RMS.08.15.348 Emergency Action Plan Provided by: Key Risk P.O. Box 49129 Greensboro, North Carolina 27419 800.942.0225 ________________________________________________________________________________________ 1 This document provides general information and suggestions related to workplace safety programs. It is not intended and cannot be assumed that every legally required and/or acceptable safety procedure is included herein or that it addresses issues applicable to your particular workplace conditions or circumstances, and it cannot replace or substitute for the services of trained professionals. Although the information contained herein was obtained from sources believed to be reliable, Key Risk Management Services, LLC and/or your W. R. Berkley insurance carrier make no guaranty and assume no liability or responsibility for the correctness, sufficiency, or completeness of such information and any errors or omissions in the content of this publication or any damages incurred resulting from the use of the information contained herein

Upload: trinhtuyen

Post on 23-Mar-2018

239 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

RMS.08.15.348

Emergency Action Plan

Provided by:

Key Risk P.O. Box 49129

Greensboro, North Carolina 27419

800.942.0225

________________________________________________________________________________________

1 This document provides general information and suggestions related to workplace safety programs. It is not intended and cannot be assumed that every legally required and/or acceptable safety procedure is included herein or that it addresses issues applicable to your particular workplace

conditions or circumstances, and it cannot replace or substitute for the services of trained professionals. Although the information contained herein

was obtained from sources believed to be reliable, Key Risk Management Services, LLC and/or your W. R. Berkley insurance carrier make no guaranty and assume no liability or responsibility for the correctness, sufficiency, or completeness of such information and any errors or omissions in

the content of this publication or any damages incurred resulting from the use of the information contained herein

Page 2: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

Emergency Preparedness – Written Program

RMS.08.15.348

Emergency Action Plan

Table of Contents

ABOUT THIS GUIDE. ........................................................................................................ 2 PURPOSE .................................................................................................................... 3 DEFINITIONS ............................................................................................................... 3 RESPONSIBILITIES ........................................................................................................ 3

The Program Administrator: .............................................................................................................. 3 The Emergency Coordinator: ............................................................................................................. 3 Evacuation Leaders ............................................................................................................................ 4 Emergency Medical Team ................................................................................................................. 4 Managers and Supervisors ................................................................................................................. 4 Employees .......................................................................................................................................... 4

PROGRAM ACTIVITIES .................................................................................................. 4 Assessment ......................................................................................................................................... 4 Equipment .......................................................................................................................................... 5 Emergency Drills ............................................................................................................................... 5 Shelter Areas ...................................................................................................................................... 5 Evacuation.......................................................................................................................................... 5 Alarm Systems ................................................................................................................................... 5 Fire Protection System ....................................................................................................................... 6 Fire Prevention ................................................................................................................................... 6 Training .............................................................................................................................................. 6

FORMS ....................................................................................................................... 7 A – Emergency Assessment Form ..................................................................................................... 8

B – Emergency Call List .................................................................................................................... 9

C – Emergency Drill Evaluation Report .......................................................................................... 10

D – Emergency Equipment List ....................................................................................................... 11

E – Emergency Preparedness Training Record ................................................................................ 12

F – Emergency Response Information ............................................................................................. 13

G – Evacuation Assignment List ..................................................................................................... 15

H – Fire Inspection Checklist........................................................................................................... 16

I – Preferred Medical Provider List ................................................................................................. 21

J – Sample Earthquake Response Procedure ................................................................................... 22

K – Sample Evacuation Leader Procedure ...................................................................................... 23

L –Evacuation Route and Exit Map ................................................................................................. 24

M – Sample Head-Count Procedure ................................................................................................ 25

N – Sample Medical Emergency Procedure .................................................................................... 26

O – Sample Tornado Response Procedure ....................................................................................... 27

Page 3: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

Emergency Preparedness – Written Program

RMS.08.15.348

Emergency Action Plan

About This Program

The following sample written program can help you develop an emergency action plan for your organization.

It is designed to walk you through the complete process section by section.

Here’s a closer look at each section:

Purpose: This section describes the purpose of the written program, what the program is expected to

accomplish and the employees, departments, operations and facilities that the program applies to. This may

include both nonemployees and contractors.

