![Page 1: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/1.jpg)
Energy Storage - Evolution and Revolution on the
Electric GridLon Huber March, 2017
![Page 2: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/2.jpg)
2
1660 Projects, 193594 MW
![Page 3: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/3.jpg)
A Sampling of Our Clients
3
Strategen provides insight to global corporations, utilities and public sector leaders, helping them to develop impactful and financially sustainable clean energy strategies
Strategen
3
![Page 4: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/4.jpg)
Storage analytics and cost/benefit
4
![Page 5: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/5.jpg)
What is energy storage?
Value and services
Key trends and drivers
Moving forward
5
Topics
![Page 6: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/6.jpg)
Energy storage is a very broad asset class
6
Electro-Chemical
(Flow battery / Lithium Ion)
Mechanical
(Flywheel)
Bulk Mechanical
Thermal
(Ice / Molten Salt)
Bulk Gravitational
(Pumped Hydro)
Transportation and Chemical
(Electric and Hydrogen Vehicles)
(CAES)
![Page 7: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/7.jpg)
Size and Duration by Technology
7
Source: Australian Renewable Energy Agency (7/2015): Energy Storage Study Funding and Knowledge Sharing Priorities
![Page 8: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/8.jpg)
What is energy storage?
Value and services
Key trends and drivers
Moving forward
8
Topics
![Page 9: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/9.jpg)
9
Bulk Storage
Ancillary Services
DistributedStorage
DistributedStorage Commercial
Storage
ResidentialStorage
Broad electric power system applicability
![Page 10: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/10.jpg)
▪ Energy storage can be deployed quickly, relocate and scaled up or down as required. (Shift, scale-able, shift-able)
▪ This makes it a critical tool to navigate the rapid change that is occurring
May 27, 2016
• SCE issues Aliso ACES RFO and DBT RFP
Jul. 18, 2016
• SDG&E files application for 150 MWhs of storage
Aug. 15, 2016
• SCE files application for 108 MWhs of storage
Aug. 18, 2016
• CPUC approves SDG&E applications
Sept. 15, 2016
• CPUC approves SCE Round 1 applications
Dec. 31, 2016 – Feb. 2017
• Projects brought online
Aliso Canyon: from RFP to online in 7 months
Total: 94.5 MW / 342 MWh
Energy storage is flexible
10
![Page 11: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/11.jpg)
Resiliency: Dominican Republic
▪ 20 MW of storage in Santa Domingo, Dominican Republic provides efficient frequency regulation to the grid
▪ Provided key services during September’s Hurricanes Irma and Maria, when about 50% of the island’s power plants were forced offline
SOURCE: AES ADVANCION CASE STUDY: HTTP://CDN2.HUBSPOT.NET/HUBFS/2810531/COLLATERAL/AES%20ES%20CASE%20STUDY%20-%20STORM%20RESILIENCE.PDF 11
![Page 12: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/12.jpg)
Provide Spin/ Non Spin
Provide Ramping
Provide Frequency Regulation Services
Provide Capacity
“Firm” Renewable Capacity
Shift Energy
Avoid dump energy and/or minimum load issues
Provide Black Start
Provide In-Basin GenerationSmooth Intermittent Resource Output
Improve Short-Driven Performance
Provide System Inertia
Avoid Congestion Fees
Defer System Upgrades
Improve System Reliability
Provide System Inertia Defer System Upgrades
Mitigate Outages
Integrate Intermittent Distributed Generation
Maintain Power Quality Self-consumption
Provide Uninterruptible Power Supply
Generation
Transmission
Distribution
End User
Demand Charge/ TOU
Energy Shifting Dynamic Response
Short (< 2 min)
Medium ( 2min – 1 hour)
Long (1 hour +)
Grid Location Minimum duration of output energy
Operational use cases for storage systems (There are many)
Source: Modified from SCE 2011 chart
12
![Page 13: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/13.jpg)
1. Identify primary need
3. Optimize value streams and understand tradeoffs
2. Explore combinations of stackable benefits; discard incompatible
value streams
Approach to evaluating storage opportunities
13
![Page 14: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/14.jpg)
Provide Spin/ Non Spin
Provide Ramping
Provide Frequency Regulation Services
Provide Capacity
“Firm” Renewable Capacity
Shift Energy
Avoid dump energy and/or minimum load issues
Provide Black Start
Provide In-Basin GenerationSmooth Intermittent Resource Output
Improve Short-Driven Performance
Provide System Inertia
Avoid Congestion Fees
Defer System Upgrades
Improve System Reliability
Provide System Inertia Defer System Upgrades
Mitigate Outages
