Belene Nuclear Power PlantProject Status

Page 2: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reProject StatusGeneral Data

Reactor type PWR, Russian DesignPlant supplier ASE, AREVA NP/SIEMENSReactor thermal power 2 x 3012 MWElectric output 2 x 1060 MWNet efficiency 35 %Capacity factor 90 %Design Life Time 60 years

Page 3: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reFinal EPC Contract(Contract Agreement)

Based on the FIDIC Silver Book (Conditions of ContractFor EPC/Turnkey Projects)

The Contract Agreement is signed on January 18th, 2008

The Contract Agreement consists of:

Terms and Conditions− Appendixes− Agreement between NEK and ASE dated November

29th,2006

Page 4: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reMain Principles of

the Contract Agreement (1 of 5)

General Provisions:– Applicable Law: Bulgarian law;– Language: English;– Definitions.

General Rights and Obligations of the Employer (NEK):– Transfer of the Site;– Responsibility for the Permit and Licensing Process.

General Rights and Obligations of the Contractor (ASE):– Responsibility for the Licenceability of the Project;– Subcontractors;– Quality Management, Care of Work & Safety;– Protection of the Environment;– Performance Securities;– Contractor’s Equipment;– Progress Reports;– Security of the Site.

Page 5: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reMain Principles of

the Contract Agreement (2 of 5)

Design:– General Responsibility of the Contractor– Technical Standards and Regulations

Plant, Materials, Workmanship:– Manner of Execution & Safety– Inspections and Testing– Rejection– Remedial Work

Time for Completion: – Extension of Time for Completion & Suspension– Project Schedule and Delays

• Liquidated Damages• Retention Money

– Suspension

Page 6: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reMain Principles of

the Contract Agreement (3 of 5)

Commissioning:– General Responsibility of the Contractor;– Guarantee Tests.

Defects Liability:– Warranty Period;– Remedy of Defects & Removal of Work.

Provisional and Final Acceptance:

– General Responsibility of the Contractor;– Early Take-over;– Certificates.

Variations:– Procedure;– Notices.

Page 7: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reMain Principles of

the Contract Agreement (4 of 5)

Contract Price:– Procedure & Payments.

Termination by the Employer:– Rights, Claims & Procedure.

Termination by the Contractor:– Rights, Claims & Procedure.

Insurance:– General Obligations of the Employer;– General Obligations of the Contractor.

Force Majeure:– Procedure, Notices & Actions

Page 8: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reMain Principles of

the Contract Agreement (5 of 5)

Hazardous Materials:

Radiological Protection:

Nuclear Liability:

Disputes and Resolution:

– Amicable settlement;– Coordination Meetings;– Arbitration Procedure.

Representations and Warranties:

Page 9: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reStrategic Investor Involvement

• On 2nd of May 2007 NEK invite candidates for participation in the tender procedure for Strategic Investor;

• On 6th of June 2007 NEK received Letters of Intent from 10 companies – CEZ, ATEL, ENEL, RWE, E.ON, EDF, Electrabel, EGL, Endesa and Kumerio Med;

• On 17th of July 2007 NEK’s Board of Directors took the decision to separate the candidates in two groups (A and B) according to the percentage indicated in their application to participate in the Project – group A includes 6 candidates (CEZ, ENEL, RWE, E.ON, EDF and Electrabel) willing to acquire 49%;

From the beginning till now (1 of 3)

Page 10: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reStrategic Investor Involvement

• In the periods as from 13th till 31st of August 2007 and as from 12th till 22nd of September 2007 for the Strategic Investors there were organized project data room access and meetings with NEK’s management and experts ;

• On 17th of October 2007 the candidates (5 of them) submitted to NEK their preliminary unbinding offers;

• In the period as from 5th November till 7th of December there were organized presentations, Q&A sessions and two rounds of negotiations with Strategic Investors;

• On 9th of January 2008 five candidates (CEZ, ENEL, RWE, E.ON, and Electrabel) submitted to NEK their final unbinding offers;

From the beginning till now (2 of 3)

Page 11: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

re

• On 10th of March 2008 the Board of Directors of NEK EAD approved Electrabel (Belgium) and RWE Power (Germany) as “preferred bidders” with whom to continue in phase 2 of tender procedure for External Investor in Belene Power Project;

• In the period as from 7th of April till 13th of May 2008 for the Strategic Investors there were organized second extended project data room access, meetings with NEK’s management;

• As from 23rd of April NEK organise for candidates various meeting with different experts from different institutions.

