Page 1: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

IBM Storwize V5000

Quick Installation Guide

GI13-2861-05

IBM

Page 2: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

NoteBefore using this information and the product it supports, read the following information:

v The general information in “Notices” on page 45

v The information in the “Safety and environmental notices” on page ix

v The information in the IBM Environmental Notices and User Guide (provided on a DVD)

This edition applies to IBM Storwize V5000 and is valid until replaced by new editions.

This edition replaces GI13-2861-04.

© Copyright IBM Corporation 2013, 2015.US Government Users Restricted Rights – Use, duplication or disclosure restricted by GSA ADP Schedule Contractwith IBM Corp.

Page 3: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Contents

Figures . . . . . . . . . . . . . . . v

Tables . . . . . . . . . . . . . . . vii

Safety and environmental notices . . . ixSafety notices and labels . . . . . . . . . . ix

Caution notices for the Storwize V5000 . . . . xDanger notices for Storwize V5000 . . . . . xii

Special caution and safety notices. . . . . . . xivGeneral safety . . . . . . . . . . . . xivHandling static-sensitive devices . . . . . . xv

Environmental notices . . . . . . . . . . xvi

About this guide . . . . . . . . . . xviiWho should use this guide. . . . . . . . . xviiStorwize V5000 library and related publications xviiHow to order IBM publications . . . . . . . xviiiRelated websites . . . . . . . . . . . . xixSending your comments . . . . . . . . . . xixHow to get information, help, and technicalassistance . . . . . . . . . . . . . . . xix

Chapter 1. Before you begin theinstallation . . . . . . . . . . . . . 1Reviewing your packing slip . . . . . . . . . 5Identify the hardware components . . . . . . . 6Verify environmental requirements . . . . . . 11Review enclosure location guidelines . . . . . . 11

Chapter 2. Installing the hardware . . . 13Installing the support rails . . . . . . . . . 13Installing the enclosures . . . . . . . . . . 17Connecting SAS cables to expansion enclosures . . 18

SAS cabling guidelines . . . . . . . . . 19Connecting Ethernet cables to node canisters . . . 22Connecting Fibre Channel cables to a 10 GbpsiSCSI-FCoE 2-port host interface adapter . . . . 22Connecting Fibre Channel cables to a Fibre Channelhost interface adapter . . . . . . . . . . . 24Connecting a control enclosure to a host . . . . 25Powering on the system . . . . . . . . . . 27

Chapter 3. Configuring the system. . . 29Checking your web browser settings for themanagement GUI . . . . . . . . . . . . 29

User name and password for system initialization 32Initializing the system with a Microsoft Windowscomputer . . . . . . . . . . . . . . . 33Initializing the system with an Apple Macintoshcomputer . . . . . . . . . . . . . . . 35Initializing the system with a Linux computer . . . 37Adding an expansion enclosure to an existingsystem . . . . . . . . . . . . . . . . 38Adding a control enclosure to an existing system . . 38

Appendix A. Accessibility features forStorwize V5000 . . . . . . . . . . . 41

Appendix B. Where to find theStatement of Limited Warranty . . . . 43

Notices . . . . . . . . . . . . . . 45Trademarks . . . . . . . . . . . . . . 47Homologation statement . . . . . . . . . . 47Electronic emission notices . . . . . . . . . 47

Federal Communications Commission (FCC)statement . . . . . . . . . . . . . . 47Industry Canada compliance statement . . . . 48Australia and New Zealand Class A Statement 48European Union Electromagnetic CompatibilityDirective . . . . . . . . . . . . . . 48Germany Electromagnetic Compatibility Directive 49People's Republic of China Class A Statement . . 50Taiwan Class A compliance statement . . . . 50Taiwan Contact Information . . . . . . . . 50Japan VCCI Council Class A statement . . . . 50Japan Electronics and Information TechnologyIndustries Association Statement . . . . . . 51Korean Communications Commission Class AStatement . . . . . . . . . . . . . . 51Russia Electromagnetic Interference Class AStatement . . . . . . . . . . . . . . 51

European Contact Information . . . . . . . . 52Taiwan Contact Information . . . . . . . . . 52

Index . . . . . . . . . . . . . . . 53

© Copyright IBM Corp. 2013, 2015 iii

Page 4: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

iv Storwize V5000: Quick Installation Guide

Page 5: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Figures

1. Rear view of a Storwize V5000 control enclosure 62. Data ports in the rear of the Storwize V5000

control enclosure . . . . . . . . . . . 73. Control enclosure support rails of a Storwize

V5000 system . . . . . . . . . . . . 84. Rear view of a Storwize V5000 expansion

enclosure. . . . . . . . . . . . . . 85. SAS ports and LEDs in rear view of a Storwize

V5000 expansion canister . . . . . . . . 96. Expansion enclosure support rails on Storwize

V5000 . . . . . . . . . . . . . . . 97. USB flash drive . . . . . . . . . . . 108. Rack mounting rails and screws. . . . . . 139. Installing the rail spring . . . . . . . . 14

10. Hole locations in the front of the rack . . . . 1411. Opening the hinge brackets . . . . . . . 1512. Closing hinge brackets and installing rear

screw . . . . . . . . . . . . . . 16

13. Inserting the enclosure . . . . . . . . . 1714. Connecting the SAS cables . . . . . . . 1915. SAS cable connectors . . . . . . . . . 2016. Connecting the SAS cables . . . . . . . 2117. Connecting the Ethernet cables . . . . . . 2218. Example configuration with two pairs of cables

connected to 10 Gbps iSCSI-FCoE 2-port hostinterface adapters . . . . . . . . . . 23

19. Example configuration with two Fibre Channelcables per canister . . . . . . . . . . 24

20. Example configuration with four FibreChannel cables per canister . . . . . . . 24

21. Mini SAS HD to Mini SAS HD cable . . . . 2522. Mini SAS HD to Mini SAS cable . . . . . 2523. Example configuration with two SAS cables

per canister . . . . . . . . . . . . 2624. Expansion canister LEDs . . . . . . . . 2725. Node canister LEDs . . . . . . . . . . 28

© Copyright IBM Corp. 2013, 2015 v

Page 6: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

vi Storwize V5000: Quick Installation Guide

Page 7: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Tables

1. IBM websites for help, services, andinformation . . . . . . . . . . . . xvii

2. Storwize V5000 library . . . . . . . . xviii3. IBM documentation and related websites xviii4. IBM websites for help, services, and

information . . . . . . . . . . . . xix

5. Steps for different installation scenarios . . . 26. Storwize V5000 enclosures . . . . . . . . 57. Selecting bracket pins for your rack . . . . 158. Default user name and password for the

initialization GUI . . . . . . . . . . 32

© Copyright IBM Corp. 2013, 2015 vii

Page 8: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

viii Storwize V5000: Quick Installation Guide

Page 9: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Safety and environmental notices

Review the safety notices, environmental notices, and electronic emission noticesfor IBM® Storwize® V5000 before you install and use the product.

Suitability for telecommunication environment: This product is not intended toconnect directly or indirectly by any means whatsoever to interfaces of publictelecommunications networks.

Here are examples of a caution and a danger notice:

CAUTION:A caution notice indicates the presence of a hazard that has the potential ofcausing moderate or minor personal injury. (C001)

DANGER

A danger notice indicates the presence of a hazard that has the potential ofcausing death or serious personal injury. (D002)

To find the translated text for a caution or danger notice:1. Look for the identification number at the end of each caution notice or each

danger notice. In the preceding examples, the numbers (C001) and (D002) arethe identification numbers.

2. Locate the IBM Systems Safety Notices with the user publications that wereprovided with the Storwize V5000 hardware.

3. Find the matching identification number in the IBM Systems Safety Notices.Then, review the topics concerning the safety notices to ensure that you are incompliance.

4. Optionally, read the multilingual safety instructions on the Storwize V5000website. Go to www.ibm.com/storage/support/storwize/v5000, search forStorwize V5000, and click the documentation link.

Safety notices and labelsReview the safety notices and safety information labels before using this product.

To view a PDF file, you need Adobe Acrobat Reader. You can download it at nocharge from the Adobe website:

www.adobe.com/support/downloads/main.html

IBM Systems Safety Notices

This publication contains the safety notices for the IBM Systems products inEnglish and other languages. Anyone who plans, installs, operates, or services thesystem must be familiar with and understand the safety notices. Read the relatedsafety notices before you begin work.

Note: The IBM System Safety Notices document is organized into two sections. Thedanger and caution notices without labels are organized alphabetically by language

© Copyright IBM Corp. 2013, 2015 ix

Page 10: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

in the “Danger and caution notices by language” section. The danger and cautionnotices that are accompanied with a label are organized by label reference numberin the “Labels” section.

Note: You can find and download the current IBM System Safety Notices bysearching for Publication number G229-9054 in the IBM Publications Center.

The following notices and statements are used in IBM documents. They are listedin order of decreasing severity of potential hazards.

Danger notice definitionA special note that emphasizes a situation that is potentially lethal orextremely hazardous to people.

Caution notice definitionA special note that emphasizes a situation that is potentially hazardous topeople because of some existing condition, or to a potentially dangeroussituation that might develop because of some unsafe practice.

Note: In addition to these notices, labels might be attached to the product to warnof potential hazards.

Finding translated notices

Each safety notice contains an identification number. You can use this identificationnumber to check the safety notice in each language.

To find the translated text for a caution or danger notice:1. In the product documentation, look for the identification number at the end of

each caution notice or each danger notice. In the following examples, thenumbers (D002) and (C001) are the identification numbers.DANGER

A danger notice indicates the presence of a hazard that has the potentialof causing death or serious personal injury. (D002)

CAUTION:A caution notice indicates the presence of a hazard that has the potential ofcausing moderate or minor personal injury. (C001)

2. After you download the IBM System Safety Notices document, open it.3. Under the language, find the matching identification number. Review the topics

about the safety notices to ensure that you are in compliance.

Note: This product was designed, tested, and manufactured to comply with IEC60950-1, and where required, to relevant national standards that are based on IEC60950-1.

Caution notices for the Storwize V5000Ensure that you understand the caution notices for Storwize V5000.

Use the reference numbers in parentheses at the end of each notice, such as (C003)for example, to find the matching translated notice in IBM Systems Safety Notices.

x Storwize V5000: Quick Installation Guide

Page 11: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

CAUTION:The battery contains lithium. To avoid possible explosion, do not burn or chargethe battery.

Do not: Throw or immerse into water, heat to more than 100°C (212°F), repair ordisassemble. (C003)

CAUTION:Removing components from the upper positions in the rack cabinet improvesrack stability during a relocation. Follow these general guidelines whenever yourelocate a populated rack cabinet within a room or building.

v Reduce the weight of the rack cabinet by removing equipment starting at thetop of the rack cabinet. When possible, restore the rack cabinet to theconfiguration of the rack cabinet as you received it. If this configuration is notknown, you must observe the following precautions.

– Remove all devices in the 32U position and above.

– Ensure that the heaviest devices are installed in the bottom of the rackcabinet.

– Ensure that there are no empty U-levels between devices installed in therack cabinet below the 32U level.

v If the rack cabinet you are relocating is part of a suite of rack cabinets, detachthe rack cabinet from the suite.

v If the rack cabinet you are relocating was supplied with removable outriggersthey must be reinstalled before the cabinet is relocated.

v Inspect the route that you plan to take to eliminate potential hazards.

v Verify that the route that you choose can support the weight of the loadedrack cabinet. Refer to the documentation that comes with your rack cabinet forthe weight of a loaded rack cabinet.

v Verify that all door openings are at least 760 x 230 mm (30 x 80 in.).

v Ensure that all devices, shelves, drawers, doors, and cables are secure.

v Ensure that the four leveling pads are raised to their highest position.

v Ensure that there is no stabilizer bracket installed on the rack cabinet duringmovement.

v Do not use a ramp inclined at more than 10 degrees.

v When the rack cabinet is in the new location, complete the following steps:

– Lower the four leveling pads.

