Download - Material Management Presentation (New 1)
R/3R/3Client / ServerClient / Server
ABAP/4ABAP/4
FIFIFinancialFinancial
AccountingAccounting
COCOControllingControlling
AMAMFixed AssetsFixed Assets
Mgmt.Mgmt.
PSPSProjectProjectSystemSystem
WFWFWorkflowWorkflow
ISISIndustryIndustry
SolutionsSolutions
MMMMMaterialsMaterials
Mgmt.Mgmt.
HRHRHumanHuman
ResourcesResources
SDSDSales &Sales &
DistributionDistribution
PPPPProductionProductionPlanningPlanning
QMQMQualityQualityMgmt.Mgmt. PMPM
PlantPlantMaintenanceMaintenance
Integrated solutions
Open systems
Client / serverarchitecture
Enterprise datamodel
Designed for all typesof business
Multinational
Comprehensivefunctionality
Presentation Agenda
Presentation Contents:
.The Integrated Supply Chain
.Organization Structures .Master data – Structures - Configuration .MM-MRP Planning . Release Strategy for Purchase Requisition
.MM-Purchasing Process .Source List , Info record, Quota arrangement
.RFQ, Maintain Quote .Purchase order .Scheduling Agreements .Inventory Management .Physical inventory .Invoice Verification.Warehouse Management .Other issues – repair processing, hard allocation, shelf life, project stores, vendor consignment processing.Valuation.Reporting , Information system
The Integrated Supply Chain
Capacity resourcesCapacity resources
Capital resourcesCapital resources
long-termlong-term short-termshort-term
Material resourcesMaterial resources
Logistic processesLogistic processes
vendorvendor
productionproduction sales sales procurementprocurement
clientclient
Organizational Levels : Logistics
Group
Company Code
Valuation level
Purchasing Organization
Sales Organization
Plants
Warehouses
001001
001001002
002
001001
002002
003003
30003000
40004000
001001
001001
00010001
00020002 0003
0003
special stocks
special stocks 0002
0002 0001 LVS0001 LVS
Organizational Structure
• Company Code– A legally independent unit within a client that prepares its own balance sheet
– Is the central organizational unit in financial accounting
• Purchasing Organization– A organizational unit that procures materials or services, and negotiates
general purchasing conditions with vendors
– Responsible for procuring materials and services for the plants to which it has been assigned
– Uniquely allocated to one company code
• Purchasing Group– A purchasing organization is divided into purchasing groups (groups of
buyers) that are responsible for operational tasks
Organizational Structure...
• Plant– An operating unit concerned with production and
planning or
Simply a combination of locations with material
stocks, known as storage locations
– Is a central organization unit in materials management
• Storage Location– The total of all storage bins in a plant that are
managed together
MM - Organizational Units
Group
Company code
Purch.Org.
Plants
Storage Location
001001
0002000200010001
300030002000200010001000
0005000500040004000300030002000200010001
WM 0088WM 00880002000200010001
Plant
Overview
MRP
Purchasing
Accounting
Warehousemanagementsystem
Goods receipt
Inventory Management Material Valuation
Goods Transferissue posting
Invoice receipt
Invoice verification
Master data
MaterialBatchesVendorsCustomers :
Organizational Structure & Master Data
Organizational Structure & Master Data
• Materials• Vendors• Information Records
MMMaster
Data
MMMaster
DataInventory
Management
Inventory ManagementProcurementProcurement
MRPMRP
Organisation Structures
P la n t1 11
P la n t2 22
P u rch .O rgC C C C
C o m p a n y co deB B B B
C o m p a n y co deX X X X
C o m p a n y co deY Y Y Y
C lie n tA A A A
Purchasing View
Purch.
