WELCOME TO Thanhphuoc Port Corporation

The first river port of Binh Duong Province. The ideal destination for commodities and means of transportation from International partner to comee

April 7, 2023

Prepared by

Thanh Phuoc Port Corporation

Page 2: TPP Presentation 001

General Introduction

Project’s feasibility study started in 2004

Operation license issued by Binhduong’s Planning & Investment Dept on 14 November, 2007.

Construction started in May 2010

First phase come into operation on quarter I/2012.

April 7, 2023

Page 3: TPP Presentation 001

TPP Shareholders

TPP( THANHPHUOC PORT CORPORATION)

April 7, 2023

BICONSI(35%)

U&I Logistics(32,5%)

NTC (NamTanUyen IP)

(32,5%)

Page 4: TPP Presentation 001

COMMODTIES FIGURE OF BINH DUONG, BINH PHUOC PROVINCE & HIGHLANDS.

No Name of terminal port UnitThe quantity of comodities go throught terminal port

2005 2006 2007 2008 2009

I

Total volume of commodities go throught port in HCM

City area.Ton 46,657,605 51,685,982 61,020,798 67,733,086 74,506,375

Container Teu 2,171,179 2,541,446 3,172,853 3,521,867 3,874,054

A/ Total commodities for export

Ton 14,298,850 15,898,05 17,546,154 19,476,231 21,423,854

Container Teu 1,008,984 1,162,74 1,382,668 1,534,761 1,688,237

B/Total commodities for import

Ton 28,795,939 32,112,393 38,976,669 43,264,103 47,590,513

Container Teu 917,030 1,093,363 1,369,442 1,520,081 1,672,089

C/ Total commodities for internal.

Ton 3,562,816 3,674,884 4,497,975 4,992,752 5,492,027

Container Teu 214,553 285,409 420,723 467,003 513,703.3

II

Total for commodities go throught Dongnai, Vungtau port erea.

Ton 2,028,057 2,271,422 2,612,144 2,899,480 3,189,428

Container Teu 205,894 230,602 265,192 294,363 323,799

IIITotal I+II Ton 48,685,662 53,957,404 63,632,942 70,632,548 77,695,803

Container Teu 2,377,03 2,772,048 3,438,045 3,816,230 4,197,853

April 7, 2023

Page 5: TPP Presentation 001

ESTIMATED COMMODITIES GO THROUGHT TPP

No Commodities Unit 2010 2013 2018 2023 2028

1Commodities that need for

loading, unloading & transportation.

Ton 5,117,596 9,090,924 22,359,355 41,571,553 67,343,642

2

Commodities that loading, unloading &

transportation follow investment planning.