Definitions: This section defines terms found in the written program.

Responsibilities: This section identifies who is responsible for specific tasks within the program to assure its

success. Every program will have a variety of tasks or action items assigned to people in your organization.

When the expectations of the program are clearly written, each individual’s accountability within the

program can be clearly established.

Program Activities: This section describes the specific management directives (practices) that establish

organization, responsibility, authority and standards and identifies which are necessary to implement the

specific safety program. Practices must be specific and factual, not procedural. Practices provide guidance on

how a particular matter should be handled.

Forms: This section includes forms and other attachments that document important program information.

If you fill in the blanks with names and titles in the sample written program and complete the appropriate

forms that are provided, you will have created a written emergency action plan for your organization.

Note: Read and verify that the information in this sample written program accurately represents your

safety program. Attach all forms to your written program.

Page 4: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

RMS.08.15.348

Purpose

The purpose of this program is to establish emergency procedures and plans at Company Name.

This program applies to all company facilities that have the potential for emergency situations,

including building evacuations, severe weather, medical emergencies and earthquakes.

Definitions

Emergency:

Any unplanned event that can cause death or injury to employees, customers or the public or that

can shut down our business, disrupt operations or cause physical or environmental damage.

Evacuation Route:

The shortest path from an affected area to an area of safety, a shelter area or a location out of the

building.

Responsibilities

The Program Administrator: Name & Title

This person is responsible for:

Issuing and administering this program and making sure that it satisfies all applicable

federal, state and local requirements

Maintaining all emergency call lists

Maintaining the evacuation leader system

Providing initial and periodic training on emergency preparedness to employees

Scheduling and coordinating all emergency drills

Auditing the emergency action plan to assure its continued effectiveness

The Emergency Coordinator: Name & Title

This person is responsible for:

Coordinating emergency responses at this facility

Interfacing between outside emergency responders and building personnel

Verifying that all employees have left the building during emergencies that require building

evacuation

Assessing the need for outside emergency responders

Coordinating disaster response with outside emergency responders

Initiating the company’s post-emergency actions

Page 5: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

RMS.08.15.348

Evacuation Leaders: Names & Titles

These people are responsible for:

Knowing and understanding the appropriate emergency response at the facility

Understanding specific actions to be taken in their departments in response to various

emergencies, including equipment shutdowns

Assuring that employees in their departments know what to do in cases of emergencies

Accounting for employees during evacuations or shelter situations

Directing employees to proper evacuation routes and exits

Emergency Medical Team: Names & Titles

These people are responsible for:

Responding to medical emergencies in the facility and providing initial emergency first aid

or cardiopulmonary resuscitation (CPR)

Assessing the need for outside emergency responders

Contacting outside emergency responders and directing them to the accident scene in the

facility

Complying with the company’s blood borne pathogens program

Managers and Supervisors

These people are responsible for:

Assuring that employees in their departments are trained on the correct actions to take in the

event of an emergency

Accounting for their employees during an evacuation (head-count method)

Initiating employee accident investigation reports for employees who sustain injuries or

illnesses while on the job

Employees

These people are responsible for:

Knowing what to do in case of an emergency

Participating in all emergency training and drills

Program Activities

Assessment

Each company facility will be analyzed for the potential of emergency situations at that

facility

A copy of all assessments and practices will be issued to all key company employees

Page 6: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

RMS.08.15.348

This assessment will be reviewed annually to determine if situations have developed that

require new or revised emergency responses

At our facility, we have the potential for the following emergencies:

– Enter emergencies here

Equipment

Equipment kept for emergencies will be inspected on a monthly basis to assure its

availability for use

An emergency weather radio will be located at: Location

This radio will be monitored for emergency weather information by: Name & Title

Equipment for emergencies is listed on the emergency equipment list

Locations for emergency equipment will be identified on the facility emergency response

map

Emergency Drills

Drills that simulate evacuation of employees, due to fire or movement of employees to

shelter areas due to severe storms or tornadoes, will be conducted in each facility according

to the following timetable:

