electric cable car project (telepherique)

31
1 Arab International University Faculty of Business Administration Management Department Feasibility Study course Electric cable car project (Telepherique) Student name 1-Sami Alfares 2-Loye Adaam 3-Tamim Kbarh Student ID 201111096 201110075 201010129 Dr Supervisor: Dr . Serene Dalati Dr. Yasser mashaal

Upload: tamim-kbarh

Post on 20-Jul-2015

139 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Electric cable car project (Telepherique)

1

Arab International University Faculty of Business Administration

Management Department

Feasibility Study course

Electric cable car project (Telepherique)

Student name 1-Sami Alfares 2-Loye Adaam 3-Tamim Kbarh

Student ID 201111096 201110075 201010129

Dr Supervisor:

Dr . Serene Dalati Dr. Yasser mashaal

Page 2: Electric cable car project (Telepherique)

2

Executive summary

The Telepherique the scientific term is (electric cable car), one of the most modern

ways of transportation, the presence of a telepherique in any area is an important tourist

attraction for the region because of the presence of all recreational facilities associated

with it , especially when he meets a global nature and the sea and the mountain .

Location:

Lattakia ( linking Alpedrosah with Kassab. Alpedrosah because of its proximity to the

beach and Kassab due to height above sea level and nature of the mountain which

constitutes an attraction for tourists because of the link that region to each other)

Service

Is the tourist product a service aims to transport tourists from the beach area to the

mountain and vice versa via the caravans within specific path and specific height via

particular number of caravans , including certain number of people does not exceed four

people within two stations, one at the bottom and the other at the top and through the

caravan starts from the beach through areas of forest with the density of trees and great

views of the sea to the terms of access to the mountain. It can reach the top of the

mountain through another way( the land route)and that for the tourists who want to

enjoy the other service of this project , which includes hotels, restaurants, swimming

Page 3: Electric cable car project (Telepherique)

3

pools and all the necessary services for tourists. It is possible to be a service for some of

the surrounding areas .

Height: telepherique route distance line is 6.5 km , It`s speed is 18:00 per second .The

arrival time of tourists to the end of the track is during 20 to 25 minutes.

Number of vehicles 60 truck and strengthen these vehicles with reinforced Plastic to

ensure the safety of passengers .

Market:

This project is the only one in Syria and this project is one of the large-scale projects .

The aim of this project is to attract the largest number of tourists from different parts of

the world, allowing substantial profits and stimulate tourism and increase the national

income of the country.

Within the statistics of the Ministry of Tourism, the number of Arab and foreign

tourists 4148822 from May to September.

The estimated proportion of tourists Syrians 1035000 local tourists.

(www.syriatourism.org ( 2014

/www.cbssyr.sy/

Opportunity

1- Legal environment, particularly in the field of tourism investment.

2- Is a large tourist projects raise the growth rate of the country.

3- The high proportion of tourism, especially in this region, which provides an

opportunity to achieve high profitability.

4- An environment conducive investment by laws that facilitate the work of large

projects.

5- The project raises the tourism revenue by a large margin

Page 4: Electric cable car project (Telepherique)

4

- Table of Contents

index pag

- Cover Sheet 1

- Executive Summary 2

- Table of Contents 4

- Introduction 5

- The Service 5

- Market Environment 7

- Competition 9

- Industry 9

o Technology 11

o Production/Operating Requirements 12

- Business Model 13

o Intellectual Property 14

o Regulations/Environmental Issues 15

o Management and Personnel Requirements 15

- Sales Strategy 17

o Advertising Strategy 18

o The Price Strategy 20

- Critical Risk Factors 23

Financial Projections -

References list 24

APPENDEX 25

Page 5: Electric cable car project (Telepherique)

5

Introduction

The Ministry of Tourism has issued executive instructions of the legislative decree No. /

23 / Date 04/05/2010 private cable car projects, to encourage the government to set up a

large Govt allows most investors think of the pump heads money in such projects

Building a project like this is said and an important tourist attraction and increases the

importance of tourism and the region economically, so they have big opportunity to

start project.

