Transcript
Page 1: Tekla Global BIM Awards 2013

Tekla Global BIM Awards 2013

Page 2: Tekla Global BIM Awards 2013

Tekl

a G

loba

l BIM

Aw

ards

201

3

2

Page 3: Tekla Global BIM Awards 2013

Tekl

a G

loba

l BIM

Aw

ards

201

3

Tekla Global BIM Awards OverviewFirst organized in 2009

Competitors are winners of regional Tekla BIM Awards

Five categories: – Total BIM

– Cast in place

– Engineering

– Precast

– Steel

Winners chosen by jury and public vote

3

Page 4: Tekla Global BIM Awards 2013

Tekla Global BIM Awards JuryLeading international BIM experts

Tekl

a G

loba

l BIM

Aw

ards

201

3

John Bacus

Product Management Director, Trimble SketchUp

Ashwin Mahalingam

Assistant Professor,Indian Institute of Technology Madras

Richard Ogden

Chairman, Buildoffsite Director, acumen7

Risto Räty

Executive Vice President, Tekla CorporationGeneral Manager, Trimble Buildings Structures Division

Viktor Várkonyi

CEO, Graphisoft

4

Page 5: Tekla Global BIM Awards 2013

ContentsProject Company CategoryPuuvilla Shopping Centre Project group of multiple companies Total BIM

BB&T Ballpark Wayne Brothers Inc. & Harris Steel Cast in place

Kalasatama Fiskari and Fregatti Insinööritoimisto Mäkeläinen Oy Precast

Gap Ice-skating Rink Sarl Patrick Millet Steel

Tesco Sheringham Pinnacle Engineering

Baku Olympic Stadium Tekfen & Sdeng Total BIM

Sengenthal Biomass Heat and Max Bögl Total BIMPower Plant

Pantin – Terralia Vinci, CBC, BET Le Joncour & Cast in placeAtelier d’Architecture Téqui

Knislinge Power Plant WSP Bridge & Civil Engineering Cast in place

Jepua Waste-to-Energy Plant Wise Group Finland Oy Steel

Kapelanka 42 Consolis Polska Precast

Nye Gand Videregåend School Constravia Precast

SAFI SAP – Sidi Rosia Plant OCP / JESA / JACOBS France Engineering

King Abdulla Sports City Six Construct Engineering

5

Tekl

a G

loba

l BIM

Aw

ards

201

3

Page 6: Tekla Global BIM Awards 2013

Puuvilla Shopping Center

Tekl

a G

loba

l BIM

Aw

ards

201

3

By Puuvilla Shopping Center project group

In Pori, Finland– Mixes 100-year-old and contemporary structures for

creating 100,00m2 of retail space

– A true product of collaboration: 13 companies teamed up for modeling

– BIM used in structural design, precast detailing, steel roof structures and façade elements to architectural, MEP and sprinkler design

6

Page 7: Tekla Global BIM Awards 2013

Puuvilla Shopping Center

Tekl

a G

loba

l BIM

Aw

ards

201

3

7

Page 8: Tekla Global BIM Awards 2013

BB&T Ballpark

Tekl

a G

loba

l BIM

Aw

ards

201

3

Concrete and coordination by Wayne Brothers Inc., Rebar by Harris Steel

In Charlotte, USA– 10,000 seat stadium used for baseball games, concerts,

festivals and community events

– Wayne Brothers modeled cast in place and sitework, and planned pours, tracked progress and coordinated sequences with other trades

– Layout managed with points created in Tekla and placed with Trimble Robotic Total Station

8

Page 9: Tekla Global BIM Awards 2013

BB&T Ballpark

Tekl

a G

loba

l BIM

Aw

ards

201

3

9

Page 10: Tekla Global BIM Awards 2013

Kalasataman Fiskari and Fregatti

Tekl

a G

loba

l BIM

Aw

ards

201

3

By Engineering Office Mäkeläinen Oy

In Helsinki, Finland– Two 6-7 story residential building with yard deck

– Modeling from conceptual design to construction site

– Challenging facade with 30 structure types

– Model includes the piled foundations, detailed and reinforced concrete elements, load-bearing structures and thermal insulation and brickwork

10

Page 11: Tekla Global BIM Awards 2013

Tekl

a G

loba

l BIM

Aw

ards

201

3

Kalasataman Fiskari and Fregatti

11

Page 12: Tekla Global BIM Awards 2013

Gap Ice-skating Rink

Tekl

a G

loba

l BIM

Aw

ards

201

3

By Sarl Patrick Millet

In Gap, France– 1970s ice-skating rink updated to match today´s

seismological and other norms

– Original timber trusses had to be preserved

– Timber and steel structures in the model

12

Page 13: Tekla Global BIM Awards 2013

Gap Ice-skating Rink

Tekl

a G

loba

l BIM

Aw

ards

201

3

13

Page 14: Tekla Global BIM Awards 2013

Tesco Sheringham

Tekl

a G

loba

l BIM

Aw

ards

201

3

By Pinnacle

In Sheringham, UK– Everyday yet bespoke Tesco supermarket with a complex

timber roof structure

– BIM used for structural design and detailing of foundations and concrete and steel frame, facade, prefabrication, and creating drawings and bills of materials

– Thanks to modeling, the client could visualize the complete shopping experience

14

Page 15: Tekla Global BIM Awards 2013

Tesco Sheringham

Tekl

a G

loba

l BIM

Aw

ards

201

3

15

Page 16: Tekla Global BIM Awards 2013

Baku Olympic Stadium

Tekl

a G

loba

l BIM

Aw

ards

201

3

By Tekfen Engineering and Sdeng Steel & Structural Detail Engineering

In Baku, Azerbaijan– 68,000 seats

– Designers working in several countries and limited time demanded lot from communication tools