– A tornado drill will be performed once each year prior to the start of the tornado season

for the part of the country in which the facility is located. This drill should coincide with

that conducted by the local government emergency preparedness agency, should it

conduct a tornado drill

– Fire drills will be performed a minimum of once each year in each facility

Written documentation of the performance of each drill will be sent to the program

administrator

Shelter Areas

Shelter areas suitable for refuge during severe weather will be established at all company

facilities

The shelter location for this building is: Location

Evacuation

Exits and evacuation routes will be established for each building location

Locations of exits and evacuation routes will be maintained on the Facility Emergency

Preparedness Map

Alarm Systems

Notification of building emergencies will be communicated via the following methods:

– Enter Here

Page 7: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

RMS.08.15.348

The building fire alarm will be activated during the following situations:

– Enter Here

The building fire alarm sounds like:

– Enter Here

Other building alarms for Location(s) sound like: Enter Here

Announcements for medical emergencies will be made via the public address system

Fire Protection System

The building sprinkler system will be maintained according to the recommendations of the

property insurance carrier

The building sprinkler system will be inspected and tested annually

The building alarm system will be inspected annually according to insurance company

recommendations

Fire Prevention

Supervisors and managers will identify fire hazards within their departments and take

appropriate preventive actions

All employees are responsible for reporting fire hazards to supervisors or the maintenance

department immediately

Each department will have a monthly fire hazard inspection as part of its monthly safety

audit

Training

All employees will be oriented to the appropriate emergency response at time of hire

All employees will participate in periodic refresher training as part of safety meetings

Emergency coordinators and evacuation leaders will be trained annually on appropriate

responses within the workplace

Page 8: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

RMS.08.15.348

Forms

A – Emergency Assessment Form

B – Emergency Call List

C – Emergency Drill Evaluation Report

D – Emergency Equipment List

E – Emergency Preparedness Training Record

F – Emergency Response Information

G – Evacuation Assignment List

H – Fire Inspection Checklist

I – Preferred Medical Provider List

J – Sample Earthquake Response Procedure

K – Sample Evacuation Leader Procedure

L – Evacuation Route and Exit Map

M – Sample Head-Count Procedure

N – Sample Medical Emergency Response Procedure

O – Sample Tornado Response Procedure

Page 9: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

RMS.08.15.348

A – Emergency Assessment Form Instructions: This form is used to assess an emergency that may occur at your company. Use this form to

determine the potential problems that the emergency may pose, the type of equipment needed to respond to

the emergency, critical information needed at the time of the emergency and any special skills or knowledge

needed to effectively respond to the emergency.

Potential Emergency

Potential Problems Caused by the Emergency

Equipment Needed to Respond to the Emergency

Resources to Contact in the Event of an Emergency

Company Contact Phone Number

Skills Needed to Respond to the Emergency

Knowledge Needed to Respond to the Emergency

Page 10: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

RMS.08.15.348

B – Emergency Call List

Designated Company Emergency Responders

Name Work # Home # Pager # Cell #

1

2

3

4

5

6

7

Key Company Employees

Name Work # Home # Pager # Cell #

1

2

3

4

5

6

7

Other Resources

Resource Contact Phone

Local fire marshal office

Sprinkler contractor

Alarm monitoring

Power company

Gas company

Phone company

Salvage company

Restoration company

Page 11: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

RMS.08.15.348

C – Emergency Drill Evaluation Report

Type of Drill

Date of Drill

Time Drill Started

Time Drill Concluded

If the drill was to simulate an evacuation, how long did the evacuation take?

Time alarm sounded

Time all employees cleared the building and were accounted for

Total evacuation time

If the drill was for a non-evacuation emergency, describe the purpose of the drill:

Give a narrative to assess the drill, including what went well and what needs improvement:

Completed By

Date

Page 12: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

RMS.08.15.348

D – Emergency Equipment List

Instructions: This form is intended to document what equipment is available to use for emergency situations.

This information records the type, amount and location of emergency equipment. The form can also be used

to inspect the equipment to determine if all the equipment is available, the equipment is in serviceable

condition and no expiration dates have passed on perishable items such as food, medications, or batteries.

Equipment Type Stored Location Person Responsible

Inspection Information

Quantities

OK?

Condition

OK?

Expiration

Dates OK?

