ERTMS RegionalERTMS Regional Leading the way to the future

Peter ElestedtUIC ERTMS World Conference Stockholm 26 April 2012UIC ERTMS World Conference, Stockholm, 26 April 2012

Agenda

Bombardier implementation of ERTMS Regional ERTMS Regional outside Europe

rese

rved

.

g p Leading the way to mainline level 3 Future possibilities

sidi

arie

s. A

ll rig

hts

rrd

ier I

nc. o

r its

sub

Bom

ba

2

Bombardier implementation of ERTMS Regional

Bombardier has developed a generic product, INTERFLO 550, that fulfils the requirements for ERTMS Regional, as set out by UIC and

rese

rved

.

Swedish Trafikverket The development of INTERFLO 550 aimed to cover all known

requirements for ERTMS/ETCS Level 3 as described in the Official

sidi

arie

s. A

ll rig

hts

rrequirements for ERTMS/ETCS Level 3, as described in the Official Journal Of The European Union, 16 October 2006:– Providing track clearance information to the interlocking

rdie

r Inc

. or i

ts s

ubs

– Train integrity supervision function supported via detection equipment located on the rolling stock

© B

omba

3 INTERFLO is a trademark of Bombardier Inc. or its subsidiaries.

Bombardier implementation of ERTMS Regional

The generic application for Trafikverket ERTMS Regional is based on the Bombardier product INTERFLO 550:

rese

rved

.

– INTERFLO 550 is communications-based with moving block– INTERFLO 550 supports communication with object controllers in open

networks and over radio

sidi

arie

s. A

ll rig

hts

rnetworks and over radio– INTERFLO 550 supports open interfaces over IP as specified by

Trafikverket/UICINTERFLO 550 t i t k t t i i ti

rdie

r Inc

. or i

ts s

ubs– INTERFLO 550 supports various track-to-train communications

• Euroradio over circuit switched GSM-R• Euroradio over GPRS, digital TETRA, Wi-Fi ......... (packet switched)

© B

omba

The generic application for TRV incorporates:– Virtual fixed block– 30 simultaneous train movements controlled by one Train Control Centre

(IL/RBC)– OC communication over leased public IP linkp

4 INTERFLO is a trademark of Bombardier Inc. or its subsidiaries.

INTERFLO 550 / ERTMS Regional

rese

rved

.

GSM-R

sidi

arie

s. A

ll rig

hts

r

TCCTrain Control

Centre

ISDN

OCS transmission via radio

rdie

r Inc

. or i

ts s

ubs

OCS 950Object

ControllerSystem

EBI Cab 2000 ETCS Onboard

TIMS, Train integrity monitoring system

via radio (optional)

© B

omba

HHT, Hand Held Terminal

EBI SwitchPoint machine

Signal marker board (optional)

EBI LinkFixed balises

EBI GateLevel crossing

5 INTERFLO and EBI are trademarks of Bombardier Inc. or its subsidiaries.

INTERFLO 550 / ERTMS Regional as lineblock

L0 or 2 L0 or L3 L0 or 2

rese

rved

.

TETRA

EBI ScreenControl room

sidi

arie

s. A

ll rig

hts

r

EBI Lock 950 R4Interlocking TCC, Train

C t l C t

TCP/IPEBI Lock 950 R4Interlocking

rdie

r Inc

. or i

ts s

ubsControl Centre

OCS 950Object

ControllerSystem

EBI Cab 2000 ETCS Onboard

TIMS, Train integrity management system

© B

ombaSystem

EBI SwitchPoint machine

EBI Light Optical signal

EBI LinkFixed balises

EBI TrackTrain detection

EBI GateLevel crossing

6 INTERFLO and EBI are trademarks of Bombardier Inc. or its subsidiaries.

ERTMS Regional is tested outside Europe

Level 0/2 in stations, INTERFLO550 with moving block between stations

rese

rved

.

First system planned to be inaugurated in June, second system planned in July

Two more lines are being engineered

sidi

arie

s. A

ll rig

hts

r Two more lines are being engineered The GA for incorporates:

– BOMBARDIER ETCS onboard but with IP communication over TETRA

rdie

r Inc

. or i

ts s

ubsBOMBARDIER ETCS onboard but with IP communication over TETRA

– TIMS device modified to interface directly to ETCS

© B

omba

7

Leading the way to Level 3

INTERFLO 550 incorporates the basic functionalities for Level 3– Moving block

rese

rved

.

g• Track occupancy and clearance based on position report and train data• Headway limited only by brake capability and poll rate

sidi

arie

s. A

ll rig

hts

r

– Train integrity monitored onboard the train• TIMS device connected directly to ETCS

Handover to/from adjacent RBC/interlocking

rdie

r Inc

. or i

ts s

ubs– Handover to/from adjacent RBC/interlocking

• RBC-RBC handover to Level 2 and Level 3 systems• Relay interface to traditional interlocking

© B

omba

y g

Static Speed ProfileDynamic Speed Profile

Virtual Occupancy Movement Authority Maximum speed according to calculated dynamic speed profile

8 INTERFLO is a trademark of Bombardier Inc. or its subsidiaries.

Migration Path to Level 3

INTERFLO550 has been implemented to allow for a smooth transition to Level3 operation.

rese

rved

.

– As an overlay on a L0 interlocking, unequipped vehicles are given exclusive right to the track from signal to signal.

– Level 2 equipped trains are controlled with CAB signalling

sidi

arie

s. A

ll rig

hts

rLevel 2 equipped trains are controlled with CAB signalling– Level 3 equipped trains are allowed to follow Level 3 trains with moving block– Level 2 equipped trains can be allowed to follow Level 3 train with moving

bl k

rdie

r Inc

. or i

ts s

ubsblock

Instant capacity gain from Level 3 operation on existing lines– Peak hour traffic very often is with EMU/DMU trains with inbuilt integrity

© B

ombaPeak hour traffic very often is with EMU/DMU trains with inbuilt integrity

control.– Unequipped or trains with no TIMS can run as L0 or L2 trains off peak or in

between L3 trainsbetween L3 trains

9

Leading the way to Level 3

End of train detectionC di l

rese

rved

.

Connects directly to ETCS

sidi

arie

s. A

ll rig

hts

rrd

ier I

nc. o

r its

sub

s

Reports train length Transmits information from last car:

© B

omba

– Position, brake pressure, motion status

Charges batteries using brake air

Controls emergency brake valve in last car

10

Future possibilities

Level 3 as an overlay on Level 0 or L2

rese

rved

.

– Trains following trains with TIMS travel in Level 3– Trains following other trains travel in Level 2 (or 0)

sidi

arie

s. A

ll rig

hts

r

GPS positioning of trains

– Cold movement detection

rdie

r Inc

. or i

ts s

ubsCold movement detection

– Augmentation of start-up position

© B

omba– To supplement or replace balises

11

Future possibilities

Integration with driving style managerL3 lt i b tt l ti t l f hi l t

rese

rved

.

– L3 results in better real time control of vehicle movements• Better control can be used for energy optimization• Achieving “Golden run” to optimize meeting other trains on single

sidi

arie

s. A

ll rig

hts

r• Achieving Golden run to optimize meeting other trains on single track lines or overtaking slower trains on double track lines

Increased/Improved functionality in the Hand

rdie

r Inc

. or i

ts s

ubs Increased/Improved functionality in the Hand

Held TerminalWork crew location augmented by GPS positioning

© B

omba– Work crew location augmented by GPS positioning

– Remote control of points in shunting areas

12

rese

rved

.si

diar

ies.

All

right

s r

rdie

r Inc

. or i

ts s

ubs

© B

omba

13