– Install stabilizer brackets on the rack cabinet.

– If you removed any devices from the rack cabinet, repopulate the rackcabinet from the lowest position to the highest position.

v If a long-distance relocation is required, restore the rack cabinet to theconfiguration of the rack cabinet as you received it. Pack the rack cabinet inthe original packaging material, or equivalent. Also lower the leveling pads toraise the casters off the pallet and bolt the rack cabinet to the pallet.

(R002)

CAUTION:

v Rack is not intended to serve as an enclosure and does not provide anydegrees of protection required of enclosures.

v It is intended that equipment installed within this rack will have its ownenclosure. (R005).

Safety and environmental notices xi

Page 12: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

CAUTION:Tighten the stabilizer brackets until they are flush against the rack. (R006)

CAUTION:Use safe practices when lifting. (R007)

CAUTION:Do not place any object on top of a rack-mounted device unless thatrack-mounted device is intended for use as a shelf. (R008)

CAUTION:If the rack is designed to be coupled to another rack only the same model rackshould be coupled together with another same model rack. (R009)

Danger notices for Storwize V5000Ensure that you are familiar with the danger notices for Storwize V5000.

Use the reference numbers in parentheses at the end of each notice, such as (C003)for example, to find the matching translated notice in IBM Systems Safety Notices.

xii Storwize V5000: Quick Installation Guide

Page 13: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

DANGER

When working on or around the system, observe the following precautions:

Electrical voltage and current from power, telephone, and communicationcables are hazardous. To avoid a shock hazard:

v If IBM supplied a power cord(s), connect power to this unit only with theIBM provided power cord. Do not use the IBM provided power cord forany other product.

v Do not open or service any power supply assembly.

v Do not connect or disconnect any cables or perform installation,maintenance, or reconfiguration of this product during an electrical storm.

v The product might be equipped with multiple power cords. To remove allhazardous voltages, disconnect all power cords.

v Connect all power cords to a properly wired and grounded electrical outlet.Ensure that the outlet supplies proper voltage and phase rotation accordingto the system rating plate.

v Connect any equipment that will be attached to this product to properlywired outlets.

v When possible, use one hand only to connect or disconnect signal cables.

v Never turn on any equipment when there is evidence of fire, water, orstructural damage.

v Disconnect the attached power cords, telecommunications systems,networks, and modems before you open the device covers, unlessinstructed otherwise in the installation and configuration procedures.

v Connect and disconnect cables as described in the following procedureswhen installing, moving, or opening covers on this product or attacheddevices.

To disconnect:

1. Turn off everything (unless instructed otherwise).

2. Remove the power cords from the outlets.

3. Remove the signal cables from the connectors.

4. Remove all cables from the devices.

To connect:

1. Turn off everything (unless instructed otherwise).

2. Attach all cables to the devices.

3. Attach the signal cables to the connectors.

4. Attach the power cords to the outlets.

5. Turn on the devices.

v Sharp edges, corners and joints might be present in and around the system.Use care when handling equipment to avoid cuts, scrapes and pinching.(D005)

DANGER

Heavy equipment–personal injury or equipment damage might result ifmishandled. (D006)

DANGER

Safety and environmental notices xiii

Page 14: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Racks with a total weight of > 227 kg (500 lb.), Use Only Professional Movers!(R003)

DANGER

Do not transport the rack via fork truck unless it is properly packaged,secured on top of the supplied pallet. (R004)

DANGER

Main Protective Earth (Ground):

This symbol is marked on the frame of the rack.

The PROTECTIVE EARTHING CONDUCTORS should be terminated at thatpoint. A recognized or certified closed loop connector (ring terminal) shouldbe used and secured to the frame with a lock washer using a bolt or stud.The connector should be properly sized to be suitable for the bolt or stud, thelocking washer, the rating for the conducting wire used, and the consideredrating of the breaker. The intent is to ensure the frame is electrically bondedto the PROTECTIVE EARTHING CONDUCTORS. The hole that the bolt orstud goes into where the terminal conductor and the lock washer contactshould be free of any non-conductive material to allow for metal to metalcontact. All PROTECTIVE EARTHING CONDUCTORS should terminate at

this main protective earthing terminal or at points marked with . (R010)

Special caution and safety noticesThis information describes special safety notices that apply to the Storwize V5000.These notices are in addition to the standard safety notices supplied and addressspecific issues relevant to the equipment provided.

General safetyWhen you service the Storwize V5000, follow general safety guidelines.

Use the following general rules to ensure safety to yourself and others.v Observe good housekeeping in the area where the devices are kept during and

after maintenance.v Follow the guidelines when lifting any heavy object:

1. Ensure that you can stand safely without slipping.2. Distribute the weight of the object equally between your feet.3. Use a slow lifting force. Never move suddenly or twist when you attempt to

lift.4. Lift by standing or by pushing up with your leg muscles; this action removes

the strain from the muscles in your back. Do not attempt to lift any objects thatweigh more than 18 kg (40 lb) or objects that you think are too heavy for you.

v Do not perform any action that causes a hazard or makes the equipment unsafe.

xiv Storwize V5000: Quick Installation Guide

Page 15: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

v Before you start the device, ensure that other personnel are not in a hazardousposition.

v Place removed covers and other parts in a safe place, away from all personnel,while you are servicing the unit.

v Keep your tool case away from walk areas so that other people cannot trip overit.

v Do not wear loose clothing that can be trapped in the moving parts of a device.Ensure that your sleeves are fastened or rolled up above your elbows. If yourhair is long, fasten it.

v Insert the ends of your necktie or scarf inside clothing or fasten it with anonconducting clip, approximately 8 cm (3 in.) from the end.

v Do not wear jewelry, chains, metal-frame eyeglasses, or metal fasteners for yourclothing.

Remember: Metal objects are good electrical conductors.v Wear safety glasses when you are hammering, drilling, soldering, cutting wire,

attaching springs, using solvents, or working in any other conditions that mightbe hazardous to your eyes.

v After service, reinstall all safety shields, guards, labels, and ground wires.Replace any safety device that is worn or defective.

v Reinstall all covers correctly after you have finished servicing the unit.

Handling static-sensitive devicesEnsure that you understand how to handle devices that are sensitive to staticelectricity.

Attention: Static electricity can damage electronic devices and your system. Toavoid damage, keep static-sensitive devices in their static-protective bags until youare ready to install them.

To reduce the possibility of electrostatic discharge, observe the followingprecautions:v Limit your movement. Movement can cause static electricity to build up around

you.v Handle the device carefully, holding it by its edges or frame.v Do not touch solder joints, pins, or exposed printed circuitry.v Do not leave the device where others can handle and possibly damage the

device.v While the device is still in its antistatic bag, touch it to an unpainted metal part

of the system unit for at least two seconds. (This action removes static electricityfrom the package and from your body.)

v Remove the device from its package and install it directly into your StorwizeV5000, without putting it down. If it is necessary to put the device down, placeit onto its static-protective bag. (If your device is an adapter, place itcomponent-side up.) Do not place the device onto the cover of the StorwizeV5000 or onto a metal table.

v Take additional care when you handle devices during cold weather. Indoorhumidity tends to decrease in cold weather, causing an increase in staticelectricity.

Safety and environmental notices xv

Page 16: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Environmental noticesThe IBM Systems Environmental Notices contains all of the required environmentalnotices for IBM Systems products in English and other languages.

The IBM Systems Environmental Notices (http://ibm.co/1fBgWFI) includesstatements on limitations, product information, product recycling and disposal,battery information, flat panel display, refrigeration and water-cooling systems,external power supplies, and safety data sheets.

xvi Storwize V5000: Quick Installation Guide

Page 17: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

About this guide

This publication provides information that helps you install and initialize IBMStorwize V5000 systems.

Who should use this guideThis guide is intended for installers of Storwize V5000 systems.

Before configuring your system, ensure that you follow the procedures as listed. Besure to gather IP addresses that you will need before you begin the installation.

Storwize V5000 library and related publicationsProduct manuals, other publications, and websites contain information that relatesto Storwize V5000.

IBM Knowledge Center for Storwize V5000

The information collection in the IBM Knowledge Center contains all of theinformation that is required to install, configure, and manage the system. Theinformation collection in the IBM Knowledge Center is updated between productreleases to provide the most current documentation. The information collection isavailable at the following website:

http://www.ibm.com/support/knowledgecenter/STPVGU

Storwize V5000 library

Unless otherwise noted, the publications in the library are available in Adobeportable document format (PDF) from a website.

www.ibm.com/e-business/linkweb/publications/servlet/pbi.wss

Click Search for publications to find the online publications you are interested in,and then view or download the publication by clicking the appropriate item.

Table 1 lists websites where you can find help, services, and more information.

Table 1. IBM websites for help, services, and information

Website Address

Directory of worldwide contacts http://www.ibm.com/planetwide

Support for Storwize V5000 (2077 or 2078) www.ibm.com/storage/support/storwize/v5000

Support for IBM System Storage® and IBM TotalStorage products www.ibm.com/storage/support/

Each PDF publication in the Table 2 on page xviii library is also available in theIBM Knowledge Center by clicking the number in the “Order number” column:

© Copyright IBM Corp. 2013, 2015 xvii

Page 18: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Table 2. Storwize V5000 library

Title Description Order number

IBM Storwize V5000 Quick InstallationGuide

The guide provides instructions forunpacking your order and installingyour system. The first chapterdescribes verifying your order,becoming familiar with the hardwarecomponents, and meetingenvironmental requirements. Thesecond chapter describes installingthe hardware and attaching datacables and power cords. The lastchapter describes accessing themanagement GUI to initiallyconfigure your system.

IBM documentation and related websites

Table 3 lists websites that provide publications and other information about theStorwize V5000 or related products or technologies. The IBM Redbooks®

publications provide positioning and value guidance, installation andimplementation experiences, solution scenarios, and step-by-step procedures forvarious products.

Table 3. IBM documentation and related websites

Website Address

IBM Publications Center www.ibm.com/e-business/linkweb/publications/servlet/pbi.wss

IBM Redbooks publications www.redbooks.ibm.com/

Related accessibility information

To view a PDF file, you need Adobe Reader, which can be downloaded from theAdobe website:

www.adobe.com/support/downloads/main.html

How to order IBM publicationsThe IBM Publications Center is a worldwide central repository for IBM productpublications and marketing material.

The IBM Publications Center offers customized search functions to help you findthe publications that you need. Some publications are available for you to view ordownload at no charge. You can also order publications. The publications centerdisplays prices in your local currency. You can access the IBM Publications Centerthrough the following website:

www.ibm.com/e-business/linkweb/publications/servlet/pbi.wss

xviii Storwize V5000: Quick Installation Guide

Page 19: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Related websitesThe following websites provide information about Storwize V5000 or relatedproducts or technologies:

Type of information Website

Storwize V5000 support www.ibm.com/storage/support/storwize/v5000

Technical support for IBM storageproducts

www.ibm.com/storage/support/

IBM Electronic Support registration www-01.ibm.com/support/electronicsupport/

Sending your commentsYour feedback is important in helping to provide the most accurate and highestquality information.

To submit any comments about this book or any other Storwize V5000documentation, send your comments by email to [email protected]. Includethe following information in your email:v Publication titlev Publication form numberv Page, table, or illustration numbers that you are commenting onv A detailed description of any information that should be changed

How to get information, help, and technical assistanceIf you need help, service, technical assistance, or just want more information aboutIBM products, you will find a wide variety of sources available from IBM to assistyou.

