Transcript

Stephen AmbroseGOES-R Data Operations Manager (DOM)

OSPO/SPSD

March 12, 2013

GOES-R Ground Segment Project

Data Operations Support Team System Validation Activities

Brief to NWS-NESDIS/SPSD Quarterly Meeting

The GOES-R System-Operational View

Data and Products

Suitland, MDFairmont, WV

Enterprise Management

Mission Management

ProductGeneration

L2+ Data and Products

Product Distribution

LAN

NSOFRBU

LAN

• MM• EM• PG (L0, L1b, L2+ GLM,

GRB, KPP)• PD

MM: Mission ManagementEM: Enterprise ManagementPG: Product GenerationPD: Product Distribution

HRIT/EMWIN, GRB

SARSAT

GE

OL

UT

BE

AC

ON

S

DCS

DR

GS

Da

ta Co

llectio

n

Pla

tform

s (D

CP

)

• MM• EM• PG• PD

Wallops, VA

75o

WAN

137o

Product

Dis

t. & A

cces

s (P

DA)

(GO

ES-R A

cces

s Sub

syst

em- G

AS)

User Community

Operate Satellites

Operate Ground Seg

MaintainGround Seg

ProduceProducts

Data and Products

LAN

WCDAS

DCPC

DCPRDCS

L1b, L2+ GLM,GRB, KPP

L0,

3

DOM/DOST “Mission”

• DOM = Data Operations Manager• DOST = Data Operations Support Team

• Prepare OSPO to operate the Core GS Data Processing and Distribution System (DPDS)

• Validate that the Core GS “DPDS” is Mission Capable and Mission Ready

• Facilitate Consumer System Readiness for GOES-R Data Operations

• Accomplished by– Procedure and CONOP Development– Prototypes and Exercises– Facilitation of Test Data– Planning and Execution of two Pre-Launch “Data Operations Tests” (DOT)– Support for Post-Launch Tests

4

Data Operations Tests

• Two Pre-Launch Validation Opportunities– DOT-1: Directly following GS Release One– DOT-2: Directly after GS is complete (Release 1a and Release 2)

• One month sustained data operations– Continuous “Forecast Based” Level 1B– Interrupts for special test cases

• Facilitate readiness testing of downstream users

Direct BroadcastCommunity

NOAAPortCommunity

Climate, Research, and Academia

NWSForecast Offices

Operational User Community

NOAA Centers, DOD, NCEP, International Partners

WCDAS

NSOF

RBU

C

C

C

PDAP

DPG

MM

PD

PG

MM

PD

PG

MM

TNCF

BNCF

ANCF

NCDC

NGDC

AncillarySources

Validation ResponsibilityConsumer System Readiness Support

Data Flow through the GOES-R System

NOAAPortCommunity

Climate, Research, and Academia

NWSForecast Offices

Operational User Community

NOAA Centers, DOD, NCEP, International Partners

WCDAS

NSOF

RBU

C

C

C

PDAP

DPG

MM

PD

PG

MM

PD

PG

MM

TNCF

BNCF

ANCF

NCDC

NGDC

AncillarySources

Validation Responsibility Consumer System Readiness Support

ForecastBasedFixed GridL1b

ForecastBasedFixed GridL1b

PretendSat

Normal DOT Data Flow

Direct BroadcastCommunity

*

NOAAPortCommunity

Climate, Research, and Academia

NWSForecast Offices

Operational User Community

NOAA Centers, DOD, NCEP, International Partners

WCDAS

NSOF

RBU

C

C

C

PDAP

DPG

MM

PD

PG

MM

PD

PG

MM

TNCF

BNCF

ANCF

NCDC

NGDC

AncillarySources

Validation Responsibility Consumer System Readiness Support

SimulatedCCSDSPacket Stream

SimulatedCCSDSPacket Stream

PretendSat

Canned “End-to-End” Test during DOT-1

8

DOT Planning

VMRD

ValidationObjectives

TestObjectives

TestDesign

Development: Test ProceduresData and Component SimulatorsAnalysis Tools

Approaching with Systems Engineering Discipline

Test Execution and AnalysisDOT-1DOT-2

Validation Assessment

GRD

9

Left Side of the V – Validation Objectives

• Validation Objectives– Validation is not a repeat of Verification

• Incorporate the People and Mission aspect• Run in a “dirty” environment• Interact with the real world

– Validation Objectives are to Validation • …as Requirements are to Verification• Decompose them like requirements• Account for them like requirements• But…• V.O.s can be subjective, not necessarily pass/fail• Use V.O.s to establish shared expectations with Stakeholders

Artwork by NWS/AWIPS, courtesy Brian Gockel

GOES-R Ground Segment Project Status Review 11

DOST Project Overview

• Phase One – Project Definition – Completed

• Phase Two – Preliminary Design – Dec 2012 – Apr 2013

• Phase Three – Detail Design – Apr 2013 – Oct 2013

• Phase Four – Implementation – Nov 2013 – Apr 2014

• Phase Five – Execution of Pre-Launch Testing – May 2014- Apr 2015

• Phase Six – Execution of Post-Launch Testing

Month DD, YYYY

GOES-R Ground Segment Project Status Review 12

Phase Two Overview

• Validation Objectives Review• Validation Objective Decomposition• Development of Ops Procedure List• Preparation of Validation Plan version 1• Coordination of External Validation Objectives Development