PRODUCT/SERVICE

The cable car is a means of pneumatic conveying is composed in the form wagon or

open chair in other times, but the current project is closed wagon

- The project consists of the first station A away from the seashore of 1.5 km and a

second station B on the surface of the mountain, the distance between stations 6.5

km Any distance 20 minutes per flight distance of 13 km

- Allows the second leg of tourists disembark and enjoy the mountain scenery and

of course can use the telescope to see the details of the cable car trip and

mountain views , and there is within this station ancillary tourist facilities (

restaurants - cafes - Supermarket )

- There on the wire 60 is closed vehicle can accommodate up to 4 people climb it

is one of the stations across someone assistant and someone else is working on

securing the safety of passengers and passenger safety factors confirm, place on a

wire cart through special drive each vehicle is designed to shock -proof glass

reinforced plastic anti- fire and not allow the glass to the tourist views of the

biggest factors of natural and cart path

Page 6: Electric cable car project (Telepherique)

6

- Upon entering the tourist of the facility from the main station , a station A is cut

ticket per person to enter Eat station which is where there are services and public

facilities with high quality and no plates and signals an indication of safety when

riding vehicles and other means , such as the means of visual and audio and

passes within a series of facilities collocated ( Supermarket - Bar - Restaurant ) to

be after riding cart.

- Is the ticket for one trip between the two stations , and leaves the choice of

tourists to the revelation of the second leg and get to know the facilities and

services that can be used ( Bar - Restaurant - Supermarket )

- Eat found within the second leg of the telescope allows a group of tourists scenes

details itinerary cart and landscape scenes.

- Display offers service for tour groups and scientific facilities could be referring to

the mechanism of the cable car and a person from the marketing department and

give this service only for groups which is the purpose of scientific

- Plant workers specific tasks for each factor

1 - receives a cart after entering the station and is secured disembarkation of the

cart and the end of the journey

2 - pull the cart to the person who secure the safety and readiness of technical

Cart

3 - are losing the vehicle and safety factors and safety

4 - helps passengers in boarding and gives them the safety instructions during the

trip and close the cart and proceed to the station after the second and put them on

the path of the wire.

- Distributed work stations due to a similar process is similar

Page 7: Electric cable car project (Telepherique)

7

MARKET ENVIRONMENT

SWOT analysis:

Strengths

1 - strong funding

2 - The project consists of the administration to the terms of reference and high skills

3 - Develop strategic plans to reach new targets

4 - Entry of a strong and effective due to the lack of similar projects

5 - The use of modern technologies in the management of labor and management

operating line

6 - Workers trained and continue to renew skills

Weaknesses

1 - the inability to predict the occurrence of risk

2 - Analysis of the ticket plan sales the wrong way

3 - difficult to link to the holidays quickly

4 - failure to resolve technical problems quickly enough

5 - conflict between departments and differing views

Opportunity

1 - The existence of a market absorbs the idea of the project

Page 8: Electric cable car project (Telepherique)

8

2 - Facilities licenses from government agencies

3 - A new project is the only one in the market

4 - climatic environment in the region

Threats

1 - The emergence of direct competitors in the market in the same field

2 - climatic factors and weather changes

3 - raising the tax rate by the government

4 - low desire for tourists to ride the cable car

5 - Use of the tourist and the preference for alternative means of tourist

- As this project is the first of its kind in the country, there is little incentive for

most people to experience the climb in the cable car , the first period will be

based on the statistics of the Central Bureau of Statistics in Damascus

- The study will be based on that number would be domestic tourism

-

- The project is located in a tourist attraction and can be a percentage of foreign

tourism targeted and based on the statistics of the Ministry of Tourism shall be

according to the following table: ( in appendix)

- The tourists sector have a lot of tourism services , including the so-called tourism

offices and can be a target group to be the source to attract customers and the

number of offices licensed by the Ministry of Tourism office in the country 935

Page 9: Electric cable car project (Telepherique)

9

- The education sector there is in the curriculum of the Ministry of Education

lessons for transportation and no detail about the cable car and can be held jointly

with the Ministry of Education in order to ride in the cable car to allow students

to view this means

COMPETITION Project on a national level , which is one of the big projects and the location of the

project and consists of its kind that has no direct competitor , but the presence of

competitors is determined indirectly from the weaknesses of the case and sometimes

force , according to the project type competitor

- Competitor indirectly

Suppose has set up a theme park next to the project in the mindset of tourists considered

Tlapt desire to enjoy watching nature

So can we build a strategy to be we focused on the establishment of ancillary projects

Another example of building a restaurant or spa at the top of the mountain would be the

biggest competitors indirectly will be a boy tourist Rgah to enjoy from randed the

mountain instead of riding the cable car because the top of the mountain would enable

him to see the landscape so you must set up a strategy to start building projects related

with the project ( great restaurants ( resort ) - an amusement park )

INDUSTRY

- The cable car is a means of pneumatic conveying is composed in the form wagon

or open chair in other times, but the current project is closed wagon

- The cable car project provides a service of great beauty and at the same time is an

easy -to-use operating

- Is the means of transport between the first leg and the second by a closed wagon

iron wire across a distance of 13 km during the time of 20 minutes

Page 10: Electric cable car project (Telepherique)

10

How does the cable car ?

