environmental statement in form-v · environmental statement in form-v (under rule-14,...

38
ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2008 Company

Upload: others

Post on 23-Apr-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

ENVIRONMENTAL STATEMENT

IN

FORM-V (Under Rule-14, Environmental protection Rules, 1986)

(2015-2016)

FOR

CLUSTER NO. – 1 (GROUP OF MINES)

Mugma Area

Eastern Coalfields Limited

Prepared at

Regional Institute – I

Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.)

G. T. Road (West End) Asansol - 713 304

CMPDI

ISO 9001:2008 Company

Page 2: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

1

ENVIRONMENTAL STATEMENT FOR CLUSTER NO. – 1 (GROUP OF MINES)

FOR THE YEAR: 2015-2016

CONTENTS

SL NO. CHAPTER PARTICULARS PAGE NO.

1 CHAPTER-I INTRODUCTION 2-7

2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I) 8-18

LIST OF ANNEXURES

ANNEXURE NO. PARTICULARS PAGE NO.

I AMBIENT AIR QUALITY 19-22

II NOISE LEVEL 23-26

III MINE AND GROUND WATER QUALITY REPORT 27-33

IV GROUNDWATER LEVEL 34

PLATES

I LOCATION PLAN

II PLAN SHOWING LOCATION OF MONITORING STATIONS

Page 3: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

2

CHAPTER – I

INTRODUCTION 1.1 GENESIS:

The Gazette Notification vide G.S.R No. 329 (E) dated13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd.22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above, the work of Environmental Statement for Cluster No. 1 was entrusted to CMPDI by GM (Environment), Eastern Coalfields Limited.

1.2 PROJECT DESCRIPTION:

Overview of Cluster No. 1: Prior to 2014 – 15, a large number of taken over mines from pre – nationalization period, mostly underground mines, in the old coalfields of Raniganj and Jharia did not have environmental clearance from the MoEF&CC and were operating on the basis of “Consents’ received from the respective PCBs. It was felt that if these mines could be brought under the ambit of EC, several measures for environmental protection and pollution control could be put in place. However, the work of obtaining EC for such mines, individually, would have taken a lot of time. To circumvent the problem, it was mooted that since the environmental problems being faced were of regional nature and not confined to individual mines alone, cluster/groups of such mines could be identified for preparing cluster-wise integrated EIA & EMPs, addressing such environmental concerns comprehensively and ensuring effective co-ordination of environmental control measures within each cluster. 13 such clusters were identified in the Raniganj Coalfield of ECL and EC has been obtained on the cluster approach for 12 such clusters. Cluster of Mines No. 1 is one of the clusters for which EC has been granted vide letter no. J-11015/78/2011-IA-II.(M) dated 16thJanuary, 2015 for a combined peak capacity of 3.30 MTY and within a ML area of 3692 Ha. Cluster No. 1 is located in the western part of Raniganj Coalfield (west of Barakar River) in the Nirsa Block of Dhanbad district of Jharkhand between latitudes 230, 44’ N & 230, 49’ N and longitudes 860, 39’ E & 860, 46’, 30” E. The area is well connected by roads and railways. N.H. – 2 and Eastern Railway Grand Chord Line pass through the cluster. The mines are administratively under Mugma Area of ECL. The cluster is situated close to the DVC Hydel and Thermal Projects of Maithon. Location of cluster – 1 is shown in plate no. – 1.

Page 4: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

3

Sl No. Name of the Mine Lease

Area (Ha)

Normative

Production Capacity

(MTY)

Peak

Production Capacity

(MTY)

Life

(Years)

1 Hariajam UG 316 0.11 0.14 > 25

2 Badjna UG 676 0.05 0.10 > 25

3 Chapapur-II UG 480 0.15 0.20 > 25

Chapapur OC Patch (14 Ha) 0.86 0.86 1

4 Khoodia UG 186 0.05 0.10 > 25

Khoodia OC Patch (18 Ha) 0.10 0.10 1

5 Lakhimata UG 217 0.08 0.10 > 25

Lakhimata OC Patch (19 Ha) 0.30 0.40 8

6 Shampur-B UG 368 0.09 0.10 > 25

Shampur-B (Sangamahal) OC Patch (33 Ha) 0.15 0.20 3

7 Mandman UG 345 0.07 0.10 > 25

8 Nirsha OC Patch 147 0.09 0.10 11

9 Shampur-A UG 491 0.05 0.10 > 25

Shampur-A OC Patch 0.12 0.12 2

10 Gopinathpur UG 157 0.05 0.10 > 25

Gopinathpur OC Patch 0.10 0.10 5

11 Kapasara UG 309 0.10 0.15 > 25

Kapasara OC Patch (24 Ha) 0.16 0.23 5

Total 3692 2.70 3.30

1. Hariajam UG In Hariajam UG mine, extraction of coal is being carried out in two seams, namely Brindabanpur (BP) seam and Gopinathpur (GP) Seam. The methods of mining adopted in the two seams are Development of panels by Bord& Pillar method. SDLs have been deployed for loading of coal. Transportation of coal is effected by means of tugger and main haulages. 2. Badjna UG In Badjna UG mine, extraction of coal is being carried out in two seams, namely Brindabanpur (BP) seam and Kalimati (KM) Seam. The methods of mining adopted in the two seams are Development of panels by Bord& Pillar method. Loading of coal into mine tubs is carried out both manually and by deploymewnt of SDLs. Transportation of coal is effected by means of tugger and main haulages. Coal from the underground coal face is hauled from the tugger haulages to feed the main surface haulage, which hauls the loaded coal tubs up ro the surface. 3. Chapapur – II UG & OC Patch

In Chapapur-II UG mine, extraction of coal is being carried out in two seams, namely Mehtadih seam and Kalimati (KM) Seam. In K.M seam, depillaring operation is under progress with caving, whereas, development of pillars is under progress in Metadih Seam. Loading of coal into mine tubs is carried out both manually and by deploymewnt of SDL. Transportation of coal is effected by means of tugger and main haulages. Coal from the underground coal face is hauled from the tugger haulages/endless haulages to feed the main surface haulage, which hauls the loaded coal tubs up to the surface.

Page 5: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

4

An OC patch has been proposed to be worked by adopting shovel-dumper combination of opencast mining. The entire OC patch falls within the existing leasehold of the mine. Some salient features of the proposed OC patch are:

Name of Patch/Mine Area (Ha)

Mineable Reserves

(MT)

Volume of OB to be

generated (Million M3)

Normative Production

Capacity (MTY)

Peak Production

Capacity (MTY)

Life in

years

Chapapur-II OC Patch 14.0 0.86 2.4 0.86 0.86 1

4. Khoodia UG & OC Patch In Khoodia UG mine, extraction of coal is being carried out BP Seam. The UG unit is currently in development phase. In future, further development work shall be done in the top section of BP Seam and in some portion of MS (Mugma Special) Seam. Loading of coal into mine tubs is carried out by deployment of two SDLs. Transportation of coal is effected by means of tugger and main haulages. Coal from the underground coal face is hauled from the tugger haulages to feed the main surface haulage, which hauls the loaded coal tubs up to the surface. An OC patch has been proposed to be worked by adopting shovel-dumper combination of opencast mining within the existing leasehold of the mine. Some salient features of the proposed OC patch are:

Name of OC Patch

Area Mineable Reserves

Volume of OB to be generated

Normative Production

Capacity

Peak Production Capacity

Life in years

Khoodia OC Patch 18Ha 0.125 MT 3.4 Million M3 0.1 MTY 0.1MTY 1

5. Lakhimata UG & OC Patch In Lakhimata UG mine, extraction of coal is being carried out in two seams, namely Mugma Special (MS) seam and Mehtadih Seam. The methods of mining adopted in the two seams are Development of panels by Bord& Pillar method. Loading of coal into mine tubs is carried out by deploymewnt of SDLs. Transportation of coal is effected by means of tugger and main haulages. Coal from the underground coal face is hauled from the tugger haulages/endless haulages to feed the main surface haulage, which hauls the loaded coal tubs up to the surface. An OC patch has been proposed to be worked by adopting shovel-dumper combination of opencast mining. The entire OC patch falls within the existing leasehold of the mine. Some salient features of the proposed OC patch are:

Name of Patch/Mine Area

(Ha)

Mineable

Reserves (MT)

Volume of

OB to be generated

(Million M3)

Normative

Production Capacity

(MTY)

Peak

Production Capacity

(MTY)

Life

in years

Lakhimata OC Patch 19.0 2.24 9.30 0.30 0.40 8

6. Shampur – B UG & OC Patch In Shampur-B UG mine, extraction of coal is being carried out in GP Seam. The UG unit is currently in development phase and getting its coal output from two Districts namely East Section and West Section. Two SDLs have been deployed in both the Districts. At present, there is no immediate plan for depillaring of pillars. However, possibility of deploying Continuous miner for winning of coal is being studied.

Page 6: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

5

Transportation of coal is effected by means of tugger, endless and main haulages. Coal from the underground coal face is hauled from the tugger haulages and endless haulage to feed the two main surface haulages, which haul the loaded coal tubs up to the surface.

An OC patch has been proposed to be worked by adopting shovel-dumper combination of opencast mining within the existing leasehold of the mine. Some salient features of the proposed OC patch are:

Name of OC Patch Area Mineable

Reserves

Volume of OB to

be generated (Mm3)

Normative

Production Capacity

Peak

Production Capacity

Life

in years

Shampur-B OC Patch (Sangmahal)

33Ha 0.4 MT 2.2 0.15 MTY 0.2 MTY 3

7. Mandman UG At present, KM Bottom seam is being worked by Bord& Pillar method of UG Mining. Mine is presently under depillaring (with caving) phase where loading of coal is being done manually into mine tubs. Transportation of coal is effected by means of tugger and main haulages. Besides KM bottom seam, preparations for development of pillars in Mehtadih seam has also been taken up. It is also being envisaged to develop the virgin patches of KM Bottom seam in future. 8. Nirsa OC Patch There was no mining activity in the mine during 2015 – 16. 9. Shampur – A UG & OC Patch There was no mining activity in the mine during 2015 – 16. 10. Gopinathpur UG & OC Patch

At present, there is no UG mining activity within the Colliery.

An OC patch is currently under operation within the Colliery. Some salient features of the OC patch are:

Name of OC Patch Area Mineable Reserves

Volume of OB to be

generated

Normative Production

Capacity

Peak Production

Capacity

Life in

years

Gopinathpur OC Patch 34 Ha 0.5 MT 2 Million M3 0.10 MTY 0.13 MTY 5

The OC patch extracts coal from developed GP(T) & GP(B) seams. The conventional shovel dumper system of mining has been adopted for coal production and over burden removal.

11. Kapasara UG & OC Patch

At present, there is no UG mining activity within the Colliery.

An OC patch is currently under operation within the Colliery. Some salient features of the OC patch are:

Name of OC Patch Area Mineable Reserves

Volume of OB to be

generated

Normative Production

Capacity

Peak Production

Capacity

Life in

years

Kapasara OC Patch 24 Ha 0.8 MT 5.5 MCum 0.16 MTY 0.23 MTY 5

Page 7: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

6

The OC patch extracts coal from BP seam, Local Seam (L1 & L2) and Kalimati (Top &

Bottom) Seams. The conventional shovel dumper system of mining has been adopted for

coal production and over burden removal.

1.3 ENVIRONMENTAL SCENARIO:

CMPDI has been engaged to carry out routine Environmental monitoring of the clusters. The monitoring is carried out every fortnight by collecting 24 – hour samples for ambient air at 4 all - weather station, 3 pre-monsoon stations and 3 post-monsoon stations (based on local meteorology) and compared with NAAQS, 2009 for quality. Samples of mine water are also collected and analysed every fortnight and compared with the MoEF Schedule – VI for discharge of effluents into land / streams. A complete analysis of the mine discharge samples which includes heavy metals and salts is carried out once every year during December. Noise level is recorded at 9 locations. Groundwater level in the cluster area is monitored by taking measurements at 6 earmarked dugwells in the months of January, May, August and November every year. Samples of groundwater from these wells, which are also utilized by the local population for drinking and other domestic purposes, are analysed once in a year during May and compared with the IS 10500:2012 standards for drinking water quality. For the year 2015 – 16, the monitoring could be started only from the second fortnight of May, 2015 owing to certain delays in fixation of monitoring stations subsequent to the grant of EC. Location of the monitoring stations of air, noise & water are shown in Plate- II. The environmental monitoring results for 21 fortnights ending 31st March, 2016 are appended as Annexures – I, II & III. The environmental monitoring results for the year 2015-16 are summarized below:

AMBIENT AIR QUALITY The PM10 concentration was found in the range of 54.0 to 344.6 µg/m3. It has exceeded limit on 27 occasions as per NAAQS, 2009 while the concentration values have exceeded limit on 2 occasions as per GSR 742 (E) dated 25.09.2000. The PM2.5 concentration was found in the range of 10.2 to 196.7 µg/m3. It has exceeded limits on 7 occasions as per NAAQS, 2009.The SO2 concentration remained below 10.0 µg/m3 and NOX concentration was in the range of 8.2 to 26.6 µg/m3.

