Page 1: Alstom’s CCS activities

Alstom’s CCS activities

World Bank Workshop – CCS Perspectives for the Southern African Region

Johannesburg, 1st June 2011

Mark Boneham

Sales and Marketing Director – Southern Africa

Page 2: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Efficiency: Plant optimisation &

retrofit

First CO2 capture demo plant in the

world

Alstom is the world leader in clean integrated solutions

Alstom Clean Power strategyCCS – A reality today

Wind, solar & geothermal

N° 1 nuclear*

& biomass

N° 1 hydro

* Conventional islands* Conventional islands

Realistic 2030 Target

Emissions CO2

(Gt/y)

Ref 2030

Efficiency

CCS

Technological mix

Page 3: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Agenda

• Update on CO2 capture within Alstom

• CCS Parasitic Power and cost

• CCS-Ready

• CO2 Capture Systems

• Conclusion

Page 4: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Technologies developed by Alstom

CO2 capture technologies pursued by Alstom

Post-combustion Oxy-combustion(New + retrofit) (New + retrofit)

• Chilled Ammonia

• Advanced Amines

• Oxy combustion with Air Separation Unit

• Chemical Looping Combustion

Page 5: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

1st and 2nd Generation CCS: Alstom statusOperating

Vattenfall Schwarze Pumpe Germany - 30 MWth

Oxy - Lignite

Total LacqFrance - 30 MWth

Oxy - Gas

Dow Chemical Co. USA, West Virginia

Advanced Amines - Coal

Alstom BSF WindsorUS - 15 MWthOxy - Coals

AEP Mountaineer USA - 58 MWth

Chilled Ammonia - Coal

DOE/Alstom WindsorUS – 3 MWth

Chemical looping - Coal

2nd GEN

RFCS EU - Darmstad Germany – 1 MWth

Chemical looping - Coal

2nd GEN

Oxy-CoalOxy-Coal Oxy-GasOxy-Gas Chemical loopingChemical looping Post CombustionPost Combustion

Page 6: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Mountaineer - Validation pilot - USA WV - AEP

• Designed to capture & store 100,000 tCO2/year (flue gas from coal)

• Captured CO2 will be sequestered into two wells on the plant property

• Commenced engineering and permitting Oct07

• First CO2 captured in Sept 09, injection started 1st of October 2009

• Alstom responsible for CAP island, AEP responsible for utilities to/from CAP island and CO2 storage

• AEP and Alstom working to develop commercial scale project (CSP) to capture 1.5 MTPY at Mountaineer facility

• Plant availability raised to 85/90% since early Jan 2011

• CO2 captured and injected near design values

Chilled Ammonia Process:Validation pilot - Montaineer

Alstom’s Chilled Ammonia Process at AEP’s Mountaineer Plant

Page 7: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

2nd Generation - Chemical Looping ProcessTechnology Overview

A Promising Break-through Technology

Principle

• Solid oxygen carrier circulates between Air Reactor and Fuel Reactor: Carrier picks up O2 in the Air Reactor, leaves N2 behind and burns the fuel in the Fuel Reactor

• Typically, Oxygen Carriers can be metal oxide or limestone-based. Alstom is developing both types

Advantages

• Avoids large costs and parasitic power

• Captures CO2 at temperatures higher than the power cycle temperatures, eliminating thermodynamic penalty associated with CO2

capture

• Uses conventional material of construction and fabrication techniques

• Largely based on Alstom’s proven CFB technology

Page 8: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Dedicated building

Darmstadt University

(Germany)

Fuel Reactor

Reducer

Air Reactor

Oxidizer

Chemical looping – 1 MWth MeOx Prototype - Coal

• Main objectives:

– Design and operation of a Chemical Looping Combustion (CLC) 1 MWth prototype with coal

– Assessment of technical, environmental and economical potential of CLC power plants

• 48 months program:

– Design of main components finalized in July 2009

– Hot Commissioning started in October 2010

– First tests with coal scheduled for 1Q 2011

• Total budget: 6.5 M€ - RFCS Funding : 2.27 M€

• Partners: TU Darmstadt, Chalmers, CSIC, SINTEF, Air Liquide, Vattenfall, Alstom

2nd Generation - Chemical Looping Process ECLAIR – Prototype - Darmstadt

Just

Inaugurated

TECHN S CHEIUN VERS TÄTI IDARMS TADT

Page 9: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Total LacqFrance - 30 MWth

Oxy - Gas

Vattenfall Schwarze Pumpe Germany - 30 MWth

Oxy - Lignite

Vattenfall JänschwaldeGermany - 250 MWe

Oxy - Lignite

Dow Chemical Co. USA, West Virginia

Advanced Amines - Coal

AEP Mountaineer USA - 58 MWth

Chilled Ammonia - Coal

Coming

TCM Mongstad Norway - 40 MWth

Chilled Ammonia - Gas

Transalta Canada - >200 MWe

Post - Coal

Alstom BSF WindsorUS - 15 MWthOxy - Coals

CET - Getica (Turceni)Romania – >250MWe

Chilled Ammonia - Lignite

Selected for receiving EEPR fundingSelected by Alberta and Federal Canadian funding

Selected by US DOE to receive CCPI Round 3 funding

EDF – Le HavreFrance – 5 MWth Adv.

