-Eng. Gr.II 24-07-1980 9707092056

17 Matir Ali Sub-Eng. Gr.II 11-04-1980 9707092016

18 Mukul Ali Sub-Eng. Gr.II 29-11-1979 9954321583

19 Arjun Sarma Sub-Eng. Gr.II 01-06-1987 9954973554

20 Birendra KumarTalukder

Sub-Eng. Gr.II 24-07-1980 9707973255

21 Monoranjan Sarma Section Asstt 10-06-1987 9864382644

22 Sukadev Talukder Section Asstt 02-05-1988 9613505949

23 Jagat Talukder Section Asstt 02-05-1988 9864148126

24 Pratul Sarma Section Asstt 10-06-1987 9954676460

25 Kameswar Talukder Section Asstt 10-06-1987 9435323017

26 Nilamoni Deka Section Asstt 01-02-1993 9859109483

27 Girish Barman Section Asstt 06-04-1988 9864750686

28 Tafiqur Rahman Section Asstt 02-07-1995 8486844765

29 Abdul Majid Section Asstt 16-06-1987 7896471832

30 Harkanta Deka Section Asstt 01-01-1987 9864843569

31 Guneswar Baruah Section Asstt 20-02-1993 9859482528

32 Ratul Talukder Section Asstt 04-11-1986 9864560059

33 Jyoti Prasad Sarma Section Asstt 15-06-1994 9854410576

Page 7: Executive Engineer, PWD Building Division

34 Pradip Basumatary Section Asstt 20-03-1995 9435293733

35 Akshay Kr. Sarma Section Asstt 05-11-1993 9854014284

36 Bhabesh Mahata Section Asstt 01-08-1994 9864933507

List of Employees of the Mukalmua P.W.D. Building Sub-Division, Mukalmua.

Sl.No.

Name of Employees Designation Date of joiningin the Division

Mobile No.

1 Sri Dilip Kr Das. AssistantExecutiveEngineer

15-09-2008 9864016944

2 Sri Pramod Sarma. H/A 12-11-1979 9613025970

3 Sri Pradip Kr Sarma Jr. Asstt. 24-12-2010 9678875875

4 Sri Keshab Mudiar. Office Peon. 07-05-2005 9864781385

5 Sri Amar BahadurChetri.

I.B.Chowkider.

30-11-1982 9859034597

6 Sri Huamesh Seal. OfficeChowkider.

18-12-2013 9854611310

7 Sri Hanif Ali. M/R Lab. 30-03-1995 9864633326

8 Sri Basudev Das. J.E. 08-08-2003 9864947702

Page 8: Executive Engineer, PWD Building Division

9 Sri Alxul Jalil Sub-Engr. Gr-II.

05-08-1987 9706064235

10 Sri Janiur Rahman J.E. 07-03-2011 9085720510

11 Sri Maser Ali. Sub-Engr. Gr-II.

25-07-1980 8822252557

12 Sri Satish Ch. Barman. S/A. 31-12-1992 9707116189

13 Sri Niyamat Ali. S/A. 06-09-1985 9707916933

14 Sri Umesh Mudiar. S/A. 26-06-1980 9864402109

15 Sri Sorat Ch. Sarma. S/A. 12-06-1987 9854705145

16 Sri Bipin ChSwargiyari.

C/C Staff. 04-05-1993 9678702103

Functional Organization structures at state , District & Local Levels underAssam Public (Bldg. & N.H.) Department

Sl.

No.

Name of Officers Name of Department Phone No.

1 Sri Ajoy Bardoloi Commissioner & Spl. Secretary

to Govt. of Assam PW(Bldg. & NH) Deptt.. Dispur ,Guwahati-6

9435012873

Page 9: Executive Engineer, PWD Building Division

2.

Sri P.K. Chaudhury Chief Engineer , PW(Bldg.)D, Assam , Chandmari , Guwahati -3

9435041799

3.

Sri Pulin Knowar Superintending Engineer , PWD, Guwahati Building Circle-I,

Fancy Bazar, Ghy-1

9435303515

4.

Sri Dipak Kr. Barman Executive Engineer , PWD ,

Nalbari Building Division, Nalbari9435114856

5.

Sri Madhu SudhanDas

Asstt. Executive Engineer PWD

Nalbari Building Sub-Division, Nalbari9435043632

6.

Sri Ajoy Kr Das Asstt. Executive Engineer PWD Mukalmua Building Sub-Division., Mukalmua

9435082586

7.

Sri Barindra Kr.Talukdar

Asstt. Executive Engineer PWD

Barpeta Building Sub-Division., Barpeta9954533398

Page 10: Executive Engineer, PWD Building Division

B) SCHEMATIC DETAILS OF SCHEMES IMPLEMENTED BY P.W.D. NALBARI BUILDING DIVISION FOR THE YEAR 2014-15.

1) UP to date Status (Physical & Financial) of the Scheme under Education Department for the year 2011-12under PWD Nalbari Building Division .

Progress Up to31st Jan . 2015S

L

No.

Name of program andScheme

Sanctioned

Amount (Rs.

inCrore .

)

TenderAmoun

t(Rs.in

Lakh.)

Nameof

Contractor

Dateof

Allotment

Dateof

completionas perTende

r

Financial(Rs.in

Lakh)

Physica

l

Remarks

1 2 3 4 5 6 7 9 11 13

1 "Establishment of 21Nos. New Polytechnicsin different District of

Assam under Planduring 2011-12 at

Chandkuchi Bahjani inNalbari District

(Pakage No. Poly-11)

12.3Cr.

780.90

PulenHaloi,GopalBazar,Nalbari

12-1-2013

12-7-2014

236.37L

62%

Work is inprogress..Contractorassured to

complete theAdm.

Bldg, Hosteland

Workshopbefore

31st

March,2015.

2

"Establishment of 21Nos. New Polytechnicsin different District of

Assam under Planduring 2011-12 at

12.3Cr.

780.92

M/SAnupa

mNirman

Pvt.

11-3-13

11-11-14

205.0

41%

Work is inprogress.

Page 11: Executive Engineer, PWD Building Division

Belguri Pathar inBaska District

(Package Poly-19.)

Ltd.

3 Const. Of 2(Two)storyed Hostel

Building of NalbariSanskrit College atNalbari under plan

2009-10.

0.50Cr.

