Team Andromeda Lucas Ibarra Alexis

SutkerEvan Long Jack Oblack

Jaevyn Faulk Dylan Anderson

Devon Connor Eric Hardwick

2 October 2012

Mission Statement Jaevyn Faulk

• Collect Ultraviolet Radiation– Compare data we collect to past data on

sun’s activity.– Study how solar activity has changed

throughout an eleven-year sunspot cycle and how it has changed recently.

– Using data from previous flights and the National Center for Atmospheric Research (NCAR) to find the change in activity of the sun.

Mission OverviewDevon Connor

• Increasing UV radiation.• Hypothesize that UV radiation

levels will be higher than in past years.

• Determine if radiation is increasing or not.

• Harmful effects on communication and life on Earth.

• Solar flare cycle

Technical Overview Lucas Ibarra

• Sensors–Six light to

frequency converters–UVB

photodiode–Positioned on

5 sides of the Balloon SAT

TW30SX UV Photo Diode

SFE Light to Frequency Converter

Design Dylan Anderson

• Rigid Structure of Foam Core• 15cm x 15cm x 15cm• Two Camera’s• Arduino• HOBO Data Logger

Arduino Uno

Heating System

HOBO Data Logger

Canon A78

Go Pro

9V Batteries

Heater Block

Switch

9V Battery 9V Battery9V Battery

UV Sensors

Camera 1(GoPro)

Camera 2(Canon A780)

9V Battery

Accelerometer

Temp Sensor(External)

Temp Sensor(Internal)

Switch

Pressure SensorHumidity Sensor

Altimeter

9V BatteryCamera Battery

MicroSD Card

GoPro Battery

GoPro MemeoryArduino Uno

HOBO Datalogger

Block DiagramEric Hardwick

ManagementEvan Long

• Evan Long - Integration• Dylan Anderson - Structural Design• Alexis Sutker - C&DH Filming• Jaevyn Faulk - Science• Lucas Ibarra - C&DH• Eric Hardwick - Power & Data Collection• Devon Connor - Power & Data Collection• Jack Oblack - Budget Management

ScheduleDate: Schedule:9.17.12 Team Dinner Meeting @ Ted’s (730-930 pm)

9.19.12 Meeting for Soldering Arduino’s in ITLL (3-430pm)

9.21.12 Meeting for Soldering Arduino’s in ITLL (2-330pm)

9.24.12 Meeting in ITTL Group Work Rooms (800-1030pm)

9.25.12 Meeting in ITTL Group Work Rooms (1-245pm)

9.27.12 Gateway to Space Free Class Period (930-1045am)`

9.27.12 Meeting in ITLL Group Work Rooms (2-400) (8-1200pm)

9.28.12 Meeting in ITLL Group Work Rooms to Assemble Proposal (12-4pm)

9.28.12 Proposal Due (4pm)

10.1.12 Regular Team Meeting (8-10pm) for CoDR

10.2.12 CoDR Turn in and Presentation (930-1045)Review of CoDR

10.5.12 HW 6 Due

10.5.12 Parts list order form due (HW 5)

TBD Parts Arrive

TBD Integration Begins

10.8.12 Regular Team Meeting to discuss CDR topics (8-10pm)

10.18.12 pCDR and Design Document Rev A/B Due (7am)Reviews of pCDR

10.22.12 Regular Team Meeting for Assembly

10.23.12 HW 7 Due

10.29.12 Regular Team Meeting (8-10pm) for Flight Testing

11.1.12 Mid Semester Evaluations Due

11.5.12 Regular Team Meeting

11.12.12 Regular Team Meeting for Final Mission Simulation Preparedness

11.13.12 In Class Mission Simulation

11.15.12 Design Document Review Due (12pm(11.16.12))

11.19.12 Regular Team Meeting to check Final Assembly

11.27.12 Launch Readiness Review

11.30.12 Final BalloonSat Weigh in and TURN in (930-1045)

12.1.12 Launch DAY (445-400pm)

12.11.12 Final Hardware Turn In

12.11.12 Final Presentations and Reports (6-900pm)

Cost OverviewAlexis Sutker

BudgetItem Cost Weight

Structure $4.00 90 g

Hardware $27.39 513g

Cameras $148.98 + S&H 371g

Sensors $23.60 + S&H 72g

Dry Ice $12.00 4536g

Total for BalloonSat

1046g

Biggest WorriesJack Oblack

• Temperature (GoPro only good to -10 C)

• Programming correctly• Sifting through all the UV

frequencies after we retrieve data

• Getting everything done on time

• Integrating everything together properly