Page 1: DTAC 3G Phase 2.1 Site Solution_V4

DTAC 3G 2.1GHz - Site Solution for

South, North & North East

www.huawei.com

Page 2: DTAC 3G Phase 2.1 Site Solution_V4

2HUAWEI TECHNOLOGIES CO., LTD.

New 3G cabinet Bay-face

Page 3: DTAC 3G Phase 2.1 Site Solution_V4

3HUAWEI TECHNOLOGIES CO., LTD.

Page 4: DTAC 3G Phase 2.1 Site Solution_V4

4HUAWEI TECHNOLOGIES CO., LTD.

Page 5: DTAC 3G Phase 2.1 Site Solution_V4

5HUAWEI TECHNOLOGIES CO., LTD.

Circuit Breaker inside new 3G Enclosure

1. BTECH will install this cabinet on site and also install PGND cable (Ground cable) THW 1*16 sq.mm.

Green color in water proof flexible conduit from new cabinet to ground bar.

2. BBTECH will provide external alarm cable 4 core inside this cabinet 20m (For door alarm and FAN alarm).

Huawei will install this cable with Huawei external alarm cable to DTAC MDF.

63A

Page 6: DTAC 3G Phase 2.1 Site Solution_V4

6HUAWEI TECHNOLOGIES CO., LTD.

New cabinet Inlet Assignment

DC input cable 25mm^2 to CB 63A

Optical patch cord to existing IPRAN

RRU power cable

CPRI cable / OIL

PGND cable 16mm^2 for cabinet

Alarm cable 3pcsTo Alarm box

1 inch

¾ inch

½ inch

Spare

MAIN 2

Page 7: DTAC 3G Phase 2.1 Site Solution_V4

7HUAWEI TECHNOLOGIES CO., LTD.

Cable Inlet Assignment

Move Alarm cable 3pcs out and use this hole for patch cord from BBU 3G U2100

Existing 3G cabinet (IPRAN inside cabinet)

1 inch

¾ inch

½ inch

If existing IPRAN not in this cabinet, no need move alarm cable out.

Page 8: DTAC 3G Phase 2.1 Site Solution_V4

8HUAWEI TECHNOLOGIES CO., LTD.

Circuit Breaker Requirement and Connecting

Circuit breaker in existing power supply

For Transmission For 2G BTS (125A)

Page 9: DTAC 3G Phase 2.1 Site Solution_V4

9HUAWEI TECHNOLOGIES CO., LTD.

Circuit Breaker Requirement and Connecting (Have space)

If has spare circuit breaker 125A- use existing circuit breaker 125A connect DC cable 25 mm^2 to new 3G

U2100 enclosure

Page 10: DTAC 3G Phase 2.1 Site Solution_V4

10HUAWEI TECHNOLOGIES CO., LTD.

New 3G U2100 Enclosure

63A

25 mm^2 cable

DC cable connection to new cabinet (Has existing CB)

Page 11: DTAC 3G Phase 2.1 Site Solution_V4

11HUAWEI TECHNOLOGIES CO., LTD.

Circuit Breaker Requirement and Connecting (No Space)

If no space- Please install new circuit breaker 63A temporary inside cabinet.- Connect DC cable 25mm^2 from DC bar to new circuit breaker 63A.

Page 12: DTAC 3G Phase 2.1 Site Solution_V4

12HUAWEI TECHNOLOGIES CO., LTD.

DC cable connection to new cabinet (no existing CB)

New 3G U2100 Enclosure

63A

25 mm^2 cable

New CB 63A

Page 13: DTAC 3G Phase 2.1 Site Solution_V4

13HUAWEI TECHNOLOGIES CO., LTD.

CPRI/Jumper Line 1

Cable color marking

CPRI/Jumper Line 2

Page 14: DTAC 3G Phase 2.1 Site Solution_V4

14HUAWEI TECHNOLOGIES CO., LTD.

PVC Tape 3M (From Local)

Page 15: DTAC 3G Phase 2.1 Site Solution_V4

15HUAWEI TECHNOLOGIES CO., LTD.

How to connect all ground cable?

Page 16: DTAC 3G Phase 2.1 Site Solution_V4

16HUAWEI TECHNOLOGIES CO., LTD.

Set the priority for grounding on the tower, as follows;

1) Connect to bus bar installed on tower by using 2 holes cable lug.

2) Connect to the main ground cable from tower to ground

How to connect all ground cable?

Page 17: DTAC 3G Phase 2.1 Site Solution_V4

17HUAWEI TECHNOLOGIES CO., LTD.

3) Connect to lightning protection ground cable

4) Connect between the tower segments connection. (If any additional ground cable, can be grounded to this cable by using C-clamps as shown below)

How to connect all ground cable?

Page 18: DTAC 3G Phase 2.1 Site Solution_V4

18HUAWEI TECHNOLOGIES CO., LTD.

5) Run a new main ground cable from equipment to ground level and Connect the equipment on the tower to the new main ground cable with C-clamps.

