International Civil Aviation Organization

ICAO PBN frameworkICAO EUR APV workshop

25-27 May 2011

Page 2: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

2

Outline

• ICAO 37th Assembly

• ANC2012 – Global ANP revision

• Modular approach

• PBN module

• PBN hurdles

• AIM

Project title (Insert, Header & Footer)

Page 3: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Slide 3

PBN - Commitment from States37th ICAO General Assembly

• Resolution A37-11 supersedes A36-23

• A37-11 urges all States to complete a national PBN

implementation plan as soon as possible to achieve:– PBN for en route and terminal areas

• According to established timelines and intermediate milestones;

– PBN approach procedures with vertical guidance (APV) for all instrument runway ends (as primary or back-up for precision approach) by 2016 , 70% by 2014

Page 4: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Commitment from States37th ICAO General Assembly

• Main additions to A37-11 compared to A36-23:

– Requirement to add LNAV minima to any approach chart for approach procedures with vertical guidance

– Allow States to publish LNAV only approach if there is no traffic equipped for operations with vertical guidance.

Slide 4

Page 5: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

5

A37-12:ICAO global air navigation plan

• Calls upon States, planning and implementation regional groups (PIRGs) and the aviation industry to utilize the guidance provided in the GANP for planning and implementation activities;

• Instructs the Council to ensure that the GANP is continuously maintained up to date in light of further operational and technical developments, in close collaboration with States and other stakeholders; and

• Instructs the Council to organize a Twelfth Air Navigation Conference in 2012, to develop longer-term planning for ICAO based on an update of the GANP.

Project title (Insert, Header & Footer)

Page 6: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

COM NAV SUR ATM

ICAO GLOBAL ATM CONCEPT

Performance Based ATM Concept

Page 7: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

7

Air Navigation Conference 2012

• GANIS September 2011

• ANC 2012

• New Global Air Navigation Plan

• EUR preparatory workshop(TBD April 2012)

Project title (Insert, Header & Footer)

Page 8: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Block 0(2013)

Block 2(2023)

Block 1(2018)

Block 3(Long-Term)

PERFORMANCE IMPROVEMENT

AREAS

New GANP

Page 9: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Block 0(2013)

Block 2(2023)

Block 1(2018)

B0-3-10. Information Management. AIXM

B1-3-10 Improved Info ManagementAIRM = xyXM models+IP; AIXM, WXXM, FIXM, etc

B2-3-10 – System Wide -Information Management. (SWIM)

Block 3(Long-Term)

B0-3-20 - Optimisation of approach procedures incl. vertical guidance. GBAS I, etc

B1-3-20 - Optimisation of approach procedures incl. vertical guidance. (GBAS II/III).

Performance Improvement Area 3

B0-4-05. IMPROVED EN-ROUTE PROFILES•Flexible ATS Routes•CDM for En-Route Airspace•PBN Procedures

B1-4-05 - Dynamic ATS Routes.

B3-4-05 - Complexity management

Page 10: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Block 0(2013)

B0-5-05. IMPROVED FLIGHT DESCENT PROFILE• CDO (including

Tailored Arrivals). • PBN Procedures • Airspace

Management

Block 2(2023)

Block 1(2018)

B1-5-05- RNP with Vertical Containment*.

B0-5-15. IMPROVED FLIGHT DEPARTURE PROFILE•Initial CCO•PBN Procedures•Airspace Management

Block 3(Long-Term)

B3-5-05 Full 4 D TBO

B2-5-15 Full CCO

B2-5-05 Optimised arrivals in dense airspace.•Full CDAs

Performance Improvement Area 5

Page 11: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

11

Module components

Project title (Insert, Header & Footer)

1. Nominate intended performance improvement• Include metrics which determine success

2. Determine necessary procedures, air and ground

3. Identify technology, air and ground

4. Outline the business case

5. Propose a regulatory approval plan

6. Define any necessary transition strategies

7. Nominate any global demonstration trials that relate to the intended operational improvement package

Page 12: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

12

Module components

Project title (Insert, Header & Footer)

Page 13: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

13

GANP -roadmaps

Project title (Insert, Header & Footer)

5yrs 10yrs 15yrs 20yrs +

C

N

S

AIM

AVIONICS

Page 14: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Slide 14

Commitment from Stakeholders

– ICAO– IATA– CANSO– IFATCA– IFALPA– IBAC– IBACC– ACI– FHA– FSF

Page 15: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

15Project title (Insert, Header & Footer)

Commitment by positive business case: minimum investment by using existing airborne technology

RNP Approach allows 3D use

Safety - accessibility

Page 16: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

16Project title (Insert, Header & Footer)

• Approximately 94% of daily departures are RNAV-capable

• More departure lanes and exit points to the en route airspace

• Capacity gain of 9-12 departures per hour

• Repeatable and predictable paths

• Benefits

• Increased throughput

• Reduced departure delays

• USD $30M annual benefit (at 2007 demand levels)

Improving runway utilisation at the world’s busiest airport – Atlanta (ATL)

Capacity - efficiency

Commitment by positive business case: minimum investment by using existing airborne technology

Page 17: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

17

Commitment by positive business case: minimum investment by using existing airborne technology

Project title (Insert, Header & Footer)

Fuel savings/emission reduction

> 24,000

10,000 – 24,000

8,000 – 10,000

6,000 – 8,000

4,000 – 6,000

2,000 – 4,000

< 2,000

Altitude

(ft MSL)

