Transcript
Page 1: Castlewood Primary School, Coventry - Phase 2

O’Brien Contractors Limited – Case Study

www. obriencontractors.co.uk | Tel: 01926 423 918

Page 2: Castlewood Primary School, Coventry - Phase 2

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Project Profile:

Castlewood Primary School, Coventry Phase 2 – Case Study

O’Brien is confident to say, using its wealth of knowledge it is able to target each and every new contract with a smart approach, offering clients the best in quality and construction knowledge.

Client: Wates Construction Project: Castlewood Primary School Location: Coventry Value: £1.9m Contract Duration:25 Weeks

Page 3: Castlewood Primary School, Coventry - Phase 2

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

About the Project:

Work carried out by O’Brien

Construction of new school, Castlewood Primary School, Coventry. Our contract works included site clearance, earthworks remediation of 11000m3 Substructure, drainage and service ducts together with the construction of the ground floor slab.

External works consisted of car parking areas constructed using the formpave block paving system, coloured surfacing works , block paving, kerbing/edgings and a MUGA.

Through Early Contractor Involvement we were able to generate £60,000 of value engineering savings on this project.

Page 4: Castlewood Primary School, Coventry - Phase 2

Core Operations:

“O’Brien – Delivering a Smart Approach to Construction”

O’Brien Group offers expert teams across a diverse range of services. All five construction led services, Design and Build, Construction, Sports Pitches, Earthworks, Laser Levelling and Plant Hire operate highly skilled teams who aim to provide the best in construction knowledge and a smart approach to every aspect of our works.

• Bulk earthworks and site clearance• Ground stabilization• Reinforced concrete works including foundations, floors, retaining walls and external service yards• Roads and sewers• Drainage, pipework and associated works• External works including block paving and slabbing• Parking areas• Earthworks’ design and ground modelling facilities• Fine tolerance Laser Levelling and 3D machine control system

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Page 5: Castlewood Primary School, Coventry - Phase 2

O'Brien Contractors Ltd Manor CottageChurch LaneLeamington SpaCV32 7JT

Website: www. obriencontractors.co.uk

Email: [email protected]

Tel: 01926 423 918

Contact Details:

Connect with us via our social media channels:

Twitter

Google+

Facebook

Linkedin


Top Related