04/15/2023 The breakthrough is happening 1
ReferenceEVCHow to mitigate ERTMS onboard baseline evolutions risks using ERTMSFormalSpecs?
04/15/2023 The breakthrough is happening 2
ERTMSFormalSpecs news
Background
http://www.railwaygazette.com/news/infrastructure/single-view/view/ertms-user-group-adopts-formal-specifications-tool.html
04/15/2023 The breakthrough is happening 3
ERTMSFormalSpecs news
https://www.youtube.com/watch?v=3Sz2c5t62oM
04/15/2023 The breakthrough is happening 4
ReferenceEVC Concept presentation
● Equip EM203 with – ReferenceEVC including ERTMSFormalSpecs– its own DMI– its own BTM (reusing BaliseLifeCheck)– its own radio channel
Reference EVC concept
NO VEHICLE CHANGENO HOMOLOGATION NEEDED
04/15/2023 The breakthrough is happening 5
ReferenceEVC Technical description
● Unique features in SIL0 EVC– Insert/remove CRs inside the train– Change Baseline
• Current : BL3• Future dev. according to market MR2, BL2
– Full recording and replay• 100% Whitebox
● Decisive advantage:– First functions can run in 2015
04/15/2023 The breakthrough is happening 6
ERTMSFormalSpecs in actionCR 1084
https://www.youtube.com/watch?v=aEjKFCWyerU
04/15/2023 The breakthrough is happening 7
Current model status
● Modelling and testing– ERTMSFormalSpecs today:
• 77% implemented 13% tested• Total # requirements in S026: 4139
100% implementedand tested
04/15/2023 The breakthrough is happening 8
ReferenceEVC SIL0 validation process
● First meeting with NOBO/ISA 29/5/2015● Quality process is supported by ERTMSFormalSpecs● Large effort but incremental● Open questions
– Scope of SIL0? • ERTMSFormalSpecs model? • ERTMSFormalSpecs toolchain?• ReferenceEVC system
– including subsystems EVC Kernel, BTM, DMI?
04/15/2023 The breakthrough is happening 9
ReferenceEVC RoadmapProofs of Concept
● Three Proofs of Concept– POC1: Reference EVC in EM203
• Start of mission in SR, transition to FS/L1
– POC2: Reference EVC in EM203• Start of mission in SR, transition to LS/L1• By translating all TBL1+ P44 in LS packets, according to INFRABEL LS programming
rules
– POC3: Reference EVC in EM203• Start of mission in SR, transition to FS/L2• Prerequisite: availability+ of test RBC, Keys, Track definition
04/15/2023 The breakthrough is happening 10
ReferenceEVC RoadmapFinal product
● Final product– Effort needed
• Implement robust ReferenceEVC runtime• Complete and test Subset-026 model• Get ISA/NOBO evaluation report
– Timing shall depend on committed users • co-development possible
– Interested parties as of today: • INFRABEL• Prorail/NS
04/15/2023 The breakthrough is happening 11
Thank you for your attention!