Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Upload: adonica

Post on 06-Jan-2016

238 views

Category:

Documents


18 download

DESCRIPTION

Earthwork & Volumes. Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates. Earthwork Specs. Payment based on excavation (Cut) Specs define methods for cut and fill Typically not paid for fill - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Earthwork & Volumes

Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Page 2: Earthwork & Volumes

Earthwork Specs Payment based on excavation (Cut)

Specs define methods for cut and fill Typically not paid for fill

Based on “Excavation measured in place as computed from survey notes” Not weighing, counting truck rounds Look for spec allowing contractor to

dispute volumes in a certain area

Page 3: Earthwork & Volumes

Excavation Specs Common excavation

Determined from survey notes Describes most of work

Rock/Muck Rock requires blasting Muck requires deep dig, granular fill Before/after volume survey

Page 4: Earthwork & Volumes

Haul Payments Volume payments - $/cy Excavation

Separate lines for common, rock , muck Free Haul - Stations Overhaul - $/cy-stations Borrow - $/cy

Covers cost of lease, haul, reclamation Waste - $/cy

Page 5: Earthwork & Volumes

End Areas Based on

Cross-sections

CL

Typical section Area – ft2

Cut Fill

Page 6: Earthwork & Volumes

Construction Grade Staking Based on “typical section” Stake centerline, slope “breakouts”

Page 7: Earthwork & Volumes

Slope Stakes

12’ + 4’(4) + 8’ + 6.3’(4) = 61.2’

Page 8: Earthwork & Volumes

Slope Staking

12’ + 3.7’(4) = 26.8’

Page 9: Earthwork & Volumes

End Area Calculations

Page 10: Earthwork & Volumes

End Area Calculations Level Sections

3-level Sections

5-level Sections

Other Sections

Triangular Sections

Page 11: Earthwork & Volumes

Level Sections

)()2

( cswcw

dcA

6.390)2

404.31(6.7)

2(

wdcA

6.390)5.16.740(6.7)( cswcA

Page 12: Earthwork & Volumes

3-Level Sections

)(2

)(4 rLrL dd

chh

wA

34.338)6.295.30(2

8.6)4.60.7(

4

40A

Page 13: Earthwork & Volumes

5-Level Sections

)(2

1rrLL dhdhcwA

2.258)3.277.61.239.6308.5(2

1A

Page 14: Earthwork & Volumes

Transition Sections

)(4

1)

2(2

1whh

wA

6.15)6.240(4

1cA 0.15)0.230(

4

1fA

Page 15: Earthwork & Volumes

End Area Calculations Planimeter Coordinate Calculations

Similar to coordinate area Start/end at same point

)()( 1121

iiii dfdfA

Page 16: Earthwork & Volumes

Coordinate Areas

Assign (0, 0)30 ‘ top, left shoulder (-15, 0)

15

0

0

0

8.25

2.7

20

8.8

7.14

0.7

0.0

0.8

0.18

1.8

0.24

3.9

1.29

4.9

15

0

0

0

Page 17: Earthwork & Volumes

Coordinate Calc Example

0

0

15

0

1.29

4.9

24

3.9

18

1.8

0

0.8

7.14

0.7

20

8.8

8.25

2.7

15

0

0

0

2.338

)15(0)1.29(0)24(4.9)18(3.9)0(1.8

)7.14(0.8)20(0.7)8.25(8.8)15(2.7

)15(4.9)1.29(3.9)24(1.8)18(0.8)0(0.7

)7.14(8.8)20(2.7)8.25(0)15(0

2

1

A

Page 18: Earthwork & Volumes

End-Area Volumes

AI = 390.6 ft2

AH = 338.3 ft2

AG = 144.8 ft2

AE = 15.6 ft2

AE = 15.0 ft2

AD = 113.2 ft2

AB = 258.2 ft2

AA = 338.2 ft2