48.92

AfzalAli,

Batsar,Nalbari

04-11-

2013

04-05--2015

22.75 L

95%

Work is inprogress..

Painting andWater

Supply is to bedone.

4

Const. Of RCCSanskrit College

Building at Nalbariunder plan 2010-11.

1.00Cr.

98.60

AfzalAli,

Batsar,Nalbari

15-12-

2013

15-06--2015

39.58 L

50%

Work is inprogress. .

2) Up to date Status (Physical & Financial) of the Schemes under GAD Department in Nalbari District.

Progress Up to31st Jan . 2015

Sl

No.

Name ofprogram and

Scheme

Sanctioned

Amount (Rs. inLakh.)

Tender

Amount (Rs.

inLakh.)

Name ofContract

or

Dateof

Allotment

Dateof

completionas perTende

r

Extention

oftimegranted up

to

Financial(Rs.in

Lakh)

Physica

lRemar

ks

1 2 3 4 5 6 7 8 9 11 13

Page 12: Executive Engineer, PWD Building Division

1

Const. of watchSecurity Tower,

PermanentSheds for VIP,

VVIP and Drainaround SP

office ParadeGround atNalbari.

33.95 34.63Md.

TazerAli

15-8-14

15-2-15

28-2-15

---90%

Workin

Progress.

Const.Of

Pavilion&

Barrack in

progress.All

workswillbe

completed

before28th

Feb,15.

2

Renovation ofD.C. CourtBuilding at

Nalbari.

25.309

Md.TazerAli

5-11-14

12-2-15

28-2-15

---30%

Workis in

progress.

3) Up to date Status (Physical & Financial) of the Schemes of Girls Hostel under P.W.D. Nalbari Building Division under RMSA Assam .

Page 13: Executive Engineer, PWD Building Division

Progress Up to31st Jan . 2015

NameofDistrict/Division

Name ofScheme/Name

of Scheme

TenderAmoun

t (InRs.)

Name ofContract

or

F.W.O.No. &Date

Dateof

Compln.

as perTende

r.

Financial

(Rs. inLakh)

Physical

Targetdate ofComple

tion.

Remarks

2 3 5 6 7 8 10 11 12 13

Nalbari

Constructionof Girls Hostel

at ChandiMedhi Balika

H.S. underBarkhetriBlock in

Nalbari Dist(Gr. No,-43)

1,42,34,200/

M/sMayur

Associates

FWO no -.BN/46/2013/9 dt.8-

8-13.

6/15/2014

--- 85%31-12-

14.

Paintingand

Finishing

worksare

to bedone.

Page 14: Executive Engineer, PWD Building Division

4) Up to date Status (Physical & Financial) of the works under Judicial Department in Nalbari District .

Progress Up to31st Jan . 2015S

L

No.

Name of program andScheme

Sanction

Amoun

t(Rsin

Lakh.)

Tender

Amount(Rs.in

Lakh.)

Nameof

Contractor

Dateof

Allotment

Dateof

compln. asper

Tender

Extension

ofTimegranted up

to

Financial(Rs

in L)

Physica

l

Remarks

1 2 3 4 5 6 7 8 9 11 131 Repair/Renovation of

Chief JudicialMagistrate Court Bldg.(Ground floor D.C.'s

Office Bldg. in NalbariDistrict at Nalbari.

54.79

53.72

BrajenDas

19-3-12

19-12-12

31-9-14

31.97

85%

Progress of

work isslow,

becauseworksite is

notclearlyreceive

d..

2Construction of ADR

Centre under 13thFinance CommissionPakage No. ADR-3 at

Nalbari District.

100.00

95.88

Harunar

Rashid

12-5-13

19-12-13

31-11-14

34.62

96%

Workin prog.

Page 15: Executive Engineer, PWD Building Division

3Const. of Garrage for P-

1 the Qtr of Dist.Sessions Judge Qtr andCJM Qtr and const. of

servant room withattach bathroom & WC

for the qtr of Dist.Sessions Judge, Nalbari& others 6 nos . JudicialQtr (One No Garrage)

25.703

26.3542

SriRajibu

lHaque

.

21-10-13

28-2-14.

30-6-14

100%

4 Imp. Of CJM’s Qtr atNalbari by providingVitrified Tiles, CC

Floring, , Gr-IV Qtr andgrill.

12.36

12.63

SriRajibu

lHaque

21-10-13

28-2-2014

.

30-6-14

Nil 100%

WorkComple

ted

5) Up to date Status (Physical & Financial) of the Model Schools under RMSA Assam in Nalbari District .

Progress Up to31st Jan . 2015

SL

No

Name ofprogram and

Scheme

Sanctioned

Amount (Rs.

inLakh.)

Tender

Amount (Rs.

inLakh.)

Name ofContract

or

Dateof

Allotment

Targetdateof

completionas perTende

r

Extension

ofTimegranted up

to

Financial(Rsin

Lakh)

Physica

l

Remarks

1 2 3 4 5 6 7 8 9 11 131 Construction

of ModelSchool atDifferent

District underRMSA, Assam

362.00

362.00

SriBalaji

Construction

25-04-12

25-2-13.

25-12-14

83.60

42%

Progress slowdue to

sitedisturba

nce

Page 16: Executive Engineer, PWD Building Division

at villageBahbari under

TamulpurBlock in Baska

District .(Group-15)

2 Constructionof ModelSchool atDifferent

District underRMSA, Assamat village Kaldi

underBarkhetriBlock inNalbariDistrict

Assam, (GroupNo.II)

362.00

361.99

M/SAnupamNirmanPvt. Ltd.

29-07-12

29-05-13

31-03-14

360.0

100%

Workcomplet

ed.Rectific

ationwork ofFloorsare inprog

and islikelyto be

completed by20th

Jan,2015.

Page 17: Executive Engineer, PWD Building Division

6) Up to date Status (Physical & Financial) of the Schemes under MPLAD fund under PWD Nalbari Building Division.

Progress Up to31st Jan . 2015

SL

No

Name of programand Scheme

Sanctioned

Amount (Rs.

inLakh.)

TenderAmoun

t(Rs.in

Lakh.)

Name of

contractor

Dateof

allotment

Targetdateof

completionas perTende

r

Extension

oftimegranted up

to.