WATER QUALITY The analysis results reveal that most of the parameters of effluent water are below permissible limits prescribed by Ministry of Environment & Forests (MOEF) as General Standards for Class-‘A’ effluent (Effluent discharged into inland surface water) and below permissible limits prescribed in IS:10500-2012 standards for groundwater quality.

NOISE LEVEL The noise level was found in the range of 54.0 to 74.2 dB (A). The noise level recorded is below permissible limit prescribed by Ministry of Environment and Forest (MOEF).

Page 8: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

7

ENVIRONMENTAL STANDARDS:

(I) Environmental standard for Raniganj Coalfield vide MOEF, Govt. of India, Gazette

Notification No.GSR 742 (E) dated 25.09.2000 for 24 hourly samples at 500 meters from

dust generating point:

Station

Category

Pollutant Concentration (µg/m3)

TSPM PM10 SO2 NOx

Industrial 700.0 300.0 120.0 120.0

Residential 200.0 100.0 80.0 80.0

Station Category

Limits for noise (Leq) dB (A)

Day Time

(6am-10pm)

Night Time

(10pm-6am)

Industrial 75.0 70.0

Residential 55.0 45.0

(II) National Ambient Air Quality Standards (NAAQS), 2009 for residential, industrial

and rural areas for 24 hourly samples:

Pollutant PM10 PM2.5 SO2 NOX

Concentration (µg/m3) 100.0 60.0 80.0 80.0

Page 9: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

8

CHAPTER - II ENVIRONMENTAL STATEMENT FORM– V

Environmental statement for the financial year ending March, 2016

PART – A SL. NO. HEADING PARTICULARS

(I) NAME AND ADDRESS OF THE PROJECT

i Hariajam UG Project Officer, ECL, M/s Hariajam Colliery, P.O. – Nirsa, Dhanbad

ii Badjna UG Project Officer, ECL, M/s Badjna Colliery, P.O. – Nirsa, Dhanbad

iii Chapapur – II UG & OC Project Officer, ECL, M/s Chapapur Colliery, P.O. – Nirsa, Dhanbad

iv Khoodia UG & OC Project Officer, ECL, M/s Khoodia Colliery, P.O. – Nirsa, Dhanbad

v Lakhimata UG & OC Project Officer, ECL, M/s Lakhimata Colliery, P.O. – Nirsachatti, Dhanbad

vi Shampur – B UG & OC Project Officer, ECL, M/s Shampur B Colliery, P.O. – Mugma, Dhanbad

vii Mandaman UG Project Officer, ECL, M/s Mandman Colliery, P.O. – Mugma, Dhanbad

viii Nirsa OC Project Officer, ECL, M/s Nirsa Colliery, P.O. – Nirsa, Dhanbad

ix Shampur – A UG & OC Project Officer, ECL, M/s Shampur A Colliery, P.O. – Mugma, Dhanbad

x Gopinathpur UG & OC Project Officer, ECL, M/s Gopinathpur Colliery, P.O. – Nirsa, Dhanbad

xi Kapasara UG & OC Project Officer, ECL, M/s Kapasara Colliery, P.O. – Mugma, Dhanbad

(II) INDUSTRY CATEGORY All mines in the cluster falls in red category

(III) PRODUCTION CAPACITY 3.30 MTY

(IV) YEAR OF ESTABLISHMENT All the mines within the cluster are taken over mines from pre-nationalisation period.

(V) DATE OF THE LAST

ENVIRONMENTAL STATEMENT SUBMITTED

The Environment Statement is being submitted for the first time in the

financial year 2015 – 16 after the grant of EC on 16th January, 2015.

PART – B

WATER AND RAW MATERIAL CONSUMPTION (I) WATER CONSUMPTION (Cu.m/day)

1. Hariajam UG Sl. No.

Particulars 2014-15 2015-16

A. MINING

i Dust suppression 0 0

ii Fire fighting 0 0

iii Others (service building etc.) 10 10

B. COOLING (in radiators of trucks/HEMM)

0 0

C. DOMESTIC

i Colony 457 459

TOTAL 467 469

2. Badjna UG

Sl. No.

Particulars 2014-15 2015-16

A. MINING

i Dust suppression 5 5

ii Fire fighting 0 0

iii Others (service building etc.) 10 10

B. COOLING 0 0

Page 10: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

9

(in radiators of trucks/HEMM)

C. DOMESTIC

i Colony 288 288

TOTAL 303 303

3. Chapapur – II UG & OC

Sl. No.

Particulars 2014-15 2015-16

A. MINING

i Dust suppression 40 40

ii Fire fighting 0 0

iii Others (service building etc.) 12 12

B. COOLING

(in radiators of trucks/HEMM)

2 2

C. DOMESTIC

i Colony (Source-Mine water) 1440 1440

ii Colony (Source-Well water) 15 15

iii Water supplied to local communities 1470 1470

TOTAL 2979 2979

4. Khoodia UG

Sl.

No.

Particulars 2014-15 2015-16

A. MINING

i Dust suppression 5 5

ii Fire fighting 0 0

iii Others (service building etc.) 10 10

B. COOLING (in radiators of trucks/HEMM)

0 0

C. DOMESTIC

i Colony 2800 2800

TOTAL 2815 2815

5. Lakhimata UG & OC

Sl. No.

Particulars 2014-15 2015-16

A. MINING

i Dust suppression 5 5

ii Fire fighting 0 0

iii Others (service building etc.) 10 10

B. COOLING (in radiators of trucks/HEMM)

0 0

C. DOMESTIC

i Colony 300 300

TOTAL 315 315

6. Shampur – B UG & OC

Sl. No.

Particulars 2014-15 2015-16

A. MINING

i Dust suppression - -

ii Fire fighting 0 0

iii Others (service building etc.) 10 10

B. COOLING 0 0

Page 11: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

10

(in radiators of trucks/HEMM)

C. DOMESTIC

i Colony 200 200

TOTAL 210 210

7. Mandman UG

Sl. No.

Particulars 2014-15 2015-16

A. MINING

i Dust suppression 3 3

ii Fire fighting 0 0

iii Others (service building etc.) 8 8

B. COOLING

(in radiators of trucks/HEMM)

0 0

C. DOMESTIC

i Colony 0 0

TOTAL 11 11

8. Gopinathpur UG & OC Sl.

No.

Particulars 2014-15 2015-16

A. MINING

i Dust suppression 230 230

ii Fire fighting 0 0

iii Others (service building etc.) 12 12

B. COOLING

(in radiators of trucks/HEMM)

0 0

C. DOMESTIC

i Colony 5790 5790

TOTAL 6032 6032

9. Kapasara UG & OC

Sl.

No.

Particulars 2014-15 2015-16

A. MINING

i Dust suppression 74 74

ii Fire fighting 0 0

iii Others (service building etc.) 10 10

B. COOLING

(in radiators of trucks/HEMM)

0 0

C. DOMESTIC

i Colony 1642 1642

TOTAL 1716 1716

Page 12: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

11

(II) RAW MATERIAL CONSUMPTION : 1. Hariajam UG

Name of raw

material

Name of

products

Consumption of raw material per

unit of product

During previous financial year

(2014-15)

During current financial year

(2015-16)

1. Explosive

Coal

0.513 kg/te 0.477 kg/te

2. Diesel 0.015 l/te 0.015 l/te

3. Lubricants - -

2. Badjna UG

Name of raw

material

Name of

products

Consumption of raw material per

unit of product

During previous financial year

(2014-15)

During current financial year

(2015-16)

1. Explosive

Coal

- -

2. Diesel - -

3. Lubricants - -

3. Chapapur UG & OC

Name of raw

material

Name of

products

Consumption of raw material per

unit of product

During previous financial year

(2014-15)

During current financial year

(2015-16)

1. Explosive

Coal

1.614 kg/te 0.897 kg/te

2. Diesel 2.134 l/te 0.965 l/te

3. Lubricants 0.117 l/te 0.051 l/te

4. Khoodia UG & OC

Name of raw

material

Name of

products

Consumption of raw material per

unit of output

During previous financial year

(2014-15)

During current financial year

(2015-16)

1. Explosive

Coal

0.385 kg/te 0.424 kg/te

2. Diesel - -

3. Lubricants - -

5. Lakhimata UG & OC

Name of raw

material

Name of

products

Consumption of raw material per

unit of output

During previous financial year

(2014-15)

During current financial year

(2015-16)

1. Explosive

Coal

0.028 kg/te 0.028 kg/te

2. Diesel - -

3. Lubricants - -

Page 13: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

12

6. Shampur – B UG & OC Name of raw material

Name of products

Consumption of raw material per unit of output

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal

0.403 kg/te 0.380 kg/te

2. Diesel - -

3. Lubricants - -

7. Mandman UG

Name of raw material

Name of products

Consumption of raw material per unit of output

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal

0.353 kg/te 0.370 kg/te

2. Diesel 0.049 l/te 0.049 l/te

3. Lubricants 0.006 l/te 0.002 l/te

8. Gopinathpur UG & OC

Name of raw material

Name of products

Consumption of raw material per unit of output

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal

- -

2. Diesel 3.716 l/te 3.740 l/te

3. Lubricants 0.155 l/te 0.249 l/te

9. Kapasara UG & OC

Name of raw material

Name of products

Consumption of raw material per unit of output

During previous

financial year (2014-15)

During current

financial year (2015-16)

1. Explosive

Coal

1.443 kg/te 2.310 kg/te

2. Diesel 2.998 l/te 2.948 l/te

3. Lubricants - -

Page 14: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

13

PART – C POLLUTION GENERATED

Pollution Quantity of pollution generated Percentage variation from prescribed standards

with reasons

WATER Mine water discharged Analysis results are given in Annexure-III.

The analysis results reveal that most of the parameters are below permissible limits prescribed by MOEF as

General Standards for class ‘A’ effluent (Effluent

discharged into inland surface water).

AIR The main air pollutant are PM10 and PM2.5

The air quality results are appended as Annexure-I.

Ambient air quality results show that the values of SO2 and

NOx are well within the prescribed standards. The values of PM10 have exceeded the limit on 27 occasions and the

values of PM2.5 have exceeded the limit on 7 occasions as

per NAAQS, 2009.

PART – D HAZARDOUS WASTE

(As specified under Hazardous Waste (Management and Handling) Rules, 1989)

1. Hariajam UG Hazardous waste Total quantity

During Previous

financial year

(2014-15)

During current

financial year

(2015-16)

Disposal

method

A) From process

i)Used oil

ii)Lead-Acid Batteries a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

6960 litres

-

- -

-

7520 litres

-

- -

-

Dealt in Part – F

2. Badjna UG

Hazardous waste Total quantity

During Previous financial year

(2014-15)

During current financial year

(2015-16)

Disposal method

A) From process i)Used oil

ii)Lead-Acid Batteries

a. Automobile batteries b. Cap-lamp batteries

iii) Used Cotton waste iv) Metal Scrap

-

- -

- -

-

- -

- -

Dealt in

Part – F

3. Chapapur UG & OC Patch

Hazardous waste Total quantity

During Previous

financial year (2014-15)

During current

financial year (2015-16)

Disposal

method

Page 15: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

14

A) From process

i)Used oil ii)Lead-Acid Batteries

a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

300 litres

16 nos.

200 nos. -

-

300 litres

21 nos.

215 nos. -

-

Dealt in Part – F

4. Khoodia UG & OC Hazardous waste Total quantity

During Previous financial year

(2014-15)

During current financial year

(2015-16)

Disposal method

A) From process i)Used oil

ii)Lead-Acid Batteries a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

-

-

80 -

-

-

-

67 -

-

Dealt in

Part – F

5. Lakhimata UG & OC

Hazardous waste Total quantity

During Previous

financial year (2014-15)

During current

financial year (2015-16)

Disposal

method

A) From process i)Used oil

ii)Lead-Acid Batteries

a. Automobile batteries b. Cap-lamp batteries

iii) Used Cotton waste iv) Metal Scrap

-

- 270 nos.

