• 2014 Construction Program Highlights– $25,018,00 expenditure level– Includes approx. $2,100,000 from 2013– Rehabilitation Program– Capacity Improvement Program– CWATS Implementation
Rehabilitation Program
• 28 Planned Projects– 5 Bridges ( 2 Construction, 3 Engineering)– 6 Culverts ( 3 Construction, 3 Engineering )– 12 Roads– 5 Maintenance
Capacity Improvement Program
• County is continuing a multi year capacity improvement program for the network
• County funding is being utilized, Senior level funding is being pursued
• 12 Planned Projects for 2014– 6 Construction, 6 Engineering
Essex County Highways• Bridge Projects ($880,000)
– 2 - Structure Rehabilitations:• CR 8 @ Belle River• CR 18 @ Big Creek
– 3 - Engineering for 2015 construction:• CR 2 @ Big Creek• CR 8 @ Silver Creek• CR 11 @ Sucker Creek
Essex County Highways
• Culvert / Drainage ( $1,274,000 )– CR 14 @ Orton Drain culvert replacement
– CR 31 @ Ruscom River culvert replacement
– CR 43 @ Sullivan Creek culvert replacement
– 3 - Culvert Engineering projects for 2015
• CR 34 @ Lebo Creek
• CR 42 @ 6-7 Sideroad Drain
• CR 46 @ Gzowski Drain
Essex County Highways• Road Projects ($4,147,000)
– Recycling/Resurfacing:
• CR 8/ CR 11 - Tecumseh/Essex/Amherstburg
• CR 8/9 – LaSalle/Tecumseh/Amherstburg
• CR 9 - Amherstburg – 0.8 km
• CR 2 - Lakeshore – 2.9 km
• CR 7 - LaSalle – 3.5 km
• CR 13 - Essex – 2.2 km
• CR 14 - Leamington – 3.6 km
• CR 20 - Leamington – 0.9 km
• CR 23 - Essex – 1.4 km
• CR 25 - Lakeshore – 2.5 km
• CR 27 - Lakeshore – 2.3 km
• CR 34 – Kingsville/Leamington – 5.3 km
Essex County Highways• Pavement Preservation ( $571,000 )
– Route and Seal – various locations– Surface Treatment – CR 15 - 5.7 km– Micro Surfacing – CR50 – 6.8 km
• Bridge / Culvert Preservation ($405,000)– Various deck and expansion joint repairs– Various guiderail repairs / upgrades
• Estimated Quantities– 26,790 tonnes of Hot Mix Asphalt– 110,120 sm. of Pavement Recycling– 18,400 tonnes of Granular A
Essex County Highways
• Capacity Projects ( $6,000,000)– CR 23/46 – Intersection Improvements – LS– CR 22 Phase 5 - Contract B – LS– CR 19/22 Improvements - Engineering– Various Connecting Link projects with Towns
• CR 22 – Lakeshore
• CR 6 – LaSalle
• CR 20 – Leamington
Essex County Highways
• EA’s / Engineering in Process:– CR 19 / CR 22 Prelim. Design– CR 42 EA, City limit to CR 25– Lauzon Parkway Extension – MTO/CoW /CoE– Active Transportation System ($52M)
• Annual expenditure @ $1,300,000
Essex County Highways