  • Technical Memorandum #5 Freight and Intermodal Systems

    February 3, 2015

  • 2040 Path Forward Long Range Transportation Plan

    EXECUTIVE SUMMARY THE MOVEMENT OF GOODS THROUGH OUR PORTS, ON OUR RAILS AND ON OUR ROADS ARE ANTICIPATED TO GROW SIGNIFICANTLY. EFFICIENT AND RELIABLE ACCESS TO THE RAIL FACILITIES AND PORTS ARE CRITICAL FOR OUR REGIONS ABILITY TO COMPETE IN THE GLOBAL ECONOMY.

    Our region is located at the confluence of three major railroads (Norfolk Southern, CSX and Florida East Coast (FEC)) and two major interstate facilities (I-10 and I-95). North Florida includes major port facilities at Blount Island, Dames Point Talleyrand and Fernandina, an international airport, and a spaceport facility at Cecil Commerce Center. More than 200 million persons or 63% of the U.S. population is easily served by rail and 63 million persons or 20% of the population is reachable in one day by truck. We serve as the gateway to Floridas 19.5 million residents. These unique transportation market service areas solidify our regions position as Americas Logistic Center.

    Floridas strong economic outlook and population growth make this market one of the fastest growing in the US. These markets demand and the shippers that serve them expect highly reliable and efficient transportation services for our region to maintain our competitiveness in the global economy.

    The movement of goods on our rails and roads are anticipated to grow significantly. This growth will contribute to significant increases in highway road congestion. Efficient and reliable access to the rail facilities and ports are critical for our regions ability to compete in the global economy. To relieve this congestion and provide for more efficient movement of freight and intermodal container movements, investments in freight-related projects are needed.

    The following major freight and intermodal project needs were identified through various planning efforts of the North Florida Transportation Planning Organization (TPO), Jacksonville Port Authority (JAXPORT), Florida Department of Transportation (FDOT), Ocean Highway and Port Authority (Port of Fernandina) and the Jacksonville Aviation Authority.

    Mile Point Navigation Improvements Jacksonville Harbor Deepening Rail capacity projects for CSX, Norfolk Southern and FEC Intermodal Yard Improvements and access for CSX, Norfolk Southern and FEC North Area/Jacksonville Rail Corridor Port access improvements at the Port of Fernandina

    The total cost of the needs is $3.4 billion. In addition to these needs, future needs that were identified based on the market demand analysis include:

    The need for additional rail intermodal facility capacity beyond the Intermodal Container Transfer Facility (ICTF) at Dames Point. Currently the FECs and Norfolk Southerns regional intermodal facilities are operating near practical capacity. About 1 million intermodal container twenty-foot equivalency units or (TEUs) are being shipped in North Florida today. This market is anticipated to grow to 2.8 to 4.3 million TEUs by the year 2040. Additional intermodal facility capacity is needed to meet this demand. One potential solution to meet this need is the development of a public-private partnership for a joint-use intermodal facility.

    Additional track improvement projects beyond the adopted needs plan may be needed. The planned operation of commuter rail, and potentially intercity passenger rail service by Amtrak or a private operator, will place increased demand on the rail track operational capacity within the region. Several system bottlenecks are likely to restrict the ability to meet the rail service demand. These include the Springfield Switch, FEC Rail Crossing of the St. Johns River and the Crawford Diamond crossing of CSX and Norfolk Southern. Additional rail operational modeling is needed for the region to identify other bottlenecks and recommend specific solutions to address these needs.

    i

  • 2040 Path Forward Long Range Transportation Plan

    CONTENTS LIST OF FIGURES ............................................................................................................................................................. III

    LIST OF TABLES ............................................................................................................................................................... III

    INTRODUCTION ............................................................................................................................................................... 1

    CURRENT SITUATION ....................................................................................................................................................... 2

    MULTIMODAL FREIGHT NETWORK ................................................................................................................................................... 2 Highways ............................................................................................................................................................................. 2 Rail ....................................................................................................................................................................................... 5 Ports ..................................................................................................................................................................................... 6 Aviation ................................................................................................................................................................................ 7 Support Infrastructure ......................................................................................................................................................... 7

    CURRENT FREIGHT MOVEMENTS ..................................................................................................................................................... 9 Trucking ............................................................................................................................................................................. 11 Ports ................................................................................................................................................................................... 11 Rail ..................................................................................................................................................................................... 11 Air Cargo ............................................................................................................................................................................ 11

    TOP COMMODITIES TYPES ............................................................................................................................................................ 12

    FUTURE FREIGHT DEMAND ............................................................................................................................................ 27

    INTRODUCTION........................................................................................................................................................................... 27 FORECASTING METHODOLOGY ...................................................................................................................................................... 27 PORT INTERMODAL ..................................................................................................................................................................... 29 RAIL ......................................................................................................................................................................................... 33

    Rail Intermodal .................................................................................................................................................................. 33 Rail Carload ........................................................................................................................................................................ 36

    TRUCK INTERMODAL FORECASTS .................................................................................................................................................... 36 Truck Trips and Volumes .................................................................................................................................................... 36 Growth Rates ..................................................................................................................................................................... 36

    AIR CARGO ................................................................................................................................................................................ 37 DEMAND VS. CAPACITY ANALYSIS .................................................................................................................................................. 37

    Intermodal Facilities ........................................................................................................................................................... 37 Track Capacity .................................................................................................................................................................... 43

    TRUCK MODEL IN THE NERPM-AB .................................................................................................................................. 45

    FREIGHT NEEDS ............................................................................................................................................................. 48

    ADOPTED NEEDS PLAN ................................................................................................................................................................ 48 ADDITIONAL NEEDS ..................................................................................................................................................................... 48 FUTURE SYSTEM IMPROVEMENT CONCEPT A REGIONAL INTERMODAL FACILITY .................................................................................... 52

    SUMMARY ..................................................................................................................................................................... 53

    ii

  • 2040 Path Forward Long Range Transportation Plan

    LIST OF FIGURES Figure 1 - Multimodal Freight Network ......................................................................................................................... 3 Figure 2 - SIS Connectors ............................................................................................................................................... 4 Figure 3 - Warehousing, Industrial and Distribution Facilities ....................................................................................... 8 Figure 4 - Top Commodity Imports .............................................................................................................................. 13 Figure 5 - Top 12 Commodity Exports ......................................................................................................................... 14 Figure 6 Top Commodities Inbound Shipments by Truck ......................................................................................... 15 Figure 7 - Top Commodities Inbound Rail Shipments by Carload................................................................................ 16 Figure 8 - Top Commodities Inbound Rail Shipments by Intermodal Container ......................................................... 17 Figure 9 Top Commodities Inbound Shipments by Air .............................................................................................. 18 Figure 10 - Top Commodities Inbound Shipments by Port .......................................................................................... 19 Figure 11 - Top Commodities Outbound Shipments by Truck ..................................................................................... 20 Figure 12 - Top Commodities Outbound Shipments by Rail Carload ........................................................................... 21 Figure 13 - Top Commodities Outbound Shipments by Rail Intermodal ..................................................................... 22 Figure 14 - Top Commodities Outbound Shipments by Air ......................................................................................... 23 Figure 15 - Top Commodities Outbound Shipments by Port ....................................................................................... 24 Figure 16 - Summary of GDP Forecasts ....................................................................................................................... 28 Figure 17 - Moderate and Aggressive TEU Port Forecast ............................................................................................ 30 Figure 18 - Summary of 2040 Moderate Forecast of Port Intermodal Shipments (TEUs) ........................................... 31 Figure 19 - Summary of 2040 Aggressive Forecast of Port Intermodal Shipments (TEUs) .......................................... 32 Figure 20 - 2040 Moderate Forecast of Rail Intermodal .............................................................................................. 34 Figure 21 - 2040 Aggressive Forecast of Rail Intermodal ............................................................................................. 35 Figure 22 - Demand Capacity Analysis for Intermodal Facilities .................................................................................. 38 Figure 23 - Rail System Bottlenecks ............................................................................................................................. 44 Figure 24 - 2010 Truck Volume Map ............................................................................................................................ 46 Figure 25 - 2040 Truck Volume Map ............................................................................................................................ 47 Figure 26 - Adopted Needs Plan Freight Projects Map ................................................................................................ 51

    LIST OF TABLES Table 1. Total Tons of Commodities (millions of tons per year) .................................................................................... 9 Table 2. Top and Origins and Destinations of Truck Freight Passing through North Florida ....................................... 10 Table 3. Top Origins and Destinations of Rail Freight Passing through North Florida ................................................. 10 Table 4. Top Consignees .............................................................................................................................................. 25 Table 5. Top Warehouse Commodities ........................................................................................................................ 26 Table 6. Summary of TEUs for North Florida Port Facilities (JAXPORT and Port of Fernandina) ................................. 29 Table 7. Summary of Rail Intermodal Forecasts .......................................................................................................... 33 Table 8. Growth Factors for Trucks .............................................................................................................................. 36 Table 9. 2013 Intermodal-Related Truck Origins and Destinations (Average Daily Trip Ends) .................................... 39 Table 10. 2013 Intermodal-Related Truck Origin and Destination Volumes (AADT) ................................................... 40 Table 11. 2040 Truck Trip (Average Daily Trip Ends) ................................................................................................... 41 Table 12. 2040 Truck Trip AADTs ................................................................................................................................. 42 Table 13. Summary of NERPM-AB Truck Model Inputs ............................................................................................... 45 Table 14. Adopted Needs Plan Freight and Intermodal Projects ................................................................................. 49

    iii

  • 2040 Path Forward Long Range Transportation Plan

    FREIGHT AND INTERMODAL SYSTEMS ANALYSIS OF THE FREIGHT SYSTEM WITHIN THE REGION IS AN IMPORTANT ASPECT OF UNDERSTANDING THE ECONOMIC IMPACTS OF TRANSPORTATION INVESTMENT AND IN PRIORITIZING PROJECTS FOR FUTURE INVESTMENTS.