Information

IBM maintains pages on the web where you can get information about IBMproducts and fee services, product implementation and usage assistance, break andfix service support, and the latest technical information. For more information,refer to Table 4.

Table 4. IBM websites for help, services, and information

Website Address

Directory of worldwide contacts http://www.ibm.com/planetwide

Support for Storwize V5000 (2077 or2078)

www.ibm.com/storage/support/storwize/v5000

Support for IBM System Storageand IBM TotalStorage products

www.ibm.com/storage/support/

Note: Available services, telephone numbers, and web links are subject to changewithout notice.

About this guide xix

Page 20: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Help and service

Before calling for support, be sure to have your IBM Customer Number available.If you are in the US or Canada, you can call 1 (800) IBM SERV for help andservice. From other parts of the world, see http://www.ibm.com/planetwide forthe number that you can call.

When calling from the US or Canada, choose the storage option. The agent decideswhere to route your call, to either storage software or storage hardware, dependingon the nature of your problem.

If you call from somewhere other than the US or Canada, you must choose thesoftware orhardware option when calling for assistance. Choose the softwareoption if you are uncertain if the problem involves the Storwize V5000 software orhardware. Choose the hardware option only if you are certain the problem solelyinvolves the Storwize V5000 hardware.When calling IBM for service regarding theproduct, follow these guidelines for the software and hardware options:

Software optionIdentify the Storwize V5000 product as your product and supply yourcustomer number as proof of purchase. The customer number is a 7-digitnumber (0000000 - 9999999) assigned by IBM when the product ispurchased. Your customer number should be on the customer informationworksheet or on the invoice from your storage purchase. If asked for anoperating system, use Storage.

Hardware optionProvide the serial number and appropriate 4-digit machine type. ForStorwize V5000, the machine type is 2077 or 2078.

In the US and Canada, hardware service and support can be extended to 24x7 onthe same day. The base warranty is 9x5 on the next business day.

Getting help online

You can find information about products, solutions, partners, and support on theIBM website.

To find up-to-date information about products, services, and partners, visit the IBMwebsite at www.ibm.com/storage/support/storwize/v5000.

Before you call

Make sure that you have taken steps to try to solve the problem yourself beforeyou call.

Some suggestions for resolving the problem before calling IBM Support include:v Check all cables to make sure that they are connected.v Check all power switches to make sure that the system and optional devices are

turned on.v Use the troubleshooting information in your system documentation. The

troubleshooting section of the knowledge center contains procedures to help youdiagnose problems.

v Go to the IBM Support website at www.ibm.com/storage/support/storwize/v5000 to check for technical information, hints, tips, and new device drivers orto submit a request for information.

xx Storwize V5000: Quick Installation Guide

Page 21: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Using the documentation

Information about your IBM storage system is available in the documentation thatcomes with the product.

That documentation includes printed documents, online documents, readme files,and help files in addition to the knowledge center. See the troubleshootinginformation for diagnostic instructions. The troubleshooting procedure mightrequire you to download updated device drivers or software. IBM maintains pageson the web where you can get the latest technical information and downloaddevice drivers and updates. To access these pages, go to www.ibm.com/storage/support/storwize/v5000 and follow the instructions. Also, some documents areavailable through the IBM Publications Center.

Sign up for the Support Line Offering

If you have questions about how to use and configure the machine, sign up for theIBM Support Line offering to get a professional answer.

The maintenance that is supplied with the system provides support when there isa problem with a hardware component or a fault in the system machine code. Attimes, you might need expert advice about using a function that is provided by thesystem or about how to configure the system. Purchasing the IBM Support Lineoffering gives you access to this professional advice while deploying your system,and in the future.

Contact your local IBM sales representative or your support group for availabilityand purchase information.

About this guide xxi

Page 22: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

xxii Storwize V5000: Quick Installation Guide

Page 23: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Chapter 1. Before you begin the installation

Before you can begin installing your system, you must unpack and verify yourorder and make other preparations.

The Quick Installation Guide contains a set of instructions to help you unpack andinstall your system. The guide is divided into three chapters.1. The steps in Chapter 1, “Before you begin the installation” (the chapter you are

now reading) involve verifying your order, becoming familiar with thehardware component terminology, and ensuring that you have met theenvironmental requirements.

2. The steps in Chapter 2, “Installing the hardware,” on page 13 involve installingthe hardware and attaching the data cables and power cords.

3. Chapter 3, “Configuring the system,” on page 29 helps you create yourconfiguration file and access the management GUI. The management GUIguides you through the initial configuration process.

Important information:v This guide presumes that you have read the planning information regarding

your physical environment that is available from the IBM Knowledge Center forStorwize V5000.

v Ensure that any cables that you are supplying are available for installation.

Installation scenarios

Depending on your order, this documentation steps you through setting up yoursystem for the following scenarios:v Setting up a new system that consists of a control enclosure only. In this case,

you are not installing any expansion enclosures.v Setting up a new system that consists of a control enclosure and one or more

expansion enclosures.

v Adding an expansion enclosure to an existing system. In this case, you initiallyinstalled a control enclosure (and, optionally, one or more expansion enclosures).You want to add an expansion enclosure to your existing system. You do notneed to power off the system. You can add an expansion enclosure while thesystem is operational.

v Adding a control enclosure (either by itself or with one or more expansionenclosures) to an existing system. You do not need to power off the system. Youcan add a control enclosure while the system is operational.

v Setting up a new system that consists of more than one control enclosure.Install the first control enclosure and then the required expansion enclosures. Foreach additional control enclosure, complete the setup as if you were adding it toan existing system.

Table 5 on page 2 lists the steps for each scenario.

© Copyright IBM Corp. 2013, 2015 1

Page 24: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Table 5. Steps for different installation scenarios

New system (controlenclosure only)

New system (controlenclosure and one ormore expansionenclosures)

Adding expansionenclosures to anexisting system

Adding controlenclosures andexpansion enclosuresto an existing system

“Reviewing yourpacking slip” onpage 5

“Reviewing yourpacking slip” onpage 5

“Reviewing yourpacking slip” onpage 5

“Reviewing yourpacking slip” onpage 5

“Identify thehardwarecomponents” on page6

“Identify thehardwarecomponents” on page6

“Identify thehardwarecomponents” on page6

“Identify thehardwarecomponents” on page6

“Verifyenvironmentalrequirements” onpage 11

“Verifyenvironmentalrequirements” onpage 11

“Verifyenvironmentalrequirements” onpage 11

“Verifyenvironmentalrequirements” onpage 11

“Review enclosurelocation guidelines”on page 11

“Review enclosurelocation guidelines”on page 11

“Review enclosurelocation guidelines”on page 11

“Review enclosurelocation guidelines”on page 11

“Installing thesupport rails” onpage 13

“Installing thesupport rails” onpage 13

“Installing thesupport rails” onpage 131

“Installing thesupport rails” onpage 132

“Installing theenclosures” on page17

“Installing theenclosures” on page17

“Installing theenclosures” on page171

“Installing theenclosures” on page172

“Connecting Ethernetcables to nodecanisters” on page 22

“Connecting SAScables to expansionenclosures” on page18

“Connecting SAScables to expansionenclosures” on page181

“Connecting SAScables to expansionenclosures” on page181

“Connecting FibreChannel cables toa Fibre Channelhost interfaceadapter” on page24

“Connecting Ethernetcables to nodecanisters” on page 22

“Powering on thesystem” on page 271

“Connecting Ethernetcables to nodecanisters” on page222

“Powering on thesystem” on page 27

“Connecting Ethernetcables to nodecanisters” on page 22

“Adding anexpansion enclosureto an existingsystem” on page 38

Optional:“Connecting FibreChannel cables to aFibre Channel hostinterface adapter” onpage 24

Chapter 3,“Configuring thesystem,” on page 29

“Powering on thesystem” on page 27

“Powering on thesystem” on page 27

Chapter 3,“Configuring thesystem,” on page 29

“Adding a controlenclosure to anexisting system” onpage 38

1Complete these steps for each expansion enclosure that you add.2Complete these steps for each control enclosure and expansion enclosure that you add.

2 Storwize V5000: Quick Installation Guide

Page 25: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Be familiar with the following informationv See “Caution notices for the Storwize V5000” on page x and “Danger notices for

Storwize V5000” on page xii for a summary of the situations that can bepotentially hazardous to you. Before installing, read and understand thefollowing caution and danger statements.

v Use safe practices when lifting. The fully populated enclosure weighs about 26kg (57 lbs). At least two people are required to lift and install the enclosure intothe rack or to remove an enclosure from the rack.CAUTION:Use safe practices when lifting.

svc00146

18-32 kg (39.7-70.5 lbs) 32-55 kg (70.5-121.2 lbs) 55 kg ( 121.2 lbs)

(27)

Also keep in mind that a rack full of equipment is extremely heavy.

DANGER: Heavy equipment–personal injury or equipment damage mightresult if mishandled. (D006)

v The following general precautions should be observed, even though thepower-on steps differ slightly from the directions that you will follow for thisproduct:

Chapter 1. Before you begin the installation 3

Page 26: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

DANGER

When working on or around the system, observe the following precautions:

Electrical voltage and current from power, telephone, and communicationcables are hazardous. To avoid a shock hazard:

– If IBM supplied a power cord(s), connect power to this unit only withthe IBM provided power cord. Do not use the IBM provided power cordfor any other product.

– Do not open or service any power supply assembly.

– Do not connect or disconnect any cables or perform installation,maintenance, or reconfiguration of this product during an electricalstorm.

– The product might be equipped with multiple power cords. To removeall hazardous voltages, disconnect all power cords.

– Connect all power cords to a properly wired and grounded electricaloutlet. Ensure that the outlet supplies proper voltage and phase rotationaccording to the system rating plate.

– Connect any equipment that will be attached to this product to properlywired outlets.

– When possible, use one hand only to connect or disconnect signal cables.

– Never turn on any equipment when there is evidence of fire, water, orstructural damage.

– Disconnect the attached power cords, telecommunications systems,networks, and modems before you open the device covers, unlessinstructed otherwise in the installation and configuration procedures.

– Connect and disconnect cables as described in the following procedureswhen installing, moving, or opening covers on this product or attacheddevices.

To disconnect:

1. Turn off everything (unless instructed otherwise).

2. Remove the power cords from the outlets.

3. Remove the signal cables from the connectors.

4. Remove all cables from the devices.

To connect:

1. Turn off everything (unless instructed otherwise).

2. Attach all cables to the devices.

3. Attach the signal cables to the connectors.

4. Attach the power cords to the outlets.

5. Turn on the devices.

– Sharp edges, corners and joints might be present in and around thesystem. Use care when handling equipment to avoid cuts, scrapes andpinching. (D005)

Tools needed

A flat-blade screwdriver with a 7 mm (1/4 inch) head is the only tool needed forinstallation.

4 Storwize V5000: Quick Installation Guide

Page 27: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Reviewing your packing slipAfter you open your shipment, you must verify the contents against the packingslip.

In each box, locate the packing slip. Verify that the items listed in the packing slipmatch what is in the box, and that any optional items that you ordered areincluded in the list. Your shipment might contain extra items, depending on theorder.

Note: If you purchased your equipment through a reseller, some of the optionsmight be preinstalled. Contact your supplier for details.

Use the following checklist to check off the items in your order as you verify thatthey are included in your shipment.__ v Control enclosure or expansion enclosure (Table 6):

Table 6. Storwize V5000 enclosures.