Ton 890,603 1,545,922 3,646,097 4,502,199 5,394,226

3Estimated ratio of

commodities go throught TPP

% 17.41 17.01 16.31 10.83 8,01

April 7, 2023

Page 6: TPP Presentation 001

Master plan of Thanh Phuoc Port Corporation

April 7, 2023

Page 7: TPP Presentation 001

April 7, 2023

Thanh Phuoc Port

Page 8: TPP Presentation 001

LOCATION MAP NEIGHBOUR TPP

April 7, 2023

Thanh Phuoc Port

Becamex BP Industrial Pack

Chon Thanh Industrial Pack

South Dong Phu Industrial Pack

Tan Khai Industrial Pack

Minh Hung III Industrial Pack

Dong Xoai Industrial Pack

North Dong Phu Industrial Pack

Minh Hung-Korea Industrial Pack

Sai Gon BP Industrial Pack

Xanh BD Industrial PackNam Tan Uyen Industrial Pack

Dat Cuoc Industrial Pack

VSIP II Industrial Pack

Dai Dang Industrial Pack

Kim Huy Industrial Pack

Phu Gia Industrial Pack

Song Than III Industrial Pack

Dong An II Industrial Pack

Thoi Hoa Industrial Pack

My Phuoc II Industrial PackMy Phuoc Industrial Pack

Bau Bang Industrial Pack

My Phuoc III Industrial Pack

My Phuoc IV Industrial Pack

Rach Bap Industrial Pack

An Tay Industrial Pack

Viet Huong II Industrial Pack

Mai Trung Industrial Pack

Page 9: TPP Presentation 001

April 7, 2023

Thanh Phuoc Port

Vung Tau Port

Cai Mep Port

Sai Gon Port Area

Hiep Phuoc Port Area

Cat Lai PortD

ong N

ai River

Viet Nam Singapore Industrial Park

My Phuoc Industrial Parkc

Linh Trung 3 Industrial Park

north-west Cu Chi Industrial Park

Duc Hoa 3 Industrial Park

Thai Hoa Industrial Park

Duc Hoa Dong Industrial Park

Xuyen A Industrial Park

Tan Duc Industrial Park

Vinh Loc 2 Industrial Park

Thuan Dao Industrial Park

Tan Son Nhat AirPort

Bien Hoa AirPort

Amata Industrial Park

Bien Hoa I Industrial Park

Song Than 1 Industrial Park

Song Than 2 Industrial Park

Binh Chieu Industrial Park

Viet Huong Industrial Park

Nam Tan Uyen Industrial Park

VSIP II Industrial Park

Tam Phuoc Industrial Park

Loteco Industrial Park

Page 10: TPP Presentation 001

DISTANCE BETWEEN THANHPHUOC PORT CORPORATION TO SOMES DEEP WATER PORT, INDUSTRIAL PARK AND

IMPORTANCE AREA IN THE SOUTH OF VIETNAM. THANH PHUOC PORT CORPORATION TO DISTANCE ( Km)

   TRUCK ON

ROAD BARGE ON RIVER

1 KCN Xanh Bình Dương ( IP) 5  

2 KCN Nam Tân Uyên (IP) 5  

3 KCN VSIP I (IP) 10  

4 KCN Tân Đông Hiệp A (IP) 10  

5 KCN Tân Đông Hiệp B (IP) 10  

6 KCN Kim Huy (IP) 10  

7 KCN Phú Gia (IP) 10  

8 KCN Đất Cuốc (IP) 10  

9 KCN Đại Đăng (IP) 10  

10 KCN VSIP II (IP) 10  

11 KCN Việt Hương I (IP) 15  

12 KCN Sóng Thần I (IP) 15  

13 KCN Sóng Thần II (IP) 15  April 7, 2023

Page 11: TPP Presentation 001

14 KCN Đồng An I (IP) 15  

15 KCN Bình Chiểu (IP) 16  

16 KCN Linh Trung II (IP) 16  

17 KCN Sóng Thần III (IP) 17  

18 KCN Đồng An II (IP) 17  

19 KCN Linh Trung II (IP) 20  

20 KCN Tân Định (IP) 20  

21 KCN Bình An (IP) 20  

22 KCN Bình Đường (IP) 20  

23 KCN VSIP III (IP) 25  

24 KCN Mỹ Phước 1,2 (IP) 25  

25 KCN Mỹ Phước 3,4 (IP) 25  

26 KCN Thới Hòa (IP) 30  

27 KCN Việt Hương II (IP) 40  

28 KCN Bầu Bàng (IP) 40  

29 KCN Rạch Bắp (IP) 40  

April 7, 2023

Page 12: TPP Presentation 001

30 KCN An Tây (IP) 40  

31 KCN Mai Trung (IP) 40  

32 Tỉnh Bình Phước (PROVINCE) 50  

33 Tỉnh Đắk Nông (PROVINCE) 150  

34 Tỉnh Đắk Lắk (PROVINCE) 250  

35 Tỉnh Gia Lai (PROVINCE) 300  

36 Cảng Đồng Nai ( DONGNAI PORT)   18

37 Cảng khu vực Sài Gòn ( SAIGON PORT AREA)   60

38Cảng khu vực KCN Hiệp Phước ( DEEP WATER

PORT)   69

39 Cảng khu vực Cái Mép (DEEP WATER PORT)   110

April 7, 2023

Page 13: TPP Presentation 001

ADVANTAGES & POTENTIALS OF TPP : 1. Geographical location : Located along right side of Dong Nai River, TPP ‘s being planned to

connect all deep water ports in HCMC & Ba Ria-Vung Tau. In the central of Binh Duong industrial areas (Nam Tan Uyen, Song

Than I,II,III; VSIP I,II; My Phuoc I,II,III…), it ‘s easy for TPP to collect & transit cargo.

2. Strong support from customers :   TPP has contacted more than 80 customers in the area of Binh

Duong and Binh Phuoc province in which 25 enterprises have signed the agreement and agrees to deliver the goods pass through TPP. Container production is estimated 4000-5000 teus / month. The remaining companies are very interested and said they will support TPP when it puts into operation.