- Basic thing in running is the wire (cable ), a cable railing the rubber material ,

brass, stainless proportions allow How does it prove the cable on towers

supportive divided by the distance between them depending on the length of

distance and geography of the place should be in some areas to be wire way

vertical by a few and not horizontal.

- Wire transmits electricity to the vehicle and no vehicle in the first two motors , a

core runs on electricity and the engine running when you put it directly on the

wire and the second engine is a diesel engine , a motor assistant and works in

emergencies.

- Wire is placed on the reel spins quickly and light and rotation is the reason not to

allow the tires friction rail wagons in one place

- When you put the wire on the supporting towers placed on an electrical insulator

, stands tourist on a platform of passenger and assisted two first ensure the safety

of the vehicle (ie confirm door lock - Confirm the engine ) and the second safety

of people ( sitting right - when an emergency Why do tourists ) cart be on the

wire , but when they enter the station no handle pay it from the path of the wire

and here the first factor comes and drives the cart toward the podium with his

hand to allow for a tourist ride and then push the carriage to the handle , which

converts it to the path of the wire and there is a sensitive devices placed on the

front side of the vehicle linked electronically with the handle opens the handle

when taking the signal from the sensor distance of the existence of safety

- Upon entering the tourist to Cart weight sensors operate automatically and there

is the weight of the weight of each vehicle to ensure the stability of vehicle is

vertical when crossing on the wire

- When the transition to the wire cart primitive trip to the second leg

- In the second leg differs form partially the second leg only where there is an

electronic handle to ensure the safety distance

Page 11: Electric cable car project (Telepherique)

11

- Tourists can to finish the first part of the journey in the second leg when he

arrived someone opens the door of the vehicle and can go down and take cart

with his hand to the platform to ride to be able tourist who finished his tour in the

second leg of the back of the station first and there are two people also said their

work in the first station

- Engines are run through the Control Panel Actual which in the first leg and there

is a special room is completely closed and not visible to tourists and there is one

person manages the process is the most important of these processes

1- Detection of any malfunction within the wire or motor vehicle or through

sensors

2- Continuous evaluation of the efficiency of the work of the wire

3- Detection permanent jobs sensors that are found in vehicles

4- Organize gigs so as not to be a difference in the preparation of vehicles

waiting for the starting inside the station

5- Constant contact with the control room in the second leg

6- Direct contact with the plant workers who help tourists going up and down.

7- Monitor the performance of the work of the vehicles on the wire in a way

direct observation through a window allowing him to watch as much as

possible of the progress Cart.

- It is the second person within the control room also helps the commander of the

control room and cares about the details and figures and statistics about the

performance of the engines and the weights and the wire and electricity

TECHNOLOGY

The project needs a set of characteristics of technology and can be summarized as

follows :

1- you need the cart to the existence of a sensitive increase in vehicle weight

when the rise of the tourist and it can be both sensitive and wagon works

automatically and no sound when overweight

2- the cable railway is the main part of the project , so manufacturers have

developed and created a system for detecting faults in or proportion of each

failure and the extent of repair this fault , and no cross- account measures led

the cable programmer automatically, the vehicles will go on the cable evenly

Page 12: Electric cable car project (Telepherique)

12

timetable so put in front of me every vehicle sensitive and delicate rear safety

measures the distance between vehicles.

3- The devices measure the presence of allergies are things that must be

monitored so always been linked to the devices to a central showing the

efficiency of each device on the end of each wagon

4- cut ticket system with boarding a vehicle presence technologies can regulate

the time of entry tourist ride with cart at each of the stations to reduce

congestion

5- Systems and safety when a cup is one of the most important vehicle needs

required by the tourists so was the introduction of a visual and audible and

written and crossing through the graphics reservation tourist safety

6- Panel Differentiation electronic circuit which is turned into electricity

generator and give the last 35 minutes of the time of emergency .