    INTRODUCTION Our region is located at the confluence of three major railroads (Norfolk Southern, CSX and Florida East Coast (FEC)) and two major interstate facilities (I-10 and I-95) and includes major port facilities at Blount Island, Dames Point, Talleyrand and Fernandina, an international airport and a spaceport facility at Cecil Commerce Center. More than 63 percent of the U.S. population is reachable by rail. About 20 percent of the population is reachable by truck in one day. We serve as the gateway to Floridas 19.5 million residents. These unique transportation market service areas solidify our regions position as Americas Logistic Center.

    Floridas strong economic outlook and population growth make this market one of the fastest growing in the U.S. These markets demand and the shippers that serve them expect highly reliable and efficient transportation services for our region to maintain our competitiveness in the global economy.

    The movement of goods on our rails and roads are anticipated to grow significantly in North Florida. This growth will contribute to significant increases in highway road congestion. Efficient and reliable access to the rail facilities and ports are critical for our regions ability to compete in the global economy.

    To relieve this congestion and provide for more efficient movement of freight and intermodal container movements to and from the rail and port facilities, investments in freight-related projects are needed by the year 2040.

    This report summarizes the methodology used to understand the existing and future freight demand within the region to support decision-making in the 2040 Path Forward Long Range Transportation Plan.

    A market-driven approach is considered in which the demand and analysis is presented from the freight network users perspective. This effort builds on the work performed in prior efforts of the North Florida

    Transportation Planning Organization (TPO) documented in the North Florida Freight, Logistics & Intermodal Framework Plan. Additional market analysis was performed and development of a truck model for use in the 2040 Northeast Florida Regional Planning Model Activity Based (NERPM-AB) are provided.

    THE SAFE, EFFECICIENT AND RELIABILE MOVEMENT OF GOODS IS ESSENTIAL TO THE ECONOMIC

    COMPETITIVESS OF OUR REGION.

    THE BOTTOM LINE FOR TODAYS SHIPPERS IS TIME TO MARKET. THE JOURNAL OF COMMERCE'S

    LANDMARK SURVEY OF THE WORLDS TOP 1,000 BLUE CHIP SHIPPERS AND BENIFICIAL CARGO

    OWNERS RESULTED IN THE FOLLOWING KEY FACTORS AS THE PRIMARY NEEDS OF THESE

    STAKEHOLDERS:

    43% OF THE SURVEYED BELIEVE SERVICE RELIABILITY IS THE PRIMARY FACTOR IN PORT/TERMINAL SELECTION.

    38% PERCENT BELIEVE COMPETITIVE FREIGHT RATE IS THE PRIME DRIVER IN THE SELECTION DETERMINATION.

    12% OF THOSE SURVEYED STATED THAT SPEED OF SERVICE OR IN-TRANSIT TIME WAS THE KEY DETERMINANT.

    1

  • 2040 Path Forward Long Range Transportation Plan

    CURRENT SITUATION MULTIMODAL FREIGHT NETWORK The level of connectivity to the North Florida region is a significant economic advantage for our region. I-95 serves as the major highway gateway to Floridas 19.5 million persons. I-10 connects our region along an east-west route to the southwest, western states, and Pacific Ocean. A third interstate, I-295 serves as a beltway around Jacksonville that connects both of these interstates and provides direct access to major Jacksonville Port Authority (JAXPORT) marine terminals at Blount Island and Dames Point and rail intermodal facilities for CSX and Norfolk Southern railroads. I-75, the nations central spine connecting Florida, southeastern and mid-western states is located 60 miles to the west of our region. North Florida provides the rail gateway into Florida. Norfolk Southern and FEC railroads have their Florida termini in North Florida. CSXs and FEC both maintain their corporate headquarters in North Florida. Genesee & Wyoming Inc., which operates major short line railroads across the US and in Australia, maintains its operations headquarters in Jacksonville.

    The following summarizes the major components of the freight network within North Florida including the Florida Department of Transportations (FDOTs) Strategic Intermodal System (SIS). Figure 1 on the following page shows the location of the major elements of the multimodal freight network in North Florida.

    FDOTs Strategic Intermodal System (SIS) is:

    a statewide system of high-priority transportation facilities. It includes the states largest and most significant commercial service airports, spaceport, deep-water seaports, freight rail terminals, passenger rail and intercity bus terminals, rail corridors, waterways and highways. These facilities are the workhorses of Floridas transportation system. They carry more than 99 percent of all enplaned commercial air passengers in the state, virtually 100 percent of all waterborne freight tonnage, almost 100 percent of all freight moving on the rail system, and more than 68 percent of all truck traffic and 54 percent of total traffic on the State Highway System. With the exception of some localized commuting,

    recreational and shopping trips, few trips in Florida are not impacted by the SIS. Virtually every freight shipment in the state, as well as nearly every visitor and business traveler, will use the SIS at some point in its journey. (Source: Strategic Intermodal System Plan)

    HIGHWAYS The major SIS highway facilities within our region are shown on Figure 2 and are summarized below.

    I-10 I-95 I-295 and SR 9B US 301/SR 200 US 1 from I-295 to the Georgia State Line SR 23 First Coast Expressway (future) SIS Connectors

    o Cecil Spaceport (Planned); SR 23 First Coast Expressway to New World Avenue to 6th Street to entrance.

    o Jacksonville Amtrak Station (Planned Drop); I-95 to New Kings Road and Martin Luther Jr. King Parkway to Clifford Lane.

    o Jacksonville CSX Intermodal Terminal; I-295 to Pritchard Road to Sportsman Club Road to entrance.

    o Jacksonville FEC Intermodal Terminal (Bowden Yard); I-95 to SR 202 J.T. Butler Boulevard to US 1 Philips Highway to entrance.

    o Jacksonville Greyhound (Planned Drop); I-95 to Forsyth Street to Pearl Street to Bay Street entrance, exit to Forsyth Street to Broad Street to Adams Street to I-95.

    o Jacksonville International Airport; I-295 to Duval Road to South International Airport Boulevard to Air Cargo Access Road to cargo entrance.

    o Jacksonville International Airport; I-95 to SR 202 Airport Road to passenger terminal.

    o Jacksonville Multimodal Terminal Center (Planned Add); I-95 to Forsyth Street to Lee Street to entrance; exit to Lee Street to Adams Street to I-95.

    2

  • ((((((((((((

    ((((((((

    ((((

    !!

    !

    !

    ! !!

    !!

    !

    !

    !! !

    !!

    !! !

    ! !!

    !!

    !!

    !!

    !!

    !!

    !

    !!

    !

    !!

    !

    !

    !!

    !!

    !!

    !!

    !!

    !!

    ! !

    !!

    !!

    !!

    !!

    !

    !!

    ! !

    !!

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !

    !

    !

    !

    !

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !!

    !!

    !!

    !!

    !!

    !

    !

    ! !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !!

    !!

    !!

    !

    !!

    !!

    !!

    !!

    !!

    !

    !

    !!

    !!

    !!

    !!

    !

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !

    !

    !!

    !!

    !

    !!

    !!

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !

    !!

    !!

    !

    !

    !!

    !!

    !!

    !!

    !

    !!

    !!

    !

    !!

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !!

    !

    !

    !!

    !

    !!

    !

    !!

    !

    !

    !!

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !!

    !

    !

    !

    !

    !

    !

    !

    !

    !!

    !

    !

    !

    !

    !

    !

    !

    !

    !!

    !

    !

    !

    !

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!!!!!!!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!!!!!!!!!!!!!!!!!!!!!!!!

    !!

    !!

    !

    ! !!

    !!

