Southern Crossroads (SoX)Participant Meeting
Fall 2016http://www.sox.net
New website next weekhttp://s1.sox.net
Agenda -‐ Thursday•Logistics•Introductions•Agenda Bash•Network Updates•Participant Updates•Commodity Internet•SoX NOC•NSF Workshops and Grant applications•Brainstorming over Dinner
Agenda -‐ Friday•RPKI and Routing Security•GENI Updates•SDX – GENI and AtlanticWave•SmartCities Projects and Opportunities•Workshops•SoX Colo for Compute and Storage -‐ Dallas•HVS update•CODA•Customer Feedback•Participant Survey•What’s next
Network Updates•Internet2 Update•Atlanta core node replacement•Was Brocade + Juniper•Now Juniper only•100G Interfaces: C-‐LIGHT, Jacksonville, Charlotte, SoX, Louisville, Washington, Jackson
Network Updates•Internet2 Update•Internet2 Network Community Investment•Call for papers (due November 1, 2017)•Workshop January 5-‐6, 2017•Plan for 2018-‐2023•Describe projected needs•Share thoughts•Do differently, or continue to do
Network Updates•Internet2 Update•NTAC DDOS•Continue to review solutions from community•I2 gauging interest in Net+ service
Network Updates•Regional Network Redundancy–Atlanta•56 Marietta St (Telx)•55 Marietta St (Colo-‐ATL)•345 Courtland St (Level3) moved from suite to cabinet
–Nashville•460 Metroplex (CenturyLink)•2990 Sidco (Level3)
Network Updates•Regional Network Redundancy–Dallas•1950 Stemmons (Equinix at InfoMart)•Georgia Tech has space here
–Chicago•710 N. Lakeshore (Starlight)
SoX 100G footprint
56 MariettaJuniper MX960
NashvilleMetroplex DrMX240
NashvilleSidco DrMX240
LEGEND: 10G20G100G
SoX 100G footprint
56 MariettaJuniper MX960
NashvilleMetroplex DrMX240
NashvilleSidco DrMX240
LEGEND: 10G20G100G
SoX 100G footprint
56 MariettaJuniper MX960
NashvilleMetroplex DrMX240
NashvilleSidco DrMX240
LEGEND: 10G20G100G
SoX 100G footprint
56 MariettaJuniper MX960
NashvilleMetroplex DrMX240
NashvilleSidco DrMX240
LEGEND: 10G20G100G
SoX 100G footprint
56 MariettaJuniper MX960
NashvilleMetroplex DrMX240
NashvilleSidco DrMX240
LEGEND: 10G20G100G
SoX 100G footprint
56 MariettaJuniper MX960
NashvilleMetroplex DrMX240
NashvilleSidco DrMX240
LEGEND: 10G20G100G
SoX 100G footprint
56 MariettaJuniper MX960
NashvilleMetroplex DrMX240
NashvilleSidco DrMX240
LEGEND: 10G20G100G
Peering statistics
• International : RedCLARA•National: Internet2, ESNet, ISC• Regional: MREN, ONE-‐NET, FLR, MARIA• TIEX: 23 peers• SNAP (55 Marietta): 2•NOTA: 1•Other 56 Marietta Peerings: 3
• TR-‐CPS participants: 12• Telia participants: 14
0
20
40
60
80
100
120
Ticket CreationsTotal Tickets
Participant Requested Tickets
Total Unscheduled Outages
Non-Participant Outages
Participant Outages
DB, Calls, and EmailsDB Entries Calls Inbound
EmailsOutbound Emails
Total Emails
Oct-‐15 N/A* 20 208 2 210
Nov-‐15 N/A* 20 71 45 116
Dec-‐15 1912 29 117 23 140
Jan-‐16 1922 8 157 24 181
Feb-‐16 1931 9 211 21 232
Mar-‐16 1948 18 241 11 252
Apr-‐16 1952 18 447 23 470
May-‐16 1972 14 784 28 812
Jun-‐16 1983 25 754 24 778
Jul-‐16 1971 6 697 15 712
Aug-‐16 1975 13 790 22 885
Sep-‐16 1966 21 589 29 618
R&E Peering
ESNet• Migration to 100G• FLR moving peering from Chicago over Internet2
to Atlanta through SoX
Commodity Internet
•Quilt•No Quilt Agreements with •NTT $0.80/Mbps•Tata $0.72/Mbps•Verizon $1.25/Mbps 10G •$1.58/Mbps 2G
NSF Workshops/Grant Applications
• OIN workshop
December 13th-14th – Nashville/Vanderbilt
• SPAN workshops• Spring 2017 Orangeburg, SC/SC State• Fall 2017 Durham, NC/Duke
NSF Workshops/Grant Applications
• OIN workshop
December 13th-14th – Nashville/Vanderbilt
• SPAN workshops• Spring 2017 Orangeburg, SC/SC State• Fall 2017 Durham, NC/Duke