eric resume

2

Upload: eric-mosley

Post on 13-Apr-2017

53 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Eric Resume

Calera, Alabama 35040

(205) 500-0873

[email protected]

Manufacturer of Aerospace/Automotive & Coal mining Equipment.

Directed manufacturing operations., managed 75+ production staff. Direct reports included

Production Supervisors, Maintenance Technicians, Engineering, Mechanic Shop, Turbine Dept, QC

Dept, R&D Staff, Machine Dept, Welding Dept, Paint Shop, Prototype Shop and Production Support

Administrators. Support shop for local major automotive, coal plants and aerospace, supplying

machining and engineering for products, xtures, jigs, dies and alike. Worked closely with ISO Auditor

developing and implementing new mfg standards, procedures, safety guidelines and rene Quality

Dept to work towards achieving “World Class” status for fast growing company.

• Planned, Quoted and Project Managed awarded bid for $1.5M, 6 month, 3 mile long Coal

Conveyor Truss Repair project. Directly supervising a team of managers, covering sourcing and

procurement of construction machinery, planning and scheduling personal, equipment and

materials. Completed project 2 weeks early under budget - overcoming serious weather setbacks

and rented equipment failures.

• Oversaw project launch and production of C130 Airplane Hatches. Responsible for new VMC

purchase and installment, hiring supporting staff, development of manufacturing processes purchase and installment, hiring supporting staff, development of manufacturing processes

and supporting training docs and classes, implementation of QA/QC project standards, designing

and machining of C130 hatch, xturing, tooling, CAM, CAD ,assembly, testing and post processing.

• Lead ERP system integration. Appointing staff, staff training, old Mgmt system data base

conversion, new hardware procurement and installation.

• Created and implemented official job titles, reqs & descriptions and Org Chart for existing and

new hire staff for clarity to meet new ISO requirements.

•• Managed deal, awarded and manufactured Mark Cuban backed “Hydro Con” premiered on ABC

“Shark Tank”. Worked directly with the “Hydro-Con” owner to re-engineer product (DFM) to

decrease cost of mfg to help bring the product to market using CAD and 3D Printer systems to

test functional prototypes and launch in-house manufacturing.

Dayjon Inc.

Plant Operations Manager/ Mfg/Mech Engineer

Feburary2013Current

• Over see Maintenance Dept., execute preventive maintenance schedules/reports, devise

responsible personnel team for machining/anodizing operations and production processes

documentation. Acting as secondary Plant Manager in management absence.

• Increased prots $975k, capacity by 38% in Machining Dept. Nissan (5year) Project,

• Reduced Processing times, 23% on14k trim parts resulting in $88k production cost reduction.

• Increased realized annual prots by $375k, decreased rejects 21% and increased throughput

56% for 2.5M parts as Kaizen Project Lead on GMC 56% for 2.5M parts as Kaizen Project Lead on GMC Impala cell layout & process operations.

• Eliminated outsourcing of machined parts resulting increased prots 144% ($24,000) annually,

• Networking CNC machinery, increased security, reliability, reduced downtime signicantly on off

-shifts by allowing instant remote access to perform diag, tests, repairs and controls.

• Work closely with Quality and Cross Functional Team to insure QMS through Process

Parameter Flow Sheet documentation and Process audits.

• Addressing production problems, ensuring optimum manufacturing methods techniques and

machine/equipment acquisition. machine/equipment acquisition.

• Create 2D/3D Graphical & Simulation Illustrations, Technical Writing and Training documentation,

Work Instructions for plant machinery, Technical processes and client presentations.

• Assisted in new quality standards that helped the operation keep ISO 9001/TS16949.

Mfg Engineer: Implement & rene mfg processes, apply continuous improvement & lean mfg principles

to all areas of production. CNC Programming, Setups, Fixtures, CAM, CAD, Reverse Engineer, Design,

machine, repair and build automation machinery, components and modular systems (8020-Creform).