Month DD, YYYY

GOES-R Ground Segment Project Status Review 13

Phase Three Overview

• Validation Preliminary Design Review• Test Designs• Data Set and Simulator Specifications• Analysis Tool Specifications• Oversight of Ops Procedure Development• Preparation of Validation Plan rev 2• Coordination with External Validation Test Developments

Month DD, YYYY

GOES-R Ground Segment Project Status Review 14

Phase Four Overview

• Validation Critical Design Review• Data Set and Generator Implementation• Tools Implementation• Test Procedure Development• Ops Procedure Evaluation and Development• Early Opportunity Testing

Month DD, YYYY

GOES-R Ground Segment Project Status Review 15

Phase Five Overview

• DOT-1 Test Readiness Review• Execution of DOT-1• DOT-1 Analysis and Reporting• DOT-2 Test Readiness Review• Execution of DOT-2• DOT-2 Analysis and Reporting

Month DD, YYYY

GOES-R Ground Segment Project Status Review 16

As of:

DOST Top Level Schedule

August 30, 2012

December 31, 2012FY12 FY13 FY14 FY15 FY16

Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Current Milestone Deliverable Development Construction Integration / Test Current MonthMilestone Slip/Change

Fiscal YearTask #

GOES-R Program Milestones1

Ground Segment2

Validation Objectives Review3

DOST Phase Two4

DOST Phase Three5

DOST Phase Four6

DOST Phase Five7

DOST Phase Six8

5/12

KDP II 8/12

CDR I

11/12

CDR II

10/13

SIR

1/14

MOR

5/14

ETE1

8/14

ETE2

12/14

ETE3

1/15

FOR

3/15

ETE4

4/15

ORR

8/15

ETE5

9/15

MRRLRD10/15

7/12

GS CDR

8/13

Form DOST

10/14

DOT1

1/15

DOT2

4/15GSP ORRReady.

7/15

PLPT

9/15

GRD

9/12

1/13

ObjectivesReview 3/13

Submit OpsProc List

5/13Data Operations Validation

Prelim Planning Review

5/13

Start DesignIn-house Ops Proc

8/13

StaffDOST 10/13

Data Ops Validation PlanApproved

12/13

Data Ops ValidationCPR 2/14

Test Proc.Dev Cmplt

4/14Data Ops Validation

Proc Approved

6/14

DOT-1TRR 7/14

DOT-1Test Cmplt

12/14

DOT-2TRR 1/15

DOT-2 Test ExecutionComplete

3/15

DOT-2 ReportApproved

7/15

PLPTTRR 8/15

PLPT ReleaseReport

Notes:

CDR: Critical Design Review DOT: Data Operational Testing MOR: Mission Operations Review ORR: Operational Readiness Review TRR: Test Readiness Review

17

As of:2012 2013 2014 2015 2016

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Current Milestone Deliverable Construction Integration / Test SlackPlanned Available Date

YearTask #

Data Operations Support Team

1

Mission Operations Support Team

2

Core Ground Segment3

ESPDS / PDA/ ADRS4

CLASS Upgrades5

AWIPS6

5/13

Data OpsValidation

PPR

8/13

FormDOST

Data OpsValidationCDR 12/13

4/14 Data OpsValidation

Proc Approved

DOT-1TRR6/14

DOT-110/14

DOT-2TRR12/14

DOT-24/15

9/15GRD

PLPT 11/15

10/13

SIR

1/14

MOR

5/14ETE1

8/14ETE2

12/14ETE31/15

FOR

3/15ETE44/15

ORR

8/15ETE5

9/15MRR

LRD10/15

2/13

ECP007IBR

6/13

RelMM

8/13

GSIR

2/14

RMMa

8/14

R1

10/14

R2

12/14

R1a

9/15

Core GSReadiness

1/13

Inc 1 TRR

10/13

Inc 1 ORR

2/14

Inc 2 TRR

10/14

Inc 2 ORR

12/12

Upgrade

8/13

Available forETE

12/13

Available for R1 I/F

4/14

CTRN Available for ETE

10/12

Phase 1

TNCF Readiness for Interface testing (w/WCDAS)

11/13 Phase 211/13

BNCF Readiness for Interface

fail-over testing 11/13

Integrate & Checkout RBU OE 12/13

ANCF & BNCF Oper. Upgrade 6/14

10/14

GOES-R SW Install

12/15

Operational GOES-R SWInstall on NCF

Notes:

CDR: Critical Design Review DOT: Data Operational Testing ETE: End to End Test MOR: Mission Operations Review ORR: Operational Readiness Review PDR: Preliminary Design Review PSR: Pre-Ship Review SIR: Systems Integration Review TRR: Test Readiness Review

Validation Testing Dependencies January 31, 2013

18

Summary

• DOM – Data Operations Manager• DOST – Data Operations Support Team• DOTS – Two One-Month Pre-Launch Shakedown Cruises

• Focus: System Validation/Readiness of Data Processing & Distribution

• DOVOs – Data Ops Validation Objectives• EDOVOs – External Stakeholder Data Ops Validation Objectives

• Not “Re-Verification”• Not “Product Science Validation”