- -

-

- 130 nos.

- -

Dealt in

Part – F

6. Shampur – B UG & OC

Hazardous waste Total quantity

During Previous

financial year

(2014-15)

During current

financial year

(2015-16)

Disposal

method

A) From process

i)Used oil ii)Lead-Acid Batteries

a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

-

-

210 nos. -

-

-

-

190 nos. -

-

Dealt in Part – F

7. Mandman UG

Page 16: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

15

Hazardous waste Total quantity

During Previous

financial year (2014-15)

During current

financial year (2015-16)

Disposal

method

A) From process i)Used oil

ii)Lead-Acid Batteries

a. Automobile batteries b. Cap-lamp batteries

iii) Used Cotton waste iv) Metal Scrap

-

- 129 nos.

- -

-

- 45 nos.

- -

Dealt in

Part – F

8. Gopinathpur UG & OC

Hazardous waste Total quantity

During Previous

financial year (2014-15)

During current

financial year (2015-16)

Disposal

method

A) From process

i)Used oil ii)Lead-Acid Batteries

a. Automobile batteries

b. Cap-lamp batteries iii) Used Cotton waste

iv) Metal Scrap

6553 litres

-

- -

-

5493 litres

-

- -

-

Dealt in Part – F

9. Kapasara UG & OC

Hazardous waste Total quantity

During Previous financial year

(2014-15)

During current financial year

(2015-16)

Disposal method

A) From process i)Used oil

ii)Lead-Acid Batteries a. Automobile batteries

b. Cap-lamp batteries

iii) Used Cotton waste iv) Metal Scrap

-

-

-

- -

-

-

-

- -

Dealt in

Part – F

Approximate values may be given where actual values are not available. Note: a) The detail of used oil is to be given to concerned Pollution Control Board in Form-13 as per time mentioned in HW (M & H), Amendment Rules, 2003. b) The detail of disposal of Lead Acid batteries is to be given to concerned State Pollution Control Board in Form-VIII as per time mentioned in Batteries (M&H) Rules, 2001.

Page 17: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

16

PART – E SOLID WASTE

Particulars Name of Mine Total quantity (In Million Cu.m)

During previous financial year

(2014-15)

During current financial year

(2015-16)

a) From process

(Mining)

Chapapur – II OC 0.599 0.463

Gopinathpur OC 0.48 0.48

Kapasara OC 0.21 0.438

b) From pollution

control facilities

Chapapur – II OC - -

Gopinathpur OC - -

Kapasara OC - -

c) Quantity recycled

or reutilized back

filled

Chapapur – II OC - -

Gopinathpur OC 0.38 -

Kapasara OC 0.194 -

PART – F

PLEASE SPECIFY THE CHARACTERISTICS (IN TERMS OF

CONCENTRATION AND QUANTUM) OF HAZARDOUS AS WELL AS SOLID

WASTE AND INDICATE THE DISPOSAL PRACTICE ADOPTED FOR BOTH

THESE CATEGORIES OF WASTE.

Hazardous waste generated is given in the table PART-D which has been deposited at area store disposal stock yard. Used oil is re-used as lubricant. Cap lamp batteries, HEMM batteries and metal scrap are stored at area store and auctioned to authorized recyclers.

PART – G IMPACT OF POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES AND CONSEQUENTLY ON COST OF PRODUCTION. In order to carry out mining in an eco-friendly manner following pollution control measures have been implemented.

1. AIR POLLUTION CONTROL MEASURES: a) In Hariajam UG, around 30.20 Ha area have been planted till 2015 – 16. b) In Badjna UG, around 20.29 Ha external dump area have been planted with local

species like Chakundi, Akasia, Sisam etc. c) In Lakhimata UG, around 11.31 Ha external dump area have been planted. d) In Kapasara colliery, around 2.60 Ha external OB dump land, 4.70 Ha backfilled area

and 4.50 Ha subsided area have been planted during 2015 – 16 with local species like Sisam, Akasia etc.

e) Wet coal transport, road maintenance is being done. f) Trucks carrying coal to the railway sidings are covered with tarpaulin to avoid spillage.

Page 18: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

17

g) Regular sprinkling of water at coal loading & discharge points with the help of stand post at Railway siding.

h) Regular water sprinkling is done along the haul road and coal transport route to reduce dust.

2. WATER POLLUTION CONTROL MEASURES:

(for Mine/CHP/Workshop/Colony discharge water) a) Pressure filter plant is installed for supply of mine water to colonies of Badjna UG. After

settling in pond, the remaining mine water is being discharged to nearby Pusai River. b) In Chapapur – II UG, after settling in pond, the remaining mine water is being

discharged to nearby river. c) 1 no. of settling tank is provided for treating domestic effluent in the colonies of Khoodia

UG. d) 1 no. of water treatment plant has been provided at R. workshop.

3. NOISE POLLUTION CONTROL MEASURES: a) Regular maintenance of machines and other equipment at Bunker and workshop

including mine fan. b) Providing green belt around core activity area, along road side in colony and in other

vacant space. c) Non-electric delay detonators are used in place of detonating fuse to eliminate noise

pollution during blasting. d) All HEMM &light vehicle are provided with silencers. e) Noise monitoring is being carried out regularly.

4. LAND RESOURCE MANAGEMENT: a) Quantity of OB backfilled in year 2014-15 & 2015-16

Name of Mine Quantity of OB generated

(Mm3)

Quantity of OB backfilled

(Mm3)

2014-15 2015-16 2014-15 2015-16

Chapapur – II OC Patch 0.60 0.46 - -

Gopinathpur OC 0.48 0.48 0.38 -

Kapasara OC 0.21 0.438 0.194 -

PART – H ADDITIONAL INVESTMENT PROPOSAL FOR ENVIRONMENTAL PROTECTION INCLUDING ABATEMENT OF POLLUTION.

a) Plantation will be carried out as per proposed plan in future. b) 7 nos. of solar lighting has been provided in Hariajam UG. c) There is a proposal of 5 nos. of solar lighting in Kapasara colliery. d) The Environmental monitoring of the cluster will be continued fortnightly as per the

guidelines of Ministry of Environment, Forests & Climate Change (MoEF& CC).

Page 19: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

18

PART – I ANY OTHER PARTICULAR IN RESPECTOF ENVIRONMENTAL PROTECTION AND ABATMENT OF POLLUTION. The Environmental Monitoring is carried out fortnightly for the project by CMPDI, RI-I as per the guideline of Ministry of Environment and Forest (MOEF) and based on the result thereof; colliery takes necessary action if needed.

Page 20: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

19

Annexure – I

AMBIENT AIR QUALITY

Station No

Station Name Month Fortnight Date of Sampling

PM10 PM2.5 SO2 NOx

1A1 Nayadih village near Shampur - A May Second 19-May-15 94.6 30.2 <10.0 14.2

1A1 Nayadih village near Shampur - A June First 01-Jun-15 90.4 26.7 <10.0 16.8

1A1 Nayadih village near Shampur - A June Second 16-Jun-15 88.3 23.4 <10.0 17.1

1A1 Nayadih village near Shampur - A July First 01-Jul-15 86.4 19.2 <10.0 16.3

1A1 Nayadih village near Shampur - A July Second 20-Jul-15 70.9 18.8 <10.0 16.2

1A1 Nayadih village near Shampur - A August First 03-Aug-15 64.8 15.2 <10.0 15.6

1A1 Nayadih village near Shampur - A August Second 17-Aug-15 62.4 14.8 <10.0 15.2

1A1 Nayadih village near Shampur - A September First 02-Sep-15 60.5 13.8 <10.0 14.3

1A1 Nayadih village near Shampur - A September Second 16-Sep-15 68.4 19.6 <10.0 14.1

1A1 In Nayadih village near Shampur - A October First 05-Oct-15 65.8 17.4 <10.0 14.4

1A1 In Nayadih village near Shampur - A October Second 16-Oct-15 64.4 16.6 <10.0 14.5

1A1 In Nayadih village near Shampur - A November First 02-Nov-15 63.6 16.2 <10.0 15.6

1A1 In Nayadih village near Shampur - A November Second 16-Nov-15 69.3 19.8 <10.0 18.4

1A1 In Nayadih village near Shampur - A December First 02-Dec-15 74.6 25.9 <10.0 19.2

1A1 In Nayadih village near Shampur - A December Second 17-Dec-15 73.8 24.8 <10.0 19.0

1A1 In Nayadih village near Shampur - A January First 04-Jan-16 78.8 28.6 <10.0 19.4

1A1 In Nayadih village near Shampur - A January Second 18-Jan-16 79.1 27.4 <10.0 18.6

1A1 In Nayadih village near Shampur - A February First 01-Feb-16 96.2 44.4 <10.0 18.8

1A1 In Nayadih village near Shampur - A February Second 16-Feb-16 98.4 42.3 <10.0 18.7

1A1 In Nayadih village near Shampur - A March First 01-Mar-16 99.6 46.5 <10.0 18.2

1A1 In Nayadih village near Shampur - A March Second 17-Mar-16 101.4 48.8 <10.0 18.6

1A10 Mugma III A near Railway siding January First 04-Jan-16 344.6 196.7 <10.0 26.6

1A10 Mugma III A near Railway siding January Second 19-Jan-16 326.8 191.8 <10.0 25.3

1A10 Mugma III A near Railway siding February First 08-Feb-16 262.2 162.8 <10.0 24.6

1A10 Mugma III A near Railway siding February Second 17-Feb-16 270.7 170.2 <10.0 24.2

1A10 Mugma III A near Railway siding March First 04-Mar-16 282.3 174.6 <10.0 25.3

1A10 Mugma III A near Railway siding March Second 17-Mar-16 286.2 175.4 <10.0 25.4

1A2 Near Mugma Village May Second 19-May-15 92.7 28.4 <10.0 9.7

1A2 Near Mugma Village June First 01-Jun-15 94.3 28.3 <10.0 10.2

1A2 Near Mugma Village June Second 16-Jun-15 92.7 27.1 <10.0 9.7

1A2 Near Mugma Village July First 01-Jul-15 88.2 20.1 <10.0 10.7

1A2 Near Mugma Village July Second 20-Jul-15 73.6 19.3 <10.0 11.4

1A2 Near Mugma Village August First 03-Aug-15 68.1 15.6 <10.0 11.4

1A2 Near Mugma Village August Second 17-Aug-15 66.8 15.2 <10.0 10.3

1A2 Near Mugma Village September First 01-Sep-15 64.6 14.0 <10.0 10.0

1A2 Near Mugma Village September Second 16-Sep-15 71.2 18.2 <10.0 10.2

1A2 Near Mugma Village October First 07-Oct-15 72.3 16.9 <10.0 10.8

1A2 Near Mugma Village October Second 16-Oct-15 71.3 15.4 <10.0 11.2

1A2 Near Mugma Village November First 02-Nov-15 72.4 15.0 <10.0 12.8

1A2 Near Mugma Village November Second 16-Nov-15 79.6 21.6 <10.0 16.6

1A2 Near Mugma Village December First 01-Dec-15 86.2 29.3 <10.0 16.0

1A2 Near Mugma Village December Second 16-Dec-15 84.0 28.4 <10.0 15.6

1A2 Near Mugma Village January First 05-Jan-16 80.6 27.3 <10.0 15.4

1A2 Near Mugma Village January Second 20-Jan-16 79.3 28.2 <10.0 17.4

1A2 Near Mugma Village February First 01-Feb-16 121.3 58.2 <10.0 18.4

1A2 Near Mugma Village February Second 16-Feb-16 126.2 54.6 <10.0 18.6

Page 21: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

20

Station

No

Station Name Month Fortnight Date of

Sampling

PM10 PM2.5 SO2 NOx

1A2 Near Mugma Village March First 01-Mar-16 128.8 56.0 <10.0 19.4

1A2 Near Mugma Village March Second 16-Mar-16 127.9 56.3 <10.0 19.2

1A3 Garphalbari Near Kapasara UG May Second 19-May-15 76.2 24.5 <10.0 12.6

1A3 Garphalbari Near Kapasara UG June First 01-Jun-15 70.2 18.2 <10.0 14.1

1A3 Garphalbari Near Kapasara UG June Second 16-Jun-15 69.4 18.8 <10.0 16.8

1A3 Garphalbari Near Kapasara UG July First 01-Jul-15 66.2 16.4 <10.0 14.4

1A3 Garphalbari Near Kapasara UG July Second 20-Jul-15 65.2 15.6 <10.0 14.9

1A3 Garphalbari Near Kapasara UG August First 03-Aug-15 63.4 13.4 <10.0 14.8

1A3 Garphalbari Near Kapasara UG August Second 18-Aug-15 60.6 12.6 <10.0 14.4

1A3 Garphalbari Near Kapasara UG September First 02-Sep-15 60.0 12.1 <10.0 13.6

1A3 Garphalbari Near Kapasara UG September Second 17-Sep-15 63.4 14.0 <10.0 13.8

1A3 In Garphalbari Near Kapasara UG October First 07-Oct-15 62.6 13.6 <10.0 13.6

1A3 In Garphalbari Near Kapasara UG October Second 23-Oct-15 61.5 13.0 <10.0 13.8