Financial(Rs

in L)

Physica

l

Remarks

1 2 3 4 5 6 78

9 11 12

1

Construction ofBuilding/Classroom(

RCC Gr.Fl) withprovision of 3

Storied Building atPiplibari HighSchool, under

MPLAD Fund inNalbari Dist. for

2010-11.

20.0020.00

SriChandraKr.

Barman.

19-9-13

5-12-13.

31-7-2014

8.50L

100%

WorkComple

ted.

2

Construction of RCCBuilding ( Gr.Fl)

with provision of 2Storied Building atKakaya HS School,under MPLAD Fund

in Nalbari Dist.2013-14.

20.0020.00

SriChandraKr.

Barman

4-3-14.

12-03-15

-------

-------

25%

Work isin

progress.

PlinthComp,

Page 18: Executive Engineer, PWD Building Division

7) Up to date Status (Physical & Financial) of the Schemes under NRHM for the year 2010-11under PWD Nalbari Building Division .

Progress Up to31st Jan . 2015S

L

No.

Name ofprogram and

Scheme

Sanctioned

Amount (Rs.

inLakh.)

TenderAmoun

t(Rs.in

Lakh.)

Name ofcontracto

r

Dateof

Allotment

Targetdateof

Completionas perTende

r

Extension

oftimegranted up

to

Financial(Rs

in L)

Physica

l

Remarks

1 2 3 4 5 6 7 8 9 11 13

1

Construction of 10bedded

Maternityward underNRHM in

NalbariDistrict for

15.0011.91

RanjitSarma,

Adarshapur Lane

No.-2,Dispur,Ghy-6.Work

17-8-11

17-10-11

31st

Aug,14.

----60%

Work hasbeen rescind

from thecont. B/swork isbeing

executedthrough

other

3

Construction of RCCBuilding ( Gr.Fl)Administrative

Building for NatunDehar Mauza MilanHigher Secondary

School, Banekushi,Nalbari, under

MPLAD Fund inNalbari Dist.

2013-14.

20.0020.00

SriDilipMed

hi

4-3-14.

12-03-15

-------

-------

25%

Work isin

progress.

.PlinthComple

ted

Page 19: Executive Engineer, PWD Building Division

the year2010-11.AtGhograpar

BPHC

re-alloted

toJ. PasaP.O.

Nalbari.

contractor.Up to Truss

Comp.

8) Up to date Status (Physical & Financial) of the Schemes for the work of Planetarium under P.W.D. Nalbari Building Division .

Progress Up to31st Jan . 2015S

L

No.

Name ofprogram and

Scheme

Sanctioned

Amount (Rs.

inLakh.)

TenderAmoun

t(Rs.in

Lakh.)

Name ofContracto

r

Dateof

Allotment

Target

dateof

completion asper

Tender

Extension

ofTimeGranted

up to

Financial(Rs

in L)

Physical Remarks

Page 20: Executive Engineer, PWD Building Division

1 2 3 4 5 6 7 8 9 11 13

1 Constructionof proposed

Sub-RegionalScience

Centre CumPlanetariumfor ASTEC

underDepartment

of Science &Technology,

Govt. ofAssam atNalbari.

150.00

150.00

SriGautamKalita

5-11-12

05-05-14

5-11-14.

36.08

87%

Work inProgressFinishingof Civil

works aregoingon...

9) Up to date Status (Physical & Financial) of the works under Revenue Department for 2014-15. in Nalbari District up to 28th Feb./2015.

SL

Name of program and Scheme Sanctioned

Tender

Nameof

Dateof

Targetdate

Progress Up to31st Jan . 2015

Remarks

Page 21: Executive Engineer, PWD Building Division

No

Amount (Rs.

inLakh.)

Amount (Rs.

inLakh.)

Contractor

Allotment

ofcompletionas perTende

r

Financial(Rs

in L)

Physica

l

1 2 3 4 5 6 7 9 11 131 Renovation of Circle Office

Building in respect of CircleOfficer Tihu.

Head “2029-LR-00-103-LR-0146-DC-00-13-MW-00(N/P)”

1.50 1.50

2 Renovation of Residence andConstruction of one Garrage in

respect of Circle OfficerBarkhetri Revenue Circle..

Head “2029-LR-00-103-LR-0146-DC-00-13-MW-00(N/P)”

5.00 5.00

3 Construction of Circle OfficeBuilding, Brick Boundary wall

and site development, RCCStaging and Electrification 100

KVA Sub Station with HT & LTline in respect of Circle Officer,

Banekushi Revenue Circle.

101.22172

Md.JiyaurPasa.

27-1-15.

12month

s

4 Construction of Residenceincluding Boundary Wall,

Heavy Duty Iron Gate, RaisingLow site in respect of CircleOfficer, Tihu Revenue Circle

under Nalbari Dist.

27.15609

Mrinmoy

Kumar Das.

14-2-15.

Page 22: Executive Engineer, PWD Building Division

5 Renovation of Circle OfficeBuilding in respect of CircleOfficer, Barkhetri RevenueCircle under Nalbari Dist

7.95369

Khairul

HoqueChoudhury

. 23-2-15.

4Month

s

6 Ghograpar 9.90 LoyRamDas

7 Construction of Residenceincluding raising low

compound, compound wall withiron gate in respect of Circle

Officer, Nalbari Revenue Circleunder Nalbari Dist.

26.09199

Rafikul IslamSarthebari.

18-2-15

4Month

s

Page 23: Executive Engineer, PWD Building Division

10) Up to date Status (Physical & Financial) of the Schemes under PWD Nalbari Building Division under Rashtriya Madhamik SikshaAbhijan for the year 2010-11 .

Progress Up to31st Jan . 2015

SL

No.

Name of programand Scheme

Sanctioned

Amount(In

Rs..)

Tender

Amount (InRs..)

Name ofContracto

r

Dateof

Allotment

Dateof

completionas perTende

r

Financial(Rs

in L)

Physica

l

Remarks

1 2 3 4 5 6 7 9 11 13

A.

Construction of High School and Higher Secondary School under Rashtriya MadhmikSiksha Abhijan for the year 2010-11 under Nalbari District) Addl. Class Room, Science

Lab., Computer Lab. & Library etc. in the Secondary School.1.

Amoni JanakalyanHigh School

(Gr.-I)

24,35,170/

20,51,358/

Dilippatowary,Ghy-21.