7- Linking all these things with the control panel is the prerogative of the parent

company, supplier of engines and maintenance prayer is measured by specific

weather factors and the proportion of Use.

PRODUCTION / OPERATING REQUIREMENTS

After the implementation of the project and the need to start the cable car to the driving

force of an electricity

- The delivery of electricity from the lines the government will arrange for the

project costs are great for that factor to generate electricity will be generated

electricity can 500 / KVA work continuously to ensure serving in and when the

maintenance period shift power to the lines of the government conducts its

regular maintenance and the subject is coordinated by the maintenance

department with periods of power outages the government does not even have a

cable car stop in the case of

- There generating circuit with the promotion of a fed into the engine for 35

minutes through Takven containers and do this circuit in case of an emergency

- The project needs to maintenance team Mobile team steady , according to the

law and the Ministry of Tourism, the team needs to be trained by experts and

technicians manufacturer of engines and have a period of 3 months is the period

Page 13: Electric cable car project (Telepherique)

13

of control by the manufacturer's maintenance team , the manufacturer of the

engines was agreed with her that the things Maintenance large and rotating at the

hands of experts , which sends them by it to ensure the protection of intellectual

quality and maintenance .

There are many stakeholders with the project, but the most important :

- The owners of the land leased to put the poles wire or wire that passes from territory

they are of two types:

- government

- Private

Systems Act and the Ministry of Tourism, the relationship between the project and the

land owners of public and private

Government : There are two types of contracts

o either be the government's profit rate measured with the proportion of land

belonging to the government between the Fund and the Ministry of

Husbandry and local tourism

o or to pay rent fixed costs attributable to fund local administration

Choosing the second decade is less legal costs and better project

Private

organization contracts with the landowners of the tasks of law section of the

project was agreed on the prices specified by the owners to be paid annually

Page 14: Electric cable car project (Telepherique)

14

Business Model

Company profit goal and working in the tourism sector and the entertainment

cable car project of the most important projects have

Legal form PARTNERSHIP consists of three partners, including the percentage

of contribution is divided equally:

1-Sami Alfares

2-Loye Adaam

3-Tamim Kbarh

- Highlight the strategy’s strengths and develop this strategy in the company's

objectives example :

- Ancillary building projects

- Construction of a similar project in the area of natural second example (Al

gab Valley - Zabadani Valley – Gabl al shekh valley).

INTELLECTUAL PROPERTY

The cable car project licensed by the Ministry of Tourism Investment idea was

based on a decree laws for implementation of the project proposal and the place

is the proposal of the Ministry of Tourism and place the proposal on the basis of

geographical factors and studies tourism and attractions

Page 15: Electric cable car project (Telepherique)

15

REGULATIONS / ENVIRONMENTAL ISSUES

Legislative Decree No. / 23 / for the year 2010 is based on the construction of the

project after it issued the Ministry of Tourism and Information Tnfveh explain

more details about the Decree

The facilities provided by the Council of Ministers were many of them

Ministry of Local Administration contracts and regulations concerning

land that passes by the wire

Ministry of tourist facilitate the commercial register the company licenses

and accreditation, decree No. 29 of 2011 Find Solutions for improved corporate

system

Ministry of Transportation as the cable car and the means of transport must

take a license for that, but due to lack of public interest to transfer the license was

canceled and work on the cable car to the benefit of tourism , especially for

tourism

Ministry of Environment and recorded the project as the project is

environmental benefit and the Governor of the integrity of the natural area where

there is

- As the tourism sector is in its infancy in Syria there are also a lot of

facilities in the contracts , customs and import for this project will evolve in

conjunction with the laws that are issued

Management and Personnel Requirements

Page 16: Electric cable car project (Telepherique)

16

Page 17: Electric cable car project (Telepherique)

17

Sales Strategy

- Develop a plan and marketing goals and strategies and policies for the

implementation of these plans , this project and its size will have a plan at the

same time would be great goals , including:

1- access to all Syrian resident idea of the project

2- stimulate every Syrian to experience the ride

3- To encourage all tourists entering all border passenger experience

4- Raising the evaluation at the national level between the rest of the country

5- reinforce the notion that the Syrian hands are capable of producing high-

efficiency projects

- Develop policies to implement these goals are easy to access as a single project

in the market and do not wish to direct competitors and the tradition of this

project will be difficult

How attract customers:

1- Through the work efficiency and equipment

2- An idea for a feature on the tourist different from any other experience and the

experience of planting the idea that the cable car will give him energy and a

special feature

- The work in the establishment phase of the project was a great effort and global

experience and access to high quality require payment of large sums of money

and in the end, the customer will be satisfied with the service and would prefer to

repeat the experiment again.

