Two Phase MethodIn the Big M Method, we observed
that it was frequently necessary to add artificial variables to the constraints to obtain an initial basic feasible solution to an LPP. If problem is to be solved, the artificial variable must be driven to zero.
The two phase method is another method to handle these artificial variable. Here the LP problem is solved in two phase.
04/12/2023 Two-Phase Method 3
Phase I1. In this phase, we find an ibfs to the original
problem, for this all artificial variable are to be driven to zero. To do this an artificial objective function (w) is created which is the sum of all artificial variables. The new objective function is then minimized, subjected to the constraints of the given original problem using the simplex method. At the end of Phase I, three cases arises
A. If the minimum value of w=0, and no artificial variable appears in the basis at a positive level then the given problem has no feasible solution and procedure terminates.
04/12/2023 Two-Phase Method 4
B. If the minimum value of w=0, and no artificial variable appears in the basis, then a basic feasible solution to the given problem is obtained.
C. If the minimum value of the w=0 and one or more artificial variable appears in the basis at zero level, then a feasible solution to the original problem is obtained. However, we must take care of this artificial variable and see that it never become positive during Phase II computations.
04/12/2023 Two-Phase Method 5
Phase IIWhen Phase I results in (B) or (C), we go on
for Phase II to find optimum solution to the given LP problem. The basic feasible solution found at the end of Phase I now used as a starting solution for the original LP problem. Mean that find table of Phase I becomes initial table for Phase II in which artificial (auxiliary) objective function is replaced by the original objective function. Simplex method is then applied to arrive at optimum solution.
Note that the new objective function is always of minimization type regardless of whether the original problem of maximization or minimization type.
04/12/2023 Two-Phase Method 6
Example 1Solve given LPP by Two-Phase Method
1 2 3
1 2 3
1 2 3
1 2 3
5 4 3
Subject to 2 6 20
6 5 10 76
8 3 6 50
Max Z x x x
x x x
x x x
x x x
04/12/2023 Two-Phase Method 7
Add artificial variable to the first constraint and slack variable to second and third constraints.
Phase IAssigning a cost 1 to artificial variable and
cost o to other variables, the objective function of the auxiliary LPP is 1 2 3 1
1 2 3 1
1 2 3 1
1 2 3 1
1 2 3 2
* 0 0 0
* 0 0 0 0
Subject to 2 6 20
6 5 10 76
8 3 6 50
MinZ x x x A
MinZ x x x A
x x x A
x x x S
x x x S
04/12/2023 Two-Phase Method 8
Basis Variable
Coefficients of RHS Ratio
X1 X2 X3 S1 S2 A1
A1 2 1 -6 0 0 1 20
S1 6 5 10 1 0 0 76
S2 8 -3 6 0 1 0 50
Z* 0 0 0 0 0 -1 0
04/12/2023 Two-Phase Method 9
Row Calculations New Z=Old Z+R1
X1 is entering variable and S2 is leaving variable
Basis Variable
Coefficients of RHS Ratio
X1 X2 X3 S1 S2 A1
A1 2 1 -6 0 0 1 20 10
S1 6 5 10 1 0 0 76 76/6
S2 8 -3 6 0 1 0 50 50/8
Z* 2 1 -6 0 0 0 20
04/12/2023 Two-Phase Method 10
Row CalculationsNew R3=Old R3/8New R1=New R3*2-Old R1New R2=NewR3*6-Old R2New Z*=New R3*2-Old Z*
X2 is entering variable and A1 is leaving variable
Basis Variable
Coefficients of RHS Ratio
X1 X2 X3 S1 S2 A1
A1 0 1.75 -7.5 0 -1/4 1 7.5 4.28
S1 0 29/4 11/2 1 -0.75 0 77/2 5.31
X1 1 -3/8 6/8 0 1/8 0 50/8 ---
Z* 0 1.75 -7.5 0 -1/4 0 7.5
04/12/2023 Two-Phase Method 11
Row CalculationsNew R1=Old R1/1.75New R2=New R1*29/4-Old R2New R3=NewR1*(3/8)+Old R3New Z*=New R1-Old Z*
As there is no artificial variable in the basis go to Phase II
Basis Variable
Coefficients of RHS Ratio
X1 X2 X3 S1 S2 A1
X2 0 1 -4.28 0 -0.14 0.57 4.28
S1 0 0 36.53 0 0.765 -4.13 7.47
X1 1 0 -8.86 0 0.073 0.041 7.85
Z* 0 0 0 0 0 0.08 0.01
04/12/2023 Two-Phase Method 12
Phase IIConsider the final Simplex table of Phase I,
consider the actual cost associated with the original variables. Delete the artificial variable A1 column from the table as it is eliminated in Phase II.
1 3 1 2
1 3 1 2
5 4 3 0 0
5 4 3 0 0 0
MaxZ x x x S S
Max Z x x x S S
04/12/2023 Two-Phase Method 13
Row calculation: New Z=Old z+5(R3)-4(R1)
Basis Variable
Coefficients of RHS Ratio
X1 X2 X3 S1 S2
X2 0 1 -4.28 0 -0.14 4.28 0
S1 0 0 36.53 0 0.765 7.47 0
X1 1 0 -0.86 0 0.073 7.85 7.85
Z* -5 4 -3 0 0
Basis Variable
Coefficients of RHS Ratio
X1 X2 X3 S1 S2
X2 0 1 -4.28 0 -0.14 4.28
S1 0 0 36.53 0 0.765 7.47
X1 1 0 -0.86 0 0.073 7.855
Z* 0 0 9.82 0 0.925 22.148
04/12/2023 Two-Phase Method 14
As the given problem is of maximization and all the values in Z row are either zero or positive, an optimal solution is reached and is given by
X1=7.855X2=4.28 and Z=5X1-4X2+3X3Z=5(7.855)-4(4.28)+3(0) = 22.15
04/12/2023 Two-Phase Method 15
Example 2Solve by Two-Phase Simplex Method
1 2 3
1 2 3
1 2 3
1 2 3
4 3 9
Subject to 2 4 6 15
6 6 12
, , 0
Max Z x x x
x x x
x x x
x x x
04/12/2023 Two-Phase Method 16
Add artificial variable to the first constraint and slack variable to second and third constraints.