25-06-13

3month

s

11.21

85%

Painting andFurniture areto be done..

2Asomi High School

Balizar(Gr-2)

19,44,335/

19,44,333/

JogeshDas

24-6-13

3month

s

------50%

WorkWithdrawnfrom Cont..

3B.R. Medhi H.S.

School(Gr.3)

17,45,505/

17,61,276/

KamalTalukdar

26-6-13

3month

s8.07

100%

Completedin all

respect.HandedOver.

Page 24: Executive Engineer, PWD Building Division

4Banbhag

Batahghilla highSchool(Gr.-4)

19,44,335/

19,28,033/

JiyaurPasa,

Nalbari

17-5-13

3month

s8.66

100%

Completedin all

respect.Handed

Over5

Banbhag KhataDigijari High

School(Gr.-5)

24,35,170/

24,35,170/

LakshmiDaimari

10-6-13

3month

s10.4

992%

Civil workscompleted.

OnlyFurniture are

to besupplied.

6Barbori High School

(Gr.-6)23,35,170/

23,10,000/

NabaKanta

Talukadr,Kalag

21-5-13

3month

s

12.01

92%

Work inprog.

7 Barnibari MilanHigh School

(Gr.-7)

24,35,170/

20,27,833/

PradipBarmanBelsor

18-4-13

3month

s9.51

89%

Painting anFurniture

Left.

8Bartala High School

(Gr. No.8)24,35,170/

21,91,653/

Altafuddin Ahmed,Mukalmu

a

10-6-13

3month

s9.65

100%

Completedin all

respect.Handed

Over

9Chanda Kushi

Public High School(Gr. 9)

19,44,335/

19,44,147/

ParameshM.B.

Baruah,Nalbari

30-05-13

3month

s------

90%

Civil workscompleted.

OnlyFurniture are

to besupplied.

10

Dahudi High School(Gr.10)

29,89,005/

29,89,005/

GolapHussainKhan,

Chenga

13-06-13

3month

s

14.90

100%

Workcompleted .

Dakhin Pokowa 29,89, 29,89, Khanindra 05- 3 11.9 90 Civil works

Page 25: Executive Engineer, PWD Building Division

11

Bahjani HighSchool (Gr. 11)

005/ 005/ Choudhury, Nalbari

06-13

months

8 % completed.Only

Furniture areto be

supplied.

12

Debiram PathsalaH.S. School

(Gr.-12)

18,08,505/

17,18,080/

M/s DDEnterprise, Nalbari

5-7-13

3month

s------

89%

Civil workscompleted.

OnlyFurniture are

to besupplied.

13

Dhamdhama GirlsHigh School

(Gr.13)

15,98,505/

15,82,520/

Anil Kr.Chakrabor

ty,Nalbari

21-06-13

3month

s8.34

90%

Civil workscompleted.

OnlyFurniture are

to besupplied.

14

Dhamdhama HighSchool

(Gr. -14)

19,44,335/

18,48,347/

ArikulHussain,Nalbari

10-7-13

3month

s------

90%

Civil workscompleted.

OnlyFurniture are

to besupplied.

15

Ganga PukhuriBarkuriha HighSchool (Gr. -15)

23,35,170/

23,35,162/

JogeshDas

24-06-13

3month

s

12.03

85%

Paint,furniture etc.

Notcompleted

16

Gograpar Girls HighSchool

(Gr. -16)

24,35,170/

24,59,241/

SatyaRanjanHaloi,Dispur

31-05-13

3month

s------ 90

%

Civil workscompleted.

OnlyFurniture tobe supplied.

Gograpar HighSchool (Gr.-17)

24,35,170/

24,59,241/

Do31-05-

3month

------90%

Civil workscompleted.

Page 26: Executive Engineer, PWD Building Division

17

13 s OnlyFurniture are

to besupplied.

18

GopalthanPolytechnical

Institution(GR.-18)

19,44,335/

19,36,919/

M/SM.M.

International, Ghy.

10-06-13

3month

s

10.66

85%

Paint,furniture etc.

Notcompleted

19

Jagra high School(Gr. 19)

29,80,005/

29,89,005/-

Abjal Ali,Nalbari

04-06-13

3month

s

19.77

100%

Completedin all

respect.Handed

Over

20

JalkhanaBhatuakhana High

School(Gr.-20)

28,89,005/

28,80,629/

BijayTalukdar,

Tihu

26-06-13

3month

s

12.70 L

75%

Completedup to rooftruss, L.D.(Penalty)

imposed oncont.

21

Janakalyan HighSchool (Gr.-21)

24,35,170/

24,35,170/

Alimuddin

Ahmed,Nalbari

30-5-13

3month

s

18.09

100%

Completedin all

respect.Handed

Over

22

Janata H.S. Rampur(Gr.-22)

11,54,670/

11,50,700/

MahseenAli,

Rampur,Nalbari

27-06-13

3month

s5.68

100%

Completed,some minorrectificationis in prog.

23

Janapit High Schhol(Gr. -23)

23,35,170/

22,41,849/

PinkuBaishya,

Ghy.

04-06-13

3month

s

16.78

100%

Completedin all

respect.Handed

Over

Page 27: Executive Engineer, PWD Building Division

24

Kakaya higherSecondary School

(Gr.-24)

17,45,505/

14,53,833/

M/S H.B.Engineers, BinothM BezBaruah

09-05-13

3month

s

11.02

95%

Civil workscompleted.Furniturenot yet

supplied25

Kamarkuchi HighSchhol

(Gr.-25)

24,35,170/

24,35,170/

ArupKalita,

Santipur,hillside

17-06-13

3month

s------

85%

painting,furniture etc.

not done

26

Kampur BidhapiyaHigh SchoolMug kushi(Gr.-26)

19,44,335/

19,05,448/

PankajBezbaruay, Nalbari

17-06-13

3month

s

10.49

100%

Workcompleted .

27 Kaldi Gopalthan

High School(Gr.-27)

24,35,170/

24,72,969/

JiyaurPasa,

Nalbari

17-05-13

3month

s

12.41

100%

Completedin all

respect.Handed

Over

28

Karia HigherSecondary School

(Gr.-28)

17,45,505/

17,01,867/

Ganashyam

Talukdar,Ghy.

