Bus Rapid Transit (BRT) Bus Rapid Transit (BRT) in Gauteng – S.A.in Gauteng – S.A.

Presented by:Hannes van der MerweHilton Vorster

22

BRT ProgressBRT Progress

Two Cities: Johannesburg (CoJ) & Two Cities: Johannesburg (CoJ) & Tshwane (Pretoria)Tshwane (Pretoria)

CoJ: Full BRT in an advanced stage of CoJ: Full BRT in an advanced stage of development and implementation. Phase 1A development and implementation. Phase 1A in operation in May 2009 (Soccer in operation in May 2009 (Soccer

Confederation Cup)Confederation Cup)Tshwane: Commencing with the Tshwane: Commencing with the

implementation process. Partial implementation process. Partial infrastructure completion with Soccer World infrastructure completion with Soccer World Cup in 2010 (June ’10)Cup in 2010 (June ’10)

33

44

CoJ BRT BackgroundCoJ BRT Background

Brief overview of the process that lead to the Brief overview of the process that lead to the CoJ’s implementation of BRTCoJ’s implementation of BRT

Implementation progressImplementation progress

ChallengesChallenges

55

CoJ BRT OverviewCoJ BRT Overview

Legacy of apartheid spatial planning where the poor were forced to live furthest from workAverage travel cost to work by public transport is R 186 per month ( 2002 figure)30% of public transport users are earning less than R 1 600 per monthAverage travel time to work is 48 minutes:

by car – 37 minutesby minibus-taxi – 51 minutesby taxi-taxi – 78 minutes, mostly forced via the Inner City

66

CoJ BRT OverviewCoJ BRT Overview

63% of households don’t own a motor carPublic/ private transport modal split: 47:53 (am peak hour, 2002)Public transport modal share:

By train – 14%By minibus-taxi – 72%By bus – 9%

Little historical investment in public transportHardly any accessibility for people with disabilities and non-motorised transport

77

CoJ BRT OverviewCoJ BRT Overview

Currently 2 major bus services covering the CoJ: Currently 2 major bus services covering the CoJ: Metrobus (City owned) & Provincially subsidised Metrobus (City owned) & Provincially subsidised bus contracts (Putco – private company)bus contracts (Putco – private company)

More than 960 busesMore than 960 buses

Annual subsidy of more than R 340 mAnnual subsidy of more than R 340 m

Also privately owned bus services.Also privately owned bus services.

88

CoJ BRT OverviewCoJ BRT Overview

Approval of the Integrated Transport Plan (ITP) & the Strategic Public Transport Plan (SPTN), 2003Commenced with the implementation of the SPTNBRT proposed as a viable public transport solution for JohannesburgPhase 1 approved by Council in November 2006Phases 1A and 1B approved in October 2007

Phase 1A – Operational May 2009Phase 1A – Operational May 2009Phase 1B – Operational SWC, May 2010)Phase 1B – Operational SWC, May 2010)

99

CoJ Full BRT NetworkCoJ Full BRT Network

OR Tambo

1010

CoJ BRT: Phases 1A & 1BCoJ BRT: Phases 1A & 1B

1111

CoJ BRT: Phase 1CoJ BRT: Phase 1

Trunk Routes Feeder Routes

1212

CoJ BRT: Phase 1ACoJ BRT: Phase 1A

1313

CoJ BRT: Inner CityCoJ BRT: Inner City

1414

CoJ BRT OverviewCoJ BRT Overview

25,5 kms of trunk infrastructure25,5 kms of trunk infrastructure10 routes (1 trunk, 4 complementary, 5 10 routes (1 trunk, 4 complementary, 5 feeders)feeders)20 BRT stations20 BRT stations143 new buses (41 articulated & 102 143 new buses (41 articulated & 102 complementary)complementary)Forecast daily passengers: 69 300Forecast daily passengers: 69 300One BRT Bus Operating companyOne BRT Bus Operating companyA BRT control centreA BRT control centreA BRT fare system using smartcards A BRT fare system using smartcards (distance based)(distance based)

1515

CoJ BRT: Station PrototypeCoJ BRT: Station Prototype

1616

CoJ BRT: ChallengesCoJ BRT: Challenges

Taxi industry buy-in (concept)Taxi industry buy-in (concept)

Formalisation of the taxi industry into a BRT Formalisation of the taxi industry into a BRT operating companyoperating company

Agreement between the taxi industry & bus Agreement between the taxi industry & bus companies on shareholding in an operating companies on shareholding in an operating companycompany

Subsidy free operationsSubsidy free operations

Affordable faresAffordable fares

Operating cost of the systemOperating cost of the system

1717

CoJ BRT: ChallengesCoJ BRT: Challenges

Timeframe for the ordering and manufacturing Timeframe for the ordering and manufacturing of the bus fleet – 143 Euro IV diesel buses, 41 of the bus fleet – 143 Euro IV diesel buses, 41 articulated & 102 complementary (solo) busesarticulated & 102 complementary (solo) buses

Development and implementation of an Development and implementation of an integrated ticketing system:integrated ticketing system:

MetrorailMetrorail

MetrobusMetrobus

Other subsidised bus contracts &Other subsidised bus contracts &

GautrainGautrain

1818

Contact DetailsContact Details

Thank you!Thank you!

Hannes van der MerweHannes van der Merwe Hilton VorsterHilton Vorster

+2712 426 6248+2712 426 6248 +2712 358 7950+2712 358 7950

+27 83 264 8281 (mobile)+27 83 264 8281 (mobile) +2782 469 2285 (mobile)+2782 469 2285 (mobile)

[email protected]@nra.co.za [email protected]@tshwane.gov.za

www.nra.co.zawww.nra.co.za


Top Related