Integrate Intermittent Distributed Generation
Maintain Power Quality Self-consumption
Provide Uninterruptible Power Supply
Generation
Transmission
Distribution
End User
Demand Charge/ TOU
Energy Shifting Dynamic Response
Short (< 2 min) Medium ( 2min – 1 hour) Long (1 hour +)
Grid Location Minimum duration of output energy
Main Use Case: Distribution deferral
Source: Modified from SCE 2011 chart
14
![Page 15: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/15.jpg)
Value stack example #1: Distribution deferral
15
![Page 16: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/16.jpg)
Provide Spin/ Non Spin
Provide Ramping
Provide Frequency Regulation Services
Provide Capacity
“Firm” Renewable Capacity
Shift Energy
Avoid dump energy and/or minimum load issues
Provide Black Start
Provide In-Basin GenerationSmooth Intermittent Resource Output
Improve Short-Driven Performance
Provide System Inertia
Avoid Congestion Fees
Defer System Upgrades
Improve System Reliability
Provide System Inertia Defer System Upgrades
Mitigate Outages
Integrate Intermittent Distributed Generation
Maintain Power Quality Self-consumption
Provide Uninterruptible Power Supply
Generation
Transmission
Distribution
End User
Demand Charge/ TOU
Energy Shifting Dynamic Response
Short (< 2 min) Medium ( 2min – 1 hour) Long (1 hour +)
Grid Location Minimum duration of output energy
Value stack example #2: Frequency regulation
Source: Modified from SCE 2011 chart
16
![Page 17: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/17.jpg)
Value stack example #2: Frequency regulation
17
![Page 18: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/18.jpg)
18
Potential benefits from additional use cases
SecondaryUse Case
PrimaryUse Case
StackedUse Cases
Value stacking: Dist. deferral + frequency regulation
![Page 19: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/19.jpg)
19
0
200
400
600
800
1000
1200
1400
Regulation RenewableIntegration
Resilency Capacity T&D
De
plo
ym
en
t (M
W)
Energy Storage Applications by State
Other Regions Arizona Hawaii ERCOT ISO-NE NYISO PJM CAISO
Application Description
Regulation Market products for wholesale market participation
Renewable Integration
Storage sited with renewable projects
Resiliency Microgrids and Black Start applications
CapacityLocal Capacity and Resource Adequacy
T&DTransmission and Distribution Upgrade Deferral
Note: Pumped Hydro technology excluded. Some storage capacity may be double-counted if the system performs multiple applicationsSource: DOE Energy Storage Database Accessed Jan 11, 2018
US installed capacity by application
![Page 20: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/20.jpg)
20
% Time per YearSource: PG&E Demand Response Programs: An Overview Presentation
The power system is underutilized
![Page 21: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/21.jpg)
▪ Analysis finds that for every $1 spent on reducing peak demand, at least $2.62 can be saved by ratepayers in Illinois and $3.26 by ratepayers in Massachusetts.
▪ Cutting top 100 hours of peak demand could save New York State up to $1.7 billion per year
▪ 15% of total production assets run less than 7 days per year or less than 2% of that time
21
MA DOER slide: Commissioner Judson presentation at Restructuring Roundtable, May 2016Source: https://info.aee.net/peak-demand-reduction-report
According to EIA:Average peaker plant runs about 2-7% of the yearOver 70 GW of new peaker plants will be built in the U.S. before 2026
Why peak demand is important
![Page 22: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/22.jpg)
What is energy storage?
Value and services
Key trends and drivers
Moving forward
22
Topics
![Page 23: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/23.jpg)
Chapter 1Frequency regulation
23
▪ Frequency regulation (FR) storage projects are low energy applications therefore lower cost for batteries
▪ Important but shallow market as renewable generation increases
▪ FR was largest front-of-meter storage application in USA until 2016
▪ 265 MW of fast-response storage in PJM
▪ Typically 30 minute to an hour capacity
▪ Volatile market pricing
Source: Energy Storage North America 2017solarprofessiobnal.com
23
![Page 24: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/24.jpg)
24
Use case attributes:▪ High T&D upgrade costs ▪ High peak-to-energy ratio▪ Modest projected load growth ▪ Uncertainty regarding the timing or likelihood of major load additions▪ T&D construction limitations (siting, line access local community opposition to new
power lines and infrastructure.)▪ An energy storage system used for T&D deferral will be able to provide additional
benefits (renewable integration, etc.)