14-06-13

3month

s8.42

85%

Workcompleted

except .Furniture,Laboratory

slab.29

Lawpara HighSchool (Gr.-29)

24,35,170/

24,70,000/

DhaniramDas,

Kulhati

29-05-13

3month

s

12.60

100%

Workcompleted ..

30

Mahendra NarayanChoudhury Balika

Bidyapith(Gr.-30)

23,35,170/

22,58,822/

ArikulHussain. .. Nalbari

10-7-13

3month

s------

70%

Work inprogress

One roomwill be in 1st

Page 28: Executive Engineer, PWD Building Division

floor.

31

Makhibaha GirlasHigh School

(Gr.-31)24,35,170/

24,35,170/

BijayTalukdar,

Tihu

26-6-13

3month

s------ --

Workwithdrawn

fromcont.and willbe executed

throughSMDC.

32

Milan High SchoolPanigaon(Gr.-32)

35,42,840/

32,13,520/

HarunurRashid,

24-05-13

3month

s

18.14

100%

workscompleted.

33

Milan High SchoolBanekushi(Gr.-33)

28,89,005/

28,89,005/

DipankarKalita,LachitNagar

24-05-13

3month

s

14.75

90%

Civil workscompleted.Furniturenot yet

supplied

34

Morowa AnandaRam Baruah H.S.

School(Gr.-34)

17,45,505/

17,72,968/

UdayBaishyaMorowa

10-6-13

3month

s------

85%

Toilet Blocknot started,finishing

works to bedone.

35

Mugdi MilanH.S.School

(Gr.-35)

23,35,170/

23,35,170/

M/S.Mayur

Associatres ,

Hatogaon

05-06-13

3month

s------

93%

Civil workscompleted.Furniturenot yet

supplied

36

Namati VidyapitHigh School.

(Gr.-36)

23,35,170/

23,35,170/

PranabKr.

Goswami,Patachark

ushi

13-06-13

3month

s

12.63

100%

workscompleted..

Page 29: Executive Engineer, PWD Building Division

37

P.B. Allia HighSchool (Gr.-37)

24,35,170/

23,01,236/

NarayanKalita,

Gograpar

26-04-13

3month

s

13.70

100%

Completedin all

respect.Handed

Over

38

Pachim BanbhagH.S. School

(Gr.-38)

24,35,170/

24,35,170/

LakshmiDaimari,Gograpar

06-06-13

3month

s

12.37

60%

WorkWithdrawnfrom Cont.

39

Pub Barkhetri HighSchool

(Gr.-39)

24,35,170/

22,61,542/

MreeganSaharia,

Ghy.

13-06-13

3month

s

11.15

93%

Civil workscompleted.

Furniture areordered

40

Pub Kalakushi HighSchool

(Gr.-40)

24,85,170/

24,40,156/

WahedurRahman,Japorigog

06-06-13

3month

s

10.77

90%

Civil workscompleted.

Furniture areordered

41

Raj Kadamtal HighSchool

(Gr.-41)

24,35,170/

23,86,467/

BrajenDas,

Nalbari

19-04-13

3month

s

11.97

100%

Completedin all

respect.Handed

Over

42

RaghunathChoudhury H.S.

School(Gr.-42)

27,06,175/

27,00,000/

KhairulHaque

Choudhury,

Mukalmua

09-05-13

3month

s

15.87

100%

Completedin all

respect.Handed

Over

43

Chamata Girls HighSchool

(Gr.-43)

19,44,335/

16,91,267/

DilipPatowary,

Ghy.

17-06-13

3month

s------

85%

Painting andfurniture areto be done.

Page 30: Executive Engineer, PWD Building Division

44

Solmara HigherSecondary School

(Gr.-44).

23,35,170/

22,40,412/

M/S.Sunrise

Enterprise,.

17-06-13

3month

s

14.03

100%

Completedin all

respect.Handed

Over

45

Suradi HighMadrassa(Gr.-45)

29,89,005/

28,39,553/

PankajBezbaruah, Nalbari

17-06-13

3month

s------

55%

Work inprog. Up toroof truss.

46

Swahid MukundaKakati Vidyapith,

Barbhag(Gr.-46)

24,35,170/

21,06,422/

DineshGoswami,Christaian

-basti,Ghy.

26-04-13

3month

s6.50

85%

Civil workscompleted.

Furniture areordered

11) Up to date Status (Physical & Financial) of the works under SCA Plan in Nalbari Distinct .

Page 31: Executive Engineer, PWD Building Division

Progress Up to31st Jan . 2015S

L

No.

Name ofprogram and

Scheme

Sanctioned

Amount (Rs.

inLakh.)

TenderAmoun

t(Rs.in

Lakh.)

Nameof

Contractor

Dateof

Allotment

Targetdate ofCompletion as

perTender

Extension oftime

granted upto

Financial(Rs

in L)

Physica

l

Remarks

1 2 3 4 5 6 7 8 9 11 13

1 Constructionof KumarBhaskarBarmanSanskrit

University atNalbari

(Administrative Building and

Barrack)Pakage-I

250.00

182.24

TapanDeka

11-03-12

30-06-14

---92.8

785%

Work is inprogressfinishingworks areleft.. Will

becompleted

inFeb,2015

2 Constructionof KumarBhaskarBarmanSanskrit

University atNalbari (EntireBoundary wall,main entrance

and siteDevelopment

200.00

176.47

TapanDeka

02-1-13

2-04-1431-05-

14170.31

98%

Work is inprogressLetter

Likely tobe

completedin

Feb,2015..

Page 32: Executive Engineer, PWD Building Division

by earth fillingunder SCAPlan during2011-12)

12) Up to date Status (Physical & Financial) of the Schemes under Medical 2011-12 & 2012-13 in Nalbari District .

Progress Up to31st Jan . 2015

Sl

No

Name of programand Scheme

Sanctioned

Amount (Rs.

inLakh.)

TenderAmoun

t(Rs.in

Lakh.)

Nameof

Contractor

Dateof

Allotment

Dateof

completionas perTende

r

TimeExtensiongranted up

to

Financial(Rs

in L)

Physica

l

Remarks

1 2 3 4 5 6 7 8 9 11 13

1

Construction/Re-construction of

boundary wallaround the Hospitalstaff Qtr campus of

SMK CivilHospital, Nalbari

under Annual plan2011-12

35.7535.76

AbjalAli

17-1-12

17-3-12

…. ---95%

Aportion

of5%wallcouldnot be

executed due to

nonpossession ofsite.