- The initial definition of the service should give tourists an idea that will get

feature suitable for a price that will pay

Page 18: Electric cable car project (Telepherique)

18

A goal of reaching customers

1- To achieve the desire of tourists.

2- need to satisfy tourist.

3- tourist confirm that the payment amount is compared with the appropriate

Service.

4- tourist satisfaction and his insistence on re- trial.

5- Get tour groups and scientific deduction by the marketing department just for

tourists of local

6- Children under the age of 5 years will have a free card

7- Children between 5 years to 9 years will be worth 40% Discounts

Advertising

The process of promoting the idea that the project has begun

Will be many ways for the promotion of the project , including a :

- TV

- Radio

- Direct Mail

- Personal contacts

- Associations and trade unions

- Newspaper

- Magazines

- Telephones guide companies

- Billboards ways

- Internet web sites and social networking

- Mobile networks

- From some other forms

Page 19: Electric cable car project (Telepherique)

19

3- positive attitude from the first experience for the tourist and talk to others for a

fun experience

4- endowment with the overall objective of the tourism sector which is fun and not

to tamper with nature sceneries of nature sends this position in the tourist that the

company deserves that frequented the experience of the ride

About prepare customers expected

- Will be the focal point to this figure is very easy because of the lack of

competition and high quality but costs paid to a marketing plan will be high to

enable the project to attract foreign tourism to experience the cable car and visit

nearby tourist areas

- Put a marketing plan in the financial statements for each year and is considered

one of the most important plans in the project plan, the initial costs are

- Pricing policy according to the laws governing the Ministry of Tourism, there are

degrees of pricing , especially within the tourist establishments that attract

foreign tourism

- Specific pricing for each category and these unmeasurable compared with the

production department in working time and daily and monthly peak days and

months of seasonal

4-5-6-7-8-9 3+10+11 Month 900 800 Price

Page 20: Electric cable car project (Telepherique)

20

The Price

- Price tag 099 SP per person includes only ride in the cable car, the price of entry

to the lounge at the station includes a telescope 50 SP

- Offer price by the time for the year and day of the season and could be on the

slide

- Every person has the motive in the aviation attract people from motives that are

owned by it easy, and if this is achieved, which will pay the amount Mtmian and

feel satisfied

- When foreign tourists, according to the statistics of the Ministry of Tourism

numbers of tourists who go to the coastal area does not have any bidder to pay

such an amount for a service they consider worth because they have a

preconceived idea about the experience, especially in the beautiful natural factors

Total revenue in high seasons :

Number of passengers In hours

The number of hours in work day

The number of flights

The number of days of the season 6*30

H 240 4 8 180 345600 M 180 4 8 180 259200 L 120 3 6 180 129600

Total 11 22 734400 The price of Ticket 900

660960000

Page 21: Electric cable car project (Telepherique)

21

Total revenue in low seasons :

Number of passengers In hours

The number of hours in work day

The number of flights

The number of days of the season 30*3

H 180 0 M 120 3 6 90 64800 L 80 3 6 90 43200 Total 6 12 108000

The price of Ticket 800

86400000

Total revenue per year 747360000

Page 22: Electric cable car project (Telepherique)

22

Other statistic

5-6-7-8-9 3-4-10-11 Month 900 800 Price

Number of passengers In hours

The number

of hours in work day

The number of flights

The number

of days of the season 30*5

H 240 4 8 150 288000

M 180 4 8 150 216000

L 120 3 6 150 108000 total 11 22 612000

The price of Ticket 900

550800000

Page 23: Electric cable car project (Telepherique)

23

Number of passengers In hours

The number of hours in work day

The number of flights

The number of days of the season 30*4

H 180 4 8 120 172800 M 120 3 6 120 86400

L 80 3 6 120 57600

316800 20 10 المجموع The price of Ticket 800

253440000

Total revenue per year 804240000

CRITICAL RISK FACTORS Some of the risk factors and indicators of occurrence:

1- Loss of diesel fuel, which will pay for the costs of the largest institution for the benefit of electricity and could be a long-term power outage at some times of the year