Machine type /model Warranty Description

2077-12C 1 year IBM Storwize V5000 12-slot Control Enclosure for 3.5-inchdrives

2077-12E 1 year IBM Storwize V5000 12-slot Expansion Enclosure for 3.5-inchdrives

2077-24C 1 year IBM Storwize V5000 24-slot Control Enclosure for 2.5-inchdrives

2077-24E 1 year IBM Storwize V5000 24-slot Expansion Enclosure for 2.5-inchdrives

2078-12C 3 years IBM Storwize V5000 12-slot Control Enclosure for 3.5-inchdrives

2078-12E 3 years IBM Storwize V5000 12-slot Expansion Enclosure for 3.5-inchdrives

2078-24C 3 years IBM Storwize V5000 24-slot Control Enclosure for 2.5-inchdrives

2078-24E 3 years IBM Storwize V5000 24-slot Expansion Enclosure for 2.5-inchdrives

__ v Rack-mounting hardware kit:__ – Two rails (right and left assembly)__ – Two rail springs__ – Two sets of rail-mount screws and alternative rail-mount pins (large and

small) for non-IBM racks__ v Two power cords for connection to rack-mounted power distribution units__ v Drive bay blanking plates (installed in the enclosure)__ v Publications package (includes a USB flash drive that is used to initialize the

system)

Options applicable to control enclosures

Note: All options other than cables are preinstalled.__ v Fibre Channel cables__ v SAS cables

Chapter 1. Before you begin the installation 5

Page 28: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

__ v Drives__ v Power cords for connection to wall sockets

Options applicable to expansion enclosures

Note: All options other than cables are preinstalled.__ v Expansion enclosure attachment cables__ v Drives__ v Power cords for connection to wall sockets

Identify the hardware componentsThe following graphics identify the hardware components and port locations forthe control enclosure and expansion enclosure on Storwize V5000 systems.

Control enclosure components

Figure 1 shows the rear view of a control enclosure and identifies the location ofthe power supply units and node canisters.

Data ports

1 2

6

1 2

1 2

OK

IN

1 2

3 4

6

1 2

1 2

OK

IN

3 4

v5000009

1

2

Figure 1. Rear view of a Storwize V5000 control enclosure

6 Storwize V5000: Quick Installation Guide

Page 29: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Figure 2 shows the rear view of a Storwize V5000 control enclosure and identifiesthe location of the ports.

v ▌1▐ USB ports. Each canister has two USB ports. One port is used duringinstallation.

v ▌2▐ Ethernet ports. Each canister has two 1 Gbps Ethernet ports.

Port 1 Must be connected for system management. Can optionally be used foriSCSI host connectivity.

Port 2 Optional. Can be used for iSCSI host connectivity or to provide analternative (redundant) management address.

v ▌3▐ Serial-attached SCSI (SAS) ports. Each canister has four SAS ports. Ports 3and 4 are optionally used for connecting to expansion enclosures. The otherports are not used.

Control enclosure support rails

The left and right control enclosure support rails (Figure 3 on page 8) are designedspecifically for installation of a control enclosure.v The ledge on the inside of the rails supports the entire length of a control

enclosure.v At the rear end of the control enclosure support rail, the top edge curves over to

capture the top edge of an inserted control enclosure. This prevents the installedcontrol enclosure bouncing when the rack is subjected to quake or vibration.

v The control enclosure support rails adjust to fit racks from 685 mm to 765 mmdeep, measured between the front and rear rack rails.

1 2

6

1 2

1 2

OK

IN

1 2

3 4

6

1 2

1 2

OK

IN

3 4

v5000011

2

1

3

Figure 2. Data ports in the rear of the Storwize V5000 control enclosure

Chapter 1. Before you begin the installation 7

Page 30: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Expansion enclosure components

Figure 4 shows the location of the power supply units and expansion canisters.v ▌1▐ Expansion canistersv ▌2▐ Power supply units

Figure 5 on page 9 shows the LEDs and SAS port locations from the rear view ofan expansion canister.v ▌1▐ LEDsv ▌2▐ SAS ports

fab10051

Figure 3. Control enclosure support rails of a Storwize V5000 system

v3500058

2

1

1

2

OK

IN

1

2

OK

IN

Figure 4. Rear view of a Storwize V5000 expansion enclosure

8 Storwize V5000: Quick Installation Guide

Page 31: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Each canister has two SAS ports that are numbered 1 on the left and 2 on the right.Port 1 is always used. Port 2 is used only if this is not the last enclosure in thechain.

Expansion enclosure support rails

The left and right expansion enclosure support rails (Figure 6) are designedspecifically for installation of an expansion enclosure.v The ledge on the inside of each rail supports the entire length of an expansion

enclosure.v The expansion enclosure support rails capture the left and right rear edges of an

inserted expansion enclosure. This prevents the installed control enclosurebouncing when the rack is subjected to quake or vibration.

v The expansion enclosure support rails adjust to fit racks from 595 mm to 755mm deep, measured between the front and rear rack rails.

1

2

2

1

v3500080

Figure 5. SAS ports and LEDs in rear view of a Storwize V5000 expansion canister

fab10053

Figure 6. Expansion enclosure support rails on Storwize V5000

Chapter 1. Before you begin the installation 9

Page 32: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Miscellaneous hardware

The USB flash drive (Figure 7) is packaged with the publications and contains theinitialization tool for completing the initial system configuration.

svc00646

Figure 7. USB flash drive

10 Storwize V5000: Quick Installation Guide

Page 33: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Verify environmental requirementsThe environmental and electrical requirements for the physical site must be met toensure that your system works reliably.

Before installing a Storwize V5000 system, you must verify that adequate space ina suitable rack is available. You must also ensure that the requirements for powerand environmental conditions are met.

This guide assumes that you have completed the physical planning for theenvironment of your system. If you have not done the environmental planning foryour system, see the “Storwize V5000 physical installation planning” topic in theIBM Knowledge Center for Storwize V5000.

Review enclosure location guidelinesBefore you install the enclosures, you must be familiar with these enclosurelocation guidelines.

Installing a control enclosure only

If you are installing a control enclosure only, follow these guidelines.v Position the enclosure in the rack so that you can easily view it and access it for

servicing.v Locate the enclosure low enough for the rack to remain stable.v Ensure that you provide a way for two or more people to install and remove the

enclosure.

Installing a control enclosure and one or more expansionenclosures

If you are installing a control enclosure plus one or more expansion enclosures,follow these guidelines.v Each Storwize V5000 enclosure to be installed requires 2U of rack space.v Each assembled enclosure weighs more than 18 kg. Provide sufficient space at

the front of the rack for two persons to carry the enclosure safely.v Install all enclosures that constitute one system in contiguous positions in a rack.

Place the control enclosure in the middle of the rack.v Each control enclosure supports connection to up to nine expansion enclosures

(four above the control enclosure and five below the control enclosure). If thissystem installation has fewer than nine expansion enclosures, reserve spacedirectly above and below the system to allow future expansion.

v If a rack is to be only partially filled, install the enclosures low enough for therack to remain stable and enable easy access to the enclosures for servicing.

Adding an expansion enclosure chain to an existing system

If you are adding an expansion enclosure chain to an existing system, follow theseguidelines.v You do not need to power off the system. You can add an expansion enclosure

while the system is operational.v Add the first expansion enclosure directly below the control enclosure.v Add the second expansion enclosure directly above the control enclosure.

Chapter 1. Before you begin the installation 11

Page 34: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

v Add the third expansion enclosure directly below the first.v Add the fourth expansion directly above the second, and so on.

12 Storwize V5000: Quick Installation Guide

Page 35: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Chapter 2. Installing the hardware

After verification that you have all of the hardware components that you require,you can install them.

You completed the initial steps of verifying the shipping contents and becomingfamiliar with the hardware components. You verified that the power andenvironmental requirements are met and planned the location of the enclosures.You are now ready to begin installing the hardware components and connectingthe data cables and power cords.

Installing the support railsBefore installing an enclosure, you must first install support rails.

Procedure

To install the support rails, complete the following steps.1. Locate the rack mounting rails and screws (Figure 8). The rail assembly

consists of two rails that must be installed in the rack cabinet.

2. Remove the springs that are taped to one of the rails.3. Attach a spring to the outside of each rail.

a. Attach the circle end of the spring around the stud on the rail. (SeeFigure 9 on page 14.)

b. Pulling on the spring, attach the hook end of the spring to the tab on therail.

v3500168

Figure 8. Rack mounting rails and screws

© Copyright IBM Corp. 2013, 2015 13

Page 36: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

4. Working at the front of the rack cabinet, identify the two standard rack units(2U) of space in the rack into which you want to install the support rails.Figure 10 shows two rack units with the front mounting holes identified.

v ▌1▐ Upper rail mounting bracket pinv ▌2▐ Lower rail mounting bracket pin

v3500067

Figure 9. Installing the rail spring

1

2

3

v3500162

Figure 10. Hole locations in the front of the rack

14 Storwize V5000: Quick Installation Guide

Page 37: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

v ▌3▐ Rack mounting screw hole5. Ensure that the appropriate bracket pins are installed in the front and rear

bracket of each rail. Each rail comes with four medium pins preinstalled (twoin the front bracket and two in the rear bracket). Large and small pins areprovided separately. Use the pins that are appropriate for the mounting holesin your rack (see Table 7).

Table 7. Selecting bracket pins for your rack

Mounting holes Bracket pins

Round,unthreaded

Use the preinstalled medium pins.

Round, threaded Unscrew the medium pins and replace with the smaller pins suppliedwith the rails.

Square Unscrew the medium pins and replace with the large pins supplied withthe rails.

6. At each end of the rail, grasp the tab ▌1▐ and pull firmly to open the hingebracket (see Figure 11).

v3500116

1

Figure 11. Opening the hinge brackets

Chapter 2. Installing the hardware 15

Page 38: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

7. Align the holes in the rail bracket with the holes on the front and rear rackcabinet flanges. Ensure that the rails are aligned on the inside of the rackcabinet.

8. On the rear of the rail, press the two bracket pins into the holes in the rackflanges.

9. Close the rear hinge bracket to secure the rail to the rack cabinet flange. (SeeFigure 12.)

10. On the front of the rail, press the two bracket pins into the holes in the rackflanges.

11. Close the front hinge bracket to secure the rail to the rack cabinet flange. (SeeFigure 12.)

12. Secure the rear of the rail to the rear rack flange with an M5 screw. (SeeFigure 12.)

13. Repeat the steps to secure the opposite rail to the rack cabinet.14. Repeat the procedure to install rails for each additional enclosure.

v3500039

Figure 12. Closing hinge brackets and installing rear screw

16 Storwize V5000: Quick Installation Guide

Page 39: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Installing the enclosuresFollowing your enclosure location plan, install the control enclosure (andoptionally, one or more expansion enclosures).

About this task

CAUTION:

v To lift and install the enclosure into the rack requires at least two people.

v Load the rack from the bottom up to ensure rack stability. Empty the rackfrom the top down.

Procedure

To install an enclosure, complete the following steps.1. On either side of the drive assemblies, remove the enclosure end caps by

grasping the handle and pulling the bottom of the end cap free, then clearingthe tab on the top of the enclosure.

2. Align the enclosure with the front of the rack cabinet.3. Slide the enclosure into the rack along the rails until the enclosure is fully

inserted (see Figure 13).

Note: The rails are not designed to hold an enclosure that is partially inserted.The enclosure must always be in a fully inserted position.