Yes No Yes No Yes No

Page 13: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

RMS.08.15.348

E – Emergency Preparedness Training Record

Facility

Department

Date

Employee Name &

Employee Identification

Number

Please print

Job Title

Please print

Employee

Signature

Name:

ID:

Name:

ID:

Name:

ID:

Name:

ID:

Name:

ID:

Name:

ID:

Name:

ID:

Name:

ID:

Name:

ID:

Name:

ID:

Name:

ID:

Name:

ID:

Signature of Trainer

Page 14: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

F – Emergency Response Information

Assess the emergency, and determine the appropriate response.

Fire Emergency or Building Evacuation

1. Sound the local alarm (i.e., activate fire alarm via pull station, contact security, notify

supervisor, call switchboard).

2. Shut down equipment, as necessary.

3. Leave the building via designated evacuation routes. Use stairways. Do not use elevators.

4. Assemble at the designated meeting point.

5. Account for people in the building.

6. Remain outside the building until told that it is safe to reenter.

Medical Emergency

1. Shout for help to alert nearby employees.

2. Assess the medical emergency. Determine the type of injury or illness.

3. Contact emergency responders and key company employees in order of appearance on the call

list.

4. Appoint an employee to guide outside emergency responders to the site.

5. Assist emergency responders, as needed.

6. Complete a company accident investigation report and workers’ compensation reports for

injured employees.

Severe Weather

1. Stay away from windows or outside doors.

2. Shut down equipment, as necessary.

3. Seek shelter inside the building in designated shelter areas. Stay away from building areas with

large roof spans, such as cafeterias or auditoriums.

4. Account for people in building shelter areas.

5. Stay in shelter areas until the “all clear” signal is given.

6. Be aware of potential hazards from downed electrical lines and structural damage.

Earthquake

1. Keep calm. Stay indoors.

2. Take cover under a sturdy piece of furniture or counter, or brace yourself against an inside wall

or heavy framed doorway.

3. Protect your head and neck. Stay away from glass, windows, outside doors or loose items that

could fall.

4. After the earthquake, stay away from windows, skylights and items that could fall. If evacuation

is necessary, use stairways to leave the building. Do not use elevators.

5. Be aware of potential hazards from broken gas lines, downed electrical lines and structural

damage.

6. Account for people in the building.

Page 15: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

Chemical Spill

1. Confine the hazard. Close doors and restrict access to the area. Do not attempt to clean up the

spill unless trained to do so. If spilled material is a flammable liquid, shut down or eliminate

sources of ignition.

2. Evacuate nonessential personnel from the area. Assist any injured personnel. Keep bystanders

from entering the spill area.

3. Report the spill to your supervisor or to the building emergency coordinator.

4. Do not reenter the building unless told to do so by the emergency coordinator or local fire

department.

Page 16: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

G – Evacuation Assignment List

Emergency Coordinator

Assistant Emergency Coordinator

Department/Building Area Leader #1 Leader #2

Identify the location where all leaders will check in after their departments have been evacuated:

Page 17: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

H – Fire Inspection Checklist Initials

Taken from the OSHA Handbook for Small Businesses, U.S. Department of Labor

Date

This checklist is by no means all inclusive. Add or delete portions or items that do not apply to your

operations.

GENERAL WORK ENVIRONMENT Yes No NA COMMENTS

1. Is your local fire department well acquainted with your

facilities, its location and specific hazards?

2. If you have a fire alarm system, is it certified as required?

3. If you have a fire alarm system, is it tested at least annually?

4. Are fire doors and shutters in good operating condition?

5. Are fire doors and shutters unobstructed and protected against

obstructions, including their counterweights?

6. Are fire door and shutter fusible links in place?

7. Are sprinkler heads protected by metal guards when exposed

to physical damage?

8. Is an 18” clearance maintained below sprinkler heads?

9. Are fire extinguishers mounted in readily accessible locations?

10. Are fire extinguishers recharged regularly and noted as such

on the inspection tags?

11. Are fire extinguishers checked monthly when flammables or

chemicals are present?

12. Are fire extinguisher locations identified by signage?

13. Are all work sites clean and orderly?

14. Is combustible scrap, debris and waste stored safely and

removed from the work site promptly?