S to ra g e T ypeB in 1B in 2
W a re h ou se9 99
S to ra g e L oc5 55
S to ra g e L oc6 66
S to ra g e L oc7 77
P la n t1 11
P la n t2 22
C o m p a n y co deB B B B
C o m p a n y co deX X X X
C o m p a n y co deY Y Y Y
C lie n tA A A A
Materials View
Master Data - Material
Configuration Issues• Material Number structure
• Material type
• Material groups
• Classification
• Price control
• Split valuation
• Material description / texts
• Screen sequence / control
• Field selection
• Define match codes
• Batch management
• Shelf life management
• MRP / Forecast profile
• Engineering change management
• Changing critical fields - Unit of measure, valuation class, material type
• Deletion / archiving material
• Authorization for views
Material Type - Design Considerations…
Material Type
• Stock Material, Direct Material, Project Material, Trading Goods etc.
Attributes of Material Type
• Field Selection , Material Number range
• Views of Master data - engineering, Procurement, MRP, Accounting etc
• Qty / Value basis
• Internal / External procurement allowed
• Accounting assignments - Account categories - Valuation classes
• Price control - Moving average, standard price
Material Type - Design Considerations…
• Restrict number of material types
• Use material groups to classify materials as far as possible
• Difficult to change the material type later on
• Example of Material type - ZSTK, ZDM, ZPRO Configuration specifics - Field reference , material number, account assignments
Materials Master Data -
How Data is Organized
General DataGeneral Data
Materials numberDescriptionUnits of measureTechnical Data
Materials numberDescriptionUnits of measureTechnical Data
Plant Plant
MRP typePlanned Delv typePurchasing groupBatch indicator
MRP typePlanned Delv typePurchasing groupBatch indicator
ValuationValuation
Valuation typeValuation priceValuation procedureValuated quantity
Valuation typeValuation priceValuation procedureValuated quantity
Warehouse Warehouse
Unit of measurePalletizationinstructions
Unit of measurePalletizationinstructions
PurchasingPurchasing
Purchase groupPurchase value key
Sales texts
Purchase groupPurchase value key
Sales texts
Storage loc.Storage loc.
Storage periodStock fields
Storage periodStock fields
Forecast dataForecast data
Forecast model paramsConsumption data
Forecast model paramsConsumption data
Vary by material type
Material TypeMaterial Type
• Raw Material• Op-Supplies • Trading Goods • Spare part • Finished goods• Etc.
Materials Master Data - How Data is Viewed
Engineering Data Accounting
Purchasing DataSales Data
Storage
MRP Data
Warehouse Management
Material TypeMaterial Type
Material Match codes and ClassificationMaterial Match codes and Classification
Material match codes and classification are two different methodologies used to search for and select materials
Material Class (Classification)...
LogicalPumps
Butterfly Pump Metal Pump
Butterfly Pumpone
Butterfly Pumptwo
SAP Classes
Butterfly Pump
Characteristics:WEIGHTVOLUMEPRESSURE
REAL CLASS
Butterfly Pump, one,110bsValuesWeight 40kgVolume 20cmPressure 110 lb
Material 100001
Butterfly Pump, two,120lbsValuesWeight 50kgVolume 25cmPressure 120 lb
Material 100005
Material Master Record
Material Match codes
Material Material DescriptionMaterial DescriptionMaterial Description... ...... ...
DescriptionOld Mat’l No Mat’l Group(Class)
SAP Transaction Screen List of Selected Materials
Material Matchcode
ClassificationClassificationMatchcodesMatchcodes
Advantages and Disadvantages
Advantages•Quick to use
•Easy to setup
•Does not require on-going maintenance
•Integrated intostandard reports
Disadvantages•Not Structured
•Depends on following naming conventions and standards
Advantages•Easy to use
•Follows specific Standards
•Uses Hierarchies
Disadvantages•Requires continuous maintenance
•Slower to use, more screens to enter
•Not integrated intostandard reports
Vendors - Complex Structures
• Central vendor master - Material, contract, Finance
• Vendor Number structure
• Match codes - vendor number, search term, vendor name
• Account group which controls field layout / data retention level
• Partner functions
• Critical fields– GR Based invoice verification
– Acknowledgement required
– Order currency
– Subsequent settlement
– Business volume comparison
– Terms of payment
• Maintenance Procedure / Authorization control
• Blocking Vendor
Vendors - Complex Structures
• ‘Vendor Partner Functions’ introduced with v3.0• Allows you to link separate ‘vendor’ address
records together in a family• Can assign roles to each type of ‘vendor’ address
records• Also referred to as ‘business partners’ in the SAP
documentation• Configuration sits under ‘Logistics’ not ‘Material
Management’
Vendors - Complex Structures...