4. Secure the enclosure with a screw in the rack mounting screw hole.

v3500047

Figure 13. Inserting the enclosure

Chapter 2. Installing the hardware 17

Page 40: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

5. Reinstall the left and right end caps. (See Figure 13 on page 17.) The left endcap has indicator windows that align with the status LEDs (light-emittingdiodes) on the edge of the enclosure.a. Ensure that the serial number of the end cap matches the serial number on

the rear of the enclosure.b. Fit the slot on the top of the end cap over the tab on the chassis flange.c. Rotate the end cap down until it snaps into place.d. Ensure that the inside surface of the end cap is flush with the chassis.

Connecting SAS cables to expansion enclosuresIf you have installed expansion enclosures, you must connect them to a controlenclosure.

About this task

This task applies if you are installing one or more expansion enclosures. Eachcontrol enclosure in the system can manage up to 19 expansion enclosures. Asystem that contains two control enclosures can have up to 38 expansionenclosures.

Note: When connecting SAS cables between enclosures, you must follow a list ofguidelines to ensure that your configuration is valid. Do not begin connecting thecables until you have read “SAS cabling guidelines” on page 19.

Procedure

To install the cables, complete the following steps.1. Using the supplied SAS cables, connect the control enclosure to the expansion

enclosure at rack position 1, as shown in Figure 14 on page 19.a. Connect SAS port 4 of the left node canister in the control enclosure to SAS

port 1 of the left expansion canister in the first expansion enclosure.b. Connect SAS port 4 of the right node canister in the control enclosure to

SAS port 1 of the right expansion canister in the first expansion enclosure.

18 Storwize V5000: Quick Installation Guide

Page 41: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

2. To add a second expansion chain to the control enclosure, use the supplied SAScables to connect the control enclosure to the expansion enclosure at rackposition 2, as shown in Figure 14 .a. Connect SAS port 3 of the left node canister in the control enclosure to SAS

port 1 of the left expansion canister in the second expansion enclosure.b. Connect SAS port 3 of the right node canister in the control enclosure to

SAS port 1 of the right expansion canister in the second expansionenclosure.

3. If more expansion enclosures are installed, connect each one to the previousexpansion enclosure in a chain; use two Mini SAS HD to Mini SAS HD cables,as shown in Figure 14 .

Note: A control enclosure can support up to 19 expansion enclosures (10 abovethe control enclosure and 9 below the control enclosure).

4. If two control enclosures are installed, repeat this cabling procedure on thesecond control enclosure and its expansion enclosures.

SAS cabling guidelinesWhen connecting SAS cables between enclosures, you must follow a list ofguidelines to ensure that your configuration is valid.

Orienting the connector

When inserting SAS cables, make sure the connector (Figure 15 on page 20) isoriented correctly.v The orientation of the connector must match the orientation of the port before

you push the connector into the port. The cable connector and socket are keyed,and it is important that you have proper alignment of the keys when the cable isinserted.

v The blue pull tab must be below the connector.v Insert the connector gently until it clicks into place. If you feel resistance, the

connector is probably oriented the wrong way. Do not force it.v When inserted correctly, the connector can only be removed by pulling the tab.

v5000007

1

3

4

2

Figure 14. Connecting the SAS cables

Chapter 2. Installing the hardware 19

Page 42: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

v When both ends of a SAS cable are inserted correctly, the green link LEDs nextto the connected SAS ports are lit.

Guidelines

Be aware of the following guidelines when you attach the cables to the SAS ports.v No more than ten expansion enclosures can be chained to port 3 of a node

canister. The expansion enclosures in this chain should be installed below thecontrol enclosure (as shown in Figure 16 on page 21).

v No more than nine expansion enclosures can be chained to port 4 of a nodecanister. The expansion enclosures in this chain should be installed above thecontrol enclosure (as shown in Figure 16 on page 21).

v No cable can be connected between a port on a left canister and a port on aright canister.

v A cable must not be connected between ports in the same enclosure.v Port 3 and port 4 of a control enclosure must not be cabled to the same

expansion enclosure.v Port 3 or port 4 of a control enclosure must not be cabled to another control

enclosure.v A connected port on the node canister must connect to a single port on an

expansion canister. Cables that split the connector out into separate physicalconnections are not supported.

v Attach cables serially between enclosures. Do not skip an enclosure.v Each expansion enclosure is connected into the system by two SAS cables. Three

different lengths of SAS cable are available for this purpose. Lengths longer than0.6 m are typically required to connect enclosures that are not adjacent.– 0.6 m (feature code ACTA)– 1.5 m (feature code ACTB)– 3.0 m (feature code ACTC)

v The last enclosure in a chain must not have cables in port 2 of canister 1 andport 2 of canister 2.

v Ensure that cables are installed in an orderly way to reduce the risk of cabledamage when replaceable units are removed or inserted.

v Arrange your cables to provide access to:

v3500179

Figure 15. SAS cable connectors

20 Storwize V5000: Quick Installation Guide

Page 43: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

– USB ports. USB port access is required when you use a USB flash drive toconfigure the system.

– The enclosures themselves. Access is required to the hardware for servicingand for two or more people to safely remove and replace components.

v5000007

1

3

4

2

Figure 16. Connecting the SAS cables

Chapter 2. Installing the hardware 21

Page 44: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Connecting Ethernet cables to node canistersTo provide system management connectivity for your Storwize V5000 system, youmust connect Ethernet cables to Ethernet port 1 of each node canister in the controlenclosure. This connection can optionally also be used for iSCSI host connection.Ethernet port 2 can optionally be connected to provide a second systemmanagement address, a second iSCSI host connection, or both.

Procedure

To install the Ethernet cables, complete the following steps.1. Connect Ethernet port 1 of each node canister in the system to the IP network

that will provide connection to the system management interfaces, as shown inFigure 17. This port can also be used for iSCSI connectivity to the system byhosts on the network. Where more than one control enclosure is present in thesystem, ensure port 1 of every node canister is connected to the same networkto provide access if the configuration node fails.

2. Optionally, connect Ethernet port 2 of each node canister in the system to asecond IP network that will provide redundant connection to the systemmanagement interfaces, as shown by the lighter cable connection in Figure 17.This port can also be used for iSCSI connectivity to the system by hosts on thenetwork. If there is more than one control enclosure in the system, ensure thatport 2 of every node canister is connected to the same network to provideaccess if the configuration node fails.

3. If a control enclosure is already installed, complete the following steps.a. Ensure that the port 1 Ethernet cables on all node canisters in the system

are connected to the same Ethernet switch.b. Ensure that the port 2 Ethernet cables on all node canisters in the system

are connected to the same Ethernet switch.

Connecting Fibre Channel cables to a 10 Gbps iSCSI-FCoE 2-port hostinterface adapter

If your Storwize V5000 system has 10 Gbps iSCSI-FCoE 2-port host interfaceadapters installed, you can use Fibre Channel cables to connect them to your 10Gbps Ethernet or FCoE SAN.

About this task

The Ethernet port numbering on the host interface adapter starts at 3, becauseEthernet ports one and two are built into the canister.

1 2

6

1 2

1 2

OK

IN

1 2

3 4

6

1 2

1 2

OK

IN

3 4

v5

00

00

15

Figure 17. Connecting the Ethernet cables

22 Storwize V5000: Quick Installation Guide

Page 45: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Note: The fibre cables are connected in pairs. Both canisters must have the samenumber of cables connected.

Procedure

To install the cables, complete the following steps.1. Identify the correct pair of fibre cables for the Ethernet ports that are labeled 3

in the left canister and the right canister.2. Connect the appropriate cable to each port.3. For each additional pair of Ethernet ports in the right and left canisters,

identify the correct pair of cables and connect them.

Results

Figure 18 shows an example configuration. The figure shows a pair of cables thatare connected to port 3 in each canister. Another pair of cables is connected to port4 in each canister.

1 2 3 4

6

1 2

1 2

OK

IN

1 2 3 4

6

1 2

1 2

OK

IN

v3

50

01

02

1 2

LNK

TxRx1 2

LNK

TxRx

Figure 18. Example configuration with two pairs of cables connected to 10 Gbps iSCSI-FCoE2-port host interface adapters

Chapter 2. Installing the hardware 23

Page 46: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Connecting Fibre Channel cables to a Fibre Channel host interfaceadapter

If your Storwize V5000 system has 8 Gbps Fibre Channel 4-port host interfaceadapters installed, you can use Fibre Channel cables to connect them to your FibreChannel SAN.

Procedure

To install the cables, complete the following steps.1. Connect the required number of Fibre Channel cables. Refer to the “Planning”

section of the IBM Knowledge Center for instructions on determining thenumber of cables required.

Note: Both canisters must have the same number of cables connected.Figure 19 shows an example configuration with two Fibre Channel cablesconnected to each canister.

2. If you want to connect additional Fibre Channel cables, make sure to connectthe same number of cables to each canister. Figure 20 shows an exampleconfiguration with four Fibre Channel cables connected to each canister.

3. If a control enclosure is already installed, you can optionally add Fibre Channelconnections between all the control enclosures.v This involves both the physical installation of the cables and configuring the

correct zoning on the Fibre Channel switches.v Configure the network so that every node canister has at least two

connections to every node canister in a different control enclosure.v You must configure the network before you attempt to add a control

enclosure to an existing system.

1 2

6

1 2

1 2

OK

IN

1 2

3 4

6

1 2

1 2

OK

IN

3 4

v5000016

Figure 19. Example configuration with two Fibre Channel cables per canister

1 2

6

1 2

1 2

OK

IN

1 2

3 4

6

1 2

1 2

OK

IN

3 4

v5000017

Figure 20. Example configuration with four Fibre Channel cables per canister

24 Storwize V5000: Quick Installation Guide

Page 47: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Connecting a control enclosure to a hostWhen installing a control enclosure, you can connect it to a host with SAS cables.You can use onboard host SAS ports on some models or an optional SAS hostinterface adapter. Note that onboard SAS host ports are not available on all systemmodels.

About this task

Two types of SAS cables are used for host attachment, depending on therequirements of the host.v Mini SAS HD to Mini SAS HD (Figure 21)

v Mini SAS HD to Mini SAS (Figure 22)

Note: When inserting SAS cables, make sure that the connector is orientedcorrectly.v When connecting to the SAS ports on the left side of the node canister, the blue

pull tab must be below the connector.v Insert the connector gently until it clicks into place. If you feel resistance, the

connector is probably oriented the wrong way. Do not force it.v When inserted correctly, the connector can only be removed by pulling the tab.

v3500179

Figure 21. Mini SAS HD to Mini SAS HD cable

ite00052

Figure 22. Mini SAS HD to Mini SAS cable

Chapter 2. Installing the hardware 25

Page 48: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Procedure

To install the cables, complete the following steps.1. Connect the required number of SAS cables. Refer to the “Planning” section of

the IBM Knowledge Center for instructions on determining the number ofcables required.

Note: When connecting to the SAS ports on the left side of the node canister,each host must be connected to both canisters. Both canisters must have thesame number of cables connected.

2. Arrange the cables to provide access to the hardware.v USB ports. USB port access is required when you use a USB flash drive to

configure the system.v The enclosures themselves. Access is required to the hardware for servicing

and for safely removing and replacing components using two or morepeople.

Results

Figure 23 shows an example configuration with two SAS cables that are connectedto each canister.

1 2

6

1 2

1 2

OK

IN

1 2

3 4

6

1 2

1 2

OK

IN

3 4

v5000014

Figure 23. Example configuration with two SAS cables per canister

26 Storwize V5000: Quick Installation Guide

Page 49: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Powering on the systemAfter you install all hardware components, you must power on the system andcheck its status.

About this task

Attention: Do not power on the system with any open bays or slots.v Every unused drive bay must be occupied by a filler panel.v Filler panels must be installed in all empty host interface adapter slots.

