dt 1320 bim
DESCRIPTION
DT 1320 BIM. Unit 1 Intro To Architectural Design and BIM. The Professional practice of architectural working drawings 4 th edition. Professional Foundations Chapter 1 The Office. The physical office: I. Local firms II. Global firms. Three Major Components: I. Administration - PowerPoint PPT PresentationTRANSCRIPT
DT 1320 BIMUNIT 1 INTRO TO ARCHITECTURAL DESIGN AND
BIM
THE PROFESSIONAL PRACTICE OF ARCHITECTURAL WORKING DRAWINGS
4TH EDITION
PROFESSIONAL
FOUNDATIONS
CHAPTER
1
THE OFFICE
THE PHYSICAL OFFICE:
I. LOCAL FIRMS
II. GLOBAL FIRMS
THREE MAJOR COMPONENTS:
I. ADMINISTRATION
II. DESIGN
III. PRODUCTION
Administration
Design Production
• Job Captain• Senior Technician• Intermediate
Technician• Junior Technician
• Project Architect• Job Captain• Senior Technician• Intermediate
Technician• Junior Technician
Architect(s)/Principal(s)Oversee
Page 5, 4th ed.
• Human Resources• Accounting• Marketing
ARCHITECTURAL SUPPORT:
I. BOARDS/ORGANIZATIONS
II. RESEARCH SOURCES
III. AFFILIATIONS
NATIONAL ARCHITECTURAL ACCREDITING BOARD
(NAAB)
ARCHITECTURE
REGISTRATION EXAMINATION (ARE)
Page 5, 4th ed.
INTERN DEVELOPMENT PROGRAM (IDP)
NATIONAL COUNCIL OF ARCHITECTURAL
REGISTRATION BOARDS (NCARB)
Page 5, 4th ed.
MASTERFORMAT GROUPS, SUBGROUPS, AND DIVISIONS PROCUREMENT AND
CONTRACTING
REQUIREMENTS GROUP
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTORY INFORMATION
PROCUREMENT REQUIREMENTS
CONTRACTING REQUIREMENTS
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
DIVISION 01 – GENERAL REQUIREMENTS
Page 6, 4th ed.
FACILITY CONSTRUCTION SUBGROUP
DIVISION 02 – EXISTING CONDITIONS
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY
DIVISION 05 – METALS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
DIVISION 08 – OPENINGS
DIVISION 09 – FINISHES
DIVISION 10 – SPECIALTIES
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 – SPECIAL CONSTRUCTION
DIVISION 14 – CONVEYING EQUIPMENT
DIVISION 15-19 – RESERVED FOR
FUTURE EXPANSION
FACILITY SERVICES SUBGROUP
DIVISION 20 – RESERVED FOR FUTURE EXPANSION
DIVISION 21 – FIRE SUPPRESSION
DIVISION 22 – PLUMBING
DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
DIVISION 24 – RESERVED FOR FUTURE EXPANSION
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
DIVISION 27 – COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
DIVISION 29 – RESERVED FOR FUTURE EXPANSION
Page 6, 4th ed.
SITE AND INFRASTRUCTURE SUBGROUP
DIVISION 30 – RESERVED FOR FUTURE EXPANSION
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
DIVISION 36-39 – RESERVED FOR FUTURE EXPANSION
PROCESS EQUIPMENT SUBGROUP
DIVISION 40 – PROCESS INTEGRATION
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
DIVISION 42 – PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT
DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT
DIVISION 45 – INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
DIVISION 47 – RESERVED FOR FUTURE EXPANSION
DIVISION 48 – ELECTRICAL POWER GENERATION
DIVISION 49 – RESERVED FOR FUTURE EXPANSION
Page 6, 4th ed.
PROCESS EQUIPMENT SUBGROUP
DIVISION 40 – PROCESS INTEGRATION
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
DIVISION 42 – PROCESS HEATING, COOLING, AND DRYING
EQUIPMENT
DIVISION 43 – PROCESS GAS AND LIQUID HANDLING,
PURIFICATION, AND STORAGE EQUIPMENT
DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT
DIVISION 45 – INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
DIVISION 47 – RESERVED FOR FUTURE EXPANSION
DIVISION 48 – ELECTRICAL POWER GENERATION
DIVISION 49 – RESERVED FOR FUTURE EXPANSION
Page 6, 4th ed.
AMERICAN INSTITUTE OF ARCHITECTS
(AIA)
LEADERSHIP
IN ENERGY AND ENVIRONMENTAL DESIGN (LEED )
Page 7, 4th ed.