ExampleManufacturer AManufacturer A
Manufacturer BManufacturer B
Vendor Record # 100001
Vendor Record # 100002
‘Order From’ Address ‘A’
‘Order From’ Address ‘A’
‘Order from’ Address ‘B’
‘Order from’ Address ‘B’
Vendor Record # 100010
Vendor Record # 100002
SupplierPrimary Vendor‘Pay To’ Address
Vendor Record # 100080
Vendor Types
Vendor Type
• Controlled by account group
• Controls field selection
• Partner Determination Procedure (role) assigned for each type (1:1)
• Number range assigned for each vendor type
• Data retention at sub range / plant level
• Purchase Requisitions• RFQs • Contracts• Purchase Orders
• Receiving• Disbursement• Physical Inventory (Raw, Crib,
Finished Goods)• Warehouse Management
MMMaster
Data
MMMaster
DataInventory
Management
Inventory ManagementProcurementProcurement
MRPMRP
MM Business Activities
Materials Requirement Planning
Configuration issues - Plant level
• MRP Types - V1, V2, VB, PD, VV
• MRP groups
• MRP Controllers
• Planning horizon
• Available stock
• PR or Planned order
• Blocked stock or Disposal store
Materials Requirement Planning
MRP determines the quantity of material required and creates the purchase order proposal based upon:
Reorder point planning (Consumption based MRP)
Forecast based planning (Deterministic MRP)
MRP General Parameters
MRP Parameters are set up at plant level
MRP groupThe MRP group, groups together materials from the planning point of view for allocating special control parameters for the planning run.
MRP controller
In this field, you must enter a key for a single MRP controller or
for a group of MRP controllers who/which is responsible for the
planning of a material. In the future, you can process
the MRP results according to the MRP controller.
MRP General Parameters
MRP parameters are set up at plant level
Purchasing group
In this field, you must enter a key for a buyer or for a group of buyers who/which is responsible for purchasing the material. As a result, during a planning run, order proposals for externally procured materials can immediately be allocated to the appropriate purchasing group.
Safety stockThe safety stock is used to prevent material shortfalls during the stocking-up period which may occur if consumption is unexpectedly high or if delivery dates are not kept. You have the choice between manually determining the safety stock or letting the system automatically.
1. Automatic creation of Purchase Requisitions
2. Automatic assignment of Buyer or Purchasing group
3. Automatic source selection for Sole supplier materials
4. Automatic assignment of MRP controller for review of plan results
5. Automatic cancellation of Purchase requests no longer required
6. Printing of MRP Replenishment List by MRP controller
7. Automatic creation of schedule line for blanket order outline agreements
MRP Planning - Automatic processes
1. Selective store can be excluded for MRP
Eg. Disposal store
2. Items under Blocked Status are excluded from MRP
3. Material in Blocked Stock area can be excluded from MRP
Eg. Rejected material after inspection lying in the blocked stock area
4. Material with Planning type - ND are not planned in MRP run
MRP Planning - Include/ Exclude
1. Schedule the MRP planning run
Automatic scheduling as per the frequency determined by MRP controller
2. Review and process the MRP List
3. Review the proposed Purchase Requisition
Amend PR quantity or Cancel PR if necessary
4. Release PR for further processing by Procurement
5. Review exception messages from MRP list for any necessary action
Eg. Cancel Purchase order if requirements no longer exist
Actions by MRP controller
Purchase Requisition Processing
Allocate and processAllocate and process
Purchase requisitionPurchase requisition
MRPMRP Direct entryDirect entry
Purchaseorder
RFQ
?Quotation
?