Open bays or slots disrupt the internal air flow, causing the drives to receiveinsufficient cooling.

Procedure

To power on the system, complete the following steps.1. Power on all expansion enclosures. Use the supplied power cords to connect

both power supply units of the enclosure to their power sources. If the powersources have circuit breakers or switches, ensure that they are turned on. Theenclosure does not have power switches. Repeat this step for each expansionenclosure in the system.

Note: Each enclosure has two power supply units. To provide power failureredundancy, connect the two power cords to separate power circuits.

2. From the rear of the expansion enclosure, check the LEDs on each expansioncanister (see Figure 24).

▌1▐ Power▌2▐ Status▌3▐ Fault

The canister is ready with no critical errors when Power is illuminated, Statusis on, and Fault is off. If a canister is not ready, refer to the “Procedure:Understanding the system status using the LEDs” topic in “Troubleshooting”.

3. Wait for all expansion canisters to finish powering on.4. Power on the control enclosure. Use the supplied power cords to connect both

power supply units of the enclosure to their power sources. If the powersources have circuit breakers or switches, ensure that they are turned on. Theenclosure does not have power switches.

Note: Each enclosure has two power supply units. To provide power failureredundancy, connect the two power cords to separate power circuits.

v3500064

2 31

Figure 24. Expansion canister LEDs

Chapter 2. Installing the hardware 27

Page 50: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

5. From the rear of the control enclosure, check the LEDs on each node canister(see Figure 25).

▌1▐ Power▌2▐ Status▌3▐ Fault

The canister is ready with no critical errors when Power is illuminated, Statusis flashing, and Fault is off. If a canister is not ready, refer to the “Procedure:Understanding the system status using the LEDs” topic in “Troubleshooting”.

v3500064

2 31

Figure 25. Node canister LEDs

28 Storwize V5000: Quick Installation Guide

Page 51: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Chapter 3. Configuring the system

Configuring your system is necessary in two situations: when you power up a newsystem for the first time, and when you add an expansion enclosure to an existingsystem.

The following instructions use the supplied USB flash drive to initialize the system.If you are not authorized to use a USB flash drive in your situation, refer to the“Troubleshooting” section of the IBM Knowledge Center. This topic describes howto make an Ethernet connection to the enclosure and to initialize the system byusing the service assistant GUI.

After initializing the system, you will use the Storwize management GUI tocomplete the configuration procedures.v The management GUI requires a supported web browser (see “Checking your

web browser settings for the management GUI”).v To configure a new system, you will log on to the management GUI with the

default user name and password (see “User name and password for systeminitialization”).

The steps for initializing a new system vary, depending on the operating system ofthe computer you use for the procedure.v For Microsoft Windows, refer to “Initializing the system with a Microsoft

Windows computer” on page 33.v For Apple MacOS, refer to “Initializing the system with an Apple Macintosh

computer” on page 35.v For Linux, refer to “Initializing the system with a Linux computer” on page 37.

The steps for adding an expansion enclosure to an existing system are described in“Adding an expansion enclosure to an existing system” on page 38.

The steps for adding a control enclosure to an existing system are described in“Adding a control enclosure to an existing system” on page 38.

Checking your web browser settings for the management GUITo access the management GUI, you must ensure that your web browser issupported and has the appropriate settings enabled.

Before you begin

The GUI supports the following web browsers:v Mozilla Firefox 45v Mozilla Firefox Extended Support Release (ESR) 38v Microsoft Internet Explorer (IE) 11 and Microsoft Edgev Google Chrome 49

IBM supports higher versions of the browsers if the vendors do not remove ordisable function that the product relies upon. For browser levels higher than theversions that are certified with the product, customer support accepts usage-related

© Copyright IBM Corp. 2013, 2015 29

Page 52: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

and defect-related service requests. If the support center cannot re-create the issue,support might request the client to re-create the problem on a certified browserversion. Defects are not accepted for cosmetic differences between browsers orbrowser versions that do not affect the functional behavior of the product. If aproblem is identified in the product, defects are accepted. If a problem is identifiedwith the browser, IBM might investigate potential solutions or work-arounds thatthe client can implement until a permanent solution becomes available.

Procedure

To configure your web browser, follow these steps:1. Enable JavaScript for your web browser.

For Mozilla Firefox, JavaScript is enabled by default and requires no additionalconfiguration.For Microsoft Internet Explorer (IE) 11 and Microsoft Edge running onMicrosoft Windows 10, JavaScript is enabled by default and requires noadditional configuration.For Microsoft Internet Explorer (IE) running on Microsoft Windows 7:a. In Internet Explorer, click Tools > Internet Options.b. Click Security Settings.c. Click Internet to choose the Internet zone.d. Click Custom Level.e. Scroll down to the Scripting section, and then in Active Scripting, click

Enable.f. Click OK to close Security Settings.g. Click Yes to confirm the change for the zone.h. Click OK to close Internet Options.i. Refresh your browser.For Microsoft Internet Explorer (IE) running on Microsoft Windows Server2008:a. In Internet Explorer, click Tools > Internet Options.b. Click Security.c. Click Trusted sites.d. On the Trusted sites dialog, verify that the web address for the

management GUI is correct and click Add.e. Verify that the correct web address was added to the Trusted sites dialog.f. Click Close on the Trusted sites dialog.g. Click OK.h. Refresh your browser.For Google Chrome:a. On the menu bar in the Google Chrome browser window, click Settings.b. Click Show advanced settings.c. In the Privacy section, click Content settings.d. In the JavaScript section, select Allow all sites to run JavaScript.e. Click OK.f. Refresh your browser.

2. Enable cookies in your web browser.

30 Storwize V5000: Quick Installation Guide

|||

Page 53: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

For Microsoft Internet Explorer (IE) 11 and Microsoft Edge running onMicrosoft Windows 10, cookies are enabled by default and require noadditional configuration.For Mozilla Firefox:a. On the menu bar in the Firefox browser window, click Tools > Options.b. On the Options window, select Privacy.c. Set "Firefox will" to Use custom settings for history.d. Select Accept cookies from sites to enable cookies.e. Click OK.f. Refresh the browser.For Microsoft Internet Explorer:a. In Internet Explorer, click Tools > Internet Options.b. Click Privacy. Under Settings, move the slider to the bottom to allow all

cookies.c. Click OK.d. Refresh your browser.For Google Chrome:a. On the menu bar in the Google Chrome browser window, click Settings.b. Click Show advanced settings.c. In the Privacy section, click Content settings.d. In the Cookies section, select Allow local data to be set.e. Click OK.f. Refresh your browser.

3. Enable file download on IE 10 and 11 running on Windows 2012.a. In Internet Explorer, click Tools > Internet Options.b. On the Internet Options window, select the Security tab.c. On the Security tab, click the Internet zone.d. Click Custom level to customize the security level for this zone.e. Scroll down to Downloads and select Enable under File download.f. Click OK.g. Click Yes to confirm.h. Click OK to close the Internet Options.For Microsoft Internet Explorer (IE) 11 and Microsoft Edge running onMicrosoft Windows 10, file download is enabled by default and requires noadditional configuration.

4. Enable scripts to disable or replace context menus. (Mozilla Firefox only).For Mozilla Firefox:a. On the menu bar in the Firefox browser window, click Tools > Options.b. On the Options window, select Content.c. Click Advanced by the Enable JavaScript setting.d. Select Disable or replace context menus.e. Click OK to close the Advanced window.f. Click OK to close the Options window.g. Refresh your browser.

5. Enable TLS 1.1/1.2 (Microsoft Internet Explorer 9 and 10 only).For Microsoft Internet Explorer:

Chapter 3. Configuring the system 31

|||

|||

Page 54: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

a. Open Internet Explorer.b. Select Tools > Internet Options.c. Select the Advanced tab.d. Scroll to the Security section.e. Check the Use TLS 1.1 and Use TLS 1.2 checkboxes.

Note: IE 11 and later and Microsoft Edge enable TLS 1.1/1.2 by default.

User name and password for system initializationDuring the initialization procedure, you need to log in to the initialization GUI forthe system.

The default user name and password for the initialization GUI are listed in thefollowing table.

Table 8. Default user name and password for the initialization GUI

User name Password

superuser passw0rd

Note: The 0 character in the password is the number zero, not the letter O.

32 Storwize V5000: Quick Installation Guide

|

Page 55: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Initializing the system with a Microsoft Windows computerTo initialize a new system with a Microsoft Windows computer, use theinitialization tool that was shipped with your order.

Before you beginv Begin this procedure after you have installed all the enclosures, drives and other

options you have purchased.v You need a Microsoft Windows computer to complete the initialization

procedure. The computer must have:– A USB port– A supported browser

For best results, the Microsoft Windows computer and the Storwize system mustbe connected to the same network.

About this task

This procedure is valid for Microsoft Windows 8.1 (64-bit) or Microsoft Windows 7(64-bit).v Use this procedure only when initializing a new control enclosure (with,

optionally, one or more expansion enclosures).v Do not use this procedure when adding an expansion enclosure to an existing

system.

Procedure

To initialize the system, complete the following steps.1. Gather the information you will use to configure the system.v You must have the IP network address you will use to manage the system.

– IP address– Subnet mask– Gateway

v Other information is optional, but useful for enabling additional capabilities.– The IP address of a Network Time Protocol (NTP) server for automated

setting of date and time– The IP address of a simple mail transfer protocol (SMTP) server for

sending notification of alerts2. Locate the USB flash drive that was shipped with your order in the

documentation package.3. Insert the USB flash drive into a USB port on the Microsoft Windows computer.4. To launch the tool, open the USB flash drive. and double-click InitTool.bat

The initialization tool wizard starts.5. In the wizard, click Next and select Create a new system.6. Follow the on-screen instructions given by the initialization tool. You will be

instructed to complete the following actions:a. Enter the details of the system management address you need to use.b. Connect the USB flash drive to the Storwize system and allow it to

initialize.c. Connect the USB flash drive to the computer to check that the initialization

completed.

Chapter 3. Configuring the system 33

Page 56: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

7. If the system initialization completed successfully, click Finish. If you have anetwork connection to the Storwize system, the system management GUI isdisplayed. If the computer does not have a network connection to the Storwizesystem, go to the computer you will use to manage the system and start asupported browser. Direct the browser to the management address youspecified for the system.

8. Log in with user name superuser and password passw0rd.

Note: The 0 character in the password is a zero, not the letter O.9. Follow the on-screen instructions to begin setting up your system.

Note: The other options that are available in the initialization tool are used torecover the service IP address or the superuser password.

34 Storwize V5000: Quick Installation Guide

Page 57: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Initializing the system with an Apple Macintosh computerTo initialize a new system with an Apple Macintosh computer, use theinitialization tool that was shipped with your order.

Before you beginv Begin this procedure after you have installed all the enclosures, drives and other

options you have purchased.v You need an Apple Macintosh computer to complete the initialization procedure.

The computer must have:– A USB port– A supported browser

For best results, the Apple Macintosh computer and the Storwize system mustbe connected to the same network.

About this task

This procedure is valid for Apple MacOS X 10.7.v Use this procedure only when initializing a new control enclosure (with,

optionally, one or more expansion enclosures).v Do not use this procedure when adding an expansion enclosure to an existing

system.

Procedure

To initialize the system, complete the following steps.1. Gather the information you will use to configure the system.v You must have the IP network address you will use to manage the system.