2Construction of

/Reconstruction of46.14

L45.24

AbjalAli

25-4-13

1-8-131-12-

1326.6

0100%

Page 33: Executive Engineer, PWD Building Division

boundary wallaround the SMKCivil Hospital

(Balance portion ofcampus coveringJoint Director,

Girls Hostel & frontsite and new

morque side) under2012-13.

WorkComple

ted

3

Construction ofPHC Building andand RCC Bldg. Gr.Fl. (Phase-1) withprovision of (G+2)

with top floorAssam type atGhograpar in

Nalbari Districtunder Non plan.

2012-13.

48.907

47.948

SriJogeshDas.

3-9-13

1-8-141-12-14.

27.44 L

60%

Work isin

progress,

Likelyto be

completed in

March,2015.

13) Up to date Status (Physical & Financial) of the Schemes under Untied fund for the year 2012-13 under PWD Nalbari BuildingDivision .

Progress Up to31st Jan . 2015S

L

No.

Name ofprogram

and Scheme

Sanctioned

Amount (Rs.

inLakh.)

TenderAmoun

t(Rs.in

Lakh.)

Name ofcontracto

r

Dateof

allotment

Dateof

completionas perTende

r

Extension

oftimegranted up

to.

Financial(Rs

in L)

Physica

l

Remarks

Page 34: Executive Engineer, PWD Building Division

1 2 3 4 5 6 78

9 11 13

Development of

NalbariGordon

Field UnderUntied fund

2012-13.

Gr.A=499,490/-

16-9-13

16-11-13

Gr.C=4 99,490/-

16-9-13

16-11-13

Gr.G=4 98,816/-

21-9-13

21-11-13

Gr.H=4 99,046/-

21-9-13

21-11-13

Gr.J=4 75,268/-

Sri BirajDas

Maligaon

21-9-13.

21-11-13

31-3-14

--90%

Work inProgress.Work is

likely to becompleted

by Feb2015.

Gr.B=499,490/-

16-9-13

16-11-13

Gr.D=4,99,490/-

16-9-13

16-11-13

1

Gr.F=4,

50.00.

96,913/-

Sri.PrasantaBarman

23-9-13

23-11-13

31-3-14

--90%

Work inProgress.Work is

likely to becompleted

by Feb2015

Page 35: Executive Engineer, PWD Building Division

Gr.E=4,75,455/-

M/sJonali

enterprise

16-9-13

16-11-13.

31-3-14

--90%

Work islikely to becompleted

by Feb2015,Work in

Progress..

RKVEY1i) Marowa

49.95Uday

Baishya26-3-

1325-9-

13

31-03-14

49.93

100%

WorksCompleted.

ESVHD

i) Debochara 28-8-13

7-3-14 ---- ---- 100%

WorksCompleted.

ii)Dhamdhama

28-8-13

7-3-14 ---- ---100%

WorksCompleted.

2

iii)Makhibaha

40.80NarayanKalita

28-8-13

7-3-14 ---- --40%

Work inprogress.

RIDF -XVIII

i) BarnadiPk-72

60.933

Sri RajibDas ZooRoad ,Ghy-5

25-12-13

25-6-13

70%

Work inprog

ii)Ghograpar

Pk-74

58.899

Nayanjyoti

Talukdar,

Sorbhog,Barpeta.

70%

Work inprog.

3

iii) Jagra 60.69 Sri 6-3- 17-11- 50Work in

Page 36: Executive Engineer, PWD Building Division

Pk-76 952 AtikurRahman,Majdia,Sartheba

ri.

14 14 % progress.

iv) SatemariPk- 77

63.495

Md.KhairulHaque

Choudhury,

Mukalmua.

17-5-14

65%

Work inProg.

v) NalbariPk-75

59.11

M/sMayur

Associates

5%

Work inProg

vi)Chandakushi

Pk-60.93

Md.JiyaurPasa.

3-3-14

6-9-1470%

Work inProg.

vii)Ranakushi

Sri UdayBaishya

30

%-

Work inProg

14) Up to date Status (Physical & Financial) of the Schemes of IMPLEMENTATION OF SCHEMES UNDER THE AWARD OFFOURTH ASSAM STATE FINANCE COMMISSION DURING THE YEAR 2011-12. .

Progress Up to31st Jan . 2015

Sl.

No

Name of Scheme

A.A.Amount (InRs..)

Tender

Value(In

Rs..)

Nameof

Contractor

F.W.O.No. &Date of

Commencemt.

Date ofCompletion (as

pertender)

Financial(Rs

in L)

Physica

l

Remarks

Page 37: Executive Engineer, PWD Building Division

1 3 5 6 7 8 9 10 111 Construction of Gr.

IV Qtr. Under theAward of FourthAssam Finance

commission duringthe year 2011-12 at16 No. Khatikuchi

G.P.

2,10,000/

210,000/

SriAnjanDeka,

Nalbari.

NZP/9/FASC/2012/637A

dt.14/8/13.

2.10 100%

WorkCompleted

2 -Do-at 13 No. Gograpar

G.P.

2,10,000/

210,000/

SriAnjanDeka,

Nalbari.

45Days

80%

Up to roof

3 -Do-at 09 No. Madhya

Bahjani G.P.

2,10,000/-

199,500/

SriDhirenBezbar

uah,Bahjani

.

NZP/9/FASC/2012/640A

dt.14/8/13.

45Days

1.186L

100%

WorkCompleted

4 -Do-at KuriahamariBarsulia G.P. 2,10,0

00/-210,000/

Sri.BirajDas,

Nalbari

Works NotStarted yet,

the workmay be

withdrawnfrom the

cont. Letterto CEO

submitted.

5 -Do-at Upper Barbhag

G.P.

2,10,000/-

210,000/

Sri.BirajDas,

Nalbari

100%

WorkCompleted

Page 38: Executive Engineer, PWD Building Division

6 Construction of Gr.IV Qtr. Under theAward of FourthAssam Finance

commission duringthe year 2011-12 at04 No. Khata G.P.

2,10,000/-

210,000/

Sri.BirajDas,

Nalbari

100%

WorkCompleted

7 -Do-at 38 No. paschimNatun dehar G.P.