Project Manager: Responsible for all aspects of $8M Federal District Court House contract to produce

Eco friendly Engineered Architectural solar light slats. At my arrival the project was 6months behind. By

study of mfg process, consulting with lead Architects to bring the design more closely to DFM

standards, injection of more practical production process/operations to overcome many constraints,

rejects were reduce by 48%, improved production throughput by 38%. Project completed on

Global manufacturer and supplier for the automotive industry (Class C).Oex Automotive

Manufacturing Engineering Project & Ops Manager

Janurary2009

PROFESSIONAL SKILLSPROBLEM SOLVINGCAD/SOLIDWORKSCAM/CNC PROGRAMMINGPROJECT MANAGEMENT ENGINEERING & DESIGNMACHINING & THEORY

Accomplished hands on seasoned Engineer with a 15 year background in both Operations & Project 15 year background in both Operations & Project Management, IT, CNC, Mechanical/Industrial Design and Electronics. Solid management capabilities with a consistant track record and proven abilities in planning, managing projects, improving efficiency of operations, team building and detailing project information to determine effective processes for operations. Analytical and able to identify areas of operations. Analytical and able to identify areas of strength and weakness and implement company policies, standards, changes in operation and systems that optimize production and bottom line. Demonstrated ability to motivate staff to maximum productivity and control costs through the most effective uses of man power and avaliable resources.

PROFILE

(Aerospace, Automotive, Coal)

Eric MosleyPlant Manager - Manufacturing Engineer

EXPERIENCE

Page 2: Eric Resume

SALTLAKE FED BUILDING OVERLAND 3MILE CONVEYOR

Rick Hudson: Vice President @Alabama Plate Cuttinglinkedin.com/in/rick-hudson-07914459

Gary Traylor: Plant Manager @O-ex Automotivelinkedin.com/in/gary-traylor-50a35688

AUTOMATION AND ROBOTICS PROCESS CELL ENGINEERING

C130 AIRCRAFT CNC HATCHCUSTOM SOLID BILLET TURBO

Experience Summary

Below are a few visual examples of my personal projects I have been a major leader in managing, designing, engineering, building, programming and machining.

EDUCATION

Comptia A+ Certicate

Comptia Network+

ProForce - Comptia Certication CenterBirmingham, AL 35244

MICROSOFT CERTIFIED SYSTEMS ENGINEERForeFront - Microsoft Certication CenterClearwater, FL 33763

Feburary2000

SOLIDWORKS ADVANCED COURSESMODERN TECH - Solidworks Certication CenterBirmingham, AL 35243

May-June2014

ProForce - Comptia Certication CenterBirmingham, AL 35244

June1997

November1998

EXPERIENCE

Major Manufacturer for Automotive (Class A) Military, Heavy Equipment.

Overall Objectives:Responsible for engineering, programming, servicing, technical support and installation of company

machinery, networks, hardware/software, servers and end client workstations. Analyze technical

problems, schedule assignments and approve all completed work. Produce estimates, invoice repairs

and order parts. Consulted daily with the President, VP and shop employees to solve production delays

and technical inefficiencies.

Performance Indicators:

• Engineered solutions that saved company over $185,000.00 annually by streamlining old

practices into faster fail safe solutions for production based fabrication.

• IT Operations Manager duties included implementing new hardware/software, policies and

procedures that signicantly reduced office and shop oor technical issues and increase

production.

•• Responsible for drawing, engineering, creating, designing and programming cnc machinery using

2D/3D CAM/CAD drawings and optimization nesting of parts to reduce part cost.

• CNC machinery programmed: Laser, Plasma, Oxy, VMC and Break Press.

• Extensive knowledge of Machine Code and ability to hand edit NC code and Post Processors.

• Work closely with Quality group to improve quality management system, check gauges and QA

tooling.

• Team Leader aptitude in a demanding, high volume, fast paced production environment with the

ability to multitask, manage, make important decisions and troubleshoot on the y. ability to multitask, manage, make important decisions and troubleshoot on the y.

• Design, build, installed and serviced new plant servers, workstations and implemented a special

network and server hardware to retro t older machines to communicate on modern networks.

Alabama Plate Cutting Company

Manufacture Engineering CNC Programmer / IT Operations Manager

July2006

PROBLEM SOLVINGCAM/CNC PROGRAMMINGMACHINING & THEORY

PREVENTIVE MAINTENANCELEAN MANUFACTURING

ANALYTICALTECHNITECHNICAL WRITING

TECHNICAL ILLUSTRATIONSTOOL, DIE, FIXTUREKAIZEN PROJECT LEADPRODUCTION MATRIX

PROJECT LAUNCHENGINEERING

CAD/SOLIDWORKSINDUSTRIAL DESIGN

NEW EQUIPMENT PURCHASE PROCESS DEVELOPMENTPROJEPROJECT MANAGEMENTPLANNING & LAUNCHPLANT LAYOUT

CONTINOUS IMPROVEMENTP&L MANAGMENT

TECHNICAL SKILLS

PHOTOSHOP

ILLUSTRATOR

POWER POINT

MS OFFICE SUITE

IT SYSTEMS