Phase IAssigning a cost 1 to artificial variable and
cost o to other variables, the objective function of the auxiliary LPP is
A new auxiliary linear programming problem1 2 3 1 2
1 2
1 2 3 1 1
1 2 3 2 2
* 0 0 0
* 0
2 4 6 15
6 6 12
MinZ x x x A A
MinZ A A
x x x S A
x x x S A
04/12/2023 Two-Phase Method 17
Phase IBasis Variable
Coefficients of RHS
X1 X2 X3 S1 S2 A1 A1
A1 2 4 6 -1 0 1 O 15
A2 6 1 6 0 -1 0 1 12
Z* 0 0 0 0 0 -1 -1 0
04/12/2023 Two-Phase Method 18
Row Calculations New Z*=R3+R1+R2
X3 is entering variable and A2 is leaving variable
Basis Variable
Coefficients of RHS Ratio
X1 X2 X3 S1 S2 A1 A1
A1 2 4 6 -1 0 1 O 15 15/6
A2 6 1 6 0 -1 0 1 12 12/6
Z* 8 5 12 -1 -1 0 0 27
04/12/2023 Two-Phase Method 19
Row CalculationsNew R2=Old R2/6New R1= New R2*6-Old R1New Z*=New R2*12-Old Z*
X2 is entering variable and A1 is leaving variable
Basis Variable
Coefficients of RHS Ratio
X1 X2 X3 S1 S2 A1 A2
A1 -4 3 0 -1 1 1 -1 3 1
X3 1 1/6 1 0 -1/6 0 1/6 2 12
Z* -4 3 0 -1 1 0 -2 3
04/12/2023 Two-Phase Method 20
Row CalculationsNew R1=Old R1/3New R2= New R1*(1/6)-Old R2New Z*=New R1*3-Old Z*
Optimality condition is satisfied as Z* is having zero value
Basis Variable
Coefficients of RHS
X1 X2 X3 S1 S2 A1 A2
X2 -4/3 1 0 -1/3 1/3 1/3 -1/3 1
X3 11/9 0 1 1/18 -2/9 -2/27 2/9 11/6
Z* 0 0 0 0 0 -1 -1 0
04/12/2023 Two-Phase Method 21
Phase IIOriginal objective function is given asConsider the final Simplex table of Phase I,
consider the actual cost associated with the original variables. Delete the artificial variable A1 column from the table as it is eliminated in Phase II.
1 2 3 1 2
1 2 3 1 2
1 2 3 1
1 2 3 2
1 2 3
4 3 9 0 0
4 3 9 0 0
Subject to 2 4 6 0 15
6 6 0 12
, , 0
Max Z x x x S S
Max Z x x x S S
x x x S
x x x S
x x x
04/12/2023 Two-Phase Method 22
Initial Basic Feasible Solution
Row calculations New Z=OldZ-3R1-9R2
Basis Variable
Coefficients of RHS
X1 X2 X3 S1 S2
X2 -4/3 1 0 -1/3 1/3
X3 11/9 0 1 1/18 -2/9
Z 4 3 9 0 0 0
04/12/2023 Two-Phase Method 23
X1 is entering variable and X3 is leaving variable
Basis Variable
Coefficients of RHS Ratio
X1 X2 X3 S1 S2
X2 -4/3 1 0 -1/3 1/3 1 ---
X3 11/9 0 1 1/18 -2/9 11/6 1.5
Z -3 0 0 1/2 1 -19/5
04/12/2023 Two-Phase Method 24
Row CalculationsNew R2=Old R2/(11/9)New R1=New R2+Old R1New Z= New R2*3+Old Z
As all the values in Z row are zero or positive, the condition of optimality is reached.
Basis Variable
Coefficients of RHS
Ratio
X1 X2 X3 S1 S2
X2 0 1 12/11 -3/11 13/33 3
X1 1 0 9/11 1/22 -2/11 3/2
Z 0 0 27/11 7/11 3/11 -15
04/12/2023 Two-Phase Method 25
X1=3/2X3=3Hence Z=-4x1-3x2-9x3
Z=-4(1.5)-3(3)-9(0)
Z=-15
04/12/2023 Two-Phase Method 26
Exercise 1.
2.
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
2
Subject to 4 6 3 8
3 6 4 1
2 3 5 4
, , 0
Max Z x x x
x x x
x x x
x x x
x x x
1 2
1 2
1 2
1 2
2
Subject to 2
4
, 0
MinZ x x
x x
x x
x x
04/12/2023 Two-Phase Method 27
3.1 2 3
1 2 3
1 2
2 3
1 2 3
5 2 3
Subject to 2 2 2
3 4 3
3 5
, , 0
Max Z x x x
x x x
x x
x x
x x x