ebc conference

63
http://www. btwholesale .com 1 EBC Conference Introduction and Welcome

Upload: grace

Post on 05-Jan-2016

49 views

Category:

Documents


1 download

DESCRIPTION

EBC Conference. Introduction and Welcome. Objectives of the day. Report progress since the February workshop Understand the EBC Solution How would I use the Routing Plans Database System? How should I use the new files in EBC? What do I have to do? - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: EBC Conference

http://www.btwholesale.com 1

EBC Conference

Introduction and Welcome

Page 2: EBC Conference

http://www.btwholesale.com 2

Objectives of the day

• Report progress since the February workshop

• Understand the EBC Solution How would I use the Routing Plans Database System?

How should I use the new files in EBC?

What do I have to do?

• Understand progress on other issues raised

• Outline BT’s plans

Page 3: EBC Conference

http://www.btwholesale.com 3

Scene Setting

• Why evolve EBC?

• What needs to be changed?

• New EBC files

• Security

Page 4: EBC Conference

http://www.btwholesale.com 4

Agenda

09.30 Coffee and Registration

10.00 Introduction & Welcome

10.05 EBC Solution - Routing Plan Database

11.05 EBC Solution - Use of Exit POCs

11.35 EBC Solution - Timeline

12.00 Break

12.15 EBC Solution – New files

12.45 EBC Solution - Processes

13.05 EBC and NIPP

13.20 Summary & Close

13:30 Lunch

Page 5: EBC Conference

http://www.btwholesale.com 5

EBC Solution –Routing Plan Database

Page 6: EBC Conference

http://www.btwholesale.com 6

EBC Solution –Routing Plan Database

• Contract

• Provisioning Manual

• Appendix 24

Page 7: EBC Conference

http://www.btwholesale.com 7

EBC Solution – What do we need ?

• We need a system with……

• A uniform presentation and feel

• Ease of use

• Accessibility

• Validation of information

• DMA dates

Page 8: EBC Conference

http://www.btwholesale.com 8

EBC Solution – Current Routing Plan Contents

• Spread sheet Routing Plans

• Operator details

• Number strings

• BT Switch Connections

• Catchment Areas

Page 9: EBC Conference

http://www.btwholesale.com 9

Page 10: EBC Conference

http://www.btwholesale.com 10

Page 11: EBC Conference

http://www.btwholesale.com 11

Page 12: EBC Conference

http://www.btwholesale.com 12

Page 13: EBC Conference

http://www.btwholesale.com 13

Page 14: EBC Conference

http://www.btwholesale.com 14

Page 15: EBC Conference

http://www.btwholesale.com 15

Page 16: EBC Conference

http://www.btwholesale.com 16

Page 17: EBC Conference

http://www.btwholesale.com 17

Page 18: EBC Conference

http://www.btwholesale.com 18

Page 19: EBC Conference

http://www.btwholesale.com 19

Page 20: EBC Conference

http://www.btwholesale.com 20

Page 21: EBC Conference

http://www.btwholesale.com 21

Page 22: EBC Conference

http://www.btwholesale.com 22

Page 23: EBC Conference

http://www.btwholesale.com 23

Page 24: EBC Conference

http://www.btwholesale.com 24

Page 25: EBC Conference

http://www.btwholesale.com 25

Page 26: EBC Conference

http://www.btwholesale.com 26

Page 27: EBC Conference

http://www.btwholesale.com 27

Page 28: EBC Conference

http://www.btwholesale.com 28

Page 29: EBC Conference

http://www.btwholesale.com 29

Page 30: EBC Conference

http://www.btwholesale.com 30

Page 31: EBC Conference

http://www.btwholesale.com 31

Page 32: EBC Conference

http://www.btwholesale.com 32

Page 33: EBC Conference

http://www.btwholesale.com 33

Page 34: EBC Conference

http://www.btwholesale.com 34

Page 35: EBC Conference

http://www.btwholesale.com 35

Page 36: EBC Conference

http://www.btwholesale.com 36

Page 37: EBC Conference

http://www.btwholesale.com 37

EBC Solution and Exit POCs

Page 38: EBC Conference

http://www.btwholesale.com 38

EBC & exit POCs: Current Process

•EBC currently uses a set of rules in conjunction with a list of exit POCs to derive the charge for:

•BT originated IA/CPS/118DQ

•Transit

Page 39: EBC Conference

http://www.btwholesale.com 39

New Solution: Agreed Exit POC

•No change to charging for BT-terminated traffic or BT-originated NTS

•The new solution will use Exit POCs shown in the routing plan database

•Least cost connectivity path to get to the agreed exit POC

•Changes to EBC algorithms, but not the use of EBC data

Page 40: EBC Conference

http://www.btwholesale.com 40

New Solution - Agreed Exit POCs (AEPs)

•Routing Plan data will directly drive EBC charge bands

•The Routing Plan data shows catchment area, number block and BT switch passing calls to CPs, e.g.

Ipswich, 01473292, Ipswich Unit A

•The routing plan database will show:

•If/when DMA has been raised by the Operator

•Agreed date of change on DMA

• When DMA has been implemented by BT

•The exit POC for a given origin will be that agreed to be in place when the EBC data goes live

Page 41: EBC Conference

http://www.btwholesale.com 41

Use of Agreed Exit POCs, BT-originated

Processing logic for each traffic type originating from a BT DLE:

Is the DLE a POC?YES NO

Use the POC in the Routing

Plan for charging

Select Tandem to use as AEP from Routing Plan

Obtain EBC charge band from DLE to Agreed Exit POC

Page 42: EBC Conference

http://www.btwholesale.com 42

Use of Agreed Exit POCs, transit

Processing logic for transit traffic at each BT tandem:

Is the tandem an Exit POC?

YES NO

Use the POC in the RoutingPlan for charging

Obtain EBC charge band from tandem to Agreed Exit POC

Identify the Agreed Exit POC from the

Routing Plan

Page 43: EBC Conference

http://www.btwholesale.com 43

Benefits

•Transparency

•CP control

•Predictability

•Simplification

Page 44: EBC Conference

http://www.btwholesale.com 44

EBC Solution and Timeline

Page 45: EBC Conference

http://www.btwholesale.com 45

EBC Solution - Timeline - DMAs

EBC Matrix ‘Y’ Build Start Date

EBC Matrix ‘Y’ Effective Date

EBC Matrix ‘X’ Effective Date

EBC Matrix ‘X’ Build Start Date

If DMA ‘A’ Agreed Implementation Date is during this period, then changes will be included in Matrix ‘Y’.

DMA ‘A’ may be raised during this period for inclusion in Matrix ‘Y’.

If DMA ‘A’ Agreed Implementation Date is during this period, then changes will NOT be included in Matrix ‘Y’.

Page 46: EBC Conference

http://www.btwholesale.com 46

EBC Solution and Two New Files

Page 47: EBC Conference

http://www.btwholesale.com 47

New Files – The Drivers

•Alignment with agreed routing

•Charging predictability

•Enabling routing optimisation

•Need for enhancements:

•Shows only existing points of connect

•Retardation of number ranges

•Exchange mapping

•Non-contractual traffic

•Effort

Page 48: EBC Conference

http://www.btwholesale.com 48

Two New Files

•A new file to assist CPs receiving traffic from BT

•A new file to assist CPs delivering traffic to BT

•Standard EBC file format

•Standard naming convention

•Standard header and trailers

•Comma-separated format data records

Page 49: EBC Conference

http://www.btwholesale.com 49

File 1 – Receiving Traffic from BT

•A BT-switch-to-BT-switch matrix, with charge band

•Any traffic type

•Valid call routing scenarios

•E.g. a DLE origin would be shown against the following destinations:

•For BT-originated traffic, the DLE itself and all switches that could be Exit POCs

•For transit traffic, nothing

•Each data record will contain:

•origin exchange NNI, destination exchange NNI, EBC charge band

•Transit / Non-transit charge bands

Page 50: EBC Conference

http://www.btwholesale.com 50

File 1 – DLE Example

0646006,0646006,5200646006,0945010,521…0646006,1311001,5250646006,1311618,5250646006,1312997,525…0646006,1440182,5210646006,1441455,5210646006,1455134,5250646006,1460128,525…0646006,4012629,5250646006,4014559,5250646006,4015916,5250646006,4016350,525…0646006,5945021,521