2,10,000/-

210,000/

SriBijay

Talukdar

Tihu

45%

Workstarted.

8 -Do-at 24 No. Dakhin

Madhya DharmapurG.P.

199,500/

Md.SarifulhaqueBelsor.

100%

WorkCompleted.

9 -Do-at Jalkhana

Bhatwakhana G.P.2,10,000/-

210,000/

SriBijay

Talukdar

Tihu

35%

Work inprogress

10

-Do-at 31 (3) Dakhin

Pakowa G.P.2,10,000/-

199,500/

Md.Abdul

AliAhmedNalbari

.

NZP/9/FASC/2012/633A

dt.14/8/13.

45Days

100%

completed

11

-Do-at Mugdi Rampur

G.P.2,10,000/-

210,000/

RafiqueZamanTalukd

ar,Mugdi.

NZP/9/FASC/2012/636A

dt.14/8/13.

45Days

100%

completed

Page 39: Executive Engineer, PWD Building Division

12

-Do-at 25 No.

Rupiyabathan G.P.2,10,000/-

199,500/

Md.SarifulhaqueBelsor.

NZP/9FASC/2012. dt.14-

8-13

10%

Modification required.

13

Construction ofG.P. Secy. Qtr.

Under the Award ofFourth assam State

FinanceCommission duringthe year 2011-12 at16 No. Khatikushi

G.P.

340,000/

340,000/

Md.RajibulHaque,Nalbari

.

50%

In progress

14

Construction ofG.P. Office Bldg.

Under the Award ofFourth assam State

FinanceCommission duringthe year 2011-12 at

05 No. PubBatahghilla G.P.

10,72,700/

1,019,065/

AnisurRahma

n,Nalbari

2.515

50%

In progress

15

Construction ofG.P. Office Bldg.

Under the Award ofFourth assam State

FinanceCommission duringthe year 2011-12 at

Kalar Char G.P.

10,72,700/

10,72,700/

AnisurRahma

n,Nalbari

----

As there isno land

available inKalar Char,

Hencework may

beWithdrwan

from theCont.Letter

issued to

Page 40: Executive Engineer, PWD Building Division

CEO.

16

Construction ofG.P. Office Bldg.

Under the Award ofFourth assam State

FinanceCommission duringthe year 2011-12 at

23 No. DakhinKhetri Dharmapur

G.P.

10,72,700/

1,019,065/

AtiqurRahma

nBarpeta

.

NZP/9/FASC/2012/628A

dt.14/8/13.

90Days

4.06 100%

Workcompleted

17

Construction ofG.P. Office Bldg.

Under the Award ofFourth assam State

FinanceCommission duringthe year 2011-12 at

Pani gaon. G.P.

10,72,700/

10,72,700/

PrabirbarmanNalbari

NZP/9/FASC/2012/629A

dt.14/8/13.

90Days

----Land

possessionnot yetgiven.

18

Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at

MukalmuaNarayanpur . G.P.

8,50,000/

8,50,000/-

Md.NazrulIslamBuri

Nagar,Nalbari

.

NZP/9/FASC/201

2/ 231Dt.22-4-

13

45Days

3.69 100%

Workcomp.

19

Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission during

8,50,000/

8,07,500/-

DipakDeka,

Bidyapur

NZP/9/FASC/201

2/ 230Dt.22-4-

45Days

7.187

100%

Comp.

Page 41: Executive Engineer, PWD Building Division

the year 2011-12 atMugdi Rampur .

G.P.

13

20

Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at13 No. Gograpar .

G.P.

8,50,000/-

8,07,500/-

SriSaratKalita

Gograpar

--Site handed

over butwork notstarted.

21

Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at

48(2) UpperBarbhag . G.P.

8,50,000/-

8,07,500/-

SriNabaKantaTalukd

ar,Kalag

NZP/9/FASC/2012/ 648ADt.14-8-

13

60Days

100%

Workcompleted

22

Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at

Nathkushi . G.P.

8,50,000/-

8,07,500/-

Sri AtulBasuma

tary,Baska

NZP/9/FASC/2012/ 649ADt.14-8-

13

60Days

5.40 90%

Work inProgress.

23

Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at7 No. Pub Bahjani .

G.P.

8,50,000/-

8,07,500/-

M/sMM

Internatio-nal,Chandmari,Ghy-3

NZP/9/FASC/2012/ 645ADt.14-8-

13

100%

Workcompleted

Page 42: Executive Engineer, PWD Building Division

24

Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at19 No. Chataibari .

G.P.

8,50,000/-

8,07,500/-

Md.ZohirulIslam

Hatigaon,

Sijubari

NZP/9/FASC/2012/ 644ADt.14-8-

13

60Days

4.05 100%

Workcompleted

25

Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at33 No. Belsor . G.P.

8,50,000/-

8,07,500/-

SriMridulBarmanVill:-

Belsor,Nalbari

.

NZP/9/FASC/2012/647A.dt 14-8-

13

60Days Only

painting isto be done

26

Extension of G.P.Office Bldg. Underthe Award of Fourthassam State FinanceCommission duringthe year 2011-12 at

38 No. PaschimNatun Dehar G.P.

8,50,000/-

8,07,500/-

SriKamalaKanta

Basumatary,

Kathalbari,

Nalbari.

NZP/9/FASC/2012/ 646ADt.14-8-

13

60Days

3.76 100%

Workcompleted

27

Construction ofBDO/ EO Qtr forA.P. Under the

Award of Fourthassam State FinanceCommission duringthe year 2011-12 atBorigog Banbhag

6,30,000/-

5,98,500/-

SriSatya

RanjanHaloi,Dispur

2.16 100%

Workcompleted

Page 43: Executive Engineer, PWD Building Division

A.P.

28

Extension of 3Storyed RCC Office

Building (Groundfloor) only forBarkhetri A. P.

Under the Award ofFourth assam State

FinanceCommission during

the year 2011-12

2,100,000/

2,100,000/

Md.JiyaurPasa,

Nalbari.

NZP/9/FASC/2012./229.

Dt. 22-4-13

45Day

s

12.997

100%

Workcompleted

29

Construction ofMultipurpose Hallfor A.P. at Paschim

Nalbari A.P.Solmara Under theAward of Fourth

assam State FinanceCommission during

the year 2011-12

1,22,56,900/

11,644,055/

M/sSunrise

Enterprise, Prop.Mainul

Ali,Khanapa

ra.