2- The aging of the service the tourism sector need to develop a permanent meets the need and desires of the tourist cable car project is difficult to be developed entirely

3- The rapid depreciation of the wire 4- Loss of vehicle and people inside because of the depreciation in the wire 5- a surprise in the case of weather and climate change 6- Workers Strike 7- interruption of road workers 8- The presence of a technical malfunction and need experts 9- fire 10- tampering in supporting Towers

11- The presence of large boulders and need greater support to be removed

Page 24: Electric cable car project (Telepherique)

24

Financial Projections

References list

Name position References other

Ali Alraee Building and construction company 954158084

Oday Darwesh

Syrian Investment Agency 4473012 http://www.investinsyria.org

Head Directorate contracts 2210122 http://www.syriatourism.org/

Amer Aitouni

National Insurance Company 3348690 www.natinsurance.com

Nasooh

Alkaree Industrial motors

Al marjee near the Ministry

of the Interior Sameer Janood Engineer in happy_land 933429909 Baghdad Street

Page 25: Electric cable car project (Telepherique)

25

APPENDEX

1- The market sigma :

Page 26: Electric cable car project (Telepherique)

26

2- The number of foreign tourist in 2009 -2010

Page 27: Electric cable car project (Telepherique)

27

20092010

764309705803الخليج

8827501363644اردنية

806118897975عراقية

9217621467701اللبنانيون

215334219406عرب آخرون

35902734654530العرب

293890348103أوروبا الغربية

9646492208أوروبا الشرقية

381677864988تركية

7720311305299مجموع أوروبا

7762184196أمريكا

430880792258ايرانية

77099108264آسيا

1597119240استراليزا

6307769003أجانب آخرون

14366792378260أجانب

50269527032790المجموع العام

10649371513060سوري مغترب

60918898545849المجموع الكلي

20092010

35902734654530العرب

14366792378260أجانب

50269527032790المجموع العام

10649371513060سوري مغترب

60918898545849المجموع الكلي

عدد السياح العرب واالجانب والسوري المغترب حسب الجنسية /2010-2009/

Page 28: Electric cable car project (Telepherique)

28

3- The number of services office

4- The survey

Page 29: Electric cable car project (Telepherique)

29

استبيان

مشروع هو واحد من أكثر الطرق الحديثة من وسائل النقل والسياحة ، وجود (التلفريكمشروع العربة الكهربائية )

المرافق الترفيهية في أي مكان هو عامل جذب سياحي مهم في المنطقة بسبب وجود جميع (التلفريكالعربة الكهربائية )

مشروع العربة الكهربائية أو وجود عوامل جذب خصوصا عندما يلتقي طابع عالمي والبحر والجبل .وجود المرتبطة به

. محافظة الالذقية شاطئ البحر (وخاصة في منطقة سياحية ويوجد فيها عوامل الجذب مثال ) منطقة كسب و (التلفريك)

االسفل ) ، التي تنقل الركاب من (الكهربائية)يشتمل على مجموعة من العربات (التلفريكالعربة الكهربائية ) مشروع

صعوداً، "متراً عن سطح األرض والعكس 02إلى 02يتراوح بين بارتفاع ) قمة الجبل ( إلى أعلى شاطئ البحر (

.طولي كم 6.5ونزوالً"، بطول

المعلومات الشخصية :

المستوى العلمي ....................... العمر ................ الجنس ..............

.اكتب رقم محددشهرياً. مستوى الدخل .......................)ليرة سوري(

................د أفراد األسرة الحالة االجتماعية ..................... إذا كنت متزوج عد

ا ؟فيه (التلفريكالعربة الكهربائية ) مشروع جميلة وتستحق إنشاءمنطقة كسب هل تعتقد أن -1

ال ○ نعم ○

؟ (تلفريكالوصعود العربة الكهربائية ) هل ترغب في تجربة هذه المنطقةل إن كنت في زيارة -2

ال أوافق بشدة○ ال أوافق ○غير متأكد ○ أوافق ○ أوافق بشدة ○

؟ تلفريك في مكان أخرالهل قمت سابقاً بتجربة -3

ال ○ نعم ○

مستحقة ؟ (تلفريكالالعربة الكهربائية ) خدمة مناسبة لتكون كم 5.6مسافة هل -4

ال ○ نعم ○

ما هي مقومات استخدامك لخدمة التل فريك ؟ -6

تجربة جديدة○ للترفيه والتسلية ○ وسيلة نقل ○ السياحة ○

هل تعتقد بأنها ستكون خدمة نقل جيدة ؟ -5

ال ○ نعم ○

أن تكون وسيلة نقل وخاصة في مواسم الشتاء والطقس الثلجي ؟ (تلفريكالالعربة الكهربائية ) هل يمكن -7

