eng-islam_sayed_mohamed resume
TRANSCRIPT
1 | P a g e
Islam Sayed Mohamed 38, Sakr Koreash Buildings.,Sheraton Heliopolis, CAIRO, EGYPT.
Mobile: 0020-127-603-0026 / 0020-100-576-8987
E-MAIL: [email protected]
Personal Information:
Marital Status: Married.
Nationality: Egyptian.
Date of Birth: 15/2/1977.
Place of Birth: Heliopolis, Cairo, Egypt.
Military Status: Completed.
EDUCATION:
B.Sc. of Mechanical Engineering 2001 “Power Department".
B.Sc. Project: Turbo-Shaft Engine “Design And Analysis".
OTHER EXPERIENCE:
Attending Project Management Body Of Knowledge-(PMBOK-4th)-AUC.
Attending Project Planning and Control Techniques-(PRMG-010) – AUC.
Attending Management of Project Resources-(PRMG-020) – AUC.
Microsoft Office Package [Very good].
AutoCad 2004/2006/2007/2010 [Very good].
LANGUAGES:
English …………………Fluent.
Arabic…………………..Native Language.
TRAINING SKILLS:
MaxiCom II Central Control System "RainBird Edition".
The CIRRUS Central Control Irrigating System "RainBird Edition".
The NIMBUS Central Control Irrigating System "RainBird Edition".
WORKING SKILLS COMPANIES / PROJECTS:
2 | P a g e
Relevant Work Experience:
From September 2014 – Till NOW…..
Company: BlueBird Co. For Site Construction.
BLUEBIRD Construction is an Egyptian company specialist in taking Design to on turn-key landscape
contracting projects serving high end residential compounds, commercial & corporate projects. BlueBird is a
company for general and Electro-mechanical contracts and professional manager of construction services
through providing soft-scape, irrigation networks, landscape lighting, hard-scape such as roads, parking and
walkways, and outdoor furniture. As well as also water features such as artificial lakes, waterfalls, fountains
and swimming pools.
BlueBird offers the highest international standard of technical and commercial solutions on turn key projects
and Electromechanical works as well as providing the typical level of co-ordination and Quality via the
different activities.
Position: Irrigation Networks and Water Features Department Manager.
The Position Includes:
Lead and Communicate with the Field Supervision, Subcontractors and Vendors to assist
them in working to the Project Schedule as it pertains to MEP’s.
Represent BlueBird with Owner(s), Architects, Consultants, Government Authorities,
Vendors and Subcontractors.
Administer financial aspects of the Owner’s contract, subcontracts, and purchase orders.
Build effective working relationships with clients and the BlueBird project team members.
Project Start-Up:
o Review the general contract and contract documents and confirm the budget setup
and project milestones in conjunction with Project Lead.
o Create a schedule of values and project logs, plan for project safety and mobilization,
including review and validation with team members.
Purchasing process and document control.
Maintain the Purchasing Schedule, write scopes of work, distribute and log subcontracts,
write required contract riders and purchase orders, and confirm compliance with project
insurance requirements.
Review subcontractor references, obtain Subcontractor bonds, and maintain project files.
Maintain and manage all purchase and delivery schedules, change order processes, shop
drawings, document control logs, Owner, Architect and Subcontractor correspondence.
Meeting Management and attend all schedule and management MEP meetings necessary to
monitor and manage the project, chairing as appropriate.
Financial Management:
o Manage all requisitions and payments including lien releases and project payroll and
maintains best possible cash flow throughout the project, communicating issues
proactively
Project Closeout:
o Deliver all necessary manuals to the Owner, consolidates project documentation and
files
o Manage subcontractor closeout, transfer of utilities, owner training, and punch list
process
o Deliver all warranties, as-builts and training to the owner.
3 | P a g e
From January 2008 – September 2014…..
Company: Curve Landscape Co. For Site Construction and Managements.- DMG
CURVE takes Design to on turn-key landscape contracting projects serving hotels, high end residential
compounds, commercial & corporate projects. The company provides soft-scape, irrigation networks,
landscape lighting, hard-scape such as roads, parking and walkways, and outdoor furniture. The company
also offers water features such as artificial lakes, waterfalls, fountains and swimming pools.
Marassi – Village k&J - EMAAR Misr. May 2012– Sep 2014.
600 Luxury Chalets, Swimming Pools, Public Areas Zones, No. of shopping centers over 6.25 million
square meter resort bordering an unspoiled beach and the glistening sapphire waters of El Alamein.