1A3 In Garphalbari Near Kapasara UG November First 06-Nov-15 62.6 13.8 <10.0 13.4

1A3 In Garphalbari Near Kapasara UG November Second 18-Nov-15 72.4 17.8 <10.0 14.8

1A3 In Garphalbari Near Kapasara UG December First 03-Dec-15 76.4 22.5 <10.0 14.3

1A3 In Garphalbari Near Kapasara UG December Second 18-Dec-15 77.2 22.8 <10.0 14.7

1A3 In Garphalbari Near Kapasara UG January First 01-Jan-16 79.1 26.4 <10.0 14.4

1A3 In Garphalbari Near Kapasara UG January Second 18-Jan-16 81.2 27.4 <10.0 14.8

1A3 In Garphalbari Near Kapasara UG February First 01-Feb-16 104.1 49.5 <10.0 16.3

1A3 In Garphalbari Near Kapasara UG February Second 16-Feb-16 108.3 50.8 <10.0 16.4

1A3 In Garphalbari Near Kapasara UG March First 03-Mar-16 110.6 52.8 <10.0 17.3

1A3 In Garphalbari Near Kapasara UG March Second 16-Mar-16 112.8 53.6 <10.0 17.4

1A4 In Bharkunrabari village October First 06-Oct-15 64.2 15.8 <10.0 14.2

1A4 In Bharkunrabari village October Second 23-Oct-15 63.8 15.2 <10.0 14.8

1A4 In Bharkunrabari village November First 03-Nov-15 64.2 15.6 <10.0 15.2

1A4 In Bharkunrabari village November Second 17-Nov-15 68.6 17.0 <10.0 16.9

1A4 In Bharkunrabari village December First 01-Dec-15 71.3 20.6 <10.0 17.2

1A4 In Bharkunrabari village December Second 16-Dec-15 72.1 21.6 <10.0 17.0

1A4 In Bharkunrabari village January First 06-Jan-16 72.6 21.5 <10.0 16.8

1A4 In Bharkunrabari village January Second 18-Jan-16 71.8 22.3 <10.0 16.2

1A4 In Bharkunrabari village February First 03-Feb-16 88.3 41.8 <10.0 16.9

1A4 In Bharkunrabari village February Second 29-Feb-16 86.1 40.9 <10.0 17.1

1A4 In Bharkunrabari village March First 04-Mar-16 90.2 43.7 <10.0 17.4

1A4 In Bharkunrabari village March Second 17-Mar-16 91.5 44.0 <10.0 17.2

1A5 In Baraban village October First 06-Oct-15 62.6 14.4 <10.0 12.6

1A5 In Baraban village October Second 23-Oct-15 62.0 14.0 <10.0 13.2

1A5 In Baraban village November First 06-Nov-15 63.7 14.6 <10.0 13.8

1A5 In Baraban village November Second 18-Nov-15 70.2 16.4 <10.0 15.2

1A5 In Baraban village December First 03-Dec-15 74.8 21.8 <10.0 15.0

1A5 In Baraban village December Second 18-Dec-15 73.6 22.4 <10.0 15.2

1A5 In Baraban village January First 01-Jan-16 73.0 21.8 <10.0 14.8

1A5 In Baraban village January Second 20-Jan-16 72.5 21.6 <10.0 15.1

1A5 In Baraban village February First 03-Feb-16 114.2 61.4 <10.0 16.0

1A5 In Baraban village February Second 29-Feb-16 112.4 57.6 <10.0 16.2

1A5 In Baraban village March First 01-Mar-16 118.8 59.9 <10.0 16.8

1A5 In Baraban village March Second 18-Mar-16 117.6 59.0 <10.0 16.6

1A6 In Jhukundar village October First 05-Oct-15 66.4 18.6 <10.0 15.3

1A6 In Jhukundar village October Second 16-Oct-15 67.3 17.7 <10.0 15.6

Page 22: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

21

Station

No

Station Name Month Fortnight Date of

Sampling

PM10 PM2.5 SO2 NOx

1A6 In Jhukundar village November First 02-Nov-15 68.4 18.4 <10.0 16.4

1A6 In Jhukundar village November Second 17-Nov-15 74.6 21.3 <10.0 19.6

1A6 In Jhukundar village December First 02-Dec-15 79.3 30.2 <10.0 19.0

1A6 In Jhukundar village December Second 18-Dec-15 78.8 29.6 <10.0 18.6

1A6 In Jhukundar village January First 05-Jan-16 77.3 27.9 <10.0 18.8

1A6 In Jhukundar village January Second 18-Jan-16 78.6 26.4 <10.0 18.4

1A6 In Jhukundar village February First 08-Feb-16 106.9 48.3 <10.0 18.2

1A6 In Jhukundar village February Second 17-Feb-16 102.3 46.8 <10.0 18.0

1A6 In Jhukundar village March First 03-Mar-16 108.6 48.8 <10.0 17.7

1A6 In Jhukundar village March Second 16-Mar-16 107.3 49.6 <10.0 17.9

1A7 Sanbad village May Second 19-May-15 72.4 22.4 <10.0 8.2

1A7 Sanbad village June First 01-Jun-15 68.1 17.5 <10.0 9.4

1A7 Sanbad village June Second 16-Jun-15 66.5 17.2 <10.0 10.2

1A7 Sanbad village July First 01-Jul-15 64.1 17.3 <10.0 12.1

1A7 Sanbad village July Second 21-Jul-15 62.5 13.9 <10.0 10.4

1A7 Sanbad village August First 04-Aug-15 60.8 12.6 <10.0 10.8

1A7 Sanbad village August Second 18-Aug-15 56.2 10.4 <10.0 9.0

1A7 Sanbad village September First 02-Sep-15 54.0 10.2 <10.0 8.6

1A7 Sanbad village September Second 17-Sep-15 59.2 12.6 <10.0 9.4

1A8 Panrra village May Second 20-May-15 124.3 34.3 <10.0 16.8

1A8 Panrra village June First 08-Jun-15 116.8 28.2 <10.0 18.1

1A8 Panrra village June Second 22-Jun-15 114.3 30.7 <10.0 16.5

1A8 Panrra village July First 07-Jul-15 108.2 34.5 <10.0 17.5

1A8 Panrra village July Second 21-Jul-15 97.9 25.6 <10.0 15.2

1A8 Panrra village August First 05-Aug-15 90.3 23.6 <10.0 13.6

1A8 Panrra village August Second 18-Aug-15 88.6 22.4 <10.0 12.8

1A8 Panrra village September First 03-Sep-15 80.3 20.4 <10.0 12.0

1A8 Panrra village September Second 18-Sep-15 84.6 24.6 <10.0 12.2

1A9 Tiltoriya village May Second 20-May-15 94.3 29.7 <10.0 10.4

1A9 Tiltoriya village June First 08-Jun-15 89.3 24.7 <10.0 12.3

1A9 Tiltoriya village June Second 22-Jun-15 86.1 24.3 <10.0 14.1

1A9 Tiltoriya village July First 07-Jul-15 84.2 20.6 <10.0 12.7

1A9 Tiltoriya village July Second 22-Jul-15 71.5 18.3 <10.0 14.0

1A9 Tiltoriya village August First 03-Aug-15 67.3 16.9 <10.0 13.4

1A9 Tiltoriya village August Second 17-Aug-15 64.2 16.8 <10.0 12.2

1A9 Tiltoriya village September First 01-Sep-15 61.7 14.2 <10.0 11.4

1A9 Tiltoriya village September Second 18-Sep-15 62.8 14.8 <10.0 11.8

AIR QUALITY METAL ANALYSIS

Station No

Station Name

Month Fortnight

Date of Sampling

Arsenic Cadmium

Chromium

Mercury

Nickel Lead

1A1 Nayadih village near Shampur - A

September First 02-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.04

1A1 Nayadih village near Shampur - A

March First 01-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

1A10 Mugma III A March First 04-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

Page 23: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

22

Station

No

Station

Name

Month Fortni

ght

Date of

Sampling

Arsenic Cadmiu

m

Chro

mium

Mercur

y

Nickel Lead

near Railway siding

1A2 Near Mugma Village

September First 01-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.07

1A2 Near Mugma Village

March First 01-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

1A3 Garphalbari Near

Kapasara UG

September First 02-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.08

1A3 Garphalbari Near

Kapasara UG

March First 03-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

1A4 In Bharkunrabari

village

March First 04-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

1A5 In Baraban village

March First 01-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

1A6 In Jhukundar village

March First 03-Mar-16 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005

1A7 Sanbad village September First 02-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.06

1A8 Panrra village September First 03-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.08

1A9 Tiltoriya village

September First 01-Sep-15 <0.005 <0.001 <0.01 <0.001 <0.10 0.06

Environmental standards: National Ambient Air Quality Standards (NAAQS), 2009 for residential, industrial and rural areas for 24 hourly/yearly samples:

Heavy Metal Arsenic (As) Cadmium

(Cd)

Chromium

(Cr)

Mercury

Hg)

Nickel

(Ni)

Lead

(Pb)

Limit (µg/m3) 0.006 Not specified Not specified Not specified 0.02 0.5

Page 24: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

23

Annexure – II

NOISE LEVEL

Station No

Station Name Month Fortnight Date of Sampling

Noise Level dB(A)

1N1 Pit-top Hariajam UG July First 01-Jul-15 66.1

1N1 Pit-top Hariajam UG June First 01-Jun-15 64.7

1N1 Pit-top Hariajam UG June Second 16-Jun-15 63.9

1N1 Pit-top Hariajam UG August Second 17-Aug-15 63.2

1N1 Pit-top Hariajam UG August First 05-Aug-15 61.4

1N1 Pit-top Hariajam UG September First 01-Sep-15 65.2

1N1 Pit-top Hariajam UG September Second 17-Sep-15 64.7

1N1 Pit-top Hariajam UG October First 07-Oct-15 68.4

1N1 Pit-top Hariajam UG October Second 16-Oct-15 67.3

1N1 Pit-top Hariajam UG November First 03-Nov-15 70.1

1N1 Pit-top Hariajam UG November Second 18-Nov-15 68.4

1N1 Pit-top Hariajam UG December First 10-Dec-15 68

1N1 Pit-top Hariajam UG December Second 21-Dec-15 70

1N1 Pit-top Hariajam UG January First 11-Jan-16 69

1N1 Pit-top Hariajam UG January Second 20-Jan-16 64

1N1 Pit-top Hariajam UG December Second 21-Dec-15 70

1N1 Pit-top Hariajam UG February First 03-Feb-16 69

1N1 Pit-top Hariajam UG February Second 16-Feb-16 69

1N1 Pit-top Hariajam UG March First 03-Mar-16 68

1N1 Pit-top Hariajam UG March Second 16-Mar-16 69

1N2 Pit-top Badjna UG July First 07-Jul-15 69.1

1N2 Pit-top Badjna UG June First 01-Jun-15 67.8

1N2 Pit-top Badjna UG June Second 16-Jun-15 70.1

1N2 Pit-top Badjna UG August Second 17-Aug-15 68.0

1N2 Pit-top Badjna UG August First 04-Aug-15 68.9

1N2 Pit-top Badjna UG September First 01-Sep-15 63.7

1N2 Pit-top Badjna UG September Second 16-Sep-15 69.3

1N2 Pit-top Badjna UG October First 06-Oct-15 71.3

1N2 Pit-top Badjna UG October Second 23-Oct-15 69.8

1N2 Pit-top Badjna UG November First 03-Nov-15 67.6

1N2 Pit-top Badjna UG November Second 18-Nov-15 66.3

1N2 Pit-top Badjna UG December First 10-Dec-15 67

1N2 Pit-top Badjna UG December Second 21-Dec-15 61

1N2 Pit-top Badjna UG January First 11-Jan-16 62

1N2 Pit-top Badjna UG January Second 20-Jan-16 66

1N2 Pit-top Badjna UG February First 03-Feb-16 72

1N2 Pit-top Badjna UG February Second 16-Feb-16 70

1N2 Pit-top Badjna UG March First 03-Mar-16 63

1N2 Pit-top Badjna UG March Second 16-Mar-16 62

1N3 Pit-top Chapapur-II UG July First 07-Jul-15 68.0

1N3 Pit-top Chapapur-II UG June First 02-Jun-15 65.2

1N3 Pit-top Chapapur-II UG June Second 16-Jun-15 66.1

1N3 Pit-top Chapapur-II UG August Second 17-Aug-15 67.3

1N3 Pit-top Chapapur-II UG August First 04-Aug-15 63.2

1N3 Pit-top Chapapur-II UG September First 01-Sep-15 65.3

1N3 Pit-top Chapapur-II UG September Second 16-Sep-15 67.0

Page 25: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

24

Station

No

Station Name Month Fortnight Date of

Sampling

Noise Level

dB(A)

