  • Page B EirGrid Irelands Draft Grid Development Strategy - Appendix 2

    Appendix 2London Power Associates External Peer Review of Grid 25 Review (2015) for EirGrid

  • Page B EirGrid Irelands Draft Grid Development Strategy - Appendix 2 EirGrid Irelands Draft Grid Development Strategy - Appendix 2 Page 1

    London Power Associates Ltd. Project Number 10352 Elizabeth House, 56-60 London Road, Staines-upon-Thames, TW18 4BQ, UK Tel: +44 (0)1784 490 057, Fax: +44 (0)1784 273 860 E-mail: enquiries@LPAworld.com, Web: www.LPAworld.com

    EirGrid

    EXTERNAL PEER REVIEW OF GRID25 REVIEW (2015)

    Consultancy Services

    FINAL PEER REVIEW REPORT

    V 1.0

    27 March 2015

  • Page 2 EirGrid Irelands Draft Grid Development Strategy - Appendix 2

  • Page 2 EirGrid Irelands Draft Grid Development Strategy - Appendix 2 EirGrid Irelands Draft Grid Development Strategy - Appendix 2 Page 3

    EXTERNAL PEER REVIEW OF GRID25 REVIEW (2015) FINAL PEER REVIEW REPORT

    PAGE III OF III 27 March 2015

    Contents

    1 Introduction ......................................................................................................................................... 4 1.1 Background Grid25 Strategy (2008): ................................................................................................. 4 1.2 Purpose of 2015 Grid25 Review: .......................................................................................................... 4 1.3 Main focus of review: ........................................................................................................................... 5 1.4 LPA Company Profile: .......................................................................................................................... 5

    2 Changes in assumptions and Drivers ................................................................................................. 8 2.1 Demand forecasts .................................................................................................................................. 8 2.2 Renewable Generation .......................................................................................................................... 9 2.3 Conventional Generation ..................................................................................................................... 10 2.4 Interconnections .................................................................................................................................. 12

    3 Impact of new Technologies on Grid Development........................................................................ 13 3.1 Changes in Grid25 Review technical report (2015) ............................................................................ 13

    4 LPA comments on the Updated Grid Development Strategies ..................................................... 16 4.1 Introduction ......................................................................................................................................... 16 4.2 Strategies ............................................................................................................................................. 16 4.3 LPA comments .................................................................................................................................... 18

    5 Impact of the Changes to Major projects and their Need cases .................................................... 19 5.1 Changes Common to all the Major Projects ........................................................................................ 19 5.2 The North- South Interconnector Project ............................................................................................ 19 5.3 The Grid Link Project ......................................................................................................................... 21 5.4 The Grid West Project ......................................................................................................................... 23 5.5 The Moneypoint North Kerry Project .............................................................................................. 24 5.6 The North West Project ....................................................................................................................... 26

    6 Commentary on EirGrid Practices Standards and Procedures .................................................... 29 6.1 Transmission system security and planning standards (TSSPS) ......................................................... 29 6.2 Grid Development Strategies .............................................................................................................. 29 6.3 Major Project Development Proposals ................................................................................................ 30

  • Page 4 EirGrid Irelands Draft Grid Development Strategy - Appendix 2

    EXTERNAL PEER REVIEW OF GRID25 REVIEW (2015) FINAL PEER REVIEW REPORT

    PAGE 4 OF32 27 March 2015

    1 INTRODUCTION

    London Power Associates Ltd has been asked to carry out an external peer review of the following documents:

    Grid 25 review (2015) Main report

    Grid 25 review (2015) Technical report

    1.1 Background Grid25 Strategy (2008): The publication of Grid25 was a major initiative in 2008, in taking a long-term strategic view of transmission infrastructure investment. The aim of the strategy was to avoid a less efficient incre-mental approach to grid development, thereby minimising unnecessary expenditure whilst ensuring compatibility with wider national and European policies and directives. Grid25 provides a Strategic Overview for anticipated grid development up to 2025 and beyond, based on a strategic Vision, identifying strategic Future Grid Requirements and, in this context, setting out a Grid Develop-ment Strategy. The Vision of Grid25 was to deliver a strong cost-effective transmission grid, which is essential for Ireland to facilitate regional economic growth by attracting high-tech industrial in-vestment. Grid25 intends to deliver high quality, secure and competitive electricity supplies to cus-tomers and, by connecting new renewable and sustainable energy sources, reduce Irelands over de-pendence on fossil fuels. Grid25 will also support further interconnections to the UK and mainland Europe, which improves security of supply and encourages competitive energy prices in the All Is-land Single Electricity Market.

    1.2 Purpose of 2015 Grid25 Review: EirGrid drafted a Grid25 review which assessed changes since 2008 and the impact of those changes on the strategies and on the major projects progressing as part of the strategy implementation.

    The Technical Report provides more detail on the Technical Issues.

    The main topics covered are:-

    Progress since 2008 The Evolving Context Drivers of Grid Investment Technology Revised Strategies Regional Development and Major Grid Development Projects

    Following a tendering process EirGrid invited London Power Associates to fulfil the role of Inde-pendent Peer Reviewer and to carry out an assessment of the Grid25 review (2015) documents (Main report and Technical report).

    The main tasks included: Part 1: Review the Grid Development Strategies

    Consideration was given to:

  • Page 4 EirGrid Irelands Draft Grid Development Strategy - Appendix 2 EirGrid Irelands Draft Grid Development Strategy - Appendix 2 Page 5

    EXTERNAL PEER REVIEW OF GRID25 REVIEW (2015) FINAL PEER REVIEW REPORT

    PAGE 5 OF32 27 March 2015

    o Changes to assumptions and drivers

    o Changes to available technology options

    o Changes to public planning and the environmental requirements

    o Updates to Strategies

    Part 2: Review the five Grid Development Major Projects

    For each Grid Development Major Project LPA was asked to:

    o Evaluate the impact of the changes on the projects o Comment on the need case

    Part 3: Compare Processes with good utility practice LPA was asked to:

    Review EirGrids Standards, Strategies and processes Compare with good utility best practice Advise whether robust grid planning procedures have been applied

    1.3 Main focus of review:

    The main focus of the review is on the following areas:

    To note the changes to assumptions and drivers, impact of new technology and of new approaches to public planning and environment.

    Review the overall strategy for Grid development and the three main Strategy Statements

    Evaluate the impact of the background changes (assumptions, drivers etc.) on Grid Development Major Projects.

    Review of the case of need for the Grid Development Major Projects o North- South Interconnector

    o Grid Link Project o Grid West Project o Moneypoint North Kerry project o North West Project

    1.4 LPA Company Profile:

    Established in 2001, LPA is one of the UKs leading power consultants, with offices in Manchester and Staines. LPA provides a highly responsive and flexible service on all aspects of power engineering projects that allow our clients to make investment decisions with confidence at any time during the projects life cycle.

  • Page 6 EirGrid Irelands Draft Grid Development Strategy - Appendix 2

    EXTERNAL PEER REVIEW OF GRID25 REVIEW (2015) FINAL PEER REVIEW REPORT

    PAGE 6 OF32 27 March 2015

    LPA provides services to large international organisations around the world. Our experience is wide-ra