Designed to be one of Egypt’s best year round destinations, Marassi is a fully integrated community,
boasting all the characteristics intrinsic to a thriving luxury town.
Exective Residence of Katamya- Mockup Zone Jan 2013– Sep 2013.
150 Luxury Villas, Swimming Pools, Public Areas Zones, No. of shopping centers Spread across 19.6
feddans, this first class residential community provides a relaxed environment in which families can grow.
Featuring endless green areas, meandering lakes, luxurious American-style homes with real front yards, and
a wide array of planned amenities, Mountain View Executive Residence Katameya offers the best of both
worlds; the intimacy of a friendly neighborhood and the luxurious facilities of a grand master planned
community.
Hyde Park - Damak –New Cairo - Pocket A-B-C-D Aug 2012– Dec 2012.
200 Luxury Villas, Swimming Pools, Public Areas Zones, No. of shopping centers Spread across 6 million
square meters. Over 350 meters above sea level, New Cairo is a milestone in environment friendly urban
developments, with pleasant weather all-year around.
Marassi – Catania Zone - EMAAR Misr. May 2012– Aug 2012.
600 Luxury Chalets, Swimming Pools, Public Areas Zones, No. of shopping centers over 6.25 million
square meter resort bordering an unspoiled beach and the glistening sapphire waters of El Alamein.
Designed to be one of Egypt’s best year round destinations, Marassi is a fully integrated community,
boasting all the characteristics intrinsic to a thriving luxury town.
Mountain View ( II ) Resort – Cairo. Nov 2011– Apr 2012.
(300 Luxury Villas, Swimming Pools, Public Areas Zones, No. of shopping centers ….etc.).
Mountain View ( I ) Resort – Cairo Jan 2010 – Nov 2011.
(200 Luxury Villas, Swimming Pools, Public Areas Zones, ClubHouse, Green Valley, No. of shopping
centers ….etc.).
Mountain View ( IV ) Resort – EL-Ein EL-Sokhna. Oct 2009 – Dec 2009.
(200 Luxury Villas, Swimming Pools, Public Areas Zones, No. of shopping centers ….etc.).
Mountain View ( III ) Resort – North Coast May 2009 – Sep 2009. (500 Luxury Villas, Beach Area Swimming Pools, Public Areas Zones, Private Swimming Pools, Green
Valley, No. of shopping centers ….etc.).
Mountain View ( II ) Resort – Cairo Feb 2009 – Apr 2009.
(300 Luxury Villas, Swimming Pools, Public Areas Zones, ClubHouse, Green Valley, No. of shopping
centers ….etc.).
4 | P a g e
Mountain View ( IV ) Resort – EL-Ein EL-Sokhna. Dec 2008 – Jan 2009.
(300 Luxury Villas, Swimming Pools, Public Areas Zones, No. of shopping centers ….etc.).
Mountain View ( III ) Resort – North Coast Jun 2008 – Nov 2008. (500 Luxury Villas, Beach Area Swimming Pools, Public Areas Zones, Private Swimming Pools, Green
Valley, No. of shopping centers ….etc.).
Mountain View ( I ) Resort – Cairo Jan 2008 – May 2008.
(200 Luxury Villas, Swimming Pools, Public Areas Zones, Club-House, Green Valley, No. of shopping
centers ….etc.).
Mountain View Projects
As part of group of one of the largest and most successful Egyptian real estate enterprises, Dar Al Mimar
Group (DMG), Mountain View boasts a multinational management team with local and international
experience, as well as Constructing its own Projects to achieve DMG goal as a luxury, comfort, friendly and
safe life style, I work as a TO, MEP, PM, and finally as PMO member in the all following Projects:
Position: SE, TO, CM, PM, and recently as MEP Engineer.
The Position Includes:
Design and Develop irrigation systems and oversees the construction and implementation.
Improve water and soil conservation techniques across the irrigation network.
Formulate and Design cost analyzed information for irrigation networks.
Clarify and identify terms and information referring to the irrigation systems.
Preparing and Presenting (Shop Drawings / Details Drawings / Work Drawings / Quantity
Survey / Manufacture list and Data Sheets / Bill Of Quantity).
Preparing and Reviewing Composite Drawings overlaying (Hardscape / Softscape /
Infrastructure networks / other trends task discrepancy).
Coordinating between the Owner’s Departments and Curve’s Departments to perform the
Construction Operation as planned in the Time Schedule and within the Cost Budget for
constructing the project.