1N3 Pit-top Chapapur-II UG October First 06-Oct-15 70.6

1N3 Pit-top Chapapur-II UG October Second 23-Oct-15 70.2

1N3 Pit-top Chapapur-II UG November First 03-Nov-15 69.5

1N3 Pit-top Chapapur-II UG November Second 17-Nov-15 70.4

1N3 Pit-top Chapapur-II UG December First 10-Dec-15 67

1N3 Pit-top Chapapur-II UG December Second 21-Dec-15 69

1N3 Pit-top Chapapur-II UG January First 11-Jan-16 64

1N3 Pit-top Chapapur-II UG January Second 20-Jan-16 62

1N3 Pit-top Chapapur-II UG February First 01-Feb-16 64

1N3 Pit-top Chapapur-II UG February Second 16-Feb-16 59

1N3 Pit-top Chapapur-II UG March First 03-Mar-16 67

1N3 Pit-top Chapapur-II UG March Second 16-Mar-16 57

1N4 Pit-top Khoodia UG July First 07-Jul-15 70.3

1N4 Pit-top Khoodia UG June First 01-Jun-15 71.4

1N4 Pit-top Khoodia UG June Second 22-Jun-15 69.7

1N4 Pit-top Khoodia UG August Second 17-Aug-15 69.8

1N4 Pit-top Khoodia UG August First 03-Aug-15 67.5

1N4 Pit-top Khoodia UG September First 01-Sep-15 67.4

1N4 Pit-top Khoodia UG September Second 18-Sep-15 67.8

1N4 Pit-top Khoodia UG October First 07-Oct-15 67.3

1N4 Pit-top Khoodia UG October Second 16-Oct-15 66.5

1N4 Pit-top Khoodia UG November First 03-Nov-15 69.2

1N4 Pit-top Khoodia UG November Second 17-Nov-15 70.1

1N4 Pit-top Khoodia UG December First 10-Dec-15 69

1N4 Pit-top Khoodia UG December Second 21-Dec-15 66

1N4 Pit-top Khoodia UG January First 11-Jan-16 69

1N4 Pit-top Khoodia UG January Second 20-Jan-16 70

1N4 Pit-top Khoodia UG February First 01-Feb-16 62

1N4 Pit-top Khoodia UG February Second 29-Feb-16 64

1N4 Pit-top Khoodia UG March First 04-Mar-16 62

1N4 Pit-top Khoodia UG March Second 16-Mar-16 64

1N5 Pit-top Lakhimata UG July First 01-Jul-15 62.9

1N5 Pit-top Lakhimata UG June First 08-Jun-15 64.1

1N5 Pit-top Lakhimata UG June Second 22-Jun-15 66.2

1N5 Pit-top Lakhimata UG August Second 18-Aug-15 65.6

1N5 Pit-top Lakhimata UG August First 05-Aug-15 61.9

1N5 Pit-top Lakhimata UG September First 02-Sep-15 63.8

1N5 Pit-top Lakhimata UG September Second 17-Sep-15 69.5

1N5 Pit-top Lakhimata UG October First 05-Oct-15 68.7

1N5 Pit-top Lakhimata UG October Second 16-Oct-15 69.0

1N5 Pit-top Lakhimata UG November First 06-Nov-15 67.4

1N5 Pit-top Lakhimata UG November Second 17-Nov-15 69.7

1N5 Pit-top Lakhimata UG December First 10-Dec-15 70

1N5 Pit-top Lakhimata UG December Second 22-Dec-15 64

1N5 Pit-top Lakhimata UG January First 11-Jan-16 67

1N5 Pit-top Lakhimata UG January Second 18-Jan-16 67

1N5 Pit-top Lakhimata UG February First 01-Feb-16 59

1N5 Pit-top Lakhimata UG February Second 29-Feb-16 63

1N5 Pit-top Lakhimata UG March First 04-Mar-16 69

Page 26: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

25

Station

No

Station Name Month Fortnight Date of

Sampling

Noise Level

dB(A)

1N5 Pit-top Lakhimata UG March Second 18-Mar-16 61

1N6 Pit-top Shampur-B UG July First 01-Jul-15 64.8

1N6 Pit-top Shampur-B UG June First 08-Jun-15 62.4

1N6 Pit-top Shampur-B UG June Second 16-Jun-15 62.1

1N6 Pit-top Shampur-B UG August Second 18-Aug-15 67.5

1N6 Pit-top Shampur-B UG August First 04-Aug-15 65.4

1N6 Pit-top Shampur-B UG September First 02-Sep-15 66.7

1N6 Pit-top Shampur-B UG September Second 16-Sep-15 66.2

1N6 Pit-top Shampur-B UG October First 05-Oct-15 65.9

1N6 Pit-top Shampur-B UG October Second 16-Oct-15 67.1

1N6 Pit-top Shampur-B UG November First 06-Nov-15 65.7

1N6 Pit-top Shampur-B UG November Second 18-Nov-15 68.2

1N6 Pit-top Shampur-B UG December First 09-Dec-15 62

1N6 Pit-top Shampur-B UG December Second 22-Dec-15 61

1N6 Pit-top Shampur-B UG January First 12-Jan-16 60

1N6 Pit-top Shampur-B UG January Second 18-Jan-16 68

1N6 Pit-top Shampur-B UG February First 01-Feb-16 70

1N6 Pit-top Shampur-B UG February Second 29-Feb-16 68

1N6 Pit-top Shampur-B UG March First 04-Mar-16 64

1N6 Pit-top Shampur-B UG March Second 18-Mar-16 58

1N7 Pit-top Mandman UG July First 01-Jul-15 69.8

1N7 Pit-top Mandman UG June First 09-May-15 68.4

1N7 Pit-top Mandman UG June Second 22-Jun-15 72.1

1N7 Pit-top Mandman UG August Second 17-Aug-15 70.2

1N7 Pit-top Mandman UG August First 03-Aug-15 69.7

1N7 Pit-top Mandman UG September First 02-Sep-15 68.5

1N7 Pit-top Mandman UG September Second 17-Sep-15 68.3

1N7 Pit-top Mandman UG October First 07-Oct-15 70.1

1N7 Pit-top Mandman UG October Second 16-Oct-15 68.4

1N7 Pit-top Mandman UG November First 06-Nov-15 71.3

1N7 Pit-top Mandman UG November Second 18-Nov-15 70.5

1N7 Pit-top Mandman UG December First 09-Dec-15 64

1N7 Pit-top Mandman UG December Second 22-Dec-15 64

1N7 Pit-top Mandman UG January First 12-Jan-16 64

1N7 Pit-top Mandman UG January Second 18-Jan-16 62

1N7 Pit-top Mandman UG February First 08-Feb-16 63

1N7 Pit-top Mandman UG February Second 17-Feb-16 62

1N7 Pit-top Mandman UG March First 01-Mar-16 59

1N7 Pit-top Mandman UG March Second 18-Mar-16 54

1N8 Workshop Gopinathpur OC Patch July First 07-Jul-15 69.1

1N8 Workshop Gopinathpur OC Patch June First 01-Jun-15 74.2

1N8 Workshop Gopinathpur OC Patch June Second 16-Jun-15 70.1

1N8 Workshop Gopinathpur OC Patch August Second 17-Aug-15 68.5

1N8 Workshop Gopinathpur OC Patch August First 03-Aug-15 68.3

1N8 Workshop Gopinathpur OC Patch September First 01-Sep-15 67.1

1N8 Workshop Gopinathpur OC Patch September Second 18-Sep-15 70.6

1N8 Workshop Gopinathpur OC Patch October First 06-Oct-15 71.5

1N8 Workshop Gopinathpur OC Patch October Second 23-Oct-15 70.6

1N8 Workshop Gopinathpur OC Patch November First 02-Nov-15 69.8

Page 27: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

26

Station

No

Station Name Month Fortnight Date of

Sampling

Noise Level

dB(A)

1N8 Workshop Gopinathpur OC Patch November Second 18-Nov-15 71.3

1N8 Workshop Gopinathpur OC Patch December First 09-Dec-15 66

1N8 Workshop Gopinathpur OC Patch December Second 22-Dec-15 67

1N8 Workshop Gopinathpur OC Patch January First 12-Jan-16 63

1N8 Workshop Gopinathpur OC Patch January Second 18-Jan-16 64

1N8 Workshop Gopinathpur OC Patch February First 08-Feb-16 68

1N8 Workshop Gopinathpur OC Patch February Second 17-Feb-16 67

1N8 Workshop Gopinathpur OC Patch March First 01-Mar-16 56

1N8 Workshop Gopinathpur OC Patch March Second 17-Mar-16 67

1N9 Workshop Kapasara OC Patch July First 07-Jul-15 64.7

1N9 Workshop Kapasara OC Patch June First 02-Jun-15 72.9

1N9 Workshop Kapasara OC Patch June Second 22-Jun-15 71.6

1N9 Workshop Kapasara OC Patch August Second 17-Aug-15 67.2

1N9 Workshop Kapasara OC Patch August First 03-Aug-15 70.1

1N9 Workshop Kapasara OC Patch September First 01-Sep-15 70.4

1N9 Workshop Kapasara OC Patch September Second 17-Sep-15 71.4

1N9 Workshop Kapasara OC Patch October First 06-Oct-15 70.7

1N9 Workshop Kapasara OC Patch October Second 23-Oct-15 69.7

1N9 Workshop Kapasara OC Patch November First 02-Nov-15 67.2

1N9 Workshop Kapasara OC Patch November Second 17-Nov-15 69.4

1N9 Workshop Kapasara OC Patch December First 09-Dec-15 64

1N9 Workshop Kapasara OC Patch December Second 22-Dec-15 69

1N9 Workshop Kapasara OC Patch January First 12-Jan-16 65

1N9 Workshop Kapasara OC Patch January Second 18-Jan-16 63

1N9 Workshop Kapasara OC Patch February First 08-Feb-16 66

1N9 Workshop Kapasara OC Patch February Second 17-Feb-16 70

1N9 Workshop Kapasara OC Patch March First 01-Mar-16 58

1N9 Workshop Kapasara OC Patch March Second 17-Mar-16 64

Page 28: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

27

Annexure – III

EFFLUENT WATER QUALITY (5 PARAMETERS)