    !!

    !

    !!

    !! !

    !

    !

    ! !! ! ! !

    !

    !!

    !

    !! ! ! ! ! !

    !!

    !!

    !!

    ! !

    !!

    !!

    !

    !

    !!!!

    !!

    !!

    !!!

    !!

    !

    ! !

    !

    !

    !!

    !!

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !!

    !

    !

    !

    !

    !

    !!

    !!

    !!

    !!

    !!

    !

    !!

    !

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !!!

    !!

    !

    !

    !!

    !

    !

    !!!

    !

    !

    !

    ! !! !

    !!

    !

    !!

    !

    !!

    !!

    !!

    !

    ! ! !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !

    !

    !

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !

    !!

    !!

    !!

    !!

    !

    !

    !

    !

    !

    ! !

    !

    !! !

    ! !

    !

    !

    !

    ! ! !

    ! ! !

    !!

    !

    !

    !

    !!

    !

    !

    !!

    !

    !

    ! !

    !! !! !

    ! ! !

    !

    ! ! !

    !

    !

    !!

    !

    !

    !

    !

    ! ! ! !

    b

    b

    bb

    X

    XX

    )

    )

    Y

    Y

    Y

    9090

    1

    301

    17

    17

    27

    301

    301

    441

    17

    1

    1

    100

    A1A

    13

    10

    16

    A1A

    A1A

    A1A

    326 326

    221

    105

    500

    23

    16

    A1A

    200

    26

    207

    200

    21

    116105

    A1A

    134

    19

    25

    202

    A1A

    2

    206

    16

    5

    20

    228

    295

    10

    75

    95

    295

    295

    95

    95

    ")335

    ")21

    ")320

    ")315

    ")326")326

    ")318

    ")2")127

    ")200A

    ")225A

    ")124

    ")209

    ")228

    ")122

    ")13A

    ")250A

    ")220

    ")316

    ")315

    ")107

    ")13

    ")204

    ")125")119

    ")115

    ")208

    ")214

    ")335

    ")130

    ")310

    ")305

    ")308

    ")108

    ")200A")25A

    ")309

    ")225

    ")329

    ")250

    ")315

    ")214

    ")218

    ")108

    Jacksonville CSX Intermodal Terminal

    Jacksonville FEC Intermodal Terminal

    Jacksonville NS Intermodal Terminal

    Port of Jacksonville Blount IslandPort of Jacksonville Dames Point

    Port of Fernandina

    Port of Jacksonville TalleyrandPort of Jacksonville Talleyrand

    Camp Blanding

    Jacksonville Naval Complex

    Naval Station Mayport Station

    LegendAirports and SpaceportsY SIS AirportY Emerging SIS Airport SIS Spaceport

    Seaports) SIS Seaport) Emerging SIS Seaport

    Freight Rail TerminalsX SIS Freight Rail TerminalX Emerging SIS Freight Rail Terminal

    ((((((((((((Intermodal Logistics Center

    Passenger Terminalsb SIS Passenger Terminal b Emerging SIS Passenger Terminal

    HighwaySIS Highway Corridor Emerging SIS Highway Corridor SIS Higway Connectors

    RailSIS Railway Corridors Emerging SIS Railway CorridorsSIS Railway Connector

    Waterways! ! ! ! SIS Waterway ! ! ! ! Emerging SIS Waterway! ! ! ! SIS Waterway Connector

    Railroad SystemRoadway SystemWater BodiesConservation LandsSix Counties Boundaries

    2040 Long Range Transportation PlanSIS Intermodal Systems 0 3 6 Miles

    0 10,560 Feet

    Date: 6/25/2014

    Figure 1

    Page 3

  • ((((((((((((((((((((((((

    ((((((((((

    (((((((((

    !!

    !!

    !!

    !!

    !

    !!

    !

    !!

    !!

    !

    !

    !!

    !!

    !

    !!

    !!

    !!

    !

    !!

    !!

    !

    !!

    !!

    !!

    !!

    !

    !

    !!

    !

    !!

    !!!

    !!

    !!

    !!

    !!

    !!

    !

    !

    !

    !!

    !!

    !!

    !

    !

    !!

    !!

    !!

    !

    !

    !!

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !

    !!

    !

    !

    !!

    !!

    !

    !!

    !!

    !!

    !!

    !

    !!

    !!

    !!

    !

    !!

    !!

    !!

    !

    !

    !!

    !!

    !

    ! !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    ! ! !!

    !

    !!

    !!

    !!

    !

    !

    !!

    !

    !!

    !!

    ! !

    !

    !

    !

    !

    ! !! !

    ! ! ! !!

    ! !

    !

    !! !

    !!

    !! ! ! ! ! ! ! ! ! !

    !!

    !!

    !!

    !!

    !!

    !

    !!

    !!

    !!

    !

    !!

    !

    !!

    !

    !!!!

    !!!!

    !!

    !!

    !!

    !!!

    !

    !

    !!!

    !!

    ! !!

    !

    !

    !!

    !

    !

    !

    !!

    !!

    !!

    !

    !

    !

    !!!

    !

    !

    !!

    !

    !

    !!!

    !!

    !!

    !!

    !!

    !

    !!

    !!!!!

    !!

    !!

    !

    !!

    !!

    !

    !

    !

    !!

    !!!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!!

    !!

    !

    !

    !!

    !

    !

    !!

    !!

    !

    !

    !

    !!

    !!

    !!

    !

    !

    !!

    !

    !! !

    !!

    !! !

    !

    !

    !

    !!

    !!

    !

    !

    !!

    !!

    !!

    !!

    !!

    !

    ! ! ! !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !

    !

    !

    !

    !

    !!

    !!

    !!

    !!

    !!

    !!

    !!

    !

    !!

    !

    !!

    !!

    !

    ! !! !

    !

    !

    ! ! !

    !

    ! ! !!

    !

    !

    ! !

    ! !!

    !

    !

    !! ! ! !

    ! !!!

    !!

    !!

    !

    ! !!

    ! !

    !!

    !

    ! !!

    !!

    !!

    !

    !

    !!!

    !!

    !

    !

    !!

    ! !

    !

    !

    ! !

    !

    ! !

    !

    !

    ! !

    !

    !

    ! !!

    !

    !

    !

    !

    !

    !!

    ! ! ! ! ! !!

    b

    bb

    X

    XX

    )

    )

    Y

    90

    301

    17

    17

    17

    90

    1

    301

    23

    1

    17

    10

    A1A

    23

    A1A

    128

    224

    A1A

    200

    115

    13

    152

    A1A

    104

    21

    116

    A1A

    134 202228

    295

    10

    95

    95

    295

    CSX Intermodal Terminal

    FEC Intermodal Terminal

    NS Intermodal Terminal

    Port of Jacksonville Blount IslandPort of Jacksonville Dames Point

    Port of Fernandina

    Port of Jacksonville Talleyrand

    Jacksonville Amtrak

    Jacksonville GreyhoundJacksonville Multimodal Terminal Center

    Port of Fernandina

    Port of Jacksonville

    Jacksonville International Airport

    Cecil Spaceport Jacksonville Naval Complex

    Naval Station Mayport Station

    Blount Island Command

    LegendAirports and SpaceportsY SIS AirportY Emerging SIS Airport SIS Spaceport

    Seaports) SIS Seaport) Emerging SIS Seaport

    Freight Rail TerminalsX SIS Freight Rail TerminalX Emerging SIS Freight Rail Terminal

    ((((((((((((Intermodal Logistics Center

    Passenger Terminalsb SIS Passenger Terminal b Emerging SIS Passenger Terminal

    HighwaySIS Highway Corridor Emerging SIS Highway Corridor SIS Higway Connectors

    RailSIS Railway Corridors Emerging SIS Railway CorridorsSIS Railway Connector

    Waterways! ! ! ! SIS Waterway ! ! ! ! Emerging SIS Waterway! ! ! ! SIS Waterway Connector

    Railroad SystemRoadway SystemWater BodiesConservation LandsSix Counties Boundaries

    2040 Long Range Transportation PlanDistrict 2 SIS Intermodal Systems 0 3.5 7 Miles0 10,560 Feet

    Date: 9/25/2014

    Figure 2Page 4

    Private Marine Terminals

    International Shipping Channel

    St. Johns River Channel

  • 2040 Path Forward Long Range Transportation Plan

    o Naval Air Station Jacksonville; I-295 to US 17 Roosevelt Boulevard to entrance.

    o Naval Station Mayport; I-295 to US 90 Atlantic Boulevard to SR A1A to entrance.

    o Port of Jacksonville Blount Island; I-295 to SR 105 Heckscher Drive to Dave Rawls Boulevard to entrance.

    o Part of Jacksonville Dames Point; I-295 to SR 105 Heckscher Drive to New Berlin Road.

    o Port of Jacksonville Dames Point Cruise Ship Terminal; I-295 to SR 105 Heckscher Drive to August Drive to entrance

    o Port of Jacksonville Dames Point Cruise Ship Terminal; I-95 to SR 105 Heckscher Drive to August Drive to entrance.

    o Port of Jacksonville; Talleyrand; I-95 to US 1 MLK Jr. Parkway to Phoenix Avenue to 21st Street to North Talleyrand Avenue to 11th Street entrance.

    o Port of Fernandina; I-95 to SR A1A to 8th Street to Dade Street to Front Street to entrance.