Reviewing and modification of the Drawings and preparing the related Documents through
the (FRI, RFP, Transmittals, Requests)
Supervising and Approving the Contractors Shop-drawings, Method of statement, Data
sheets, and Sample data sheets.
Following-up and Re-directing the Contractors On-Site Progress with correspondence to the
estimated cash flow impact and planned time schedule frame.
Supervising, Following-up and Re-directing the on-site contractors achievement for the given
planned tasks and the requested works to be done including and not
- Supply and construct all Sub-Surface Networks including drainage,
irrigation, lighting improvements as designated on Grading Plans.
- Supply and Construct all Water Features (Water Falls, Water Cannel, Linear
Lakes, Concrete Base Lake, Over flow type Swimming pools and skimmer
type swimming pools) as shown on Drawings and Plans.
Monitoring the Project Cost Control by following-up the Cash flow, Procurement Orders,
Clients Invoices, Sub-Contractor Invoices Processes
5 | P a g e
August 2007 – January 2008
Company: Botanica Co. For Projects Managements.
Project : Sun Set Golf & Country Club Resort – Cairo
(2 Golf Courses, 200 Luxury Villas, Swimming Pools, No. of shopping centers, Golf Academy,
ClubHouse….etc.).
Little Venice & Country Club Resort – EL-Ein EL-Sokhna.
(1 Golf Course, 400 Luxury Villas, Swimming Pools, No. of shopping centers, Golf Academy,
ClubHouse….etc.)
Position: Projects Department Manger:
The Position Includes: Coordinating between the Golf Course Owner’s Departments and Botanica’s Department to perform
the Construction Operation as planned in the time schedule and within one year for constructing the
project, and supervising the contractors achievement for the given planned tasks and the requested
works to be done which mainly includes:
- Staking and surveying of proposed improvements..
- Excavation, distribution and rough grading of fill material in all designated areas shown on the
grading plans.
- Supply and construct all drainage improvements as designated on Grading Plans.
- Supply and installation of irrigation system, and pump station installation.
- Fine shaping and cleaning of all graded areas and improvements.
- Grassing of greens, tees, fairways, roughs and surrounds as shown on Grassing Plan.
- Construction of all greens, tees, bunkers, lakes, and other golf course features.
- Supply and installation of greens mix, regulation bunker sand.
- Supply and construct all cart and maintenance paths.
- Repair any areas disturbed throughout golf course construction.
- Clean up and removal of all debris from golf course construction site.
- Preparation and submittal to OWNER of as-built drawings for all drainage, irrigation, and golf
features.
- All other items necessary to complete golf course construction in accordance with plans and
specifications.
January 2003 – August 2007
Company: Misr Co. For Touristic Projects & Urban Development " Eng. Soliman Ammer".
Project : Pyramids Golf & Country Club Resort – Cairo
(7 Golf Courses, 2000 Luxury Villas, Swimming Pools, No. of shopping centers, Tennis Club,
No. of restaurants, Golf Academy….etc.)
Position: Operation and Maintenance Engineer for GOLF COURSES & WORKSHOP EQUIPMENTS:
-The Golf courses and The Landscape Areas in the Resorts about 1500 acres 40 % of the total area of
the project:
The Position Includes: Programming and Operating Engineer for Golf Course Irrigation " with Smart Weather Station:
-The CIRRUS Central Control Irrigating System "RainBird Edition" program "For irrigating 27
Holes in Additional to Outer Miscellaneous Areas.".
-The NIMBUS Central Control Irrigating System "RainBird Edition" program "For irrigating
Additional 18 Holes".
- Constructing Golf courses by providing and following Design\Shop-drawing\As-built.
6 | P a g e
- Commissioning of the total golf courses project including: “The Main Pressurized water sources
“Variable Speed GRUNDFOS Pump Stations of 7 Bar pressure”, the Main Piping Networks, The
Lateral Piping, The Sprinklers, The Wiring to the controllers in the field, The wiring and The Maxi
Cables to the Memory Interface Module MIM, and The Central Control Computerized System.
- Maintaining all the system including the piping networks, the wiring, the controller units, the main
central irrigation program, and this system includes the following items in details:
- Preparation of Material take and Invoices.
- Management and maintenance of The CLUBCAR Workshop \ The TORO's Workshop \ The all
related golf course equipment’s and The Walk Behind Machines.
From August 2001 – December 2002
Company: Mantrac Egypt. Alexandria, Egypt.
Position: Technical and Mechanical Maintenance Engineer in the Diesel Generators Preparation
Department.