How to connect all ground cable?

Page 19: DTAC 3G Phase 2.1 Site Solution_V4

19HUAWEI TECHNOLOGIES CO., LTD.

Solution –Part 1

1) Tower• Guyed mast• Self Slope• Square Self (L type)

Page 20: DTAC 3G Phase 2.1 Site Solution_V4

20HUAWEI TECHNOLOGIES CO., LTD.

Solution –Normal Tower

Type S IDCriterias( GM /L)

Tower type Site Solution Description Antenna LevelMounting

typeAntenna Problem

2G Only

1.1a

2G Ant <= 3

Guy Install new 3G U2100 ant same level 2G. same level 2G Single arm mounting  

1.1b Sq. Self / Self slope Install new 3G U2100 ant same level 2G. same level 2GSingle arm mounting

Special mounting

1.2a

2G Ant > 3

Guy / Sq. Self

Install new 3G U2100 ant below level 2G . below level 2G

Single arm mounting

 

1.2b Self slopeSingle arm mounting

Special mounting

               

2G +3G (850)

2.1a 2G Ant <=3 , 3G (850) =3

Guy

Install new 3G U2100 ant same level 2G. same level 2G

Single arm mounting  

2.1b Sq. Self; Self slopeSingle arm mounting

Special mounting

2.22G Ant > 3 and <= 6,

3G (850) = 3 Guy /Sq. Self / Self

slopeinstall new 3G U2100 ant same level 3G. same level 3G(U850)

Single arm mounting

Special mounting

2.3a

2G Ant > 6, 3G (850) = 3

Sq. Self /Self slope

priority-1 : install new 3G U2100 ant same level 3G. (Check by level 2 engineer)

same level 3G(U850)Single arm mounting

Special mounting

priority-2 : Re-enforce tower same level 3G(U850)Single arm mounting

Special mounting

2.3b Guy

priority-1 : install new 3G U2100 ant same or lower than 3G 850. (Check by level 2 engineer)

same level 3G(U850)Single arm mounting

Special mounting

priority-2 : Re-enforce tower same level 3G(U850)Single arm mounting

Special mounting

Page 21: DTAC 3G Phase 2.1 Site Solution_V4

21HUAWEI TECHNOLOGIES CO., LTD.

Only 2G

Page 22: DTAC 3G Phase 2.1 Site Solution_V4

22HUAWEI TECHNOLOGIES CO., LTD.

Solution 1.1a (2G ant <=3)

Condition:1.Only 2G2.tower&Antenna• Guyed mast

Solution:• Single band ant ,Install new 3G U2100

ant same level 2G.

Antenna mounting type:• Single arm mounting.

Page 23: DTAC 3G Phase 2.1 Site Solution_V4

23HUAWEI TECHNOLOGIES CO., LTD.

Solution 1.1b (2G ant <=3)

Condition:1.Only 2G2.tower&Antenna• Square self (L type)/Self

slope

Solution:• Single band ant ,Install new 3G U2100

ant same level 2G.

Antenna mounting type:• Single arm mounting (Special

mounting)

Page 24: DTAC 3G Phase 2.1 Site Solution_V4

24HUAWEI TECHNOLOGIES CO., LTD.

Solution 1.2a (2G ant >3)

Condition:1.Only 2G2.tower&Antenna• Guyed mast• Square self (L type)

Solution:• Single band ant ,Install new 3G

U2100 ant below level 2G.

Antenna mounting type:• Single arm mounting.

Page 25: DTAC 3G Phase 2.1 Site Solution_V4

25HUAWEI TECHNOLOGIES CO., LTD.

Solution 1.2b (2G ant >3)

Condition:1.Only 2G2.tower&Antenna• Self slope

Solution:• Single band ant ,Install new 3G U2100

ant below level 2G.

Antenna mounting type:• Single arm mounting (Special

mounting)

Page 26: DTAC 3G Phase 2.1 Site Solution_V4

26HUAWEI TECHNOLOGIES CO., LTD.

2G + 3G (850)

Page 27: DTAC 3G Phase 2.1 Site Solution_V4

27HUAWEI TECHNOLOGIES CO., LTD.

Solution 2.1a {2G ant <=3, 3G (850)=3}

Condition:1. 2G + 3G (850)2.tower&Antenna• Guyed mast

Solution:• Single band ant ,Install new 3G U2100

ant same level 2G.

Antenna mounting type:• Single arm mounting.

Page 28: DTAC 3G Phase 2.1 Site Solution_V4

28HUAWEI TECHNOLOGIES CO., LTD.

Solution 2.1b {2G ant <=3, 3G (850)=3}

Condition:1. 2G + 3G (850)2.tower&Antenna• Square self (L type)/Self

slope

Solution:• Single band ant ,Install new 3G U2100

ant same level 2G.

Antenna mounting type:• Single arm mounting (Special

mounting)

Page 29: DTAC 3G Phase 2.1 Site Solution_V4

29HUAWEI TECHNOLOGIES CO., LTD.