Station No

Station Name Month Fortnight Date of Sampling

pH TSS TDS O&G COD

1MW1 Hariajam UG May Second 21-May-15 7.75 <25.0 357 <2.0 16

1MW1 Hariajam UG June Second 16-Jun-15 7.20 32 336 <2.0 24

1MW1 Hariajam UG July First 01-Jul-15 7.83 30 332 <2.0 16

1MW1 Hariajam UG July Second 20-Jul-15 7.34 <25.0 322 <2.0 08

1MW1 Hariajam UG August First 03-Aug-15 7.56 <25.0 330 <2.0 30

1MW1 Hariajam UG August Second 17-Aug-15 7.52 30 344 <2.0 28

1MW1 Hariajam UG September First 01-Sep-15 7.64 26 339 <2.0 28

1MW1 Hariajam UG June First 01-Jun-15 7.72 34 350 <2.0 24

1MW1 Hariajam UG September Second 17-Sep-15 7.68 6 224 <2.0 08

1MW1 Hariajam UG October First 05-Oct-15 7.72 10 430 <2.0 16

1MW1 Hariajam UG October Second 16-Oct-15 8.35 12 498 <2.0 20

1MW1 Hariajam UG November First 03-Nov-15 7.72 14 524 <2.0 16

1MW1 Hariajam UG November Second 16-Nov-15 8.02 10 528 <2.0 24

1MW1 Hariajam UG December Second 17-Dec-15 8.04 6 460 <2.0 08

1MW1 Hariajam UG January First 01-Jan-16 7.94 6 465 <2.0 16

1MW1 Hariajam UG January Second 18-Jan-16 7.90 9 470 <2.0 24

1MW1 Hariajam UG February First 03-Feb-16 7.39 8 448 <2.0 16

1MW1 Hariajam UG February Second 16-Feb-16 7.25 6 438 <2.0 08

1MW1 Hariajam UG March First 01-Mar-16 7.54 7 478 <2.0 20

1MW1 Hariajam UG March Second 17-Mar-16 7.49 10 467 <2.0 12

1MW10 Kapasara OC Patch May Second 21-May-15 7.70 28 377 <2.0 32

1MW10 Kapasara OC Patch June Second 17-Jun-15 7.80 28 377 <2.0 24

1MW10 Kapasara OC Patch July First 01-Jul-15 7.78 26 364 <2.0 24

1MW10 Kapasara OC Patch July Second 22-Jul-15 7.56 <25.0 365 <2.0 32

1MW10 Kapasara OC Patch August First 04-Aug-15 7.66 28 380 <2.0 20

1MW10 Kapasara OC Patch August Second 18-Aug-15 7.93 26 387 <2.0 22

1MW10 Kapasara OC Patch September First 01-Sep-15 7.96 28 390 <2.0 24

1MW10 Kapasara OC Patch June First 01-Jun-15 7.62 26 384 <2.0 24

1MW10 Kapasara OC Patch September Second 19-Sep-15 7.73 8 352 <2.0 16

1MW10 Kapasara OC Patch October First 05-Oct-15 8.35 10 464 <2.0 20

1MW10 Kapasara OC Patch October Second 16-Oct-15 8.36 8 496 <2.0 20

1MW10 Kapasara OC Patch November First 02-Nov-15 7.92 12 484 <2.0 16

1MW10 Kapasara OC Patch November Second 17-Nov-15 8.12 5 448 <2.0 08

1MW10 Kapasara OC Patch December Second 17-Dec-15 8.22 12 412 <2.0 40

1MW10 Kapasara OC Patch January First 06-Jan-16 8.20 8 508 <2.0 16

1MW10 Kapasara OC Patch January Second 20-Jan-16 8.31 8 519 <2.0 16

1MW10 Kapasara OC Patch February First 08-Feb-16 7.50 6 448 <2.0 24

1MW10 Kapasara OC Patch February Second 29-Feb-16 7.62 8 474 <2.0 32

1MW10 Kapasara OC Patch March First 03-Mar-16 7.80 6 468 <2.0 40

1MW10 Kapasara OC Patch March Second 18-Mar-16 7.68 7 462 <2.0 28

1MW2 Badjna UG May Second 21-May-15 7.99 28 423 <2.0 24

1MW2 Badjna UG June Second 16-Jun-15 7.88 30 370 <2.0 28

1MW2 Badjna UG July First 01-Jul-15 7.92 28 364 <2.0 16

1MW2 Badjna UG July Second 22-Jul-15 7.70 <25.0 366 <2.0 24

1MW2 Badjna UG August First 04-Aug-15 7.84 <25.0 364 <2.0 30

1MW2 Badjna UG August Second 17-Aug-15 7.86 <25.0 360 <2.0 30

Page 29: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

28

Station

No

Station Name Month Fortnight Date of

Sampling

pH TSS TDS O&G COD

1MW2 Badjna UG September First 02-Sep-15 7.82 28 370 <2.0 26

1MW2 Badjna UG June First 01-Jun-15 7.94 32 418 <2.0 24

1MW2 Badjna UG September Second 17-Sep-15 7.92 8 422 <2.0 32

1MW2 Badjna UG October First 06-Oct-15 7.89 12 428 <2.0 32

1MW2 Badjna UG October Second 16-Oct-15 8.24 10 468 <2.0 28

1MW2 Badjna UG November First 03-Nov-15 8.14 10 508 <2.0 20

1MW2 Badjna UG November Second 16-Nov-15 7.92 8 506 <2.0 16

1MW2 Badjna UG December Second 17-Dec-15 7.96 7 452 <2.0 16

1MW2 Badjna UG January First 04-Jan-16 7.99 8 459 <2.0 16

1MW2 Badjna UG January Second 18-Jan-16 7.92 6 472 <2.0 08

1MW2 Badjna UG February First 03-Feb-16 8.14 10 408 <2.0 24

1MW2 Badjna UG February Second 16-Feb-16 8.22 8 402 <2.0 24

1MW2 Badjna UG March First 01-Mar-16 8.30 8 420 <2.0 36

1MW2 Badjna UG March Second 17-Mar-16 8.29 12 819 <2.0 28

1MW3 Chapapur-II UG May Second 21-May-15 7.75 30 416 <2.0 24

1MW3 Chapapur-II UG June Second 16-Jun-15 7.97 32 400 <2.0 24

1MW3 Chapapur-II UG July First 01-Jul-15 7.84 32 408 <2.0 20

1MW3 Chapapur-II UG July Second 20-Jul-15 7.82 <25.0 389 <2.0 40

1MW3 Chapapur-II UG August First 04-Aug-15 7.92 <25.0 392 <2.0 28

1MW3 Chapapur-II UG August Second 17-Aug-15 8.26 <25.0 390 <2.0 24

1MW3 Chapapur-II UG September First 02-Sep-15 8.04 30 410 <2.0 28

1MW3 Chapapur-II UG June First 01-Jun-15 7.80 28 422 <2.0 16

1MW3 Chapapur-II UG September Second 17-Sep-15 7.98 6 420 <2.0 16

1MW3 Chapapur-II UG October First 05-Oct-15 8.10 8 442 <2.0 12

1MW3 Chapapur-II UG October Second 16-Oct-15 8.16 9 472 <2.0 16

1MW3 Chapapur-II UG November First 06-Nov-15 7.94 9 492 <2.0 16

1MW3 Chapapur-II UG November Second 17-Nov-15 7.98 9 474 <2.0 24

1MW3 Chapapur-II UG December Second 17-Dec-15 8.38 8 462 <2.0 24

1MW3 Chapapur-II UG January First 04-Jan-16 8.32 7 478 <2.0 24

1MW3 Chapapur-II UG January Second 18-Jan-16 8.35 7 478 <2.0 08

1MW3 Chapapur-II UG February First 03-Feb-16 8.30 12 812 <2.0 24

1MW3 Chapapur-II UG February Second 16-Feb-16 8.23 10 803 <2.0 24

1MW3 Chapapur-II UG March First 01-Mar-16 8.39 10 801 <2.0 32

1MW3 Chapapur-II UG March Second 17-Mar-16 8.39 13 433 <2.0 32

1MW4 Chapapur OC Patch May Second 21-May-15 7.56 26 442 <2.0 16

1MW4 Chapapur OC Patch June Second 16-Jun-15 7.77 26 592 <2.0 24

1MW4 Chapapur OC Patch July First 01-Jul-15 7.58 28 586 <2.0 16

1MW4 Chapapur OC Patch July Second 21-Jul-15 8.02 <25.0 594 <2.0 56

1MW4 Chapapur OC Patch August First 03-Aug-15 8.00 26 610 <2.0 30

1MW4 Chapapur OC Patch August Second 17-Aug-15 8.08 <25.0 602 <2.0 40

1MW4 Chapapur OC Patch September First 02-Sep-15 8.10 <25.0 592 <2.0 38

1MW4 Chapapur OC Patch June First 01-Jun-15 7.60 <25.0 430 <2.0 16

1MW4 Chapapur OC Patch September Second 17-Sep-15 8.02 10 416 <2.0 24

1MW4 Chapapur OC Patch October First 06-Oct-15 7.96 9 502 <2.0 24

1MW4 Chapapur OC Patch October Second 16-Oct-15 7.92 7 528 <2.0 16

1MW4 Chapapur OC Patch November First 06-Nov-15 8.28 7 536 <2.0 08

1MW4 Chapapur OC Patch November Second 17-Nov-15 7.86 7 498 <2.0 16

1MW4 Chapapur OC Patch December Second 16-Dec-15 7.86 12 508 <2.0 48

1MW4 Chapapur OC Patch January First 05-Jan-16 7.78 8 512 <2.0 16

Page 30: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

29

Station

No

Station Name Month Fortnight Date of

Sampling

pH TSS TDS O&G COD

1MW4 Chapapur OC Patch January Second 18-Jan-16 7.75 7 518 <2.0 16

1MW4 Chapapur OC Patch February First 08-Feb-16 8.19 14 541 <2.0 32

1MW4 Chapapur OC Patch February Second 16-Feb-16 7.99 12 524 <2.0 40

1MW4 Chapapur OC Patch March First 03-Mar-16 8.17 12 541 <2.0 64

1MW4 Chapapur OC Patch March Second 17-Mar-16 8.11 14 570 <2.0 48

1MW5 Khoodia UG May Second 20-May-15 7.43 32 583 <2.0 40

1MW5 Khoodia UG June Second 16-Jun-15 7.42 30 604 <2.0 44

1MW5 Khoodia UG July First 01-Jul-15 8.11 32 602 <2.0 36

1MW5 Khoodia UG July Second 22-Jul-15 7.64 <25.0 590 <2.0 40

1MW5 Khoodia UG August First 04-Aug-15 7.72 28 634 <2.0 40

1MW5 Khoodia UG August Second 18-Aug-15 7.76 <25.0 612 <2.0 42

1MW5 Khoodia UG September First 01-Sep-15 7.84 32 632 <2.0 40

1MW5 Khoodia UG June First 01-Jun-15 7.52 28 594 <2.0 32

1MW5 Khoodia UG September Second 18-Sep-15 7.82 12 542 <2.0 24

1MW5 Khoodia UG October First 07-Oct-15 8.35 7 398 <2.0 20

1MW5 Khoodia UG October Second 23-Oct-15 7.86 8 510 <2.0 24

1MW5 Khoodia UG November First 02-Nov-15 7.92 6 498 <2.0 16

1MW5 Khoodia UG November Second 17-Nov-15 7.84 3 496 <2.0 08

1MW5 Khoodia UG December Second 16-Dec-15 7.88 10 429 <2.0 16

1MW5 Khoodia UG January First 05-Jan-16 7.91 12 435 <2.0 32

1MW5 Khoodia UG January Second 20-Jan-16 7.99 10 449 <2.0 32

1MW5 Khoodia UG February First 08-Feb-16 7.99 16 472 <2.0 40

1MW5 Khoodia UG February Second 16-Feb-16 7.95 <5 500 <2.0 40

1MW5 Khoodia UG March First 03-Mar-16 8.13 14 500 <2.0 40

1MW5 Khoodia UG March Second 17-Mar-16 7.99 12 489 <2.0 32

1MW6 Lakhimata UG May Second 21-May-15 7.92 <25.0 420 <2.0 16

1MW6 Lakhimata UG June Second 16-Jun-15 8.04 30 385 <2.0 20

1MW6 Lakhimata UG July First 01-Jul-15 7.81 28 392 <2.0 16

1MW6 Lakhimata UG July Second 21-Jul-15 7.92 <25.0 380 <2.0 24

1MW6 Lakhimata UG August First 03-Aug-15 8.02 <25.0 387 <2.0 24

1MW6 Lakhimata UG August Second 18-Aug-15 8.45 28 404 <2.0 22

1MW6 Lakhimata UG September First 01-Sep-15 8.34 34 400 <2.0 20

1MW6 Lakhimata UG June First 01-Jun-15 7.87 26 432 <2.0 16

1MW6 Lakhimata UG September Second 18-Sep-15 7.98 8 408 <2.0 16

1MW6 Lakhimata UG October First 07-Oct-15 7.82 6 438 <2.0 16

1MW6 Lakhimata UG October Second 23-Oct-15 7.78 14 490 <2.0 32

1MW6 Lakhimata UG November First 02-Nov-15 7.78 8 484 <2.0 16

1MW6 Lakhimata UG November Second 16-Nov-15 7.96 5 488 <2.0 08

1MW6 Lakhimata UG December Second 18-Dec-15 7.99 14 438 <2.0 16

1MW6 Lakhimata UG January First 05-Jan-16 8.11 9 449 <2.0 16

1MW6 Lakhimata UG January Second 20-Jan-16 8.19 8 463 <2.0 16

1MW6 Lakhimata UG February First 08-Feb-16 8.15 18 450 <2.0 32

1MW6 Lakhimata UG February Second 16-Feb-16 7.89 11 449 <2.0 28

1MW6 Lakhimata UG March First 03-Mar-16 8.17 10 462 <2.0 56

1MW6 Lakhimata UG March Second 17-Mar-16 8.25 16 469 <2.0 20