SUMMARY:
- Experience in revising design, shop-drawings, and re-design for Landscape Projects drawings.
- Experience in preparing tendering phase project documents such as, method of statements,
B.O.Q, pricing, material list, list of vendors …etc.)
- Experience in supervising and coordinating Landscape projects including hardscape and
softscape items.
- Experience in reviewing and revising technical design and shop drawing.
- Experience in making composite drawings to solve technical design and shop-drawing issues.
- Experience in interpreting contracts’ drawings and technical specifications.
- Experience in controlling project’s quantity survey (QS) and survey activities.
- Experience in handling the method of statements and project recourses, such as manpower,
material, scope, time, cost and quality.
- Well known of all Project’s Documentation and paper work, such as RFP, RFI, CVI, MIR,….etc.
- Well known of all the material technical data.
- Well known of all the latest design in architectural or interior design.
PERSONAL TRAITS:
- Decision-maker, responsible, strong personality and a team leader with the ability to adapt to
different cultures and environments to build rapport with all team members participating in the
project.
- Ability to handle stress and meet deadlines along with maintaining quality of work.
- Ability to find alternative, and substitute actions to decrease both financial losses and time
schedule deviation.
HOPPIES:
Reading scientific books, playing tennis, riding, swimming, also interested in everything related to the
technology "especially computerized technology".
7 | P a g e
REFRENCES:
Eng.\ Bassem Elsayed
Curve Landscape – Chief Executive Officer (CEO.)
Curve Landscape Co. For Site Construction and Managements – Egypt
Contacts: +20 122 395 1448 [email protected]
Eng.\ Mahmoud Attya
BlueBird Construction – Chief Executive Officer (CEO.)
BlueBird Co. For Site Construction and Managements – Egypt
Contacts: +20 120 423 3627 [email protected]
Eng.\ Mahmoud Azab
Curve Landscape – Marassi Construction Manger (CM.)
Curve Landscape Co. For Site Construction and Managements – Egypt
Contacts: +20 100 333 4556
8 | P a g e
BUBLIC AREAS for a 200
Luxury Villas, Swimming Pools,
Public Areas Zones, Club House,
Green Valley, Lakes and
Playgrounds.
Position:
Project Manager.
THE SCOPE OF WORK includes:
Walkways.
Stamped concrete.
Marble works (paving &
cladding)
Wooden Pergolas.
Irrigation Networks.
Lighting Networks.
Planting works.
Retaining Walls.
Playgrounds.
Tents.
Interlock Road Paving.
Lakes and Water Falls.
MOUNTAIN VIEW I DISTRICT TH5
9 | P a g e
BUBLIC AREAS for a 300
Luxury Villas, Swimming Pools,
Public Areas Zones, ClubHouse,
Green Valley, No. of shopping
centers.
Position:
Project Manager.
THE SCOPE OF WORK includes:
Walkways.
Stamped concrete.
Marble works (paving &
cladding)
Wooden Pergolas.
Irrigation Networks.
Lighting Networks.
Planting works.
Retaining Walls.
Playgrounds.
Tents.
Interlock Road Paving.
Lakes and Water Falls
MOUNTAIN VIEW II DISTRICT TH5
10 | P a g e
BUBLIC AREAS for a 200 Luxury
Villas, Swimming Pools, Public
Areas Zones, No. of shopping
centers
Position:
Project Manager.
THE SCOPE OF WORK includes:
Walkways.
Stamped concrete.
Marble works (paving & cladding)
Wooden Pergolas.
Irrigation Networks.
Lighting Networks.
Planting works.
Retaining Walls.
Playgrounds.
Tents.
Interlock Road Paving.
Lakes and Water Falls.
MOUNTAIN VIEW III -DMG ELSOKHNA
11 | P a g e
BUBLIC AREAS for a 600
Luxury Chalets, Swimming Pools,
Public Areas Zones, No. of
shopping centers over 6.25
million square meter.
Position:
Irrigation Networks Department
Manager.
THE SCOPE OF WORK includes:
Revise Design Drawing.
Produce Shop Drawings.
Revise and Follow Procurements
Plan
Produce Project Documentations.
Follow-up time schedule and cash
flow charts.
Arrange and Attend meeting with
consultant and owner
representative.
Preparing and submitting Handing
Over Documents.
Preparing Lesson Learned
Reports at the end of the Project.
Preparing monthly Progress
Report.
Solving Site obstacles that may
exist and find alternative
solutions.