    RAIL From a rail perspective, North Florida is located at a key junction for three railroads, CSX, Norfolk Southern and FEC. CSX, headquartered in Jacksonville, maintains the largest rail network in Florida and will soon provide enhanced connectivity to the Dames Point and Blount Island marine terminals with the Intermodal Container Transfer Facility (ICTF) at Dames Point. Norfolk Southern maintains its Florida terminus in northwest Jacksonville and provides direct service to the Talleyrand Marine terminals, other key sites along the St. Johns River, and inland facilities. FEC maintains maintains its corporate operations center and its northern terminus in Jacksonville including a river bridge crossing in Downtown that facilitates connections to the CSX and Norfolk Southern railroads. Genesee & Wyoming Inc., which operates major short line railroads across the US and in Australia, maintains its operations headquarters in Jacksonville. The following summarizes the SIS and other major rail intermodal facilities in the study area.

    The Florida East Coast Industries intermodal terminal (Bowden Yard), located west of US 1 Philips Highway near SR 202 J. T. Butler Boulevard is included as a hub in

    the SIS. This terminal serves distribution facilities and shippers in Florida accessing the facility using I-95 and I-10. Preliminary estimates show this facility generates approximately 300,000 lifts (a lift is the move of one container on or off a rail car) per year which would equate to about 600,000 truck trips per year.

    The Norfolk Southern intermodal terminal (Simpson Yard), located east of the I-295 interchange with Pritchard Road, is included as a hub in the SIS. This terminal serves distribution facilities and shippers in Florida accessing the facility using I-95 and I-10. Preliminary estimates show this facility generates approximately 225,000 lifts per year which would equate to about 450,000 truck trips. Norfolk Southern also operates an auto distribution facility with access from Old Kings Road north of Pritchard Road in the project study area. This facility serves the Jacksonville Port Authority (JAXPORT) auto terminal and other commercial shippers of automobile traffic destined for in the southeastern US. This facility is currently not part of the SIS.

    The CSX intermodal terminal (Jacksonville Yard), located just west of I-295 at the Pritchard Road interchange, is a major intermodal facility within CSXs operations and is included as a hub in the SIS. This terminal serves distribution facilities and shippers in Florida accessing the facility using I-95 and I-10. Preliminary estimates show this facility generates approximately 300,000 lifts per year which would equate to about 600,000 truck trips. CSX also operates an auto distribution facility in the study area with access from Commonwealth Boulevard to the south. This facility is similar in size and services to

    AN INTERMODAL FREIGHT SHIPMENT IS ONE THAT IS MOVED VIA A STANDARDIZED REUSABLE SHIPPING BOXES CALLED CONTAINERS. TYPICAL MARINE CONTAINERS ARE

    40-FT LONG AND TYPICAL TRUCK CONTAINERS ARE 53-FT LONG. EACH CONTAINER CAN CARRY BETWEEN 20

    AND 25 TONS OF FREIGHT.

    THE UNITS OF MEASURE ARE EXPRESSED IN TWENTY-FOOT EQUIVALENCY UNITS OR TEUS.

    5

  • 2040 Path Forward Long Range Transportation Plan

    the Norfolk Southern facility. This facility is currently not part of the SIS.

    AMTRAK, the National Railroad Passenger Corporation, operates a passenger intermodal facility on the northwest side of Jacksonville off of US 23/SR 15 New Kings Road. This facility serves approximately 30,000 passengers per year. This facility is part of the SIS.

    The FDOT SIS connectors include the following Rail Connectors

    CSX Eastport Railroad Connector to Blount Island and Dames Point Terminals

    CSX Connector to CSX Intermodal Facility Talleyrand Terminal Railroad CSX Downtown Jacksonville to Port of Fernandina

    along US 17 Main Street and SR 200 Buccaneer Trail

    PORTS JAXPORT1 and its maritime partners handle containerized cargo, automobiles, recreational boats and construction equipment, dry and liquid bulks, break-bulk commodities, and oversized and specialty cargoes.

    Blount Island is a 754-acre terminal and is JAXPORT's largest marine facility. It is one of the largest vehicle import/export centers in the United States. The terminal also handles bulk cargo via roll-on/roll-off, heavy lift, and liquid bulk cargo operations. Blount Island has one 112-ton whirly crane and eight container cranes (five 50-ton cranes, one 45-ton crane and two 40-ton cranes). The terminal also offers 240,000-square feet of transit shed space and a 90,000-square-foot Container Freight Station for cross-dock efficiency.

    The Dames Point Marine Terminal (TraPac) is located 10 nautical miles from the Atlantic Ocean, the Dames Point Marine Terminal is home to the 158-acre TraPac Container Terminal, where vessels from Tokyo-based MOL and other carriers offer direct containership service between Jacksonville and ports throughout Asia. The TraPac terminal features new port infrastructure, including roadways, terminal buildings, two 1,200-foot berths and six new Panamax container cranes. This 173-acre terminal has 4,780 linear feet of berthing space on

    1 Adapted from http://www.jaxport.com/

    40 feet of deep-water. A second terminal is planned at Dames Point but a tenant is currently not identified.

    The Talleyrand Terminal, located north of Downtown on the west bank of the St. Johns River, is a 173-acre terminal that has 4,780 linear feet of berthing space on 40 feet of deep-water. The Talleyrand terminal offers two 50-LT capacity rubber tired gantry cranes, both of which straddle four rail spurs totaling 4,800 linear feet Talleyrand's on-dock rail facilities are run by Talleyrand Terminal Railroad, Inc., which provides direct switching service for Norfolk Southern and CSX rail lines. The terminal is only 25 minutes from Florida East Coast Railroad's intermodal ramp, and is conveniently located within minutes of interstates I-95 and I-10. Talleyrand is equipped with four container cranes, on-dock rail and 160,000 square feet of transit shed space capable of handling cargo in refrigerated, freezer or ambient conditions. Additionally, a 553,000-square foot warehouse stores a variety of cargoes, including rolls of fine and specialty papers.

    The US Marine Corps Terminal is located on Blount Island and supports deployments by the US Transportation Command. Shipments include roll-on-roll off cargo, intermodal and break bulk cargo.

    A network of privately-owned maritime facilities also operates in Jacksonvilles harbor, and in Northeast Florida.

    The Port of Fernandina has deep-water access with 47-ft channel depth and two berths. The Port consistently handles over 225 vessels per year. The Ports principal cargoes include break bulk cargo2 consisting of forest products including Kraft liner board, wood pulp, steel and, treated lumber and imports of lumber, wood pulp, hardboard, and steel. The containerized commodities moving through the Port include wood pulp, automobile parts, steel products, beer, frozen foods, machinery, consumer goods just to mention a few.

    2http://www.portoffernandinamaritimeexchange.org/resources_port.html

    6

  • 2040 Path Forward Long Range Transportation Plan

    AVIATION Although a smaller market relative to tonnage handled by other modes of transportation, aviation services are also part of the regions freight movement. Several passenger airlines and dedicated all-cargo airlines provide air cargo service at the Jacksonville International Airport (JIA). The airports air cargo area has more than 200,000 square feet of warehouse space dedicated to air cargo operations and hundreds of acres of on-airport property suitable for air cargo development. FedEx, UPS, and Airborne all utilize JIA. It is anticipated that Cecil Airport will help support economic development within the region, serving both aviation and aerospace dependent industries. The airport is adjacent to the Cecil Commerce Center and recently was designated a spaceport and space territory by the state of Florida (HB59). As a result, the newly named Cecil Field Spaceport is included in Space Floridas Spaceport Master Plan and the SIS.

    SUPPORT INFRASTRUCTURE North Florida maintains a significant amount of support infrastructure such as distribution centers, warehousing, industrial and manufacturing facilities. In fact, this region includes more than 100 million square feet of such space and has added nearly 10 million square feet in the past five years, including 1.1 million square feet in 2012. The opportunity to grow this sector is significant given the amount of developable land at existing sites, as well as growing areas such as Cecil Commerce Center in Duval County just north of Clay County, the Crawford Diamond site in Nassau County, and the Woodstock Industrial Site in Baker County.

    Figure 3 on the following page shows the locations of the major warehousing and distribution facilities.