15. Are accumulations of combustible dust routinely removed

from elevated surfaces including the overhead structures of

buildings, etc.?

16. Is combustible dust cleaned up with a vacuum system to

prevent the dust going into suspension?

17. Are covered metal waste cans used for oily and paint-soaked

waste?

18. Are paint spray booths, dip tanks, etc. cleaned regularly?

19. Are fire watchers assigned when welding or cutting is

performed in locations where a serious fire might develop?

20. Before hot work is begun, are used drums, barrels, tanks and

other containers so thoroughly cleaned that no substances

remain that could explode, ignite or produce toxic vapors?

Page 18: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

WALKWAYS Yes No NA COMMENTS

1. Are aisles and passageways kept clear?

2. Are changes of direction or elevation readily identifiable?

EXITS OR EGRESS Yes No NA COMMENTS

1. Are all exits marked with exit signs and illuminated by

reliable light sources?

2. Are the directions to exits, when not immediately apparent,

marked with visible signs?

3. Are doors, passageways or stairways, that are neither exits nor

access to exits and which could be mistaken for exits,

appropriately marked “NOT AN EXIT,” “TO BASEMENT,”

“STOREROOM,” etc.?

4. Are exit signs provided with the word “EXIT” in lettering at

least 5 inches high and the stroke of the lettering at least ½

inch wide?

5. Are all exit doors side hinged?

6. Are all exits kept free of obstructions?

7. Are at least two means of egress provided from elevated

platforms, pits or rooms where the absence of a second exit

would increase the risk of injury from hot, poisonous,

corrosive, suffocating, flammable or explosive substances?

8. Are there sufficient exits to permit prompt escape in case of

emergency?

9. Do all exit doors open outward to level surfaces or stairs?

10. Are emergency lights provided and inspected?

11. Will all exits operate during a power failure?

12. Are all exits checked regularly for blockage from outside?

EXIT DOORS Yes No NA COMMENTS

1. Are all doors which are required to serve as exits designed and

constructed so that the way of exit travel is obvious and

direct?

2. Are all exit doors openable from the direction of exit travel

without the use of a key or any special knowledge or effort

when the building is occupied?

3. Are all revolving, sliding or overhead doors prohibited from

serving as required exit doors?

4. Where panic hardware is installed on required exit doors, will

it allow the doors to open by applying a force of 15 pounds or

less in the direction of the exit traffic?

Page 19: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

EXIT DOORS Yes No NA COMMENTS

5. Are all doors on cold storage rooms provided with an inside

release mechanism which will release the latch and open the

door even if it is padlocked or otherwise locked on the

outside?

6. Where exit doors open directly onto any street, alley or other

area where vehicles may be operated, are adequate barriers

and warnings provided to prevent employees from stepping

into the path of traffic?

SPRAYING OPERATIONS Yes No NA COMMENTS

1. Is adequate ventilation assured before spray operations are

started?

2. Is mechanical ventilation provided when spraying operations

are done in enclosed areas?

3. Is the spray area free of hot surfaces?

4. Is the spray area at least 20 feet from flames, sparks, operating

electrical motors and other ignition sources?

5. Do solvents used for cleaning have a flash point of 100F or

more?

6. Are fire control sprinkler heads kept clean?

7. Are “NO SMOKING” signs posted in spray areas, paint

rooms, paint booths and paint storage areas?

8. Is the spray area kept clean of combustible residue?

9. Are spray booths constructed of metal, masonry or other

substantial noncombustible material?

10. Are spray booth floors and baffles noncombustible and easily

cleaned?

11. Is the spray booth completely ventilated before using the

drying apparatus?

12. Are lighting fixtures for spray booths located outside the

booths and the interiors lighted through sealed clear panels?

13. Are the electric motors for exhaust fans placed outside booths

or ducts?

14. Are belts and pulleys inside the booths fully enclosed?

15. Do ducts have access doors to allow cleaning?

16. Do all drying spaces have adequate ventilation?

FLAMMABLE AND COMBUSTIBLE MATERIALS Yes No NA COMMENTS

1. Are combustible scrap, debris and waste materials (oily rags,

etc.) stored in covered metal receptacles and removed from the

work site promptly?