MARASSI-KATANIA NORTH COAST
12 | P a g e
BUBLIC AREAS for a 200
Luxury Chalets, Swimming Pools,
Public Areas Zones, No. of
shopping centers over 3.25
million square meter.
Position:
Irrigation Networks Department
Manager.
THE SCOPE OF WORK includes:
Revise Design Drawing.
Produce Shop Drawings.
Revise and Follow Procurements
Plan
Produce Project Documentations.
Follow-up time schedule and cash
flow charts.
Arrange and Attend meeting with
consultant and owner
representative.
Preparing and submitting Handing
Over Documents.
Preparing Lesson Learned
Reports at the end of the Project.
Preparing monthly Progress
Report.
Solving Site obstacles that may
exist and find alternative
solutions.
MARASSI-ISOLA NORTH COAST
13 | P a g e
BUBLIC AREAS for a 200 Luxury
Villas, Swimming Pools, shopping
centers Spread across 210,000 square
meters. Over 350 meters above sea
level.
Position:
Irrigation Networks Department
Manager.
THE SCOPE OF WORK includes:
Revise Design Drawing.
Produce Shop Drawings.
Revise and Follow Procurements Plan
Produce Project Documentations.
Follow-up time schedule and cash
flow charts.
Arrange and Attend meeting with
consultant and owner representative.
Preparing and submitting Handing
Over Documents.
Preparing Lesson Learned Reports at
the end of the Project.
Preparing monthly Progress Report.
Solving Site obstacles that may exist
and find alternative solutions.
HYDE PARK - DAMAC DISTRICT TH5
14 | P a g e
Roofing for the MASA Hotel
Landscape.
Position:
Project Manager.
THE SCOPE OF WORK includes:
Marble works cladding.
Wooden Pergolas.
Irrigation Networks.
Lighting Networks.
Planting works.
EL MASA HOTEL ROOFING NASR CITY
15 | P a g e
DESIGN for Private Villas to meet
the clients’ vision as per desired
cost and satisfied quality level.
THE SCOPE includes:
Irrigation Networks Design.
Irrigation Networks Working
Drawings.
Irrigation Networks Details
Drawings
Irrigation Networks Itemized
B.O.Q & Pricing.
Irrigation Networks Method Of
Statement.
Irrigation Networks Time
Schedule and Cash Flow
Charts.
Irrigation Networks
Construction Processes
Documentations.
DESIGN PROJECTS Private Villas
16 | P a g e
DESIGN for Private Villas to meet
the clients’ vision as per desired
cost and satisfied quality level.
THE SCOPE includes:
Irrigation Networks Design.
Irrigation Networks Working
Drawings.
Irrigation Networks Details
Drawings
Irrigation Networks Itemized
B.O.Q & Pricing.
Irrigation Networks Method Of
Statement.
Irrigation Networks Time
Schedule and Cash Flow
Charts.
Irrigation Networks
Construction Processes
Documentations.
DESIGN PROJECTS Private Villas
17 | P a g e
DESIGN for Private Villas to meet
the clients’ vision as per desired
cost and satisfied quality level.
THE SCOPE includes:
Irrigation Networks Design.
Irrigation Networks Working
Drawings.
Irrigation Networks Details
Drawings
Irrigation Networks Itemized
B.O.Q & Pricing.
Irrigation Networks Method Of
Statement.
Irrigation Networks Time
Schedule and Cash Flow
Charts.
Irrigation Networks
Construction Processes
Documentations.
DESIGN PROJECTS Private Villas
18 | P a g e
DESIGN for Private Villas to meet
the clients’ vision as per desired
cost and satisfied quality level.
THE SCOPE includes:
Irrigation Networks Design.
Irrigation Networks Working
Drawings.
Irrigation Networks Details
Drawings
Irrigation Networks Itemized
B.O.Q & Pricing.
Irrigation Networks Method Of
Statement.
Irrigation Networks Time
Schedule and Cash Flow
Charts.
Irrigation Networks
Construction Processes
Documentations.
DESIGN PROJECTS Private Villas
19 | P a g e
DESIGN for Private Villas to meet
the clients’ vision as per desired
cost and satisfied quality level.
THE SCOPE includes:
Irrigation Networks Design.
Irrigation Networks Working
Drawings.
Irrigation Networks Details
Drawings
Irrigation Networks Itemized
B.O.Q & Pricing.
Irrigation Networks Method Of
Statement.
Irrigation Networks Time
Schedule and Cash Flow
Charts.
Irrigation Networks
Construction Processes
Documentations.
DESIGN PROJECTS Private Villas