    7

  • n

    qn

    q

    q

    ^^

    ^^^^^

    ^^

    ^

    ^^^^

    ^

    ^^^

    ^^^

    ^

    ^^^^^^^^^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^^^^^^^

    ^^^^^^

    ^

    ^

    ^

    ^^

    ^^

    ^ ^

    ^^^^^

    ^

    ^^

    ^^^^^^^

    ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

    ^^

    ^^^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^

    ^

    ^ ^^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^^

    ^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^

    ^

    ^

    ^^

    ^^

    ^

    ^^

    ^^

    ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^ ^

    ^

    ^^^ ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^^

    ^^^

    ^

    ^

    ^^

    ^

    ^

    ^^^

    ^

    ^

    ^^^

    ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^

    ^^

    ^^

    ^

    ^

    ^^^

    ^

    ^

    ^

    ^^

    ^^^

    ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^^

    ^

    ^

    ^

    ^

    ^^

    ^^

    ^

    ^

    ^

    ^^

    ^

    ^^

    ^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^^^

    ^

    ^^^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^^^^^^^^

    ^

    ^^^

    ^

    ^

    ^^^

    ^

    ^

    ^

    ^

    ^ ^

    ^

    ^

    ^

    ^^

    ^^^

    ^^

    ^^

    ^

    ^^

    ^

    ^

    9090

    1

    301

    17

    17

    27

    301

    301

    441

    17

    1

    1

    100

    A1A

    13

    10

    16

    A1A

    A1A

    A1A

    326 326

    221

    105

    500

    23

    16

    A1A

    200

    26

    207

    200

    21

    116105

    A1A

    134

    19

    25

    202

    A1A

    2

    206

    16

    5

    20

    228

    295

    10

    75

    95

    295

    295

    95

    95

    ")335

    ")21

    ")320

    ")315

    ")326")326

    ")318

    ")2")127

    ")200A

    ")225A

    ")124

    ")209

    ")228

    ")122

    ")13A

    ")250A

    ")220

    ")316

    ")315

    ")107

    ")13

    ")204

    ")125")119

    ")115

    ")208

    ")214

    ")335

    ")130

    ")310

    ")305

    ")308

    ")108

    ")200A")25A

    ")309

    ")225

    ")329

    ")250

    ")315

    ")214

    ")218

    ")108

    Legend^ Industrial Sitesq Airportn Amtrak Stationn Passenger Rail Station

    Railroad SystemRoadway SystemWater BodiesConservation LandsSix Counties Boundaries

    2040 Long Range Transportation PlanIndustrial Sites 0 3 6 Miles

    0 10,560 Feet

    ^

    ^

    ^

    ^^^^^

    ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^^

    ^

    ^^

    ^

    ^

    ^

    ^

    ^

    ^

    ^ ^^ ^

    ^^^^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^ ^

    ^^

    ^^

    ^

    ^

    ^^

    ^

    ^

    ^

    ^

    ^

    ^

    ^ ^

    ^

    ^

    ^^^

    ^^^ ^

    ^^

    ^^^

    ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^

    ^^

    ^

    ^

    ^^

    ^^

    ^

    ^

    ^^

    ^^^

    ^

    ^

    ^^

    ^

    Date: 6/25/2014

    Figure 3Page 8

  • 2040 Path Forward Long Range Transportation Plan

    CURRENT FREIGHT MOVEMENTS North Florida is the origin or destination of freight moving over roadways and railways in Florida and the Southeast US. The following summarizes some of the key findings of analysis of the current freight and commodity flows within the region.

    The total shipments that originate in, are destined for, or travel through North Florida are summarized in Table 1. This data is based on the US Department of Transportations Freight Analysis Framework data.

    The top origins and destinations for truck or rail shipments are summarized in Table 2 and Table 3.

    Table 1. Total Tons of Commodities (millions of tons per year)

    Origin and Destination Truck Rail Total Percentage

    Internal to area 34.9 0.0 34.9 18%

    Originates in area

    and is destined to within Florida 18.5 0.2 18.7 10% and is destined to outside Florida 8.0 0.6 8.6 5% Is destined for the area And originated from within Florida 7.5 0.4 7.9 4% And originated from outside Florida 8.9 11.6 20.5 11% Port related 11.7 0.6 12.3 6% Through traffic 70.0 18.0 88.0 46%

    Total 159.5 31.4 190.9 100%

    Mix Percent 84% 16% 100%

    Source: Freight Analysis 2012 data.

    9

  • 2040 Path Forward Long Range Transportation Plan

    Table 2. Top and Origins and Destinations of Truck Freight Passing through North Florida

    Through Origins Through Destinations Locations Tonnage Mix Locations Tonnage Mix

    Florida Locations

    Polk County 10% Miami-Dade County 14%

    Miami-Dade County 8% Polk County 5% Hillsborough County 7% Hillsborough County 4% Palm Beach County 4% Orange County 3% Broward County 4% Orange County 2%

    Out of State

    Savannah, GA 13% New York, NY 12% New York, NY 5% Baltimore, MD 5% Baltimore, MD 4% Boston, MA 4% Charleston, WV 2% Philadelphia, PA 4%

    Savannah, GA 3% Other Origins 39% 47% Total 100% Total 100%

    Table 3. Top Origins and Destinations of Rail Freight Passing through North Florida

    Through Origins Through Destinations Locations Tonnage Mix Locations Tonnage Mix

    Florida Locations Polk County 7% Polk County 13% Hillsborough County 5% Orange County 11% Manatee County 3% Hillsborough County 11% Miami-Dade County 3% Miami-Dade County 10% Martin County 5%

    Alachua County 3% Sumter County 3% Brevard County 3% Broward County 3%

    Out of State Charleston, WV 8% New York, NY 3%

    Lexington, KY 8% Chicago, IL 7% Atlanta, GA 6% Birmingham, AL 5% Macon, GA 3%

    Other Origins 45% 35% Total 100% 100%

    10

  • 2040 Path Forward Long Range Transportation Plan

    TRUCKING North Florida has a large internal truck market (both the origins and the destinations are within North Florida). North Florida roadways handle 159.5 million tons of freight each year. About 84% of all freight moved within the region is moved on trucks.

    Freight originating in North Florida that is moved by truck is split between break bulk, bulk and containerized commodities. About 43% of the freight destined for North Florida is bulk cargo with the balance split between break bulk and bulk cargo.

    Cargo travel to and from south and central Florida is the largest market for trucks that travel through the region, but do not stop in North Florida. About 61% of the through freight traveling through North Florida is break bulk cargo, 29% bulk and 10% container.

    PORTS About 12.3 million tons of freight are handled each year by the ports in North Florida. The cargo includes freight that is originating in or destined for the six-county region and cargo that uses the port but originates or is destined for another location in the US.

    International shipments account for 71% of cargo handled by North Florida ports. Over 74% of the imports are from the Caribbean or South America. Of these international shipments, 55% is destined for distribution and consumption in North Florida.

    Cargo exported through North Florida ports totaled 4.9 million tons. About 75% of the market is to the Caribbean. About 11% of the freight exported through the port originates in North Florida. Of the exports that move through North Florida ports, 80% are containerized.

    More than 70% of the freight originating in North Florida is exported using ports in North Florida. This means 30% of the freight is exported through a port outside of North Florida. For example, some of the goods produced in North Florida are driven to the Port of Savannah and exported for consumption in other markets.

    About 4.7 million tons of cargo exported from the US passes-through the region each year. Of these, 59% of the freight originated in one of the top ten markets summarized in Table 2 or Table 3. The container market is 47% of the shipments. The balance is split between bulk and break bulk cargo.

    About 9.3 million tons of international cargo imported to the U.S. pass through North Florida. Domestic waterborne cargo is handled at public and private terminals in North Florida and 62% of the tonnage is petroleum and petroleum products.

    RAIL Most of the rail cargo shipped in North Florida originated outside of Florida and is consumed within North Florida. Table 1 and Table 3 summarize the total tonnage and top origin and destinations for rail cargo.

    AIR CARGO In 2012, air cargo operators moved more than 0.75 million tons of air cargo through Jacksonville International Airport (JAX). The typical commodities shipped by air are high value and time sensitive. Shipments of Florida citrus, Vidalia onions, peaches, fish from the Caribbean and flowers from Columbia being shipped to Asia is an emerging air-cargo market. Air cargo delivered on underutilized aircraft flying to Asia represents the greatest recent growth in air cargo.

    11

  • 2040 Path Forward Long Range Transportation Plan

    TOP COMMODITIES TYPES The following tables and figures summarize the top commodities

    Top commodity imports. Top commodity exports. Top inbound and outbound commodities carried on

    truck. Top inbound and outbound commodities carried by

    rail carload. Top inbound and outbound commodities by rail

    intermodal. Top inbound and outbound commodities by air. Top inbound and outbound commodities by

    waterborne.