Page 20: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

FLAMMABLE AND COMBUSTIBLE MATERIALS Yes No NA COMMENTS

2. Are approved and labeled containers and safety cans and tanks

used for storage and handling of flammable and combustible

liquids?

3. Are all connections tight on drums and combustible liquid

piping, vapor and liquid?

4. Are all flammable liquids kept in closed containers when not

in use (e.g., parts cleaning tanks, pans, etc.)?

5. Are bulk drums of flammable liquids grounded and bonded to

containers during dispensing?

6. Do storage rooms for flammable and combustible liquids have

explosion-proof lights?

7. Do storage rooms for flammable and combustible liquids have

mechanical or gravity ventilation?

8. Is liquefied petroleum gas stored, handled and used in

accordance with safe practices and standards?

9. Are NO SMOKING signs posted on liquefied petroleum gas

tanks?

10. Are liquefied petroleum storage tanks guarded to prevent

damage from vehicles?

11. Are all solvent wastes and flammable liquids kept in fire-

resistant, covered containers until they are removed from the

work site?

12. Are fuel gas cylinders and oxygen cylinders separated by a 20-

foot distance or by fire-resistant barriers while in storage?

13. Are appropriate fire extinguishers mounted within 75 feet of

outside areas containing flammable liquids and within 10 feet

of any inside storage areas for such materials?

14. Are extinguishers free from obstructions or blockage?

15. Are NO SMOKING signs posted where appropriate in areas

where flammable or combustible materials are used or stored?

16. Are all spills of flammable or combustible liquids cleaned up

promptly?

17. Are NO SMOKING rules enforced in areas involving storage

and use of hazardous materials?

ELECTRICAL Yes No NA COMMENTS

1. Are multiple-plug adapters prohibited?

2. Are extension cords prohibited from being run through doors

and windows?

3. If there are electrical installations in hazardous dust or vapor

areas, do they meet the National Electrical Code (NEC) for

hazardous locations?

Page 21: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

ELECTRICAL Yes No NA COMMENTS

4. Are exposed wiring and cords with frayed or deteriorated

insulation repaired or replaced promptly?

5. Are flexible cords and cables free of splicing or taps?

FUELING Yes No NA COMMENTS

1. Is it prohibited to fuel an internal combustion engine with a

flammable liquid while the engine is running?

2. Are fueling operations done in such a manner that likelihood

of spillage will be minimal?

3. When spillage occurs during fueling operations, is the spilled

fuel washed away completely, evaporated or other measures

taken to control vapors before restarting the engine?

4. In fueling operations, is there always metal contact between

the container and the fuel tank?

5. Are fueling hoses of a type designed to handle the specific

types of fuel?

6. Is it prohibited to handle or transfer gasoline in open

containers?

7. Are smoking, open lights, open flames and sparking or arcing

equipment prohibited near fueling or transfer of fuel

operations?

8. Are fueling operations prohibited in building or other enclosed

areas that are not specifically ventilated for this purpose?

9. Where fueling or transfer of fuel is done through a gravity

flow system, are the nozzles of the self-closing type?

10. Are TURN OFF ENGINE and NO SMOKING signs posted at

fuel islands?

11. Is a fire extinguisher available in case of emergency?

12. Are fuel tanks properly labeled NO SMOKING?

13. Are above-ground tanks protected from spills by a dike?

OTHER Yes No NA COMMENTS

1.

2.

3.

4.

5.

6.

Page 22: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

I – Preferred Medical Provider List

Company

Address

The following are the preferred treatment locations for employee injuries:

Preferred Treatment Location

Hospital/Clinic Name

Address

City

State

Zip

Phone

Hours of Service

Alternate Treatment Location

Hospital/Clinic Name

Address

City

State

Zip

Phone

Hours of Service

Preferred Trauma Center

Hospital/Clinic Name

Address

City

State

Zip

Phone

Hours of Service

Page 23: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

J – Sample Earthquake Response Procedure

1. Keep calm. Assess the situation around you. Look out for items that could fall or topple over on

you.