ARCHITECT/CLIENT RELATIONSHIP: I. WORKING RELATIONSHIP
A. CONTRACT
B. RETAINER
C. PROJECT PROGRAM
D. CLIENT REVIEW
E. CLIENT APPROVAL
SCHEMATIC DESIGN (SD) I. DESIGN AND REVIEWS
A. ARCHITECTURE PROGRAM
1. ESTIMATED SQ. FT.
2. TYPE OF USE
3. OTHER ELEMENTS
Page 7-9, 4th ed.
SCHEMATIC DESIGN (SD)
B. STUDY DRAWINGS, DOCUMENTS, AND
OTHER MEDIA
1. CONCEPTS
2. SPATIAL RELATIONS
3. SCALE
4. FORM
5. CLIENT REVIEW
Page 7-9, 4th ed.
SCHEMATIC DESIGN (SD)
C. RESEARCH PHASE
1. ZONING
2. PLANNING
3. BUILDING
4. ENVIRONMENTAL
5. ENGINEERING
6. SITE ANALYSIS
Page 7-9, 4th ed.
SCHEMATIC DESIGN (SD)
D. PRODUCE SCHEMATIC
1. CLIENT REVIEW
2. ESTIMATE COST
3. SITE & FLOOR PLAN
4. SECTION &
ELEVATION
5. MODEL/RENDERING
6. OVERALL DIMENSION
7. CLIENT APPROVAL
Page 7-9, 4th ed.
DESIGN DEVELOPMENT (DD) II. DESIGN AND REVIEWS
A. LAYOUT & DETERMINE
1. MECHANICAL
2. ELECTRICAL
3. PLUMBING
4. STRUCTURAL DETAILS
5. ARCHITECTURAL
DETAILS
6. MATERIAL TYPES
7. DOOR/WINDOW LOCATIONS
8. OTHER ELEMENTS
Page 9, 4th ed.
DESIGN DEVELOPMENT (DD)
B. PRODUCE DESIGN
1. CLIENT REVIEW
2. ESTIMATE COST
3. SITE & FLOOR PLANS
4. SECTIONS &
ELEVATIONS
5. OUTLINE
SPECIFICATIONS
6. CLIENT APPROVAL
Page 10, 4th ed.
CONSTRUCTION DOCUMENTS (CD) III. DESIGN AND REVIEWS
A. LAYOUT & DETERMINE
1. DRAWINGS WITH GREATER
DETAIL
2. SPECIFICATIONS
3. DETAILS
4. MATERIALS
Page 12, 4th ed.
CONSTRUCTION DOCUMENTS(CD)
B. PRODUCE DOCUMENTS
1. CLIENT REVIEW
2. CLIENT APPROVAL
3. AGENCY REVIEW
4. AGENCY APPROVAL
5. OUT TO BID
Page 12, 4th ed.
BIDDING & NEGOTIATING I. PUBLICALLY OWNED PROJECTS
A. QUALIFIED BIDDERS
1. UNLIMITED NUMBER
2. LOWEST BID
3. BID DELIVERED ON TIME
Page 12, 4th ed.
BIDDING & NEGOTIATING II. PRIVATELY OWNED PROJECTS
A. OWNER/ARCHITECT
DETERMINED
1. BID/NEGOTIATED
2. 4 TO 5 BIDDERS
3. BUDGET OR TIME
Page 12, 4th ed.
CONSTRUCTION ADMINISTRATION (CA) I. OBSERVE PHASES OF
CONSTRUCTION
A. ARCHITECTS ROLE
1. FIELD ACTIVE
2. FIELD VISIT
3. WRITTEN REPORTS
4. RFI
5. PUNCH LIST
Page 13, 4th ed.
BUILDING CODES I. PURPOSE
A. LIFE SAFETY
1. REVISED OFTEN
2. CATASTROPHIC CONDITIONS
A. HURRICANES
B. SEISMIC
C. FIRES
3. DETAILS
4. STRUCTURE
Page 13, 4th ed.
BUILDING CODES II. PROCEDURE
B. BUILDING USE &
OCCUPANCY
1. CLASSIFY USE
2. FIRE RATED
ASSEMBLIES
3. LOCATE BUILDING ON SITE
4. DETERMINE FLOOR AREAS
5. DETERMINE HEIGHT OF BUILDING 6. BUILDING EXITING
Page 13, 4th ed.