Australia Example: Grid utility support system, 20 energy storage systems to support remote networks
Energy storage for T&D deferral is expected to grow from 332 MW in 2017 to 14,325 MW in 2026.
Chapter 2Niche transmission & distribution infrastructure deferral
Source: energy-storage.news, businesswire.com, ergon.com
24
![Page 25: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/25.jpg)
Chapter 3Battery peaker – local capacity
25
SellerResource
TypeTotal
ContractsMW
Adv. MicrogridSolutions
BTM Battery 4 50.0
AES FTM Battery 1 100.0
Ice EnergyBTMThermal
16 25.6
NRG FTM Battery 1 0.5
Stem BTM Battery 5 85.0
Total 27 261.1
SCE Energy Storage LCR Procurement
▪ Aliso - 94.5 MW / 342 MwhPeaker Plants Constructed In 7-months
▪ Highlighted Fast Deployment Of Energy Storage
▪ Led To 100MW In 100 Days’ Deployment In Australia
▪ Primarily a Storage-only Application
SCE purchased 5X CPUC requirement (50MW)
![Page 26: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/26.jpg)
▪ Great River Energy Co-op in Minnesota issued RFP for 10 MW PV and 10 MW/20 MWh Storage system in 2018
▪ Primary use case for storage is to dispatch over 2-4 hours peak period for demand reduction
▪ Storage to be charged 100% by co-located PV
Irvine Company Hybrid Electric Buildings
▪ Batteries and advanced software
▪ 10 MW / 60 MWh
▪ 20 buildings
▪ 20% peak demand reduction
26
Chapter 3.5C&I and Co-op Demand Charge Mitigation
Source: greatriverenergy.com, advmicrogrid.com,
![Page 27: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/27.jpg)
27
Australia: Cooktown Solar and Storage
▪ 33MW solar plus 1.4MW/5.4MWh Lithium based battery storage
▪ Fringe grid in Australia and will test the boundaries of operation of utility scale solar battery storage in these conditions.
▪ The Project is now in operation.
▪ Funding dependent on dispatchable/storage aspect to assist with supplying solar during evening peak
▪ Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020
Arizona: Tucson Electric Power 100 MW solar plus storage plant
▪ 30 MW of four-hour duration batteries▪ 20 year PPA
▪ ~3 cents/kWh solar – ~4.5 cents/kWh with battery▪ Will be largest solar-plus-utility-scale-battery system in the US
Source: http://www.lyoninfrastructure.com/cooktown.html
Chapter 4Dispatchable solar – PV + storage peaker
Source: http://insights.globalspec.com/article/4139/solar-storage-peaker-plant-for-kaua-i
27
![Page 28: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/28.jpg)
28
New York: Brooklyn Queens Demand Management program
▪ 41 MW customer sited solutions
▪ 11 MW utility sited solutions
California: SCE & PG&E Energy Storage Solicitation for Local Capacity
▪ Several behind and in-front of meter energy storage resources procured
Australia: AGL virtual power plant.
▪ 1000 aggregated BTM storage systems, 5MW/7MWh total for customer, distribution and wholesale benefits
▪ Customer sited DER and embedded solutions will be leveraged more in the future to avoid utility infrastructure.
▪ New markets and compensation models will be required to encourage, guide and extract this value.
▪ New grid operation approaches will be required to compliment new markets
Chapter 4.5DER alternatives
Source: conedbqdmauction.com, arena.gov.au
28
![Page 29: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/29.jpg)
Chapter 5RE + longer duration storage
KIUC: The Lawai Project
▪ 28 MW solar farm
▪ 100 MWh 5 Hour Li-Ion Battery
▪ Expected 3.7 million gallon reduction in fossil fuel consumption per year.
▪ 25-year PPA, 11 cents/kWh
▪ Near the wholesale energy price!
▪ Supply power at peak evening times
Australia: Australia’s largest solar farm.