– IP address– Subnet mask– Gateway

v Other information is optional, but useful for enabling additionalcapabilities.– The IP address of a Network Time Protocol (NTP) server for automated

setting of date and time– The IP address of a simple mail transfer protocol (SMTP) server for

sending notificatication of alerts2. Locate the USB flash drive that was shipped with your order in the

documentation package.3. Insert the USB flash drive into a USB port on the Apple Macintosh computer.4. Open a terminal window.5. Locate the root directory of the USB flash drive. The root directory is usually

located in the /Volumes/ directory.6. Type: sh InitTool.sh The initialization tool wizard starts.7. In the wizard, click Next and select Create a new system.8. Follow the on-screen instructions given by the initialization tool. You will be

instructed to complete the following actions:a. Enter the details of the system management address you need to use.b. Eject the USB flash drive and remove it from the computer.

Chapter 3. Configuring the system 35

Page 58: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

c. Connect the USB flash drive to the Storwize system and allow it toinitialize.

d. Connect the USB flash drive to the computer to check that the initializationcompleted.

9. If the system initialization completed successfully, click Finish. If you have anetwork connection to the Storwize system, the system management GUI isdisplayed. If the computer does not have a network connection to theStorwize system, go to the computer you will use to manage the system andstart a supported browser. Direct the browser to the management address youspecified for the system.

10. Log in with user name superuser and password passw0rd.

Note: The 0 character in the password is a zero, not the letter O.11. Follow the on-screen instructions to begin setting up your system.

Note: The other options in the initialization tool are used to reset the serviceIP address or the superuser password.

36 Storwize V5000: Quick Installation Guide

Page 59: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Initializing the system with a Linux computerTo initialize a new system with a Linux computer, use the initialization tool thatwas shipped with your order.

Before you beginv Begin this procedure after you have installed all the enclosures, drives and other

options you have purchased.v You need a Linux computer to complete the initialization procedure. The

computer must have:– A USB port– A supported browser

For best results, the Linux computer and the Storwize system must be connectedto the same network.

About this task

This procedure is valid for Red Hat Enterprise Server 5 and 6 or Ubuntu desktop11.04 and 13.10.v Use this procedure only when initializing a new control enclosure (with,

optionally, one or more expansion enclosures).v Do not use this procedure when adding an expansion enclosure to an existing

system.

Procedure

To initialize the system, complete the following steps.1. Gather the information you will use to configure the system.v You must have the IP network address you will use to manage the system.

– IP address– Subnet mask– Gateway

v Other information is optional, but useful for enabling additionalcapabilities.– The IP address of a Network Time Protocol (NTP) server for automated

setting of date and time– The IP address of a simple mail transfer protocol (SMTP) server for

sending notificatication of alerts2. Locate the USB flash drive that was shipped with your order in the

documentation package.3. Insert the USB flash drive into a USB port on the Linux computer.4. Open a terminal window.5. Locate the root directory of the USB flash drive. It is usually located in the

/media/ directory. If an automatic mount system is used, the root directorycan be located by typing the mount command.

6. Type: sh InitTool.sh The initialization tool wizard starts.7. In the wizard, click Next and select Create a new system.8. Follow the on-screen instructions given by the initialization tool. You will be

instructed to complete the following actions:a. Enter the details of the system management address that you need to use.

Chapter 3. Configuring the system 37

Page 60: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

b. Connect the USB flash drive to the Storwize system and allow it toinitialize.

c. Connect the USB flash drive to the computer to check that the initializationcompleted.

9. If the system initialization completed successfully, click Finish. If you have anetwork connection to the Storwize system, the system management GUI isdisplayed. If the computer does not have a network connection to theStorwize system, go to the computer that you will use to manage the systemand start a supported browser. Direct the browser to the management addressyou specified for the system.

10. Log in with user name superuser and password passw0rd.

Note: The 0 character in the password is a zero, not the letter O.11. Follow the on-screen instructions to begin setting up your system.

Note: The other options that are available in the initialization tool are used torecover the service IP address or the superuser password.

Adding an expansion enclosure to an existing systemWhen you add an expansion enclosure to an existing system, you must use themanagement GUI to update the system configuration.

About this task

The management GUI requires a supported web browser (see “Checking your webbrowser settings for the management GUI” on page 29).

Procedure

To add an expansion enclosure to your system, complete the following steps.1. Install support rails for the new enclosure.2. Install the new enclosure in the rack.3. Connect the expansion enclosure attachment cables.4. Connect the power cables and wait for the SAS light-emitting diodes (LEDs) to

illuminate.5. Start the management GUI.6. Go to Monitoring > System.7. On the System page, select Actions > Add Enclosures.8. Continue to follow the on-screen instructions.

Adding a control enclosure to an existing systemTo add a control enclosure to an existing system, you must first install it in therack. Then, you must connect it to the system through a zone in the SAN.

About this task

The management GUI requires a supported web browser (see “Checking your webbrowser settings for the management GUI” on page 29).

Note: When you add a control enclosure, do not use the initialization tool or theUSB flash drive.

38 Storwize V5000: Quick Installation Guide

Page 61: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Procedure

To add a control enclosure to an existing system, complete the following steps.1. Install support rails for the new enclosure.2. Install the new enclosure in the rack.3. Connect the canisters to the storage area network. Use Fibre Channel cables to

connect the SAN to a 10 Gbps iSCSI-FCoE 2-port host interface adapter (see“Connecting Fibre Channel cables to a 10 Gbps iSCSI-FCoE 2-port host interfaceadapter” on page 22) or an 8 Gbps Fibre Channel 4-port host interface adapter(see “Connecting Fibre Channel cables to a Fibre Channel host interfaceadapter” on page 24).

4. Configure the zoning on the SAN switches. The correct zoning provides a wayfor the Fibre Channel or FCoE ports to connect to each other. If theconfiguration tool for the SAN switches does not provide details of the worldwide port names (WWPNs), use the service assistant to find them. You can alsouse the USB flash drive to find the status of the node.

5. Start the management GUI.6. Go to Monitoring > System.7. On the System page, select Actions > Add Enclosures.8. Continue to follow the on-screen instructions.

Chapter 3. Configuring the system 39

Page 62: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

40 Storwize V5000: Quick Installation Guide

Page 63: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Appendix A. Accessibility features for Storwize V5000

Accessibility features help users who have a disability, such as restricted mobilityor limited vision, to use information technology products successfully.

Accessibility features

These are the major accessibility features for the Storwize V5000:v You can use screen-reader software and a digital speech synthesizer to hear what

is displayed on the screen. HTML documents have been tested using JAWSversion 15.0.

v This product uses standard Windows navigation keys.v Interfaces are commonly used by screen readers.v Industry-standard devices, ports, and connectors.

The Storwize V5000 online documentation and its related publications areaccessibility-enabled. The accessibility features of the online documentation aredescribed in Viewing information in the information center .

Keyboard navigation

You can use keys or key combinations to perform operations and initiate menuactions that can also be done through mouse actions. You can navigate theStorwize V5000 online documentation from the keyboard by using the shortcutkeys for your browser or screen-reader software. See your browser or screen-readersoftware Help for a list of shortcut keys that it supports.

IBM and accessibility

See the IBM Human Ability and Accessibility Center for more information aboutthe commitment that IBM has to accessibility.

© Copyright IBM Corp. 2013, 2015 41

Page 64: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

42 Storwize V5000: Quick Installation Guide

Page 65: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Appendix B. Where to find the Statement of Limited Warranty

The Statement of Limited Warranty is available in both hardcopy format and in theStorwize V5000 information center.

The Statement of Limited Warranty is shipped (in hardcopy form) with yourproduct. It can also be ordered from IBM (see Table 2 on page xviii for the partnumber).

© Copyright IBM Corp. 2013, 2015 43

Page 66: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

44 Storwize V5000: Quick Installation Guide

Page 67: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Notices

This information was developed for products and services offered in the US. Thismaterial might be available from IBM in other languages. However, you may berequired to own a copy of the product or product version in that language in orderto access it.

IBM may not offer the products, services, or features discussed in this document inother countries. Consult your local IBM representative for information on theproducts and services currently available in your area. Any reference to an IBMproduct, program, or service is not intended to state or imply that only that IBMproduct, program, or service may be used. Any functionally equivalent product,program, or service that does not infringe any IBM intellectual property right maybe used instead. However, it is the user's responsibility to evaluate and verify theoperation of any non-IBM product, program, or service.

IBM may have patents or pending patent applications covering subject matterdescribed in this document. The furnishing of this document does not grant youany license to these patents. You can send license inquiries, in writing, to:

IBM Director of LicensingIBM CorporationNorth Castle DriveArmonk, NY 10504-1785U.S.A.

For license inquiries regarding double-byte character set (DBCS) information,contact the IBM Intellectual Property Department in your country or sendinquiries, in writing, to:

Intellectual Property LicensingLegal and Intellectual Property LawIBM Japan, Ltd.19-21, Nihonbashi-Hakozakicho, Chuo-kuTokyo 103-8510, Japan

INTERNATIONAL BUSINESS MACHINES CORPORATION PROVIDES THISPUBLICATION "AS IS" WITHOUT WARRANTY OF ANY KIND, EITHEREXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIEDWARRANTIES OF NON-INFRINGEMENT, MERCHANTABILITY OR FITNESSFOR A PARTICULAR PURPOSE. Some jurisdictions do not allow disclaimer ofexpress or implied warranties in certain transactions, therefore, this statement maynot apply to you.

This information could include technical inaccuracies or typographical errors.Changes are periodically made to the information herein; these changes will beincorporated in new editions of the publication. IBM may make improvementsand/or changes in the product(s) and/or the program(s) described in thispublication at any time without notice.

Any references in this information to non-IBM websites are provided forconvenience only and do not in any manner serve as an endorsement of those

© Copyright IBM Corp. 2013, 2015 45

Page 68: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

websites. The materials at those websites are not part of the materials for this IBMproduct and use of those websites is at your own risk.

IBM may use or distribute any of the information you provide in any way itbelieves appropriate without incurring any obligation to you.

Licensees of this program who wish to have information about it for the purposeof enabling: (i) the exchange of information between independently createdprograms and other programs (including this one) and (ii) the mutual use of theinformation which has been exchanged, should contact:

IBM Director of LicensingIBM CorporationNorth Castle Drive, MD-NC119Armonk, NY 10504-1785US

Such information may be available, subject to appropriate terms and conditions,including in some cases, payment of a fee.

The licensed program described in this document and all licensed materialavailable for it are provided by IBM under terms of the IBM Customer Agreement,IBM International Program License Agreement or any equivalent agreementbetween us.

The performance data discussed herein is presented as derived under specificoperating conditions. Actual results may vary.

Information concerning non-IBM products was obtained from the suppliers ofthose products, their published announcements or other publicly available sources.IBM has not tested those products and cannot confirm the accuracy ofperformance, compatibility or any other claims related to non-IBM products.Questions on the capabilities of non-IBM products should be addressed to thesuppliers of those products.

Statements regarding IBM's future direction or intent are subject to change orwithdrawal without notice, and represent goals and objectives only.

All IBM prices shown are IBM's suggested retail prices, are current and are subjectto change without notice. Dealer prices may vary.

This information is for planning purposes only. The information herein is subject tochange before the products described become available.

This information contains examples of data and reports used in daily businessoperations. To illustrate them as completely as possible, the examples include thenames of individuals, companies, brands, and products. All of these names arefictitious and any similarity to the names and addresses used by an actual businessenterprise is entirely coincidental.

COPYRIGHT LICENSE:

This information contains sample application programs in source language, whichillustrate programming techniques on various operating platforms. You may copy,modify, and distribute these sample programs in any form without payment toIBM, for the purposes of developing, using, marketing or distributing application

46 Storwize V5000: Quick Installation Guide

Page 69: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

programs conforming to the application programming interface for the operatingplatform for which the sample programs are written. These examples have notbeen thoroughly tested under all conditions. IBM, therefore, cannot guarantee orimply reliability, serviceability, or function of these programs. The sampleprograms are provided "AS IS", without warranty of any kind. IBM shall not beliable for any damages arising out of your use of the sample programs.