2. Stay indoors. Most injuries occur when people rush out of the building and are hit by falling

debris.

3. Take cover under a sturdy piece of furniture or counter. Choose a shelter that will provide an air

space if the building collapses. If your shelter moves, follow it and stay under it.

4. If there is no item under which you can take cover, stand in a doorway or brace yourself against

an inside wall.

5. Protect your head and neck. Stay away from glass, windows, outside doors or loose items that

could fall.

6. If you are outside, stay there. Move away from buildings, walls, utility poles and overhead wires.

If you are in a moving car, stop as quickly and safely as possible. Do not stop near bridges or

overpasses or where buildings could topple over onto your vehicle.

7. After the shaking stops, take time to assess the quake effects. Be prepared for possible after-

shocks. If evacuation is necessary, use stairways to leave the building. Do not use elevators. Be

aware of structural damage and loose items in cabinets and closets. Carefully open doors to

storage areas.

8. Be aware of gas leaks. Do not operate electrical equipment, smoke or use open flames. If you

smell gas, leave the building and shut off the gas supply at the main shut-off point.

9. Make a quick initial check for people who may be injured or trapped. Provide emergency first

aid if needed. Do not try to move seriously injured persons unless they are in immediate danger

of further injury. Account for all people in the building.

10. Key company employees will meet at:

to determine the impact of the earthquake upon company operations. A decision will be made

on steps to be taken to resume company operations based on discussions with the fire

department or local emergency management representatives. Steps to consider include

retaining employees at work, cleanup and salvage, protection of building contents and

resumption of normal company operations.

Page 24: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

K – Sample Evacuation Leader Procedure

Instructions: Follow this procedure when the building must be evacuated due to fire, chemical release or

other conditions that require employees to leave the building. This procedure uses the evacuation leader

method of accounting for employees.

1. Fire alarms in the building will be activated by the following methods:

Automatically via smoke detectors, heat detectors or sprinkler flow

Manually via wall-mounted pull stations

2. If there is no fire alarm system in the building, supervisors and evacuation leaders will spread

the alarm throughout the building to all employees. If the fire alarm system does not

automatically contact the fire department, the receptionist or other key person will call the fire

department by dialing 911 or

3. After a fire or evacuation alarm has been sounded, the evacuation leaders will assist in the

orderly evacuation of all employees from their areas of responsibility. Leaders will initiate

searches of their designated areas, including rest rooms or other closed rooms to assure that all

employees, contractors and visitors have left the building.

4. If, during searches of their areas, the evacuation leaders find the source of the fire, they will

limit the fire by closing doors to the areas or, if appropriate, by attempting to extinguish the fire

with available fire extinguishers.

5. Evacuation leaders will proceed to the evacuation team meeting place, located at

Once there, leaders will check in with the emergency coordinator and advise him or her of the

evacuation statuses of their areas.

6. If the fire was in a given evacuation leader’s area, he or she will inform the emergency

coordinator of the location and extent of the fire or source of the alarm.

7. The emergency coordinator will advise the arriving fire department of the status of the

evacuation and the source of the fire, if known.

8. Key company employees will meet at the evacuation team meeting place to determine the status

of the evacuation and the impact the evacuation has on company operations. A decision will be

made on steps to resume company operations, based on discussions with the fire department.

Steps to consider include retaining employees at work, cleanup and salvage, protection of

building contents and resumption of normal company operations.

Page 25: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

L –Evacuation Route and Exit Map

Instructions: Photocopy a blueprint of the facility or use an online application, and draw lines to identify

evacuation routes and exits. When complete, make color photocopies of the master, and post them where

employees can refer to them.

Insert Photo

Page 26: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

M – Sample Head-Count Procedure

Instructions: Follow this procedure when the building must be evacuated due to fire, chemical release or

other conditions that require employees to leave the building. This procedure uses the head count method to

account for employees.

1. Fire alarms in the building will be activated by the following methods:

Automatically via smoke detectors, heat detectors or sprinkler flow

Manually via wall-mounted pull stations

2. If there is no fire alarm system in the building, supervisors will verbally spread the alarm

throughout the building to all employees. If the fire alarm system does not automatically contact

the fire department, the receptionist or other key company employee will call the fire

department by dialing 911 or

3. After a fire or evacuation alarm has been sounded, all employees will leave the building via the

closest exit or designated evacuation route.