Directly connected WATs

WATs tandemed with directly connected WATs

All SYSX DMSUs

ItselfMiddleton Unit C (DLE)

All NGS DMSUs

Directly connected SYSX DLTEs

Directly connected AXE10 DLTEs

Page 51: EBC Conference

http://www.btwholesale.com 51

File 1 – Trunk Example

All SYSX DLEs and DLTEs

All SYSX DMSUs

All ASUs

Ipswich Morganite (NGS DMSU)

All NGS DMSUs

…4073327,0723111,5244073327,0723118,5244073327,0724119,5234073327,0724166,523…4073327,1311001,5294073327,1311618,5294073327,1312997,529…4073327,1712241,5254073327,1712300,5254073327,1715359,525…4073327,4012629,5294073327,4014559,5294073327,4015916,529…4073327,5710060,5254073327,5710312,5254073327,5710360,525…

All AXE10 DLEs and DLTEs

Page 52: EBC Conference

http://www.btwholesale.com 52

File 1 – Benefits to CPs

•Transparency

•Trunk-to-trunk connectivity

•Routing plan applicability

•Mapping to catchment areas

•All possible points of connect covered

Page 53: EBC Conference

http://www.btwholesale.com 53

File 2 – Delivering Traffic to BT

•Point of connect to number block, with EBC charge band

•Full-length number blocks

•Valid call routing scenarios

•E.g. a WAT origin would be shown against the following destination number blocks:

•BT number blocks hosted on directly connected DLEs

•CP number blocks accepted at this WAT

•Each data record will contain:

•origin exchange NNI, destination number block (unretarded), EBC charge band

Page 54: EBC Conference

http://www.btwholesale.com 54

File 2 – DLE Example

0973004,0120671,5200973004,01206760,5200973004,01206761,520…0973004,01394380,5200973004,01394385,5200973004,01394389,5200973004,01394600,520…0973004,01473106,5200973004,0147321,5200973004,0147322,5200973004,01473230,5200973004,01473231,5200973004,01473232,520…0973004,0172845,5200973004,0172860,5200973004,01728633,520…0973004,01787220,5200973004,01787221,5200973004,01787222,520

Unretarded BT number blocks hosted on DLE

Ipswich Unit B (DLE)

Page 55: EBC Conference

http://www.btwholesale.com 55

File 2 – Benefits to CPs

•Full length number blocks

•Only valid routing shown

•Route Optimiser-friendly

•No need to expand out retarded number blocks

•Invalid routings will not be shown

Page 56: EBC Conference

http://www.btwholesale.com 56

EBC Solution - Processes

Page 57: EBC Conference

http://www.btwholesale.com 57

EBC Solution - Processes

•Most processes unchanged

•Preparation of Routing Plans

•Submission of DMAs

•Timing of DMAs

•Checking DMA Dates

Page 58: EBC Conference

http://www.btwholesale.com 58

EBC Solution - Processes

Use two new files to:

Switch to switch file - where to receive calls

POC to Number Block file - where to deliver calls to BT

When published run checks

Re-distribute traffic flow

Open up new connections as necessary

Page 59: EBC Conference

http://www.btwholesale.com 59

EBC and NIPP

Page 60: EBC Conference

http://www.btwholesale.com 60

EBC and NIPP – Alignment of Data

Worked on aligning

Implication of Dates

Dates to align

Current data

Planning data

Page 61: EBC Conference

http://www.btwholesale.com 61

EBC and NIPP – Rationalisation of Files

Previously announced

Duplicated files removal

Both EBC and NIPP

Web site for network Briefings

Some Increased

Page 62: EBC Conference

http://www.btwholesale.com 62

EBC Workshop

Summary & Close

Page 63: EBC Conference

http://www.btwholesale.com 63

EBC Solution - Summary

• Routing Plan Database

• Two New Output Files

• EBC and NIPP

• Communicate progress on delivery

• Thank you… and lunch