– Team modeled precast, reinforced concrete, steel structures and extracted fabrication drawings for fabrication facility in Turkey

– 3D animation of the complex roof installation developed using Tekla

16

Page 17: Tekla Global BIM Awards 2013

Baku Olympic Stadium

Tekl

a G

loba

l BIM

Aw

ards

201

3

17

Page 18: Tekla Global BIM Awards 2013

18

Tekla Global BIM Awards 2013

Finalists

Tekl

a G

loba

l BIM

Aw

ards

201

3

Page 19: Tekla Global BIM Awards 2013

Sengenthal Biomass Heat and Power Plant

Tekl

a G

loba

l BIM

Aw

ards

201

3

By Max Bögl

In Sengenthal, Germany– Supplies heat from biomass

combustion and gasification to the headquarters of Max Bögl

– Includes a main hall, carburetor building and a wood chip store

– A Max Bögl project from planning to assembly

19

Page 20: Tekla Global BIM Awards 2013

Tekl

a G

loba

l BIM

Aw

ards

201

3

Sengenthal Biomass Heat and Power Plant

20

Page 21: Tekla Global BIM Awards 2013

Pantin - Terralia

Tekl

a G

loba

l BIM

Aw

ards

201

3

By Vinci, CBC, BET Le Joncour & Atelier d’Architecture Téqui

In Paris– Residential cast in place building project with

41 apartments and a canal-side brasserie

– The team modeled the concrete frame and planned the pour program

– Documents on planning and structures including daily formwork created from the model

21

Page 22: Tekla Global BIM Awards 2013

Tekl

a G

loba

l BIM

Aw

ards

201

3

Pantin - Terralia

22

Page 23: Tekla Global BIM Awards 2013

Knislinge Power Plant

Tekl

a G

loba

l BIM

Aw

ards

201

3

By WSP Bridge & Civil Engineering

In Skåne, Sweden– Hydropower plant producing 4GWh

– Tricky geometry around the waterway made modeling concrete and reinforcement challenging

– WSP modeled parts that supplement the frame, including wood battens, furring, isolation and facade materials, plus extracted drawings from the Tekla model

23

Page 24: Tekla Global BIM Awards 2013

Tekl

a G

loba

l BIM

Aw

ards

201

3

Knislinge Power Plant

24

Page 25: Tekla Global BIM Awards 2013

Jepua Waste-To-Energy Plant

Tekl

a G

loba

l BIM

Aw

ards

201

3

By Wise Ground Finland Oy

In Jepua, Finland– Several buildings including gas

processing, reception and 24-meter high boiler buildings

– Structural designer Wise and general contractor Fira collaborated extensively

– Models of process equipment and structures combined to avoid clashes

25

Page 26: Tekla Global BIM Awards 2013

Tekl

a G

loba

l BIM

Aw

ards

201

3

Jepua Waste-To-Energy Plant

26

Page 27: Tekla Global BIM Awards 2013

Kapelanka 42

Tekl

a G

loba

l BIM

Aw

ards

201

3

By Consolis Polska

In Cracow, Poland– 25,000m2 of office space in two

buildings

– Tekla utilized for designing and detailing the precast concrete elements plus monolithic and steel parts

– Creating the model in the tendering phase allowed the team to make quantity takeoffs and present structural changes to the client understandably

27

Page 28: Tekla Global BIM Awards 2013

Tekl

a G

loba

l BIM

Aw

ards

201

3

Kapelanka 42

28

Page 29: Tekla Global BIM Awards 2013

Nye Gand Videregåend Skole

Tekl

a G

loba

l BIM

Aw

ards

201

3

By Costravia

In Stavanger, Norway– A school building designed to last seismic

activity

– Constravia modeled precast concrete structures including columns, beams, hollow-core slabs and internal walls, and cast in place concrete foundations & steel parts of frame

– Very tight schedule and simultaneous work on design and construction on site

29

Page 30: Tekla Global BIM Awards 2013

Tekl

a G

loba

l BIM

Aw

ards

201

3

Nye Gand Videregåend Skole

30

Page 31: Tekla Global BIM Awards 2013

SAFI SAP - Sidi Rosia Plant

Tekl

a G

loba

l BIM

Aw

ards

201

3

By OCP / JESA / JACOBS France

In Sidi Rosia, Morocco– Two production units for sulfuric acid, both producing 3,400 tons of acid per day

– Effective design process: The units are designed 80% alike although differently integrated

– Interoperability crucial: PDMS reference models of initial process design and piping were exported into Tekla, and further exported from Tekla to Tekla BIMsight and Navisworks

31

Page 32: Tekla Global BIM Awards 2013

Tekl

a G

loba

l BIM

Aw

ards

201

3

SAFI SAP - Sidi Rosia Plant

32

Page 33: Tekla Global BIM Awards 2013

Tekl

a G

loba

l BIM

Aw

ards

201

3

King Abdulla Sport City

By Six Costruct

In Saudi Arabia– 60,000 seat stadium with 500 person

Mosque and a minaret plus 8 km asphalted road and 2 km pedestrian walkways

– BIM used in structural design and detailing of the frame and foundations, modeling precast and cast in place concrete

– Drawing and bills of materials extracted from the Tekla model

33

Page 34: Tekla Global BIM Awards 2013

King Abdulla Sport City

Tekl

a G

loba

l BIM

Aw

ards

201

3

34


Top Related