Amines - Coal

PGE BelchatowPoland – 260 MWe Adv.

Amines - Lignite

Pre-commercial Projects

AEP Mountaineer USA – 235MWe

Chilled Ammonia - Coal

Alstom activity on demonstrations 1st and 2nd Generation CCS

RFCS EU - Darmstad Germany – 1 MWth

Chemical looping - Coal

DOE/Alstom WindsorUS – 3 MWth

Chemical looping - Coal

Drax - SelbyUK - 426 MWe

Oxy – Hard Coal

2nd GEN

2nd GEN

NER300 appl.

NER300 appl.

NER300 appl.

NER300 appl.

Operating

Page 10: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Chilled Ammonia ProcessValidation Pilot - Mongstad

Mongstad - Validation Pilot - Norway

• European CO2 Technology Centre Mongstad

• Flue gases from natural gas CHP plant and a catalytic cracker (refinery)

• Designed to capture 80 000 t CO2/year

• Amine-based post tested in parallel

• Project schedule:

– Engineering started June 09

– Construction on going

– Plant Commissioning complete: Q1 2012

Concrete part of Alstom's absorber tower completed (June 2010)

3D Model of Capture facilities

Page 11: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

C2A2 - field pilot - Le Havre - France

• Designed to capture 25 tCO2/ day

• Advanced flow scheme & operation validation

• Flue gas: slipstream from 600 MWe coal plant (EDF host facility)

• Project partners: EDF and Alstom. Alstom has a partnership with Dow

• Project schedule

- Overall 2010-2013 program

- Test from Q2 12 to Q1 13 (one year)

• No storage

• French funding by ADEMEEDF 600 MWe coal power plant (field pilot represented in

orange)

Advanced Amine Process: Field Pilot - Le Havre

Page 12: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Advanced Amine ProcessLarge scale demonstration - Belchatow

Belchatow - Large scale - Poland - PGE

• MOU between Alstom and PGE Elektrownia Belchatow

• Large-scale CCS demonstration facility

• Host facility new 850 MW lignite unit constructed by Alstom

• 1.8 million tonnes CO2 captured and stored per year

• Selected for funding from EEPR

• Candidate for NER 300 Funding

• Project schedule:

– Engineering for permitting started Jan10

– Operational in end 2014/early 2015Belchatow Power Plant

Page 13: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Chilled Ammonia ProcessDemonstration project at Turceni

Romanian CCS Demonstration Project

• Integrated CCS demo: 1.5 Mtpa CO2

– Capture: 85% minimum capture

– Transport: onshore pipeline, with tentative to use existing pipe route

– Storage: deep saline aquifers (>800m) within a radius of 50 km

• Developers-Operators:

– Capture: Turceni Energy Complex

– Transport: Transgaz

– Storage: Romgaz

• Technical Consortium:

– Project Management and Technical & Financial Consultant: ISPE (Institute for Studies and Power Engineering)

– Capture Plant: Alstom

– Storage: GeoEcoMar, Schlumberger

• Alstom awarded a feasibility study

• Candidate for NER 300 funding

Turceni Power Plant4x330 MW

Page 14: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Agenda

• Update on CO2 capture within Alstom

• CCS Parasitic Power and cost

• CCS-Ready

• CO2 Capture Systems

• Conclusion

Page 15: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

What we have achieved

Pilot operation confirm CO2 capture works and performances are improving

We Energies Pleasant Prairie USA - Coal - Chilled Ammonia

Vattenfall Schwarze PumpeGermany - Lignite & Bit. Coal - Oxy

Dow Chemical Co. Charleston USA - Coal - Advanced Amines

CO2 capture rate

CO2 purity

Reached

>99.7%

>99.9%

>99.5%90%

90%

90%

Parasitic load [%] on net efficiency

Pilot phase Demo phase Commercial phase

Thermodynamic theoretical limit: assuming ideal separation and compression processes*

Realistic limit

*Theoretical limit assumes ideal separation and compression processes (110bar): isentropic, no losses

AEP Mountaineer USA - Coal - Chilled Ammonia

>99%90%

15

20

25

10

First commercial units will be at or below 20%

Page 16: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Source: Alstom

2030 CCS target line

2010 2015 2020 2030 Nuclear OnshoreWind

OffshoreWind

Solar CSP Solar PV

CoECoE

800 Mwe net new Coal/CCS vs other decarbonised power sources - Europe

2010 prices

Cost of decarbonised power 1/2

jfl

• CCS cost will decrease through learning effect– Target: 15% energy penalty

• No clear winner among CCS technologies• Competitive against any other decarbonised power,… from day one

CCS Learning Curve

Work Ongoing incl peer reviews

Work Ongoing incl peer reviews

Page 17: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

- Saturday 22 April 2023 - P 17

Cost of decarbonised power 2/2

CCS even more competitive on gas than on coal !