1MW7 Shampur-B UG May Second 21-May-15 8.09 26 335 <2.0 32

1MW7 Shampur-B UG June Second 17-Jun-15 7.73 28 325 <2.0 24

1MW7 Shampur-B UG July First 01-Jul-15 7.62 <25.0 332 <2.0 16

1MW7 Shampur-B UG July Second 21-Jul-15 8.00 <25.0 320 <2.0 16

Page 31: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

30

Station

No

Station Name Month Fortnight Date of

Sampling

pH TSS TDS O&G COD

1MW7 Shampur-B UG August First 04-Aug-15 8.12 <25.0 333 <2.0 22

1MW7 Shampur-B UG August Second 18-Aug-15 8.20 26 340 <2.0 22

1MW7 Shampur-B UG September First 02-Sep-15 8.24 <25.0 327 <2.0 24

1MW7 Shampur-B UG June First 01-Jun-15 8.02 30 332 <2.0 24

1MW7 Shampur-B UG September Second 18-Sep-15 8.04 6 310 <2.0 08

1MW7 Shampur-B UG October First 07-Oct-15 8.14 5 468 <2.0 08

1MW7 Shampur-B UG October Second 23-Oct-15 7.84 6 478 <2.0 16

1MW7 Shampur-B UG November First 03-Nov-15 7.82 5 482 <2.0 24

1MW7 Shampur-B UG November Second 18-Nov-15 7.94 12 492 <2.0 16

1MW7 Shampur-B UG December Second 18-Dec-15 7.92 6 499 <2.0 24

1MW7 Shampur-B UG January First 05-Jan-16 8.01 11 518 <2.0 24

1MW7 Shampur-B UG January Second 20-Jan-16 8.05 12 525 <2.0 32

1MW7 Shampur-B UG February First 08-Feb-16 7.92 9 397 <2.0 16

1MW7 Shampur-B UG February Second 16-Feb-16 7.64 12 386 <2.0 24

1MW7 Shampur-B UG March First 03-Mar-16 7.99 9 411 <2.0 32

1MW7 Shampur-B UG March Second 18-Mar-16 7.97 10 393 <2.0 16

1MW8 Mandman UG May Second 21-May-15 7.60 28 534 <2.0 24

1MW8 Mandman UG June Second 17-Jun-15 7.57 26 504 <2.0 16

1MW8 Mandman UG July First 01-Jul-15 7.34 <25.0 516 <2.0 20

1MW8 Mandman UG July Second 20-Jul-15 7.86 <25.0 498 <2.0 24

1MW8 Mandman UG August First 03-Aug-15 7.90 <25.0 496 <2.0 18

1MW8 Mandman UG August Second 18-Aug-15 8.02 <25.0 503 <2.0 16

1MW8 Mandman UG September First 02-Sep-15 8.10 <25.0 500 <2.0 16

1MW8 Mandman UG June First 01-Jun-15 7.74 732 526 <2.0 24

1MW8 Mandman UG September Second 19-Sep-15 7.94 10 510 <2.0 12

1MW8 Mandman UG October First 07-Oct-15 7.96 8 478 <2.0 08

1MW8 Mandman UG October Second 23-Oct-15 7.86 5 506 <2.0 08

1MW8 Mandman UG November First 02-Nov-15 7.84 11 478 <2.0 16

1MW8 Mandman UG November Second 18-Nov-15 8.34 6 524 <2.0 08

1MW8 Mandman UG December Second 18-Dec-15 8.54 8 508 <2.0 08

1MW8 Mandman UG January First 05-Jan-16 8.53 8 496 <2.0 16

1MW8 Mandman UG January Second 20-Jan-16 8.59 9 499 <2.0 16

1MW8 Mandman UG February First 08-Feb-16 7.69 12 700 <2.0 16

1MW8 Mandman UG February Second 17-Feb-16 7.87 14 691 <2.0 16

1MW8 Mandman UG March First 03-Mar-16 7.76 8 713 <2.0 20

1MW8 Mandman UG March Second 18-Mar-16 7.76 8 709 <2.0 20

1MW9 Gopinathpur OC Patch May Second 21-May-15 7.52 32 822 <2.0 48

1MW9 Gopinathpur OC Patch June Second 17-Jun-15 7.21 26 834 <2.0 32

1MW9 Gopinathpur OC Patch July First 01-Jul-15 7.91 28 826 <2.0 32

1MW9 Gopinathpur OC Patch July Second 20-Jul-15 7.84 <25.0 827 <2.0 48

1MW9 Gopinathpur OC Patch August First 04-Aug-15 7.74 <25.0 835 <2.0 30

1MW9 Gopinathpur OC Patch August Second 17-Aug-15 7.99 <25.0 840 <2.0 32

1MW9 Gopinathpur OC Patch September First 01-Sep-15 8.02 26 847 <2.0 30

1MW9 Gopinathpur OC Patch June First 01-Jun-15 7.60 28 830 <2.0 32

1MW9 Gopinathpur OC Patch September Second 19-Sep-15 7.81 6 788 <2.0 28

1MW9 Gopinathpur OC Patch October First 07-Oct-15 8.16 6 476 <2.0 12

1MW9 Gopinathpur OC Patch October Second 16-Oct-15 7.95 9 502 <2.0 16

1MW9 Gopinathpur OC Patch November First 02-Nov-15 7.86 13 532 <2.0 08

1MW9 Gopinathpur OC Patch November Second 18-Nov-15 7.68 9 398 <2.0 12

Page 32: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

31

Station

No

Station Name Month Fortnight Date of

Sampling

pH TSS TDS O&G COD

1MW9 Gopinathpur OC Patch December Second 18-Dec-15 7.60 10 489 <2.0 32

1MW9 Gopinathpur OC Patch January First 05-Jan-16 7.62 6 427 <2.0 08

1MW9 Gopinathpur OC Patch January Second 20-Jan-16 7.69 6 438 <2.0 16

1MW9 Gopinathpur OC Patch February First 08-Feb-16 7.89 7 955 <2.0 24

1MW9 Gopinathpur OC Patch February Second 17-Feb-16 7.70 16 962 <2.0 40

1MW9 Gopinathpur OC Patch March First 03-Mar-16 7.97 7 950 <2.0 48

1MW9 Gopinathpur OC Patch March Second 18-Mar-16 8.00 9 941 <2.0 32

Effluent Water Quality Standards (MoEF Schedule – VI Standards)

Parameters pH TSS TDS Oil & Grease COD

Limit 5.5-9.0 100 Not Specified 10 250

Page 33: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

32

Annexure – III

EFFLUENT QUALITY (29 PARAMETERS) Cluster 1 1 1 1 1 1 1 1 1 1 Effluent

Water (MOEF

Schedule-VI

Standard)

Station No 1MW1 1MW2 1MW3 1MW4 1MW5 1MW6 1MW7 1MW8 1MW9 1MW10

Station Name

Hariajam UG

Badjna UG

Chapapur-II UG

Chapapur OC Patch

Khoodia UG

Lakhimata UG

Shampur-B UG

Mandman UG

Gopinathpur OC Patch

Kapasara OC Patch

Month December

December

December

December

December

December December December December December

Fortnight First First First First First First First First First First

Date of Sampling

02-Dec-15

02-Dec-15

02-Dec-15

02-Dec-15

02-Dec-15

02-Dec-15 03-Dec-15 03-Dec-15 02-Dec-15 02-Dec-15

Colour 4 3 3 4 4 3 3 4 3 4 Unobjectionable

Odour Unobjectionabl

e

Unobjectionabl

e

Unobjectionabl

e

Unobjectionabl

e

Unobjectionabl

e

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

TSS 8 6 9 12 10 8 10 12 14 6 100.0

pH 8.1 8.0 7.9 8.11 8.20 8.0 7.98 8.11 8.12 8.0 5.5-9.0

Temperature(Deg C)

21.2 20.8 21.7 22.1 21.0 20.9 20.8 21.2 21.0 20.9 Shall not exceed

50C above the

receiving water temp

Oil & Grease

<2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 10.0

Total Residual Chlorine

<0.02 0.02 <0.02 0.03 <0.02 <0.02 0.03 <0.02 0.03 <0.02 1.0

Ammonical Nitrogen

0.62 0.54 0.48 0.59 0.54 0.46 0.42 0.48 0.52 0.68 50.0

Total Kjeldahi Nitrogen

1.34 1.48 1.46 1.54 1.36 1.45 1.26 1.38 1.32 1.28 100.0

Free Amonia

<0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 5.0

BOD 5 4 3 2 3 4 3 4 4 5 30.0

COD 16 16 16 40 16 08 16 08 16 24 250.0

Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.2

Lead <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.1

Hexavalent Chromium

0.02 0.03 0.03 0.02 0.03 0.04 0.02 0.03 0.02 0.04 0.1

Total Chromium

0.04 0.05 0.04 0.03 0.04 0.06 0.03 0.04 0.04 0.05 2.0

Copper 0.03 0.03 0.03 0.04 0.03 0.04 0.04 0.03 0.03 0.03 3.0

Zinc 0.04 0.06 0.03 0.04 0.06 0.04 0.06 0.04 0.06 0.04 5.0

Selenium <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05

Nickel <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 3.0

Fluoride 0.54 0.63 0.46 0.71 0.47 0.68 0.35 0.56 0.43 0.67 2.0

Dissolved Phosphate

1.42 1.34 1.46 1.38 1.32 1.52 1.36 1.38 1.26 1.34 5.0

Sulphide 0.006 0.007 0.008 0.007 0.008 0.009 0.007 0.006 <0.005 0.006 2.0

Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 1.0

Manganese 0.20 0.18 0.22 0.24 0.21 0.20 0.22 0.20 0.18 0.20 2.0

Iron 0.14 0.12 0.16 0.14 0.12 0.16 0.14 0.16 0.12 0.10 3.0

Nitrate Nitrogen

3.2 2.9 3.6 3.8 3.7 3.4 2.8 3.2 2.4 3.6 10.0

Cadmium <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.003

Total Dissolved

Solids

445 450 460 516 425 440 468 502 490 482 Not Specified

Page 34: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

33

Annexure – III

GROUNDWATER QUALITY

Cluster No 1 1 1 1 1 1 Indian Drinking

Water Standard

(IS-10500)

Station No 1GW1 1GW2 1GW3 1GW4 1GW5 1GW6

Station Name

Dugwell at Singhpur

village near 27 no Incline

Dugwell at Nirsha Thana

Dugwell at CISF Mugma

Camp, Badjna Colony

Dugwell at ground of Kuwardi

village near school

Dugwell at New primary

school Amdangal (Marma)

Dugwell at Mugma more station road

Month May'15 May'15 May'15 May'15 May'15 May'15

Fortnight Second Second Second Second Second Second

Date of sampling

20-May-15 20-May-15 20-May-15 20-May-15 20-May-15 20-May-15

Colour,Hazen unit Max

4 3 3 4 2 4 5

Odour Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Unobjectionable

Taste Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable

Turbidity,NTU Max

3.1 2.8 3.0 4.0 3.4 2.8 5

pH 8.10 7.89 7.89 7.44 7.84 7.62 6.5-8.5

Total Hardness

104 96 92 320 312 92 300.0

Iron <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 0.30

Chlorides 56 10 10 87 46 17 250.0

Res Free chlorine

<0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.20

Dissolved Solids

383 124.4 126.3 673 434 12.9 500.0

Calcium 19.2 20.8 19.2 84.8 57.6 24 75.0

Copper <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 0.05

Manganese <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.10

Sulphate 47 53 62 44 49 58 200.0

Nitrate 3.99 3.10 2.66 4.43 6.64 5.75 45.0

Fluoride 0.72 0.39 0.58 0.64 0.39 0.68 1.0

Selenium <0.005 <0.005 <0.005 <0.005 <0.005 <0.005

Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05

Lead <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05

Zinc <0.01 0.21 <0.01 <0.01 <0.01 <0.01 5.00

Hex Chromium

<0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.05

Boron <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 1.00

Coliforms (MPN)

Nil Nil Nil Nil Nil Nil Nil

Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.001

Alkalinity 236 176 164 132 180 140 200.0

Page 35: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2015-16

34

Annexure – IV

GROUNDWATER LEVEL

Station No

Station Name Month Fortnight Date of Sampling

Ground Water

Level BGL (mtr )