Solution 2.2 {2G ant >3 and <=6, 3G (850)=3}

Condition:1. 2G + 3G (850)2.tower&Antenna• Guyed mast / Square self (L type) / Self

slope

Solution:• Single band ant ,Install new 3G U2100

ant same level 3G(U850).

Antenna mounting type:• Single arm mounting (Special

mounting)

Page 30: DTAC 3G Phase 2.1 Site Solution_V4

30HUAWEI TECHNOLOGIES CO., LTD.

Solution 2.3a {2G ant >6, 3G (850)=3}

Condition:1. 2G + 3G (850)2.tower&Antenna• Square self (L type) / Self slope

Solution: priority 1• install new 3G U2100 ant same level

3G 850. (Check by level 2 engineer).

Antenna mounting type:• Single arm mounting (Special

mounting)

Solution: Priority 2• Re-enforce tower (Install same level

3G)

Page 31: DTAC 3G Phase 2.1 Site Solution_V4

31HUAWEI TECHNOLOGIES CO., LTD.

Solution 2.3b {2G ant >6, 3G (850)=3}

Condition:1. 2G + 3G (850)2.tower&Antenna• Guy mast

Solution: priority 1• install new 3G U2100 ant same level

3G 850. (Check by level 2 engineer).

Antenna mounting type:• Single arm mounting (Special

mounting)

Solution: Priority 2• Re-enforce tower (install same level

3G)

Page 32: DTAC 3G Phase 2.1 Site Solution_V4

32HUAWEI TECHNOLOGIES CO., LTD.

Solution –Part 22、 Special tower• Pole(3M)• Pole(6M/9M)• Wall-mount Pole• Electrical Pol

Page 33: DTAC 3G Phase 2.1 Site Solution_V4

33HUAWEI TECHNOLOGIES CO., LTD.

Solution – Special Tower

Type S IDCriterias ( GM /L)

Tower type Site Solution Description Antenna LevelMounting

typeAntenna Problem

2G Only

3.1a 2G Ant <= 3 Pole 3 ,6 , 9

Priority-1 : install new 3G U2100 ant same level 2G same level 2G

Single mounting

 

T mounting

Down time 3 Hours

Priority-2 : Dual band antenna same level 2G ExistingDown time

3 Hours

3.1b 2G Ant > 3 Pole / Electrical

Pole

Priority-1: Check by level 2 engineer ; (Change to dual band 1800+2100 antenna)

same level 2G ExistingDown time

3 Hours

priority-2 : Re-enforce tower (Change to dual band 1800+2100 antenna)

same level 2G ExistingDown time

3 Hours

priority-3 : New Pole      

priority-4 : Combiner Solution      

               

2G +3G (850)

3.22G Ant >=3 , 3G (850) =3

Pole / Electrical Pole

Priority-1: Check by level 2 engineer ; (Change to dual band 850+2100 antenna)

same level 3G ExistingDown time

3 Hours

priority-2 : Re-enforce tower (Change to dual band 850+2100 antenna)

same level 3G ExistingDown time

3 Hours

priority-3 : New Pole      

priority-4 : Combiner Solution      

Page 34: DTAC 3G Phase 2.1 Site Solution_V4

34HUAWEI TECHNOLOGIES CO., LTD.

Power supply Solution• Solution #1 : Add new rectifier module+ new battery• Solution #2 : Install new rectifier cabinet +battery

system• Solution # 3 : Replace existing rectifier

Note: only confirm solution, for other work will be done by DTAC.

Page 35: DTAC 3G Phase 2.1 Site Solution_V4

35HUAWEI TECHNOLOGIES CO., LTD.

Solution #1 : Add new rectifier module+ new battery

AC cable

AIR

BTS

Rectifier &Battery

Transmission RRU 850

Combiner

Battery

Add new

module

Module

Add new Battery

RRU 2.1Ghz

2.1GhzCabinet

• Add new rectifier module 1 unit + Add Battery 1 String

Page 36: DTAC 3G Phase 2.1 Site Solution_V4

36HUAWEI TECHNOLOGIES CO., LTD.

Solution #2 : Install new rectifier cabinet +battery system

AC cable

AIR

BTS

Existing Rectifier &Battery

Transmission RRU 850

Combiner

Battery

New Rectifier & Battery

for DTN

Module

2.1GhzCabinetBattery

RRU 2.1Ghz

Add new rectifier and battery 1 set ( 3 modules and 1 battery set )

Page 37: DTAC 3G Phase 2.1 Site Solution_V4

37HUAWEI TECHNOLOGIES CO., LTD.

Solution # 3 : Replace existing rectifier

AC cable

AIR

BTS

Rectifier &Battery

Transmission RRU 850

Combiner

Battery

Module

Replace to new rectifier

cabinet

Page 38: DTAC 3G Phase 2.1 Site Solution_V4

38HUAWEI TECHNOLOGIES CO., LTD.

Page 38