ال أوافق بشدة○ ال أوافق ○غير متأكد ○ أوافق ○ أوافق بشدة ○

Page 30: Electric cable car project (Telepherique)

30

كوسيلة نقل في طقس عاصف وثلجي ووسائل المواصالت التقليدية (تلفريكالبة الكهربائية )العر هل يمكن أن تستخدم -8

مقطوعة ؟

ال أوافق بشدة○ ال أوافق ○غير متأكد ○ أوافق ○ أوافق بشدة ○

دقيقة هل هي مناسبة للحالة السابقة إذا كانت وسيلة نقل ؟ 22المدة للوصول بين المحطتين هي -9

ال أوافق بشدة○ ال أوافق ○غير متأكد ○ أوافق ○ أوافق بشدة ○

اكتب رقم محدد. كم عدد المرات التي ستجرب فيها ركوب التلفريك في كل موسم على حدا يوميا ؟ -12

الصيف ....................... الشتاء........................

؟هل تعتقد بأنها ستكون عامل جذب سياحي هام -11

ال ○ نعم ○

في أي فصل تفضل أن تستخدم الخدمة للسياحة ؟ -12

فصل الصيف ○ فصل الشتاء )الثلج فقط على قمة الجبل ( ○ فصل الشتاء الطقس الثلجي ○

دقيقة. 22في حال استخدام الخدمة للسياحة إن الوقت المناسب -13

ال أوافق بشدة ○ال أوافق ○غير متأكد ○ أوافق ○ أوافق بشدة ○

وجود شخص مساعد في كل مركبة -14

ال أوافق بشدة○ ال أوافق ○غير متأكد ○ أوافق ○ أوافق بشدة ○

يمكن أن تكون العربة مفتوحة من السقف ؟ -16

ال أوافق بشدة○ ال أوافق ○غير متأكد ○ أوافق ○ أوافق بشدة ○

عربة ؟ماذا تفضل وضعيتك عند الركوب في ال -15

واقفا مع استخدام وسائل للوقوف ○ وضعية الجلوس على مقعد مريح ○

أخرى......................................

تيح لك مشاهدة المناظر الطبيعية.أن تكون العربة مكونة من الزجاج لت أفضل -17

ال أوافق بشدة○ ال أوافق ○غير متأكد ○ أوافق ○ أوافق بشدة ○

كل عربة.أن يكون هاتف طوارئ ضمن -18

ال أوافق بشدة○ ال أوافق ○غير متأكد ○ أوافق ○ أوافق بشدة ○

سنوات تجربة الخدمة. 6طفال دون يمكن لأل -19

ال أوافق بشدة○ ال أوافق ○غير متأكد ○ أوافق ○ أوافق بشدة ○

المحطة هي:شكل اإلرشادات الموجودة في العربة أو في -22

االثنين معاً ○ مسموعة ○مكتوبة ○

..................................................................أخرى

برأيك ما هي أهم عوامل للمحافظة على السالمة واألمان ؟ -21

..........................................................................................

..........................................................................................

Page 31: Electric cable car project (Telepherique)

31

..........................................................................................

..........................................................................................

مكبر الصوت ضمن العربة للموسيقى.يمكن استعمال -22

ال أوافق بشدة○ ال أوافق ○غير متأكد ○ أوافق ○ أوافق بشدة ○

إذا كنت ستجرب الخدمة للسياحة والترفيه كم عدد المرات التي ستجرب فيها ركوب التلفريك في الموسم الذي ستختاره ؟ -23

رقم محدد.اكتب

..........................

ما هي عوامل الجذب االخرى التي تريدها بالتزامن مع تجربة التلفريك ؟ -24

........................................................................

........................................................................

........................................................................

.......................................................................

اكتب رقم محدد. ؟ ماذا تتوقع أن تكون سعر خدمة ركوب التلفريك وما هو السعر المناسب -26

...........................................

برأيك هل يوجد أمور أن تكون موجودة ولم تذكر ؟اذكرها -25

..............................................................................

..............................................................................

..............................................................................

..............................................................................