1GWL1 Dugwell at Singhpur village near 27 no Incline May Second 20-May-15 0.95

1GWL1 Dugwell at Singhpur village near 27 no Incline November Second 23-Nov-15 1.90

1GWL1 Dugwell at Singhpur village near 27 no Incline January Second 21-Jan-16 0.50

1GWL1 Dugwell at Singhpur village near 27 no Incline August Second 18-Aug-15 0.45

1GWL2 Dugwell at Nirsha Thana May Second 20-May-15 2.25

1GWL2 Dugwell at Nirsha Thana November Second 23-Nov-15 2.00

1GWL2 Dugwell at Nirsha Thana January Second 21-Jan-16 2.05

1GWL2 Dugwell at Nirsha Thana August Second 18-Aug-15 1.95

1GWL3 Dugwell at CISF Mugma Camp, Badjna Colony May Second 20-May-15 4.00

1GWL3 Dugwell at CISF Mugma Camp, Badjna Colony November Second 23-Nov-15 3.90

1GWL3 Dugwell at CISF Mugma Camp, Badjna Colony January Second 21-Jan-16 3.90

1GWL3 Dugwell at CISF Mugma Camp, Badjna Colony August Second 18-Aug-15 3.35

1GWL4 Dugwell at ground of Kuwardi village near school May Second 20-May-15 10.80

1GWL4 Dugwell at ground of Kuwardi village near school November Second 23-Nov-15 2.05

1GWL4 Dugwell at ground of Kuwardi village near school January Second 21-Jan-16 2.30

1GWL4 Dugwell at ground of Kuwardi village near school August Second 18-Aug-15 0.85

1GWL5 Dugwell at New primary school Amdangal (Marma) May Second 21-May-15 1.70

1GWL5 Dugwell at New primary school Amdangal (Marma) November Second 24-Nov-15 3.10

1GWL5 Dugwell at New primary school Amdangal (Marma) January Second 20-Jan-16 2.00

1GWL5 Dugwell at New primary school Amdangal (Marma) August Second 17-Aug-15 1.75

1GWL6 Dugwell at Mugma more station road May Second 21-May-15 4.70

1GWL6 Dugwell at Mugma more station road November Second 24-Nov-15 4.70

1GWL6 Dugwell at Mugma more station road January Second 20-Jan-16 4.90

1GWL6 Dugwell at Mugma more station road August Second 18-Aug-15 2.30

Page 36: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

Plate - 1

Jharkhand

IndiaLocation of Cluster – 1 mines in

Country, State & District

Page 37: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma
Page 38: ENVIRONMENTAL STATEMENT IN FORM-V · ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma

23°45'

23°50'

K

O

L

K

A

T

A

D

H

A

N

B

A

D

TO DHANBAD

NH-2

Maithan Dam

Barakar River

G

r

a

n

d

C

h

o

r

d

E

a

s

t

e

r

n

R

a

i

l

w

a

y

E

a

s

t

e

r

n

R

l

y

.

C

h

a

n

c

h

B

r

.

South Eastern Railway

Kendua Branch

To Dhanbad

T

o

S

a

l

a

n

p

u

r

Barira

Ramdih

Barabal

Haldar Colony

Kalyaneswari

Lalbazar

Victoria

Ramnagar

Tentuljhora

Mahespur

Nekrajuria

Debipur

Damagaria

Duburdih

Kadhhito

Purandih

Hadlo

Dendua

Chanptaria

Damagaria

Sabanpur

Digari

Shrirampur

Mahatanr

Dhanudih

Banskutia

Bathanbari

Sidhabari

Jasaidi

Belachak Ganyutia

Pothiara

Nadiha

Barsiodih

Harayanpur

Baghmara

Chalmara

Jamuidanga

Mahishnadih

Chakaltabari

Palnudih

Bahardardih

Paharpur

Puapur

Lalpur

Gusaidanga

Kalyasota

Khedadanga

Pathardih

Hijuli

Dishergarh

Benipur

Ranipur

Bhagabatidih

Manpura

Gopalpur

Sarbari

Nimdanga

Dubeswari

Deliya

Sialdanga

Saltore

Rakta

Narayanchak

Hatinal

Debidanga

Kumradanga

Parbelia

Hirakhun

Shitalpur

Chhottadhemo

Patra

Harbala

Sanctoria

Chapa Dhawra

Sodepur

Manberia

Boldih

Chunga

Begunia

Barakar

R

S

Barira

Kurargaria

Kulti

Azadnagar

Patharkhad

Ramchandra Dangal

Kendua

Shipur

Syaldanga

Lalbazar

Kultora

Barakar

(Running)

Maithan Colony

Chakarbathan

Paradih

Barajor

Beliyad

Kalimati

Rajpura Colony

Mahatadih

Tiltoriya

Bakardangal

Kesharkural

Shimuldanga

Madanpur

Jajpur

Bathandangal

Badurdih

Kumardih

Palhar

Punnal

Dambhul

Madandih

Magurdih

Kendulitar

Kumar Jajpur

Durgapur

Talberia

BanddihPF

PF

Kulbana

Raybandh

Asta

Guniyara

Mangram

Sidpur

Sulanga

Gobindapur

Bakbari

Bhiringi

Simuliya

Kalipathar

Malancha

Ghatkul

Bhurkundabari

Tantlai

Bathanba

Mahuda

Ajodhya

Pahargora

Birgaon

Panjania

Lekrapahar

Bathanatanr

Sijua

Rangadih

Gunduba

Chalnpur

Dumarjor

Polkora

Nayadih

Hikimaral

Barajor

Garga

Jodhadih

Bhalpahari

Gunduba

Dharampur

Chargara

Bhagabandh

Beldih

Rangameta

AngulkataMudidih

Benagaria

Gugitapa

Talberia

Bagdudih

Kherdanga

Gabhia

Paharpur

Rampur

Kochagora

Bardahi

Asna

Karitar

Tilaboni

Marhadih

Gargora

Kashitani

Daldal

Rengadih

Kaladabar

Champapur

Sanbad

Dakhinbad

Jambad

Berwa

Baruigara

Ramkanali

Tetulia

Shahraj

Nutahdih

Hospital

Bhojpur

Asurbandh

Raghunathpur

Ranjitpur

Bamanbaid

Mohanpur

Kurwa

Barhadih

Shibpur

Gopalnathdih

Machamahul

Metayala

SingraidihKaritanr

Baromasia

Jiramuri

Kapasora

Ratanpur

Kumardih

Gobindpur

Phakirdih

Bandhdih

Karmatanr

Amaghata

Khertanr

NawatanrBara

Chandudih

Gortopa

Kistopur

Domandih

Kinudih

Kasitanr

Bahadurpur

Kurchi

Bandhdih

Baghsuma

Ramchandrapur

Acid Factory

Bargidih

Pathrakhun

Devli

JangalpurNerodih

Murgabani

Mahlidih

Phaphuadih

Kharikabad

Gopinathpur

Jargari

Bara Baghmara

Chandraidih

Horangadih

Moranga

Bhelatanr

Pathrakhun

Chirobad

Mohubani

Narodih

Jamkudar

Ghoramurga

Parasi

Fatepur

Chanddih

Lakhybad

Billi

Katajani

Dumdum Dubi

Jhirka

Belkupa

Kuhuka

Bara Ambana

Chhota Ambana

Kushiyara

Pirrahat

Makamahataran

Dalabar

Salukchapra

Sitalpur

Barmuri

Dudhiya

Salpatra

Elakend

Kantajani

Lakshipur

Nayadih

Kayarabank

Simuldan

Dankata

Khardanga

Kanadih

Bhaiber

Chhirudih

Kusumdaha

Tentuliya

Badalpur

Baurikulhi

Ankberiya

Kalbana

Kanjidih

Bandrabad

Dumuriya

Mukundadih

Daldali

Jaypur

Dhabari

Bariya

Nayadih

Urma

Khetidih

Khokrapahari

Kalubathan

Patharkua

Bansgajra

Bharkunrabari

Bandarchua

Chhatabar

Gopinathpur

Churuinala

Markora

Shyampur

SanolapurPatlabari

Santarkuli

Bengagoriya

Patlabar

Dahibari

Baraban

Kethardih

BeldangaTalberiya

Ledaharia

Guliardih

Luchibad

Nutangaon

Dumarkanda

Jogira

Lakhdih

Jhukundar

Chanch

Garphalbari

Kumardubi

Panchmahali

Dudhapani

Chirkunda

Gusainpara

Jaldanga

Kewra

Satyanarayan Colony

Bhalka

Bijra

Kastabad

Raghunathpur

Banda

Sonabad

RF

RF

RF

RF

PF

PF

PF

DAMODAR RIVER

Saltore

Gagna

PF

PF

PF

PF

Gopalpur

Alladih

Ratanpur

Barbendya

Charkanla

Punui

Kashitanr

Palarpur

Sana

Gangpur

Panrra

Sirpuria

Mahatodih

Birsingpur

Belchuri

Mugma

Chandih

Saharpura

Nirsa

Hatibari

Rangamati

Kumthal

Topatanr

Badjna

Sambandhpur

Tulsibhita

Hariharpur

Ubchuria

Harakatarya

Garga

Bhalahit

Nayadih

Kadamkanali

Kulkunri

Panredih

Poddardih

Birajbhannarapur

Udaypur

N

BADJNACHAPAPUR-II

KAPASARA

KHOODIA

NIRSHAGOPINATHPUR

SHAMPUR-'B'

SHAMPUR-'A'

HARIAJAM

LAKHIMATA

MANDMANUG

UG

UG

UG

UG UG

UG

UG & OC

UG

UG & OC

M

u

g

m

a

C

e

n

t

r

a

l

Pool RS

Kachcha Road

Protected Forest

Reserved Forest

SAND

Built Up

Road (ECL/NH)

Water Bodies

(River, Nala, Dam)

EASTERN COALFIELDS LIMITED

Location of Sampling

JOB NO

CMPDIISO 9001 Company

R I NE V XXX X 21

1 OF 1

0

Stations CLUSTER NO. 1

ENVIRONMENT STATEMENT OF CLUSTER NO. 1

111438

2 KMS

PLATE NO 2

86°40' 86°45' 86°55'86°50'

86°55'86°50'86°30'

River/Nalah

Predominant Wind Direction

during April - September

(Pre - Monsoon & Monsoon Period)

Permanent Air Station

Pre - monsoon

Post - monsoon

Predominant Wind Direction

during October - March (Post - Monsoon)

1A2

1A1

1A3

1A4

1A5

1A6

1A7

1A8

1A9

1N1

1N2

1N8

1N3

1N4

1N5

1N6 1N7

1N9

1MW1

1MW3

1MW4

1MW2

1MW9

1MW5

1MW7

1MW8

1MW10

1MW6

Mine / Effluent WaterStation Code Name of Mine

1MW1 Hariajam UG1MW2 Badjna UG1MW3 Chapapur-II UG1MW4 Chapapur OC Patch1MW5 Khoodia UG1MW6 Lakhimata UG1MW7 Shampur-B UG1MW8 Mandman UG1MW9 Gopinathpur OC Patch

1MW10 Kapasara OC Patch

Noise Sampling Stations (Workplace)Station Code Name of Station

1N1 Hariajam UG1N2 Badjna UG1N3 Chapapur-II UG1N4 Khoodia UG1N5 Lakhimata UG1N6 Shampur-B UG1N7 Mandman UG1N8 Gopinathpur OC Patch1N9 Kapasara OC Patch

Air Quality Monitoring StationsStation Code Type of Station Name of Station

1A1 Permanent Air Station Nayadih village near Shampur - A1A2 Permanent Air Station Near Mugma Village1A3 Permanent Air Station Garphalbari Near Kapasara UG1A4 Post monsoon Air Station Bharkunrabari village1A5 Post monsoon Air Station Baraban village1A6 Post monsoon Air Station Jhukundar village1A7 Pre monsoon Sanbad village1A8 Pre monsoon Panrra village1A9 Pre monsoon Tiltoriya village

Ground Water LevelStation Code Location of Dugwell

1GWL1 Dugwell at Singhpur village near 27 no Incline1GWL2 Dugwell at Nirsha Thana1GWL3 Dugwell at CISF Mugma Camp, Badjna Colony1GWL4 Dugwell at ground of Kuwardi village near school1GWL5 Dugwell at New primary school Amdangal (Marma)1GWL6 Dugwell at Mugma more station road

1GWL1

1GWL2

1GWL3

1GWL4

1GWL6

1GWL5