Obtain Quotes Evaluate Quotations
RFQ
? Quotation
?Quotation
?
Price Comparison
vs
Purchase Requisitions Types
•Store Stock(ZSTK)•Direct Materials(ZDM)
•Work Order PR(F)•Cost Center PR(K)•Project PR(Q)
Purchase Requisition Release Strategy:
A. Store Stock:
•According to Company Standard Level of Authorization Policy.
Purchasing documents
Purchaserequisition
Quotation
Contract/Release order
Request forquotation
Purchase order
Schedulingagreement
Purchaserequisition
Purchaseorder
Contract
Quot.
A
Quot.
B?Quot.
A
Quot.
B?
Req. f. quot.
?
The Procurement Cycle
PurchaseOrder
Invoice
Invoice verification
=Determination of
material requirements
Determination of source of supply
Purchase order processing
MMMMMaterialsMaterials
ManagementManagement
Purchase order monitoring
Goods receipt andinventory management
Vendor selection
Requirementsplanning
Vendor
Outline agmt.
Processing of RFQs
Vendor AVendor A
Vendor AVendor A
Vendor AVendor A
Quotation
?
!Quotation
M X B
K G P
H E C
Stock materialStock material Consumable materialConsumable materialPurchaserequisition
Request for quot.
Quotation processing
Quotation for RFQ 1Quotation for RFQ 1 Quotation for RFQ 2Quotation for RFQ 2 Quotation for RFQ 3Quotation for RFQ 3
AA BB CCVendorVendor VendorVendor VendorVendor
Certificate
Purchase order unit
Texts
Reminder
Conditions Purchase order statistics
Purchase Purchase orderorder
RejectionRejection
Price comparison listPrice comparison list
Purchase Orders
CreateRequisition
ApprovePR
Allocate Vendor (incl. RFQ
process)
Direct source or subcontract requisition
SUBSTITUTEITEM
PURCHASE ORDER
No. 890 Vendor No. 1304
Item No. 27
Create P.O.
Purchase order processing
PurchasePurchaserequisitionrequisition
RFQRFQ QuotationQuotation ContractContract
History
Purchase order
For external purchase order
o Standard itemo Consignmento Text
Stock material
Consumable mat.
Single/ multipleAcc. assignment
n Cost centern Projectn Sales Documentn Ordern Asset
Items/item categoryoptional
mandatory
Methods of Creating POs on SAP
• PO with reference to a purchase requisition
• PO with reference to a contract (Release Order)
• PO with reference to a RFQ
• PO with reference to another PO
• PO without reference
How is the source of supply determined?
Quota arrangements?Quota arrangements?
Source lists?Source lists?
Outline agreement?Outline agreement?
Info record?Info record?
Purchaserequisition
Purchaserequisition
Purchaserequisition
nn Outline Outline agreement item agreement itemnn Fixed vendor Fixed vendor
nn Outline Outline agreement item agreement item
nn Fixed vendor Fixed vendor/ vendor item information
80% 20%80% 20%
Outlineagreement
Piece
% Conditions
$
SourceList
Outline agreements
SupplementSupplement
Contract
Quality contract
Value contract
Consignment contract
Schedulingagreement
SupplementSupplement
Release orders
Deliveryschedule
Source list
Maintainmanually
Maintain fromoutline
agreement
Maintain frompurchasing info
record
Generate frominfo record or
outline agreement
Validity period Fixed vendor
Fixed outline agreement
Default source of supply in requisitionvia source determination
Check in purchase requisition andpurchase order for reliability
SourceList
SAP Inventory Management Structure
IM
WMfor Finished Goods
Storage Bin
Storage Section
Storage Bin
Finished GoodsStorage Location
Plant
Raw Material Storage Location
CribStorage Location
• Pick• Bulk• Interim• Mixed
Warehouse
Storage Type
Storage Bin
Inventory Management Functions
Inventory Management in SAP supports the following tasks:
• Receiving
• Management of material stocks by quantity and value
• Planning, data entry and documentation of all goods movements
• Warehouse Management
• Physical Inventory/
Cycle Counting
What is the result of a Goods Receipt ?