4. Employees will proceed to their designated meeting places. Meeting place assignments are as

follows:

Department Meeting Location

5. Once at their designated meeting places, employees will check in with their supervisors. Once

all employees have checked in or been accounted for, supervisors will then contact the

emergency coordinator and advise him or her of the evacuation status of their areas.

6. If the fire was in a given supervisor’s area, the supervisor will inform the emergency

coordinator of the location and extent of the fire or source of the alarm, if other than fire, such as

a false alarm or sprinkler damage.

7. The emergency coordinator will advise the arriving fire department of the status of the

evacuation and the source of the fire, if known.

8. Key company employees will meet at the evacuation team meeting place to determine the status

of the evacuation and the impact the evacuation has on company operations. A decision will be

made on steps to resume company operations, based on discussions with the fire department.

Steps to consider include retaining employees at work, cleanup and salvage, protection of

building contents and resumption of normal company operations.

Page 27: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

N – Sample Medical Emergency Procedure

Instructions: Follow this procedure when an injury or sudden illness occurs that requires assistance from

designated company emergency responders trained in first aid or cardiopulmonary resuscitation (CPR). The

designated company emergency responders will assess the situation to determine the need for outside

emergency response.

1. If an employee becomes injured or suddenly ill, his or her co-workers or supervisor should

assess the injury or illness to determine if additional assistance is needed.

2. If the employee’s condition appears life threatening, an ambulance or local paramedics should

be called immediately. Someone attending the victim should be assigned to wait at the door to

which the paramedics were directed and guide them to the victim’s location.

3. If the victim’s condition requires additional medical assistance from designated company

emergency responders, they will be alerted by direct contact using the information on the

emergency call list or by paging via the building public address system.

4. If the paging must be done from the receptionist, he or she will be contacted, and the page

request will be given. The person requesting assistance should clearly state who he or she is and

where the designated company emergency responders are needed.

5. The receptionist will then make the page on the public address system using the following

words: “Medical emergency at _____________________________.” This message will be

repeated twice.

6. Those individuals who are designated to respond are to immediately go to the location indicated

in the page and provide whatever assistance is necessary. If outside emergency medical

assistance is needed, it shall be requested according to item 2 above.

7. All injuries other than minor first aid cases will be evaluated by the company’s preferred

medical provider.

8. All injured employees sent out for medical treatment will be accompanied by their supervisors

or other designated manager or supervisor.

9. The supervisor or manager of the injured employee will initiate an accident investigation and

complete a company employee injury report, as appropriate.

Page 28: Emergency Action Plan - Key Risk Action Plan_RMS...Emergency Action Plan Provided by: ... Emergency Drill Evaluation Report ... describe the purpose of the drill: Give a narrative

O – Sample Tornado Response Procedure

Instructions: Follow this procedure when weather conditions indicate that a tornado or other severe weather

may affect company facilities. This procedure assumes that designated personnel on the emergency call list

will be contacted to make the decision to have building employees take cover in designated shelter areas.

1. A weather alert radio will be kept at the receptionist’s desk. He or she will monitor emergency

weather broadcasts made by the National Weather Service (NWS). If the NWS broadcasts a

Tornado Watch, the receptionist will contact key company employees on the emergency call

list and advise them of the potential weather conditions.

2. If the NWS issues a Tornado Warning, the receptionist will immediately contact available key

company employees and advise them that a warning has been issued.

3. Key company employees will proceed to the receptionist’s desk and decide if the approaching

weather system affects the company facility. This decision will be based on NWS broadcasts,

commercial radio broadcasts and observation of approaching weather.

4. If the decision is made to send employees to shelter areas, an announcement will be made on the

company public address system. Employees will be accounted for in shelter areas.

5. All employees will go to shelter areas and remain there until the weather system has passed and

an “all clear” has been issued by the NWS.

6. When leaving shelter areas, employees must be aware of any building damage or downed power

lines outside the building.

7. Key company employees will evaluate the effects of the storm and decide whether to continue

building operations, as appropriate.