NZP/9/FASC/2012/232..

Dt. 22-4-13

45Day

s6

months

47.868

91%

Work inProgress

30

Construction ofG.P. Secy. Qtr.

Under the Award ofFourth assam State

FinanceCommission duringthe year 2011-12 at

31 (3) DakshinPokowa G.P.

3,40,000/-

3,40,000/-

Sarif AliBatsor

NZP/9/FASC/2012/655A

dt.14/8/13.

60Day

s

1.855

100%

Completed& handed

over

Page 44: Executive Engineer, PWD Building Division

31

Construction ofG.P. Secy. Qtr.

Under the Award ofFourth assam State

FinanceCommission duringthe year 2011-12 at

JalkhanaBhatuakhana G.P.

3,40,000/-

3,23,000/-

Bijoytalukdar

Tihu 35%

Work inProgress

32

Construction ofG.P. Secy. Qtr.

Under the Award of4th.Assam State

Finance Commi-ssion during theyear 2011-12 at

50(4) UpparBarbhag G.P.

3,40,000/-

3,23,000/-

Sri UdayBaishyaMorowa

Tender notreceived.

33

Construction ofG.P. Secy. Qtr.

Under the Award of4th.Assam State

Finance Commi-ssion during the

year 2011-12 at 6No. Batahgilla G.P.

3,40,000/-

3,38,635/-

SriGurucha

ranDeka,

Kazipara.

NZP/9/FASC/201

2/656ADt.14-8-13

60Day

s

1.874

100%

Workcompleted

34

Construction ofG.P. Secy. Qtr.

Under the Award4th.Assam State

Finance Commi-ssion during the

year 2011-12 at 9No. Madhya

3,40,000/-

3,23,000/-

M/s MMInternati

onal,Chandmari, Ghy-

3

100%

Onlypainting isto be done

Page 45: Executive Engineer, PWD Building Division

Bahjani G.P.

35

Construction ofG.P. Secy. Qtr.

Under the Award4th.Assam State

Finance Commi-ssion during the

year 2011-12 at 38No. Paschim Natun

Dehar G.P.

3,40,000/-

3,23,000/-

KamalaKanta

Basumatary,

Kathalbari,

Nalbari

NZP/9/FASC/2012/ 660ADt.14-8-

13

60Day

s1.69

100%

Workcompletedup to Post

plate.

36

Construction ofG.P. Secy. Qtr.

Under the Award4th.Assam State

Finance Commi-ssion during the

year 2011-12 at 26No. Bangaon G.P.

3,40,000/-

3,23,000/-

Md.Mahrum

Ali,Barnaddi

,Nalbari.

NZP/9/FASC/2012/ 661ADt.14-8-

13

60Day

s

100%

Workcompleted

37

Construction ofG.P. Secy. Qtr.

Under the Award of4th.Assam State

Finance Commi-ssion during theyear 2011-12 at

Mugdi Rampur G.P.

3,40,000/-

3,23,000/-

RafiqueZaman

Talukdar, Mugdi.

NZP/9/FASC/2012/652A

dt.14/8/13.

60Day

s3.23

100%

Workcompleted

38

Construction ofG.P. Secy. Qtr.

Under the Award of4th.Assam State

Finance Commi-3,40,00

0/-3,40,00

0/-DipakDeka,

60Day

s

85%

GlassFitting inWindows

and

Page 46: Executive Engineer, PWD Building Division

ssion during theyear 2011-12 at

Loharkatha AdabariG.P.

Bidyapur Electricalfittings areto be done.

39

Construction ofG.P. Secy. Qtr.

Under the Award of4th.Assam State

Finance Commi-ssion during theyear 2011-12 at

Kurihamari BarsuliaG.P.

3,40,000/-

3,40,000/-

Md.Sarif Ali,Batsor,Nalbari.

NZP/9/FASC/2012/653A

dt.14/8/13.

60Day

s

100%

Workcompleted

40

Construction of Gr.III Qtr for AP.

Under the Award4th.Assam State

Finance Commi-ssion during theyear 2011-12 at

Pub Nalbari A.P.

3,40,000/-

3,23,000/-

Md.SafikulIslam,

Mularkushi,

Nalbari.

60Day

s

100%

Workcompleted

Executive Engineer, P.W.D.Nalbari Building Division.

Nalbari.

Page 47: Executive Engineer, PWD Building Division

Model School at Kaladi

Page 48: Executive Engineer, PWD Building Division

Additional Classrooms & Computer Lab.

Page 49: Executive Engineer, PWD Building Division

Girls Hostel at Mukalmua

\

Page 50: Executive Engineer, PWD Building Division

Polytechnic College at Chandkuchi

Page 51: Executive Engineer, PWD Building Division

Veterinary Hospital

Page 52: Executive Engineer, PWD Building Division

ADR (Judicial)BUILDING AT NALBARI

Page 53: Executive Engineer, PWD Building Division

Major Projects in last 3 years

Name of Project Amount (Rs.)

New Polytechnic Building at Chandakushi 780.00 L

Brick Boundary wall and Gate of Sanskrit University 200.00 L

Administrative Building of Sanskrit University at Namati 200.00 L

Model School at Kaldi under RMSA 362.00 L

Planetarium at Sariahtuli village 200.00 L

Boundary Wall around SMK Civil Hospital 146.00 L

ADR centre at Nalbari under Judicial Department 100.00 L

Development of Nalbari Gordon Field (Untied Fund) 50.00 L

Ambedkar Bhawan 50.00 L

Page 54: Executive Engineer, PWD Building Division

Name of Project Amount (Rs.)

9 Nos. of Office Building and Residential Quarter of Vety. Deptt. 60.00 L (each)

Auditorium of District Library 100.00 L

40 nos. of office and Residential Buildings of CEO, Zilla Parishad 349.80 L

100 Bedded Girls Hostel at Mukalmua under RMSA 142.34 L

3 nos. of School Building under MPLAD fund 60.00 L

Additional Class Rooms, Science Lab., Computer Lab. etc.(46Schools)

1066.65 L

Sanskrit College and Hostel Building, Nalbari 150.00 L

Construction of Class Room and Science Laboratory forintroduction of Science Stream in High Schools.(8 nos.)