Strategic Investor InvolvementFrom the beginning till now (3 of 3)

Page 12: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reStrategic Investor Involvement

• Preliminary binding offers submission from the Preferred Bidders;

• Negotiation process;

• Signing of Shareholders’ Agreement.

From now till the end of the process (1 of 1)

Page 13: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reStrategic Investor Involvement

Timeline

May 2007 July 2008

2.5.07Invitation of

Investors

6.6.07Letter of Intent 17.7.07

Candidates in 2groups (A & B)

13.8.07 - 30.8.07

Data Room I12.9.07 - 22.9.07

17.10.07Preliminary unbinding

offers

5.11.07 - 7.12.07Presentations, Q&A,

negotiations

9.1.08Finale unbinding offers 10.3.08

Preferred bidderschoise

7.4.08 - 13.5.08 Data Room II

23.6.08Binding offers

submition

7.4.08 - 31.5.08Q&A, meetings

23.6.08Negotiations

Page 14: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

re

• On 6th of July 2007 NEK announced a tender for Lead Structuring and Arranging Bank;

• On 24th of September two banks (Societe Generale and BNP Paribas) requested to participate;

• NEK examined the submitted requests to participate in the tender and on 11th of October 2007 invited both candidates to submit initial offers;

• On 31st of October the candidates submitted to NEK their initial offers;

Lead Structuring and Arranging BankTender process (1 of 2)

Page 15: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

re

• As from 11th of December 2007 till 5th of March 2008 NEK entered into 3 round negotiation process with the candidates.

• On 21st of April 2008 NEK’s Board of Directors took a decision and ranked BNP Paribas on 1st place and Societe Generale on 2nd place.

Lead Structuring and Arranging BankTender process (2 of 2)

Page 16: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reLead Structuring and Arranging Bank

Timeline

July 2007 June 2008

11.12.07 - 5.3.08 Negotiation process

21.4.08Contract signing

6.7.07Tender

announcement

24.9.07Request forpaticipation

11.10.07Initial offer

request 31.10.07Initial offersubmition

21.4.08Ranking of candidates

Page 17: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reProject Belene

Timeline

May 2007 July 2008

2.5.07Invitation of

Investors

6.6.07Letter of Intent 17.7.07

Candidates in 2groups (A & B)

13.8.07 - 30.8.07

Data Room I12.9.07 - 22.9.07

17.10.07Preliminary unbinding

offers

5.11.07 - 7.12.07Presentations, Q&A,

negotiations

9.1.08Finale unbinding offers 10.3.08

Preferred bidderschoise

7.4.08 - 13.5.08 Data Room II

23.6.08Binding offers

submition

7.4.08 - 31.5.08Q&A, meetings

23.6.08Negotiations

May 2007 July 2008

11.12.07 - 5.3.08 Negotiation process

21.4.08Contract signing

21.4.08Ranking of candidates

31.10.07Initial offersubmition

11.10.07Initial offer

request

24.9.07Request forpaticipation

6.7.07Tender

announcement

Page 18: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

re

• Phase I – Structuring– bankability review;– consultants due diligence;– risk matrix preparation;– development of project financing base case;– preliminary market test;– financial plan delivery.

• Phase II – Fund raising– optimisation of financial plan;– market test;– term sheet finalisation;– MLA choice.

• Phase III - Documentation – loan document negotiation;– financial close.

Lead Structuring and Arranging BankScope of work

Page 19: Energy for the Future Belene Nuclear Power Plant Project Status

En

erg

y f

or

the F

utu

reDebt Raising & Equity Partner Process

Time Schedule