Download - Ashok Leyland (Bhandara Unit)
The Industrial Training In Ashok Leyland
(Bhandara Unit) Presented By: -
Yogendra P. Tembhurne
Introduction• Founded in 1948• India's leading manufacturers of commercial vehicles, such as trucks
and buses, as well as emergency and military vehicles. • AL transmission exists over the Globe in 40 countries.• Bhandara Unit established in 1984.
1St , 2nd 3rd, 4th, 5th And Reverse Gear On Main Shaft1. Shape Clutch Teeth2. Hobbing3. Washing4. Clutch Teeth Chamfer5. Gear Chamfering6. Taper Roll Clutch Teeth7. Washing
Constant Mesh (CM), 3rd, 4th And 5th Gear on Lay Shaft
1. Hobbing2. Gear Chamfering3. Washing
GEAR HARD LINE• Bore Grinding• Grinding Route• Teeth Grinding• Shaving Route• Noise Testing• Final Inspection- Baker Gauge
Input Shaft, Lay Shaft And Main Shaft Shoft Line• Part No. Punching• Hob Spline• Hob Gear Teeth• Chamfering• Shape Clutch Teeth• Skin Turning• Drill Oil Hole• Washing
Shaft Hard Line• OD Grinding• ID Grinding• Shaving Rout• Grinding Rout• Teeth Grinding• Noise Testing• Final Inspection
SOFT LINE WORKING OF SYNCRO HUB• Broaching• Washing• Hobbing• Deburring• Drilling• Slot milling• Washing• Part No. Punching
SOFT LINE PROCESSING OF SYNCHRO CONE
Input Broaching Washing Hobbing
Washing Oil GrooveTooth Chamfering
Finish Turning
Washing Part No. punching Output
SOFT LINE PROCESSING OF SYNCHRO SLEEVE
Input Part No. Punching Broaching Washing
TurningTapper Turning
Scoop milling
Correction Broach
Tooth Chamferin
g
Finish Turning Washing Output
IN HEAT TREATMENT SHOPS
Input Loading in fixture Preheating Carburizing
Oil quenchingWashingTemperingShotBlasting
Air cleaning QC inspection Output
GEAR BOX ASSEMBLY (GBA)• Washing• Sub assembly• Main assembly• Testing• Dressing• Final passing
TESTINGTesting consists of -• Noise testing• Engagement of gear• Leakage
RECTIFICATION & REASSEMBLY• In rectification GB is de-assembled manually and any problem is
rectified by operator.• There are many vibration problems due to any defect during
machining such defects are removed by charging that gear/sleeve/synchro component.
CASING LINE
InputPart No. Punching
No. of m/c 2Infeed loading
MachiningNo. of m/c 6
Outfeed unloadingDeburring
WashingNo. of m/c 1
Helicoil fitment Output
TQM• GEMBA• 5S:- Seiri (Sort out and arrange properly) Seiton (Set right or set in order) Seiso (Cleaning) Seiketsu (Standardize work practices) Shitsuke (Self discipline)• EEI (Efforts and Ergonomics Index)• Waste reduction • CMI (Cost Management Initiative) • Suggestion scheme and • Six sigma
ConclusionAshok Leyland is one of the biggest Units of the Bhandara district employing thousands of people. Creating the one of the best and reliable gear box (Transmission) for the Latest vehicle to be in race with the heavy load moving worldwide automobile industrial developments.
Thank You