Key Accounts : VIETNAM RUBBER GROUP (VRG); PETEC Logistics Joint Stock Company; MAGNUSEN; Return Gold…

April 7, 2023

Page 14: TPP Presentation 001

April 7, 2023

Page 15: TPP Presentation 001

Construction of infrastructure & Materials handling equipment

Total areas 63ha with total investment cost VND1,450 Billion.

16 piers ( 62 meter per pier). The first phases 2011-2014 build 08 piers. The second phases 2012-2018 build more 08 piers.

04 (Four) Liebherrs’ fixed cranes handling bulk cargo up to 90tons.

12 ( Twelve) Quay side gantry crane handling container 20”, 40” 45”.

Rubber Tired Gantry handling for container 20”, 40” 45” at container yard.

Reachstakers of Hyster for handling container up to 45tons.

Install updated software system for container, yard and barge planning

April 7, 2023

Page 16: TPP Presentation 001

HANDLING MATERIALS EQUIPMENTRail mounted quay cranes,17m rail span.Lifting capacity underSpreader (20’/40’/45’)Crane lifting capacityFixed crane

06 Sets ( First phase)

41m/t50 m/t30 cont/h/move02 sets ( First

phase)

Rubber Tired GantryCranes ( 41m/t)Lifting capacity

12 (one over four, six wide)

33 cont/h/move

Reach Stacker 04

Side Lifter 06

CFS forklifts 06

Yard tractors (company owned)Trailers (company owned)

28

20

Reefer connections 370

April 7, 2023

Page 17: TPP Presentation 001

TPP option for the first two piers come into operation on QI/2012

April 7, 2023Illustrate picture

Page 18: TPP Presentation 001

April 7, 2023

WAREHOUSING

Page 19: TPP Presentation 001

Activities since Jan, 2012

April 7, 2023

Page 20: TPP Presentation 001

Handling commodities from barge to truck

April 7, 2023

Page 21: TPP Presentation 001

April 7, 2023

Page 22: TPP Presentation 001

International standard piers

April 7, 2023

Page 23: TPP Presentation 001

April 7, 2023

Page 24: TPP Presentation 001

TPP’s barge operation

April 7, 2023Illustrate picture

Page 25: TPP Presentation 001

Sea access to Thanhphuoc Port

April 7, 2023

THANH PHUOC PORT

Page 26: TPP Presentation 001

Save cost, time and labor for clients

Save cost compare to truck on road to deep water port area of CATLAI, HIEPPHUOC & CAIMEP.

- TPP handle for barge transportation with cost cheaper 5% compared to truck on road transportation (Depend on distance).

- Barge transportation save cost for clients up to 5%.- Reduce traffic jam and road accidence.- Avoid and reduce pollution for environment.

Save time and labor for clients.- Save transportation time for clients.- TPP handle the commodities for clients from clients

factory to deep water port ( go in/out) in shortest time with suitable cost.

- Big volume in container or bulk cargo in barge transportation.April 7, 2023

Page 27: TPP Presentation 001

Benefits to use TPPQuay side gantry crane and Liebherr fixes cranes with

productivity 30move/crane/hour.Brand new yard equipment – Reachstackers and RTG ( 1

over 4 high, six wide).Late cut time.High productivity.Pier availability. Close to high volume commodities market.On par or better cost saving to cargo owners

April 7, 2023

Page 28: TPP Presentation 001

Easy access to Thanhphuoc port by truck on road for location near BinhDuong as BinhPhuoc, Highlands of south Vietnam to move by barge to deep water port at Hochiminh City and Caimep ( Vungtau province).

Barge transportation cost cheaper than by using truck on road by 5%.

Flexible customs.Congestion FREE, ability to grow.Attractive rates.

April 7, 2023

Page 29: TPP Presentation 001

www.thanhphuocport.com.vnPort address: 207, DT 747A, Thanhphuoc Ward, Tan

Uyen District, Binh Duong Province.Email: [email protected] Mobil: +84.908 458590.Tel: +84.650.2475.859 Fax: +84.650.3629.434

April 7, 2023

Page 30: TPP Presentation 001

Welcome to Thanh Phuoc Port

Presented by TPP

April 7, 2023

Thank you!


Top Related