    The information for inbound movements is provided first, followed by outbound movements. In the charts provided, the abbreviation FAK means freight of all kinds.

    This data was summarized based on a compilation of various sources published through recent studies including

    North Florida TPOs Freight, Logistics and Intermodal Framework Plan was used as a foundation.

    Real-time data collected through the Automated Commercial Environment of the US Customs and Border Patrol was used. This data was mined using the Trade Intelligence Analysis Tool (TradeIQ) for import and export data directly from the Automated Commercial Environment System.

    Market analysis development by the St. Onge Institute was added to the data summaries and used as a reasonableness check.

    12

  • 2040 Path Forward Long Range Transportation Plan

    Figure 4 - Top Commodity Imports

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    13

  • 2040 Path Forward Long Range Transportation Plan

    Figure 5 - Top 12 Commodity Exports

    -

    10,000

    20,000

    30,000

    40,000

    50,000

    60,000

    70,000

    80,000

    Mill

    ions

    of T

    ons

    14

  • 2040 Path Forward Long Range Transportation Plan

    Figure 6 Top Commodities Inbound Shipments by Truck

    -

    5,000

    10,000

    15,000

    20,000

    25,000

    Thou

    sand

    s of T

    ons

    15

  • 2040 Path Forward Long Range Transportation Plan

    Figure 7 - Top Commodities Inbound Rail Shipments by Carload

    -

    1,000

    2,000

    3,000

    4,000

    5,000

    6,000

    7,000

    Thou

    sand

    s of T

    ons

    16

  • 2040 Path Forward Long Range Transportation Plan

    Figure 8 - Top Commodities Inbound Rail Shipments by Intermodal Container

    -

    500

    1,000

    1,500

    2,000

    2,500

    Thou

    sand

    s of T

    ons

    17

  • 2040 Path Forward Long Range Transportation Plan

    Figure 9 Top Commodities Inbound Shipments by Air

    -

    1

    2

    3

    4

    5

    6

    Thou

    nds o

    f Ton

    s

    18

  • 2040 Path Forward Long Range Transportation Plan

    Figure 10 - Top Commodities Inbound Shipments by Port

    -

    500

    1,000

    1,500

    2,000

    2,500

    3,000

    Thou

    sand

    s of T

    ons

    19

  • 2040 Path Forward Long Range Transportation Plan

    Figure 11 - Top Commodities Outbound Shipments by Truck

    -

    500

    1,000

    1,500

    2,000

    2,500

    3,000

    3,500

    Thou

    sand

    s of T

    ons

    20

  • 2040 Path Forward Long Range Transportation Plan

    Figure 12 - Top Commodities Outbound Shipments by Rail Carload

    0

    100

    200

    300

    400

    500

    600

    700

    Thou

    sand

    s of T

    ons

    21

  • 2040 Path Forward Long Range Transportation Plan

    Figure 13 - Top Commodities Outbound Shipments by Rail Intermodal

    -

    500

    1,000

    1,500

    2,000

    2,500

    Thou

    sand

    s of T

    ons

    22

  • 2040 Path Forward Long Range Transportation Plan

    Figure 14 - Top Commodities Outbound Shipments by Air

    0

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    1.4

    1.6

    1.8

    Thou

    sand

    s of T

    ons

    23

  • 2040 Path Forward Long Range Transportation Plan

    Figure 15 - Top Commodities Outbound Shipments by Port

    -

    100

    200

    300

    400

    500

    600

    700

    800

    Thou

    sand

    s of T

    ons

    24

  • 2040 Path Forward Long Range Transportation Plan

    Table 4. Top Consignees

    Consignee Address % Total Unknown N/A 17.7% UP-Kymmene Westmont, IL 3.4% Michaels Stores Procurement Irving, TX 2.4% Amware Pallet Services Jacksonville, FL 2.2% Beaver Street Fisheries, Inc. Jacksonville, FL 1.7% Aloe Vera of America Dallas, TX 1.7% Bacardi Bottling Co. Jacksonville, FL 1.4% Uniliver Jacksonville, FL 1.3% Southern Tires, Inc. Jackson, AL 1.2% Baxter Healthcare Crossdock Memphis, TN 1.1% Proctor & Gamble Browns Summit, NC 1.1% Bridgestone Americas Jacksonville, FL 0.8% The Coca Cola Company Austell, GA 0.7% Goodnight Jacksonville, FL 0.7% Altadis Tampa, FL 0.7% Aqua Gulf Transport Blount Island, FL 0.7% Fleet Industrial Supply Center Jacksonville, FL 0.6% Giti Tire Rancho Cucamonga, CA 0.6% Atlanta Consolidated Warehouse Austell, GA 0.6% Costco Depot College Park, GA 0.5% Arauco Wood Products Atlanta, GA 0.5% General Products International Lake In The Hill, IL 0.5% Walgreens Orlando, FL 0.5%

    25

  • 2040 Path Forward Long Range Transportation Plan

    Table 5. Top Warehouse Commodities

    Commodity % Total Fresh, Chilled, Frozen & Processed Foods 23.3% Beverages Alcoholic & Non alcoholic 21.0% Furniture and Home Furnishings 15.1% Household Cleaners & Paper Products 9.6% Apparel and Footwear 10.1% Medical Devices and Pharmaceuticals 4.8% Office Products and General Use 4.1% Home Improvement, Building Supplies, Garden Products 3.0% Auto Aftermarket; Vehicle Dealers 2.7% Sporting Goods, Athletic Equipment, Hobby 1.9% Consumer Electronics & Appliances 1.8% Candy/Card/Gift/Novelty 1.1% Other 1.5% Total 100%

    26

  • 2040 Path Forward Long Range Transportation Plan

    FUTURE FREIGHT DEMAND INTRODUCTION This section summarizes the forecast of freight and intermodal demand for the region. The following sections summarize the following

    Forecasting Methodology Port Intermodal Rail Truck Air

    These freight forecasts were used in the development of the truck model in the NERPM-AB and to identify potential needs for freight and intermodal infrastructure to support economic development. The modeling update and future needs are discussed later in this report.

    FORECASTING METHODOLOGY Historically, the demand for freight shipments and the gross domestic product (GDP) and gross state product (the equivalent considering only the economic productivity in Florida) growth are highly correlated. Therefore, the first step in developing a forecast for the regional freight movements was to forecast the anticipated growth in GDP and gross state product for Florida. The GDP-based forecasts are appropriate for estimating the total movement of commodities that include trips that are shipped by rail and port intermodal.

    Figure 16 shows the basis of the GDP forecast used in continuous annual growth rates. In the figure, the acronyms used are for the Congressional Budget Office (CBO), Organization for Economic Co-operation and Development (OECD) and Toronto Dominion Bank (TD). The historical growth is shown as HIS growth.

    The average of the forecasted growth rates shown on the dashed line show the basis of the forecasts provided in this report.

    27

  • 2040 Path Forward Long Range Transportation Plan

    GDP forecasts used as basis for freight

    forecasts.

    Figure 16 - Summary of GDP Forecasts

    28

  • 2040 Path Forward Long Range Transportation Plan

    PORT INTERMODAL The forecast of intermodal rail originating and destined for JAXPORT and Port of Fernandina Facilities is based on published historical 20-ft Equivalency Units (TEU) and rail intermodal market analysis. Below is a comparison of the TEU data published for the JAXPORT.

    Two levels of forecasts were prepared: a moderate and a more aggressive forecast. The moderate split uses a growth factor of 1.25 times the GDP growth in freight movements. The aggressive forecast uses a factor of 1.75 times GDP. The more aggressive forecast anticipates a greater shift of freight movements moving by intermodal rail than by truck movements today. Figure 17 shows a summary of historical data as reported by the American Association of Port Authorities (AAPA) and the moderate and aggressive forecasts for loaded commodities in TEUs. For the areas outside the Jacksonville area, two forecast splits were developed for both the moderate forecast and the aggressive forecast. 1. Conservative estimate: Assumes that today 10% of

    the total TEU imports and exports are shipped via rail. This rate is increased by 0.4% annually

    2. High estimate: Assumes that today 20% of total TEU imports and exports are shipped via rail. This rate is also increased by 0.4% annually.

    3. The percent of TEUs shipped via rail ranges from 8% to 18% for the conservative estimate, or 16% to 26% for the high estimate.

    4. Two TEU forecasts for loaded containers were developed for the Jacksonville and Fernandina ports.

    In addition to the loaded TEUs that are imported and exported empty TEUs are also moved - primarily to the Jacksonville Ports. Many of the TEUs are from the Jacksonville area, but many also travel from locations beyond North Florida to our ports. Table 6 provides a summary of the historical volume of container movements through the port facilities in North Florida (JAXPORT and Port of Fernandina combined). These historical data were used to estimate the number of imported, exported and empty containers traveling through the ports in North Florida. The moderate and aggressive forecasts are summarized in Figure 18 and Figure 19 on the following pages.