If you are viewing this information softcopy, the photographs and colorillustrations may not appear.

TrademarksIBM, the IBM logo, and ibm.com® are trademarks or registered trademarks ofInternational Business Machines Corp., registered in many jurisdictions worldwide.Other product and service names might be trademarks of IBM or other companies.A current list of IBM trademarks is available on the web at Copyright andtrademark information at www.ibm.com/legal/copytrade.shtml.

Adobe, the Adobe logo, PostScript, and the PostScript logo are either registeredtrademarks or trademarks of Adobe Systems Incorporated in the United States,and/or other countries.

Java and all Java-based trademarks and logos are trademarks or registeredtrademarks of Oracle and/or its affiliates.

Linux and the Linux logo is a registered trademark of Linus Torvalds in the UnitedStates, other countries, or both.

Microsoft, Windows, and the Windows logo are trademarks of MicrosoftCorporation in the United States, other countries, or both.

Other product and service names might be trademarks of IBM or other companies.

Homologation statementThis product may not be certified in your country for connection by any meanswhatsoever to interfaces of public telecommunications networks. Furthercertification may be required by law prior to making any such connection. Contactan IBM representative or reseller for any questions.

Electronic emission noticesThis section contains the electronic emission notices or statements for the UnitedStates and other countries.

Federal Communications Commission (FCC) statementThis explains the Federal Communications Commission's (FCC’s) statement.

This equipment has been tested and found to comply with the limits for a Class Adigital device, pursuant to Part 15 of the FCC Rules. These limits are designed toprovide reasonable protection against harmful interference when the equipment isoperated in a commercial environment. This equipment generates, uses, and canradiate radio frequency energy and, if not installed and used in accordance withthe instruction manual, might cause harmful interference to radio communications.

Notices 47

Page 70: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Operation of this equipment in a residential area is likely to cause harmfulinterference, in which case the user will be required to correct the interference athis own expense.

Properly shielded and grounded cables and connectors must be used in order tomeet FCC emission limits. IBM is not responsible for any radio or televisioninterference caused by using other than recommended cables and connectors, or byunauthorized changes or modifications to this equipment. Unauthorized changesor modifications could void the user's authority to operate the equipment.

This device complies with Part 15 of the FCC Rules. Operation is subject to thefollowing two conditions: (1) this device might not cause harmful interference, and(2) this device must accept any interference received, including interference thatmight cause undesired operation.

Industry Canada compliance statement

This Class A digital apparatus complies with Canadian ICES-003.

Cet appareil numérique de la classe A est conform à la norme NMB-003 duCanada.

Australia and New Zealand Class A StatementAttention: This is a Class A product. In a domestic environment this productmight cause radio interference in which case the user might be required to takeadequate measures.

European Union Electromagnetic Compatibility DirectiveThis product is in conformity with the protection requirements of European Union(EU) Council Directive 2004/108/EC on the approximation of the laws of theMember States relating to electromagnetic compatibility. IBM cannot acceptresponsibility for any failure to satisfy the protection requirements resulting from anon-recommended modification of the product, including the fitting of non-IBMoption cards.

Attention: This is an EN 55022 Class A product. In a domestic environment thisproduct might cause radio interference in which case the user might be required totake adequate measures.

Responsible Manufacturer:

International Business Machines Corp.New Orchard RoadArmonk, New York 10504914-499-1900

European community contact:

IBM Deutschland GmbHTechnical Regulations, Department M372IBM-Allee 1, 71139 Ehningen, GermanyTele: +49 (0) 800 225 5423 or +49 (0) 180 331 3233Email: [email protected]

48 Storwize V5000: Quick Installation Guide

Page 71: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Germany Electromagnetic Compatibility DirectiveDeutschsprachiger EU Hinweis: Hinweis für Geräte der Klasse A EU-Richtliniezur Elektromagnetischen Verträglichkeit

Dieses Produkt entspricht den Schutzanforderungen der EU-Richtlinie2004/108/EG zur Angleichung der Rechtsvorschriften über die elektromagnetischeVerträglichkeit in den EU-Mitgliedsstaaten und hält die Grenzwerte der EN 55022Klasse A ein.

Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zuinstallieren und zu betreiben. Des Weiteren dürfen auch nur von der IBMempfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung fürdie Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung derIBM verändert bzw. wenn Erweiterungskomponenten von Fremdherstellern ohneEmpfehlung der IBM gesteckt/eingebaut werden.

EN 55022 Klasse A Geräte müssen mit folgendem Warnhinweis versehen werden:

“Warnung: Dieses ist eine Einrichtung der Klasse A. Diese Einrichtung kann imWohnbereich Funk-Störungen verursachen; in diesem Fall kann vom Betreiberverlangt werden, angemessene Mabnahmen zu ergreifen und dafüraufzukommen.”

Deutschland: Einhaltung des Gesetzes über die elektromagnetischeVerträglichkeit von Geräten

Dieses Produkt entspricht dem “Gesetz über die elektromagnetische Verträglichkeitvon Geräten (EMVG).” Dies ist die Umsetzung der EU-Richtlinie 2004/108/EG inder Bundesrepublik Deutschland.

Zulassungsbescheinigung laut dem Deutschen Gesetz über dieelektromagnetische Verträglichkeit von Geräten (EMVG) (bzw. der EMC EGRichtlinie 2004/108/EG) für Geräte der Klasse A

Dieses Gerät ist berechtigt, in übereinstimmung mit dem Deutschen EMVG dasEG-Konformitätszeichen - CE - zu führen.

Verantwortlich für die Einhaltung der EMV Vorschriften ist der Hersteller:

International Business Machines Corp.New Orchard RoadArmonk,New York 10504Tel: 914-499-1900

Der verantwortliche Ansprechpartner des Herstellers in der EU ist:

IBM Deutschland GmbHTechnical Regulations, Abteilung M372IBM-Allee 1, 71139 Ehningen, GermanyTele: +49 (0) 800 225 5423 or +49 (0) 180 331 3233Email: [email protected]

Generelle Informationen:

Notices 49

Page 72: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Das Gerät erfüllt die Schutzanforderungen nach EN 55024 und EN 55022 KlasseA.

People's Republic of China Class A Statement

Taiwan Class A compliance statement

Taiwan Contact InformationThis topic contains the product service contact information for Taiwan.IBM Taiwan Product Service Contact Information:IBM Taiwan Corporation3F, No 7, Song Ren Rd., Taipei TaiwanTel: 0800-016-888

Japan VCCI Council Class A statementThis explains the Japan Voluntary Control Council for Interference (VCCI)statement.

f2c0

07

90

50 Storwize V5000: Quick Installation Guide

Page 73: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Japan Electronics and Information Technology IndustriesAssociation Statement

This statement explains the Japan JIS C 61000-3-2 product wattage compliance.

This statement explains the Japan Electronics and Information TechnologyIndustries Association (JEITA) statement for products less than or equal to 20 A perphase.

This statement explains the JEITA statement for products greater than 20 A, singlephase.

This statement explains the JEITA statement for products greater than 20 A perphase, three-phase.

Korean Communications Commission Class A StatementThis explains the Korean Communications Commission (KCC) statement.

Russia Electromagnetic Interference Class A StatementThis statement explains the Russia Electromagnetic Interference (EMI) statement.

Notices 51

Page 74: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

European Contact InformationThis topic contains the product service contact information for Europe.

European Community contact:IBM Technical RegulationsPascalstr. 100, Stuttgart, Germany 70569Tele: 0049 (0)711 785 1176Fax: 0049 (0)711 785 1283Email: mailto: tjahn @ de.ibm.com

Taiwan Contact InformationThis topic contains the product service contact information for Taiwan.IBM Taiwan Product Service Contact Information:IBM Taiwan Corporation3F, No 7, Song Ren Rd., Taipei TaiwanTel: 0800-016-888

rusem

i

f2c0

07

90

52 Storwize V5000: Quick Installation Guide

Page 75: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Index

Numerics10 Gbps iSCSI-FCoE 2-port host interface

cardfibre cables 22

Aaccessibility 41

repeat rateup and down buttons 41

accessingpublications 41

air flow 27

Bbrowsers

See web browsers

CCanadian electronic emission notice 48caution ixcaution notices xcomments xixconfiguration

web browserssettings 29

contact informationEuropean 52Taiwan 50, 52

control enclosureadding to an existing system 38data ports 7installing 17location guidelines 11power cords 27

cooling 27

Ddanger ixdanger notices xiiDeutschsprachiger EU Hinweis 49disk drives

large form factor 5small form factor 5

Eelectronic emission notices

Deutschsprachiger EU Hinweis 49European Union (EU) 48Federal Communications Commission

(FCC) 47Germany 49Industry Canada 48

electronic emission notices (continued)Japanese Voluntary Control Council

for Interference (VCCI) 50Korean 51New Zealand 48People's Republic of China 50Taiwan 50

EMC statement, People's Republic ofChina 50

environmental notices ix, xvienvironmental requirements 11Ethernet

cablesfor system management 22

ports 7switch 22

European contact information 52European Union (EU), EMC Directive

conformance statement 48expansion canister

data ports 8LEDs 27

expansion enclosureadding to an existing system 38attachment cables 18, 19installing 17location guidelines 11power cords 27

FFCC (Federal Communications

Commission) electronic emissionnotice 47

Federal Communications Commission(FCC) electronic emission notice 47

feedback xixfibre cables 22Fibre Channel

cables 24Fibre Channel 4-port host interface

card 24

GGermany electronic emission compliance

statement 49

Hhardware components

list 5help xixhomologation statement 47host attachment cables 25host interface card

Fibre Channel 4-port 24

IIEC 60950-1 ixinformation help xixinitializing the system

Apple Macintosh 35Linux 37Microsoft Windows 33

JJapanese electronic emission notice 50

Kkeyboards

accessibility features 41Knowledge Center xviiKorean electronic emission statement 51

Llabels ixLEDs

expansion canister 27node canister 28

location guidelines 11

Mmanagement GUI

adding a control enclosure 38adding an expansion enclosure 38

Nnavigation

accessibility 41New Zealand electronic emission

statement 48node canister

Ethernet cables 22fibre cables 22Fibre Channel cables 24LEDs 28

notices ixenvironmental ix, xvisafety ix

Ppacking slip 5password 32People's Republic of China, electronic

emission statement 50power cords 27powering on the system 27publications

accessing 41

© Copyright IBM Corp. 2013, 2015 53

Page 76: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

Rrails 13, 17reader feedback xixrelated information xvii

Ssafety ix

caution notices xdanger notices xiienvironmental notices ix

safety information labels ixsafety notices ixSAS cables 18, 19, 25send a comment xixshortcut keys

keyboard 41Statement of Limited Warranty, Where to

find the 43static-sensitive devices xvStorwize V5000

safety notices x, xiiStorwize V5000 library

related publications xviisuperuser 32

TTaiwan

contact information 50, 52electronic emission notice 50

technical assistance xixtrademarks 47

UUSB flash drive

initializing the systemApple Macintosh 35Linux 37Microsoft Windows 33

locating 10user name 32

Wweb browsers

configuring 29requirements 29

websites xix

54 Storwize V5000: Quick Installation Guide

Page 77: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install
Page 78: with IBM Corp. · Safety and environmental notices Review the safety notices, envir onmental notices, and electr onic emission notices for IBM ® Storwize ® V5000 befor e you install

IBM®

Printed in USA

GI13-2861-05