Track

Color

> 24,000

10,000 – 24,000

8,000 – 10,000

6,000 – 8,000

4,000 – 6,000

2,000 – 4,000

< 2,000

Altitude

(ft MSL)

Track

Color

Atlanta CDO demo

Published STAR

West Flow operations

11 Tracks

Vertical Profiles

Miami CDO demo

Published STAR

East Flow operations

4 Tracks

Vertical Profiles

CDO’s provide large benefits in fuel, emissions, and flight time reductions

May 2008 Demos:

• North Arrival STAR at Atlanta (ATL)

• 144 Liters of fuel savings and 360kg reduction in CO2 emissions per flight

• North Arrival STAR at Miami (MIA)

• 182-197 liters of fuel savings and 460-500kg reduction in CO2 emissions per flight

600 CDO night demos at ATL from August –November 2008

• Two North Arrival STARs

• 151-227 liters of fuel savings and 380kg reduction in CO2 emissions per flight

RNAV Arrivals: Continuous Descent Operation (CDO)

Page 18: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Commitment translated in the numbers

Slide 18

0

50

100

150

200

250

AFI APAC CAR/SAM EUR MID

Series1

Series2

Number of RNP APCH from Jan 2008 to Jan 2011

Page 19: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

…But still not worldwide implemented!

Page 20: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Roadblocks

• Lack of expertise– Airspace development

– Operational approval process

– Pilots and ATC Controllers training

• Coordination between Stakeholders– National

– Regional

And some Misconceptions…

Page 21: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Misconceptions on PBN

• PBN, it looks complicated but it is not:

– It does not add new navigation philosophy, but just isa pragmatic tool to implement navigation procedures for aircraft capability that exists for more than 30 years!

– It does not require States to completely overhaul navigation infrastructure, but can be implemented step-by-step

– It does not require States to implement the most advanced navspec, only needs to accommodate the operational needs

Slide 21

Page 22: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Slide 22

Need to transition from planning to implementation

• Focus from new Standards to implementation

guidance and State assistance

Implementation guidance

Education

Direct assistance

Page 23: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

New implementation guidance

• CDO manual (Doc 9931)

• CCO manual (maybe combined with CDO manual) to be expected in draft by end this year/early next year

• Airspace design manual (based on Eurocontrolhandbook/ICAO course material) to be finalized by end this year

• Ops approval manual (based on COSCAP handbook and to include sample regulatory approval guidance), finalized as early draft, to be finished end of this year

• GNSS manual. Revision to bring in line with PBN

Slide 23

Page 24: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Education

• Airspace design

• Ops approval

Slide 24

Page 25: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Direct assistance Go- teams

• Go-Team visits in coordination with IATA– 4 per year– Target: reasonably advanced PBN States who:

• Have political will• Potential capability • Willingness to help other States in Region

– Output:• Go-Team Report

– Areas of improvement and recommendations• Enhancement of national PBN Implementation Plan• On case by case basis: sample implementation project

(CDO/approach)

Slide 25

Page 26: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

Beyond implementationNew requirements ….

New navigation Specifications under consideration

a) RNP 2 (Remote and oceanic)

b) Advanced RNP

c) RNP 0.3New Navspecs still under scrutiny to ensure full operational justification

Accommodation of simple GNSS aircraft to be PBN approved by either:

a) New Navspec (RNP2 “light” under consideration) or

b) Facilitation through easy approval mechanism

Slide 26

Page 27: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

27

AIM Central component of ATM System

AOM

AO

DCB

TSCM

AUOIM / SDM

Airspace Organisation

and Management

Aerodrome

Operations

Demand and Capacity

Balancing

Traffic Synchronisation

Airspace Users

Operations

Conflict Management

IM / SDM = Information Management / ATM Service Delivery Management

Page 28: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

28

AIM - Elements

• Phase 1 : Consolidation, mainly quality requirements; AIRAC adherence; WGS-84; and the provision of terrain and obstacle data.

• Phase 2 : Going digital, introduction of database-driven processes (eAIP, AIXM); enhance the quality and availability of existing products.

• Phase 3 : Information Management, new products and services; provision of the new data that will be required by the future ATM components.

Page 29: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

29

Transition to AIM• 2009 - Completed. AIS-AIMSG first meeting 2-4 Dec. 2008, see

http://www.icao.int/anb/aim, -– Amendment 36 Annex 15 effective form July 2010.

Amendment 56 Annex 4; ( e-AIP, AIXM Recommendations, public internet, QMS)

– Amendment 2 Doc 8126 (update to AIS Manual);– Amendment 30 PANS-ABC (an update)

• 2011, Going digital– Start developing Amendment 37 Annex 15 ( update to

AIXM, eAIP, eTOD& Amendment 57 Annex 4 (electronic charting, instrument procedure charts);

– Recommendations and guidance on data exchange, no obligations.

– Standards for eAIP, AIXM, Training, Quality Guidance Material

Page 30: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

30

Transition to AIM

• 2013, Information Management

– Amendment 37 Annex 15 & Amendment 57 Annex 4 become applicable.

– Possible Divisional Meeting in 2014 to agree on new requirements for data exchange.

• 2016, Transition achieved

– Amendment 38 to Annex 15 (Standards for AIXM and restructuring ) & Amendment 58 to Annex 4 (restructuring ) would become applicable including recommendations of divisional meeting to be held in 2014

Page 31: International Civil Aviation Organization Meetings Seminars and Workshops... · International Civil Aviation Organization ICAO PBN framework ICAO EUR APV workshop ... Slide 3 PBN

31

Q&A

Project title (Insert, Header & Footer)


Top Related