    Table 6. Summary of TEUs for North Florida Port Facilities (JAXPORT and Port of Fernandina)

    TEUs 2009 2010 2011 2012

    Import TEUs 139,653 162,645 174,174 192,830

    Export TEUs 376,044 436,172 444,526 425,393

    Total loaded TEU's 515,697 598,817 618,700 618,223

    Empty TEUs* 262,532 291,176 303,151 319,455

    Empties as % of Total Loaded 51% 49% 49% 52%

    Average % past 4 years 50%

    * Empties are not defined as imported or exported

    29

  • 2040 Path Forward Long Range Transportation Plan

    Figure 17 - Moderate and Aggressive TEU Port Forecast

    2020, 848,872

    2030, 1,272,981

    1,903,555

    2013, 618,500

    2020, 927,670

    2030, 1,628,602

    2,847,947

    -

    500,000

    1,000,000

    1,500,000

    2,000,000

    2,500,000

    3,000,000

    2003 2006 2009 2012 2015 2018 2021 2024 2027 2030 2033 2036 2039

    TEU

    s per

    yea

    r

    Actual (AAPA Loaded TEUs)

    Vickerman Moderate Forecast (Loaded TEUsonly)

    Vickerman Aggressive Forecast (Loaded TEUsonly)

    Moderate Forecast (Loaded TEUs only)

    Aggressive Forecast (Loaded TEUs only)

    30

  • 2040 Path Forward Long Range Transportation Plan

    2013, 927,750

    2020, 1,273,308

    2030, 1,909,471

    2040, 2,855,333

    -

    500,000

    1,000,000

    1,500,000

    2,000,000

    2,500,000

    3,000,000

    3,500,000

    4,000,000

    4,500,000

    2003 2006 2009 2012 2015 2018 2021 2024 2027 2030 2033 2036 2039

    Moderate Forecast Imports

    Exports

    Empties

    Total TEUs (Loaded + Empties)

    Figure 18 - Summary of 2040 Moderate Forecast of Port Intermodal Shipments (TEUs)

    31

  • 2040 Path Forward Long Range Transportation Plan

    2020, 1,391,506

    2030, 2,442,902

    2040, 4,271,920

    -

    500,000

    1,000,000

    1,500,000

    2,000,000

    2,500,000

    3,000,000

    3,500,000

    4,000,000

    4,500,000

    2003 2006 2009 2012 2015 2018 2021 2024 2027 2030 2033 2036 2039

    Aggressive Forecast

    Imports

    Exports

    Empties

    Total TEUs (Loaded + Empties)

    Figure 19 - Summary of 2040 Aggressive Forecast of Port Intermodal Shipments (TEUs)

    32

  • 2040 Path Forward Long Range Transportation Plan

    RAIL

    RAIL INTERMODAL The mix of the forecasted TEUs that travel via rail, both to and from North Florida, as well as to and from areas outside North Florida, is based on US Department of Transportations Freight Analysis Framework published data. The assumptions with the moderate and aggressive forecasts vary. Moderate forecast: Assumes that today 10% of the

    total TEU imports and exports are shipped via rail. This rate is increased by 0.4% annually

    Aggressive forecast: Assumes that today 20% of total TEU imports and exports are shipped via rail. This rate is also increased by 0.4% annually.

    The percent of TEUs shipped via rail ranges from 8% to 18% for the conservative estimate, or 16% to 26% for the high estimate.

    Table 7 summarizes the rail intermodal forecasts. Figure 20 and Figure 21 show this information graphically.

    Table 7. Summary of Rail Intermodal Forecasts

    Rail Intermodal TEUs 2013

    2040 Moderate or Conservative Aggressive

    Incremental TEUs shipped via rail 68,245 212,484 317,902 TEUs shipped outside the metro area 70,975 450,497 673,952 TEUs shipped within the metro area 7,653 65,716 98,318 Total TEUs

    728,697 1,090,172

    33

  • 2040 Path Forward Long Range Transportation Plan

    Figure 20 - 2040 Moderate Forecast of Rail Intermodal

    2013, 7,653

    2025, 21,344

    2040, 65,716

    2013, 70,975

    2025, 171,226

    2040, 450,467

    2013, 68,245

    2025, 112,649

    2040, 212,484

    -

    100,000

    200,000

    300,000

    400,000

    500,000

    600,000

    700,000

    800,000

    2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039

    Incremental TEU's shipped via Rail(Conservative Rate vs. High Rate)

    TEUs shipped outside the Metro area -Conservative Range

    TEUs shipped within the JacksonvilleMetro area

    34

  • 2040 Path Forward Long Range Transportation Plan

    Figure 21 - 2040 Aggressive Forecast of Rail Intermodal

    2013, 7,653

    2025, 25,204

    2040, 98,318

    2013, 70,975

    2025, 202,191

    2040, 673,952

    2013, 68,245

    2025, 133,020

    2040, 317,902

    -

    200,000

    400,000

    600,000

    800,000

    1,000,000

    1,200,000

    2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039

    Incremental TEU's shipped via Rail(Conservative Rate vs. High Rate)

    TEUs shipped outside the Metro area -Conservative Range

    TEUs shipped within the JacksonvilleMetro area

    35

  • 2040 Path Forward Long Range Transportation Plan

    RAIL CARLOAD Similar to the rail intermodal growth forecast, rail carload movements are also anticipated to grow. This growth will be less than the increase of rail intermodal because of the anticipated shift between carload and intermodal and the consumption orientation of the carload shipments within these areas. This growth is anticipated in be 2.0% to 2.2% per year or a growth factor (GF) of 2.7.

    TRUCK INTERMODAL FORECASTS

    TRUCK TRIPS AND VOLUMES Using the port and rail intermodal forecasts and existing truck counts at the entrances to the major intermodal facilities, a worksheet model was prepared to estimate the truck movements between each of the major intermodal facilities within the region.

    To build a truck trip table between each of the regional intermodal facilities, the following steps were performed.

    1. The existing (2013) truck volumes at the entrances to the intermodal facilities were estimated based on the FDOT Traffic Online database.

    2. Using the market and information developed through the cargo and logistics demand forecast, the ratio of truck movements between intermodal facilities was estimated.

    3. External truck volumes were identified at the major external nodes within the 2040 NERPM-AB.

    4. Table 9 provides a summary of the truck trips ends. Table 10 provides a summary in Annual Average Daily Traffic (AADT) truck volumes for the movement of trucks between each of the facilities.

    After establishing the base year truck flows, growth rates were forecast by using growth rates based on the following assumptions.

    All of the truck related volumes presented in this report are based on AADT. From September to January, a seasonal peaking of demand occurs with intermodal shipments. The peaking is due to the build-up for the holiday shopping season. The peaking factor for these volumes is 40 percent higher than the average. AADTs are shown in the NERPM-AB.

    GROWTH RATES Where GDP are highly correlated to the overall growth in commodity movements, population growth also serves as a reasonable basis for estimating the growth of the internal-internal truck trips. For external truck trips that remain in Florida the forested population growth in Florida was used. Both GF were based on the University of Floridas Bureau of Economic and Business Research (BEBR) medium growth forecasts. These growth factors are summarized in Table 8.

    Table 8. Growth Factors for Trucks

    2011 BEBR

    (millions

    2040 BEBR

    Medium (millions)

    Growth Factor (GF)

    Internal GF based on population growth 1.4 1.9 1.36 External GF based on population growth in Florida 18.905 25.847 1.37

    36

  • 2040 Path Forward Long Range Transportation Plan

    An anticipated shift in truck to rail intermodal traffic based on industry trends is anticipated to occur. With this shift, a growth factor of 3.08 was used to reflect the change in rail intermodal demand versus truck trip growth. This shift explaining the basis for the growth rate is discussed in greater detail in the rail intermodal forecasting section.

    In addition, two major shifts in truck movements associated with intermodal shipments were assumed:

    The opening of ICTF near Blount Island requires trucks to leave the port gate by truck. These containers are then shifted to the rail network for short-haul movement to the CSX Intermodal Facility or long-haul movement by rail.

    The delivery of containers to the ICTF by truck is anticipated to be small with most of the regional port-related container shipments being delivered to the CSX Intermodal Facility.

    Neither the FEC nor Norfolk Southern railroads are anticipated to use the ICTF.

    The second Dames Point intermodal terminal is anticipated to be open by the year 2040 and operating near capacity similar to the exiting intermodal terminal.

    Table 11 and Table 12 summarize the anticipated intermodal-related truck movements in the year 2040.