• A material document (goods receipt) is created• An accounting document is generated
(unless consignment stock)• Stock quantities are updated• Inventory values are updated• The PO is updated or closed
Invoice Verification Overview
Invoice
Invoice
Order
Goods receipt
Vendor Invoice
Invoice Verification
Vendor Open items
Invoice Verification Process
Delivery costs
Conditions
Material
Purchase order
Vendor master
Invoiceverification
G/L accounts
Assets
Cost centers
Projects *
Orders
InvoiceDocument
Invoiceverification
* From 2.0
GR-Based Invoice Verification
GR document50000100Delivery slip 4711
GR document50000099Delivery slip 08-15
GR document50000099Delivery slip ABC
Purchase Order
100 piece GR-based inv. verif.
Goods receiptGoods receipt50 pcs50 pcs
Goods receiptGoods receipt40 pcs40 pcs
Goods receiptGoods receipt10 pcs10 pcs
n GR-based invoiceverification indicatordefaulted from vendormaster/info record
n Invoice receipt only aftergoods receipt
Selection screenPurchase order Delivery note QuantityX 45000012 01 ABC 50X 45000012 01 4511 40X 45000012 01 08-15 10
Entry via purchase order,delivery slip or GR document
Invoice
Invoice Receipt Posting Schema
Cost account
from orderitem
IR document
Item Consumable1 material
Item Stock2 material
Price difference account
derived from table
GR/IRclearing account
Stock account
derived fromtable materialmaster record
Materialmaster record
A/P account
G/L accountpayable
Carry forward to profit and loss
Balance Sheet
Inventory Control Methods
SAP Inventory Management has two methods of inventory control:
• Physical Inventory
• Cycle Counting
General Purpose of warehouse managementGeneral Purpose of warehouse management
* Define/manage storage areas and bins in the warehouse
* Monitor stock movements
* Take inventory at storage bin level
* Ensure MM and warehouse stock posting is the same
* Integrate MM,PP and SD
Warehouse Management
Structuring the warehouse / basic data
StoragelocationStoragelocation
Warehouse Number
Warehouse Number
Storage typeStorage type Storage typeStorage type Storage typeStorage type
Storage binStorage bin Storage binStorage bin Storage binStorage bin Storage binStorage bin
QuantQuantQuantQuant QuantQuant QuantQuantQuantQuant
Physical Warehouse Structure
Goods Receipt
Goods Issue
GI Area
GR Area
HSR1
Blocked Stock
Transfer RequirementTransfer OrderTransfer RequirementTransfer Order
Transfer OrderPicking ListsTransfer OrderPicking Lists
Picking Area
NoneBlock storageOpen storageFixed bin storageAddition to existing stockNext Empty storage binStorage unit type
Cross line searchingCapacity checking
Strategies for Placing Goods
Partial Quantities first then standard quantities
FIFOLIFOAccording to quantityStringent FIFO for all storage types
Strategies for Removing Goods
Other Issues :
- Repair Processing
- Hard Allocation
- Shelf Life Items
- Project items
- Vendor Consignment Processing
- Valuation
MM Information SystemMM Information System
EIS
LIS
0
5
10
15
20
25
30
35
40
45
50
Inventory controllingPurchasing information system
ABC analysisRange of coverageStock valueSlow-moving itemInventory turnoverTotal analysisRanking listsDual classificationetc.
PlanningFlexible analysis according to- Purchasing group- Vendor- Material group- MaterialABC analysisPlan / actual comparisonetc.
SD PP QM PMPS
MM
PI