Drying Shrinkage Presentation By Savita Goel May 17, 2002

Upload: jhoner-frank-valero

Post on 22-Oct-2015

76 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Drying Shrinkage

Drying Shrinkage

Presentation By

Savita Goel

May 17, 2002

Page 2: Drying Shrinkage

Overview

• Test Program

• Test Results Data

• Phase II Tests

Page 3: Drying Shrinkage

Specifications

•ASTM C 157

•ASTM C 490

Page 4: Drying Shrinkage

Specimens: Mortar Bars

• Size: 1”x1”x10”

• No.: 3 nos. with studs at each end along the length of the bar

• Total Bars Made: 144

Page 5: Drying Shrinkage

Specimens: Concrete Cylinders

• Size: 6”x12”• No.: 2 nos. with 3

demec stud points along the surface on each cylinder

• Total cylinders made: 108

Page 6: Drying Shrinkage

Curing

• Temperature: 23o C + 1.5o C

• Relative Humidity: > 98 %

• Duration: 7 Days and 14 Days

Page 7: Drying Shrinkage

Drying

• Mortar Bars

– Temp.: 73.3 + 3 oF

– RH: 50 + 4 %

•Concrete Cylinders

–Temp.: 96 + 3 oF

–RH: 20 + 4 %

Page 8: Drying Shrinkage

Instrumentation

• Length Comparator

• Demec Strain Gage

Page 9: Drying Shrinkage

Length Measurement Age

• Length measured at drying age of– 4, 7, 14, 21, 28, 35, 42, 49, 56, 90,

180 and 365 Days

Page 10: Drying Shrinkage

Mixtures

• Mortar: 24 mixtures

• Concrete: 12 mixtures

Page 11: Drying Shrinkage

Tests

• Fresh Concrete– Slump (5 + 1 ½ ”)

– Air Content (6 + 1 ½ %)

– Unit Weight

– Temperature

• Hardened Concrete

– Compressive Strength (at 7 & 28 Days)

Page 12: Drying Shrinkage

Influence of w/cm(28-Days Drying Shrinkage As Per B3 Model)

0.35 0.4 0.45w/cm

Dry

ing

Sh

rin

kag

e

Page 13: Drying Shrinkage

Influence of Relative Humidity(7Days Moist Cured 100% PC Mortar Bars)

0

500

1000

1500

2000

0 20 40 60 80 100Drying Age (Days)

Dry

ing

Sh

rin

ka

ge

(M

icro

str

ain

s)

6.5x/PC100/50%

6x/PC100/50%

5.5x/PC100/50% 6.5x/PC100/70%

6x/PC100/70%

5.5x/PC100/70%

Page 14: Drying Shrinkage

7 Days Moist Cured - 6x/PC-FA-SF Mortar Bars

0

500

1000

1500

2000

0 10 20 30 40 50 60 70Drying Age (Days)

Dry

ing

Sh

rin

kag

e (M

icro

stra

ins)

6x/PC100

6x/PC70FA30

6x/PC70FA27SF3

Page 15: Drying Shrinkage

7 Days Moist Cured - PC-BS-SF Mortar Bars

0

500

1000

1500

2000

0 10 20 30 40 50 60 70 80Drying Age (Days)

Dry

ing

Sh

rin

kag

e (M

icro

stra

ins)

6x/PC100

6x/PC65BS35

6x/PC55BS42SF3

Page 16: Drying Shrinkage

7 Days Moist Cured - PC-SF Mortar Bars

0

500

1000

1500

2000

0 10 20 30 40 50 60 70Drying Age (Days)

Dry

ing

Sh

rin

kag

e (M

icro

stra

ins)

6x/PC100

6x/PC55BS42SF3

6x/PC97SF3

6x/PC70FA27SF36x/PC93SF7

Page 17: Drying Shrinkage

7 Days Moist Cured - 100% PC Concrete Cyl.

0

100

200

300

400

500

600

0 10 20 30 40 50 60 70Drying Age (Days)

Dry

ing

Sh

rin

kag

e (M

icro

stra

ins)

6

5.5

6.5

Page 18: Drying Shrinkage

7 Days Moist Cured - PC-FA-SF Concrete Cyl.

0

100

200

300

400

500

600

0 10 20 30 40 50 60 70

Drying Age (Days)

Dry

ing

Sh

rin

kag

e (M

icro

stra

ins) 6x/PC100

6x/PC70FA30

6x/PC70FA27SF3

Page 19: Drying Shrinkage

7 Days Moist Cured - PC-BS-SF Concrete Cyl.

0

100

200

300

400

500

600

0 10 20 30 40 50 60 70Drying Age (Days)

Dry

ing

Sh

rin

kag

e (M

icro

stra

ins)

100 % PC

PC 65 BS 35

PC 55 BS 42 SF 3PC 55 BS 45

Page 20: Drying Shrinkage

7 Days Moist Cured - PC-SF Concrete Cyl.

0

100

200

300

400

500

600

0 10 20 30 40 50 60 70Drying Age (Days)

Dry

ing

Sh

rin

kag

e (M

icro

stra

ins)

6x/70FA27SF3

6x/PC97SF3

6x/PC100

6x/PC55BS42SF3

Page 21: Drying Shrinkage

Conc Cyl - Conc Bars - Mortar Bars(6x/PC97SF3)

0

500

1000

1500

2000

0 10 20 30 40 50 60 70Drying Age (Days)

Dry

ing

Sh

rin

kag

e (M

icro

stra

ins)

Conc. Cyl.(375)

Conc. Bar (407)

Mortar Bar (1449)

Page 22: Drying Shrinkage

Phase II Test

• 25 Concrete Mixtures Based on Comp. Strength and Strength Ratio

• Specimens:– 4”x4”x10” Concrete Bars– 6”x12” Concrete Cylinders

Page 23: Drying Shrinkage

Thank You !

Any Questions ?