• Solar Q proposes to build 350MW solar PV + storage with a second phase to expand to 800MW
• 800MW would provide ~ 15% of the state's south-east electricity needs from PV and 4,000 MWh of batteries
• Storage is critical aspect to serve evening load
Source: theverge.com, abc.net.au, hawaiienergypolicy.hawaii.edu
29
![Page 30: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/30.jpg)
What is energy storage?
Value and services
Key trends and drivers
Moving forward
30
Topics
![Page 31: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/31.jpg)
31
Bulk Storage
Ancillary Services
DistributedStorage
DistributedStorage Commercial
Storage
ResidentialStorage
✓ Market Rules✓ Market Study,
Valuation & Targets
✓ All Source Procurements and Resource Plans
✓ Renewable Energy Strategy
✓ Non-wires Alternatives
✓ Resiliency✓ Rate Design✓ EV Infrastructure
Chapters won’t happen by themselves
Making it a reality
Source: EPRI
![Page 32: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/32.jpg)
32
Source: ABB
FuturePast
Conceptual path forward Li-Ion batteries(Costs are proportional to energy/time)
Source: SCE 2011
![Page 33: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/33.jpg)
33
▪ Modest sales of EV/hybrids can have significant impact on global cell production
▪ Currently, significant underutilization in global cell production
The importance of demand
Source: CEMAC report to DOE
![Page 34: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/34.jpg)
34
▪ China are expecting Li-ion to play significant role in clean energy future
▪ China’s 13th 5 year plan guarantees payouts if manufacturers meet targets
▪ Directing and encouraging internal manufacturing to increase production and capture market
China targeting/investing in energy storage
Source: www.visualcapitalist.com
![Page 35: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/35.jpg)
35
![Page 36: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/36.jpg)
What is at stake?
36
Low Carbon Grid Study (February 2016): http://lowcarbongrid2030.org/wp-content/uploads/2016/PDFs/160307_PhaseIIResults.pdf
![Page 37: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/37.jpg)
Renewable curtailment & negative prices
SOURCE: (HTTPS://WWW.EIA.GOV/TODAYINENERGY/DETAIL.PHP?ID=30692) (HTTPS://WWW.CAISO.COM/DOCUMENTS/WIND_SOLARREAL-TIMEDISPATCHCURTAILMENTREPORTMAY13_2017.PDF)
37
![Page 38: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/38.jpg)
The RPS 2.0
38
https://www.strategen.com/reports-1/2018/3/28/evolving-the-rps-implementing-a-clean-peak-standard
![Page 39: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/39.jpg)
Are your state policies ready?
39
Coming in less than 5 years!
![Page 40: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/40.jpg)
Thank you!Lon HuberVice PresidentStrategen Consulting, LLC
▪ Email: [email protected]▪ Phone: 928-380-5540
40
6th Energy Storage North America (ESNA) Conference + Expo: November 6-8, Pasadena,
CALargest grid-connected energy storage
conference in North America, covering all applications including EV charging
(www.esnaexpo.com)
https://www.strategen.com/new-blog/2016/12/1/evolving-the-rps-a-clean-peak-standard-for-a-smarter-renewable-future
Clean Peak Paper:
![Page 41: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/41.jpg)
Appendix
41
![Page 42: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/42.jpg)
▪ Storage is eligible for ITC if charged from solar
▪ Level of benefit dependent on ability to charge from solar-paired system
▪ Battery must be ≥75% charged from solar to receive ITC
▪ Retrofits eligible for ITC, if 100% RE charged
▪ Tax reform includes changes to depreciation/MACRS, and ITC – stay tuned for new IRS rules
42
Adding solar to storage unlocks tax benefits
Source: NREL
![Page 43: Energy Storage: Revolution and Evolution of the Electric Grid · supplying solar during evening peak Altogether, Lyon Group planning 1.7GW of PV and 1GW of battery storage by 2020](https://reader034.vdocuments.site/reader034/viewer/2022050516/5f9ffd841507300a600b85e0/html5/thumbnails/43.jpg)
▪ By 2030 all new cars in the Netherlands must be emission free
▪ India announced that it would end sales of gas and diesel cars by 2030.
▪ Norway agreed to end sales of gas and diesel cars by 2025.
▪ France announced it would end sales of gas and diesel cars by 2040.
▪ Britain announced it would end sales of gas and diesel cars by 2040.
▪ The Scottish government announced it would phase out gas and diesel cars by 2032.
Others soon to announce
43
Global drivers of EVs
Source: www.vox.com