    AIR CARGO Florida Trade and Logistic Study (2011) and 2013-2043 Florida and Metro Forecast published by the University of Central Florida anticipate that air cargo within the region will increase by 45% between now and the year 2040. This forecast will largely be driven by population growth within the region. Air cargo accounts for less than 1% by volume shipped in the region, but may be as high as 4% of the total value of goods.

    DEMAND VS. CAPACITY ANALYSIS

    INTERMODAL FACILITIES As previously discussed, the projected growth in intermodal traffic by the year 2040 indicates that demand may be 2.8 to 4.3 times the current demand as presented in the prior sections.

    A comparison of the demand and theoretical capacity of the FEC, Norfolk Southern and CSX intermodal was performed based. The analysis builds on the capacity analysis conducted in the Norfolk Southern and CSX SIS Connector PD&E Study performed by FDOT. The results are summarized in Figure 22.

    The practical capacity identified in Figure 22 is primarily a function of the rail siding lengths and intermodal container storage available within the facility.

    In this scenario, the CSX facility will have demand above the theoretical capacity of the current facility and their operational capacity is enhanced with additional container storage provided at the ICTF.

    The demand at the FEC and Norfolk Southern facilities will be nearly twice the capacity of the current facility. CSX is considering advancing plans for the expansion of their intermodal facility. FECs and Norfolk Southerns opportunities for expansion are limited due to available rights-of-way at their existing facility.

    37

  • 2040 Path Forward Long Range Transportation Plan

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    FEC Intermodal NS Intermodal CSX Intermodal JAXPORT ICTF

    Lift

    s Per

    Yea

    r

    Current Demand 2040 Demand (Moderate Forecast) Practical Capacity

    Figure 22 - Demand Capacity Analysis for Intermodal Facilities

    38

  • 2040 Path Forward Long Range Transportation Plan

    Table 9. 2013 Intermodal-Related Truck Origins and Destinations (Average Daily Trip Ends)

    Blount Island

    (includes Gate)

    Dames Point

    (TraPac) Talleyrand

    FEC Inter-modal

    CSX Inter-modal

    Norfolk Southern

    Inter-modal

    CSX Auto-ramp

    Norfolk Southern

    Auto-ramp Total

    Internal 865 99 472 30 146 120 4 4 1,740

    External 247 347 143 70 408 88 4 4 1,311

    Blount Island (includes Gate) - - - 37 74 13 - - 124 Dames Point (TraPac) - - - 15 30 5 - - 50

    Talleyrand - - - - - - 50 50 100

    FEC Intermodal 37 15 - - 73 75 - - 200 CSX Intermodal 74 30 - 73 - - - - 177

    Norfolk Southern Intermodal 13 5 - 75 - - - - 93

    CSX Auto - - 50 - - - - - 50 Norfolk Southern Auto - - 50 - - - - - 50

    Total 1,236 496 715 300 731 301 58 58

    39

  • 2040 Path Forward Long Range Transportation Plan

    Table 10. 2013 Intermodal-Related Truck Origin and Destination Volumes (AADT)

    Blount Island

    (includes Gate)

    Dames Point

    (TraPac) Talleyrand FEC Inter-

    modal CSX Inter-

    modal

    Norfolk Southern

    Inter-modal

    CSX Auto-ramp

    Norfolk Southern

    Auto-ramp Total

    Internal 1,730 198 944 60 292 240 7 7 3,478

    External 494 694 286 140 815 175 8 8 2,6202620 Blount Island (includes Gate) 74 148 25 - - 247

    Dames Point (TraPac) 30 59 10 - - 99

    Talleyrand - - - 100 100 200 FEC 74 30 - 146 150 - - 400

    CSX 148 59 - 146 - - - 353

    NS 25 10 - 150 - - 185 CSX Auto - - 100 - - - - 100

    Norfolk Southern Auto - - 100 - - - - 100

    Total 2,471 991 1,430 600 1,460 600 115 115

    40

  • 2040 Path Forward Long Range Transportation Plan

    Table 11. 2040 Truck Trip (Average Daily Trip Ends)

    Blount Island

    (includes Gate)

    Dames Point

    (TraPac) Talleyrand

    Dames Point

    Terminal 2

    ICTF FEC

    Inter-modal

    CSX Inter-modal

    Norfolk Southern

    Inter-modal

    CSX Auto-ramp

    Norfolk Southern

    Auto-ramp

    Total

    Internal 2,664 305 641 305 - 93 450 370 5 5 4,838 External - 1,069 194 1,069 - 216 1,255 270 6 6 4,085 Blount Island (includes Gate) - - - - 50 114 178 39 - - 381 Dames Point (TraPac) - - - - - 46 91 16 - - 153 Talleyrand - - - - - - - - - - 0 Dames Point Terminal 2 - - - - - 46 91 16 - - 153 ICTF 50 - - - - - - - - - 50 FEC Intermodal 114 46 - 46 - - 225 231 - - 662 CSX Intermodal 178 91 - 91 - 225 - - - - 585 Norfolk Southern Intermodal 39 16 - 16 - 231 - - - - 302 Total 3,045 1,527 835 1,527 50 970 2,290 940 11 11

    41

  • 2040 Path Forward Long Range Transportation Plan

    Table 12. 2040 Truck Trip AADTs

    Blount Island

    (includes Gate)

    Dames Point

    (TraPac) Talleyrand

    Dames Point

    Terminal 2

    ICTF FEC

    Inter-modal

    CSX Inter-modal

    Norfolk Southern

    Inter-modal

    CSX Auto-ramp

    Norfolk Southern

    Auto-ramp

    Total

    Internal 5,328 610 1,281 610 185 899 739 10 10 9,672

    External - 2,138 388 2,138 431 2,510 539 11 11 8,166

    Blount Island (includes Gate) - - - - 100 228 356 77 - -

    761

    Dames Point (TraPac) - - - - 92 182 31 - - 305

    Talleyrand - - - - - 0

    Dames Point Terminal 2 - - - - - 92 182 31 - - 305 ICTF 100 -

    100 FEC Intermodal 228 92 - 92 - 450 462 - -

    1,324912 CSX Intermodal 356 182 - 182 450 - - - -

    1,170 Norfolk Southern Intermodal 77 31 - 31 462 - - - -

    601 Total 6,089 3,053 1,669 3,053 100 1,940 4,579 1,879 21 21

    42

  • 2040 Path Forward Long Range Transportation Plan

    TRACK CAPACITY With the increase in demand that is anticipated to occur for freight rail and intermodal movements, the operational capacity on the existing rail infrastructure is anticipated to reach or exceed capacity within the region.

    The SIS Needs Plan and the 2040 Path Forward Adopted Needs Plan, considered the track improvements provided by FDOT through coordination with the railroads. However, the focus of the railroad operations analysis usually does not exceed five to ten years. Currently there are as many as 20 trains per day that operate on the FEC line, 14 trains per day operate on CSXs S-line main. Six trains per day operate on Norfolk Southern main line.

    With the addition of intercity passenger service proposed by Amtrak and commuter rail by the JTA, the available operational capacity will be further impacted.

    Looking to the year 2040 additional track including triple tracking CSX S-line, FEC and Norfolk Southern north of their intermodal facility may be needed to provide the operational capacity associated with the increase in freight rail and passenger rail.

    Based on knowledge of the current rail system, the following locations are likely system bottlenecks where the greatest need for operational improvements may be needed. These bottlenecks are shown on Figure 23.

    Springfield Switch this location is currently abottleneck for the interchange of traffic between theCSX and Norfolk Southern and for trains to travelnorth to the JAXPORT connections along Eastport.

    North Rail Corridor This new rail connector willreduce some the congestion by allowing CSX trainsdestined for the ICTF to avoid the Springfield switchdowntown. A phase 2 of the corridor is needed toconnect to Norfolk Southern and shared operationalrights to fully leverage the capacity of the newconnector. A new roadway is also recommended forinclusion in this corridor between US 17 Main Streetand SR 23 New Kings Road.

    FEC Railroad Bridge over the St. Johns River - Thisbridge is a system bottleneck and will limit thecapacity for trains to move through region andaccess the intermodal and port facilities.

    Crawford Diamond - With the opening of the WinterHaven Intermodal Facility and the beginning ofoperations of SunRail in Central Florida, CSX isshifting more a significant portion of its freight trafficdaily from the A-line, which runs along US 17 to theS-line, running along US 301. This rail traffic crossesthe Crawford Diamond at Norfolk Southern. TheCrawford Diamond also presents an operationalchallenge, considering the increased traffic and theneed for CSX to clear the crossing for NorfolkSouthern to traverse the crossing. In the futureoperational improvements (or eliminating the needfor some of Norfolk Southern trains to cross thediamond) are needed.

    To determine the extent and scope of the future track capacity needed, a rail operations model for the region is needed. However, the development of this model is beyond the scope of the 2040 Path Forward LRTP.