0

10

20

30

40

50

60

Nuclea

r

CCPP CCS F

GR 201

5

Hydro

Lar

ge

Onshore

Win

d

PC Har

dcoal

CCS 2

015

Hydro

Pum

p&Stora

ge

Offshore

Win

d

Hydro

Min

i

Solar C

SP - Tro

ughs +

stora

ge

Solar -

PV C

ryst

- ce

ntraliz

ed

Solar P

V - Thin

Film

Solar p

V - Cris

t dec

entra

lized

CoE Cents€ per kWh CoE Europe – Low Carbon technologies ordered in 2010 – 2015 period

Source : Alstom analysis. CCS including T&S

Reference case

Page 18: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Agenda

• Update on CO2 capture within Alstom

• CCS Parasitic Power and cost

• CCS-Ready

• CO2 Capture Systems

• Conclusion

Page 19: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

CCS-ready

Queensland

• Scope: All coal-fired power plants

• Requirements:

− Use of world’s best practice low emission technologies − CCS-ready and− Commitment to retrofit that technology within five years of CCS being proven

on a commercial scaleNSW & WA

• Scope: Recommendation for all coal-fired power plants

• Implement CCS if it is economically and technically feasible

Australia

European Union• Scope: All combustion plants >300 Mwe (coal and gas)

• Requirements:

− Assessment of availability of suitable storage sites and technical and economical feasibility of CO2 capture and transport

− Suitable space for future CO2 capture system if conditions are met

• The UK has transposed the directive and requires CCS-Readiness

World Bank• Financing coal projects facing

polemic/debates due to CO2

• Looking at CCS readiness

A mounting requirement…

Page 20: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Capture-Ready studyIdentified pre-investments for future capture retrofit - Coal

Provisions in arrangement planning

Steam Turbine:reservations in turbine design for future

steam extraction

Steam Turbine:reservations in turbine design for future

steam extraction

Electrical & Control Building:

Extra space

Electrical & Control Building:

Extra space

Transformer Area: installing an isolated bus

Transformer Area: installing an isolated bus

Stack duct:potential longer

stack duct

Stack duct:potential longer

stack duct

Waste Water Treatment System: foresee interconnection with

power block WWTS

Waste Water Treatment System: foresee interconnection with

power block WWTS

FGD: leaving space for

upgrade

FGD: leaving space for

upgrade

Optimisation of theBoiler heat transfer surfaces according

Modificationsof heat load sharing

Optimisation of theBoiler heat transfer surfaces according

Modificationsof heat load sharing

Optimisation of the cooling system recovery of heat in

CO2 capture and compression

Optimisation of the cooling system recovery of heat in

CO2 capture and compression

Alstom Capture Ready solutions developed upon three pillars:• Early and substantial investment in Capture technologies development• Integrated power plant expertise (EPC supplier of turnkey power plant)• Component supplier experience (supplier of a major equipment in 25% of the

worldwide installed power capacity)

Page 21: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

INJECTORS

MONITORING

Alstom-Schlumberger Partnership

Combining two experts to cover the CO2 Capture, Transport and Storage chain

Page 22: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Agenda

• Update on CO2 capture within Alstom

• CCS Parasitic Power and cost

• CCS-Ready

• CO2 Capture Systems

• Conclusion

Page 23: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Status

• Deal closed in August 2009 - formerly ABB Lummus

Rationale

• Reinforces CCS development team - 111 experienced employees with full EPC capability

• Significant references in Oil & Gas, refining & petrochemicals (especially in amines wash, compression, ..) suitable for CO2 Capture and transportation.

Wiesbaden acquisition

Alstom European execution center for CCS

Page 24: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

CCS business rationale

A dedicated business unit

• CCS moving to another stage:

- From small pilots large demos;

- From technology validation

industrialization & plant

integration

• Requires solid engineering &

execution set-up

• Qualitative gap in resources (e.g.

chemical process engineering) needed to

be addressed

• Focus of resources on CCS projects, for

successful execution (incubator model)

CO2 Capture Systems business rationale

CCS EPC execution centre Wiesbaden, Germany

CCS R&D / Execution center, Knoxville, USA

CCS Head-office Baden, Switzerland

CCS R&D labs in Växjö, Sweden

Oxy Labs Windsor, US

CCS EPC execution centreBeijing

Page 25: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Agenda

• Update on CO2 capture within Alstom

• CCS Parasitic Power and cost

• CCS-Ready

• CO2 Capture Systems

• Conclusion

Page 26: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Conclusions

• A portfolio approach of technology is needed: Renewables, Nuclear, Efficiency and CCS.

• Retrofitable CCS technologies are a must to have: Post and Oxy-combustion

• Alstom is currently developing CO2 capture technologies and is on the good path to go commercial by 2015. A dedicated business unit has been created to support this effort.

• CCS-Ready: Alstom has both expertise and partnership to support on the entire CCS chain

• Clear a stable business framework and regulations are needed for CCS to play its role along all other forms of decarbonised energy sources.

Alstom will be a key partner on the CCS value chain

Page 27: Alstom’s CCS activities

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.