Download - Burlingame Hoover School Attendance Area
-
Burlingame School District BSD/Hoover Student Attendance Areas
June 9, 2015
-
Process
Town Hall Meetings
April 21, 2015
May 18, 2015
Input used to create three options for Hoover attendance area
-
Summary of Town Hall Meetings
Share process for opening a new school
Describe District parameters for determining BSD/Hoover Student Attendance Area
Gather input from BSD community
-
Hoover Today
-
Decisions for Opening a New School
Hoover Students
First year
K-4 versus K-5
Numbers of students a concern
Two transitions
Community building
-
Decisions for Opening a New School
Attendance
All those in Hoover Area
5th Graders stay
Siblings
Transportation/Childcare
-
BSD/Hoover Attendance Areas
Lines show the school student attendance areas
Dots plot the students
Parameters= student #, neighborhood school, relieve crowding at Franklin, growth for the future
-
FranklinLincoln
Hoover
Roosevelt McKinley Washington
-
BSD Current Enrollment
School Site Enrollment Capacity
Franklin 609 560
Lincoln 499 560
McKinley 526 583
Roosevelt 341 358
Washington 342 358
-
Attendance Area All 3 Options
-
Attendance Area Option A
-
Attendance Area Option B
-
Attendance Area Option C
-
Attendance Area Option D
Final Draft for Hoover Student Attendance Area
-
Opening up a New School..
Teacher Transfers
9-10 openings at Hoover
Posting for teachers at all school sites
Teacher Interviews (mix of teachers)
Open positions in the district for teacher transfer
-
Building the Hoover School Community
Creation of student groups & parent groups
Traffic Drop off and Pick up
School Colors and Mascot
School Mission and Vision
School Philosophy & Rules
Safety Emergency Plans
-
In closing.
We look forward to the opening of Hoover School in fall 2016-2017
Board Approval June 23, 2015 Board Meeting
-
Any questions or comments, please contact Maggie MacIsaac, Superintendent
[email protected](650) 259-3800